Development User Fee Document - May 5, 2026.pdf

City of Buckeye — Regular Council Meeting (2026-05-05)

View PDF Meeting page

Extracted text (via pymupdf) 45574 characters
2 
May 5, 2026 
Table of Contents 
SUMMARY ............................................................................................................................................................. 3 
SECTION 0: GENERAL REQUIREMENTS ................................................................................................................. 4 
SECTION 1: PLANNING .......................................................................................................................................... 5 
SECTION 2: ENGINEERING REVIEW ....................................................................................................................... 9 
SECTION 3: ENGINEERING, UTILITIES, ROW, HORIZONTAL CONSTRUCTION ...................................................... 14 
SECTION 4: BUILDING SAFETY, VERTICAL CONSTRUCTION ................................................................................ 23 
SECTION 5: FIRE SAFETY ...................................................................................................................................... 29 
SECTION 6: BUSINESS LICENSES .......................................................................................................................... 31 
SECTION 7: INCENTIVE DISTRICT ......................................................................................................................... 33

3 
May 5, 2026 
SUMMARY 
The City of Buckeye has adopted the following Development User Fee Schedule to provide clearly described, 
value-added service to its residents and business partners. This new user fee schedule will assist in streamlining 
the City’s processes and thereby provide a more cost-effective way of meeting the public’s needs for services. 
The Development User Fee Schedule contains in-depth descriptions of what is included with the fees collected 
and is broken down into seven (7) sections for ease of use. Each section describes the fee structure and services 
included with those fees.  
The City Council will review the User Fee Schedule on an annual basis and reserves the right to adjust fees 
based on the Consumer Price Index for Urban Communities (CPI-U). Additionally, the Council will undertake a 
user study every five (5) years to re-evaluate fees based on economic trends and the City's financial status. 
 
 
Our Mission Statement is to serve as an exceptional city government that prioritizes the needs of its residents,  
businesses, and visitors. The city aims to provide a safe and sustainable quality of life, foster economic growth 
and stability, and ensure the maintenance of reliable infrastructure. This mission is supported by a strategic 
plan that emphasizes teamwork, innovation, and fiscal responsibility.

4 
May 5, 2026 
SECTION 0: GENERAL REQUIREMENTS 
All new fees are applicable at the time of permit applications and effective at the date of adoption. 
1. Expired Permit  
A. Any permit that has not requested a required inspection within 180 calendar days from the 
permit issuance date or the most recent inspection is considered expired. 
B. Applicants may be required to resubmit plans for review and re-approval.   
C. All non-legitimate requested inspections are required to pay the re-inspection fee, and the 
permit expiration date will not be extended. 
D. Pay all applicable fees. 
E. See individual sections for actual fees. 
2. Permit Extension  
A. The Applicant can extend the permit expiration date when requested in writing before the 
permit expires. 
B. Permit Extension Fee is 10% of the original Permit Fee. 
C. Each extension is 180 calendar days from the date of request. 
D. There is a maximum of two (2) permit extensions. 
3. Work Commenced Prior to Permit Issuance  
A. The fee is one (1) time the amount of the original calculated permit fee (excludes plan review 
fees) and shall be in addition to the required permit fees.  
B. Applies to all work or construction that requires a city permit.   
4. Expedited Submittal Review – *Expedited plan review services are based on resource availability* 
A. Expedited fees are two (2) times the amount of the original calculated fee. 
5. Unclassified or Unspecified Services  
A. The rate for any unclassified or unspecified fees shall be charged at the User Fee hourly rate 
per fee Section. This includes, but is not limited to inspections, plan review, meetings, records 
investigation, etc. as determined by the city. 
6. Refunds  
A. All refund requests shall be made in writing within 180 calendar days of payment date by the 
Permit Applicant stating the reason for the requested refund. All fees not refunded within 180 
calendar days will revert to the city with no exceptions. 
B. Up to 80% of the original permit fee may be refunded if no work has commenced, and no 
inspections have been conducted. 
C. No Planning, Building, Fire or Engineering plan review fees will be refunded once City review 
has commenced. 
7. Cancellation Fee  
A. Cancellation Fee will be $55.00 
B. This fee shall apply to all cancellation requests. 
8. Inspections 
A. All non-legitimate requested inspections are required to pay the re-inspection fee, and the 
permit expiration date will not be extended.

5 
May 5, 2026 
SECTION 1: PLANNING  
1. Discovery Meetings are requests for the status of development projects. Information requested at 
these meetings generally includes overall project completion status, utility service availability including 
water and sewer capacity, request for documents, and other due diligence items related to 
development.  
2. Modification of Condition/s refers to a request for a change to one (1) or more approved Conditions.  
The process will include decision from the same body. 
3. Amendment per acreage fee will be calculated on the impacted area only. 
4. Concept Site Plan only applies to the Apache Rainbow Employment Overlay District unless otherwise 
specified in the Development Code. 
5. Please refer to the City Development Code and/or application guidelines and checklists for additional 
criteria, terms and definitions. 
User Fee Description 
User Fee ($) 
ADMINISTRATIVE FEES  
Annexation 
0 
Pre-Application Conference (PAC) Meeting – less than 360 acres 
500 
Pre-Application Conference (PAC) Meeting – with 360 acres or more 
1,000 
Discovery Meeting 
1,980 
Zoning Verification Letter, (only zoning), per parcel, per request 
300 
Planning Consultation Meeting, per hour (one hour minimum) 
100 
Applicant Initiated Continuance Request 
500 
Modification of Stipulations (Applicant initiated) 
845 
PC  
Time Extension: Administrative 
250 
APPEALS 
Appeal of Administrative or Planning Commission Decision 
1,240 
USE PERMITS AND SIGNS 
Conditional Use Permit without Site Plan 
1,600 
Conditional Use Permit with Site Plan 
4,500 
Special Event Temporary Use Permit 
100

6 
May 5, 2026 
SECTION 1: PLANNING  
User Fee Description 
User Fee ($) 
Temporary Sign Permit 
100 
Comprehensive Sign Plan: Administrative 
1,112 
Comprehensive Sign Plan: Planning Commission 
1,650 
Comprehensive Sign Plan: Amendment 
700 
DESIGN REVIEW 
Residential Design Review 
780 
Commercial Design Review 
555 
Residential or Commercial Design Review Amendment 
555 
Planning Unit Plan: base fee plus per acre  
5,520 
Planning Unit Plan Amendments: base fee plus per acre 
4,165 
Planning Unit Plan: fee per acre 
3 
DEVELOPMENT CODE AMENDMENTS 
Development Code Amendment (Applicant initiated) 
3,330 
GENERAL PLAN AMENDMENTS 
General Plan Amendments: Major 
5,900 
General Plan Amendments: Minor 
3,064 
LANDSCAPE 
Native Plant Inventory and Native Plant Salvage Permit: base fee 
435 
Native Plant Inventory and Native Plant Salvage Plan Review: per sheet 
40 
REZONE  
Rezone to PAD: base fee (for 40 acres or less) 
3,930 
Rezone to PAD: base fee (for 40+ acres) 
7,860 
Rezone to PAD: plus per acre fee (41+ acres) 
3 
Rezoning (non-PAD) 
2,895 
Major amendments to PAD/CMP including PAD/CMP with overlays base fee (up to 
160 acres) 
6,555

7 
May 5, 2026 
SECTION 1: PLANNING  
User Fee Description 
User Fee ($) 
Major amendments to PAD/CMP including PAD/CMPs with overlays base fee plus 
per acre fee (for 161+ acres) 
1 
Minor Amendment to PAD/CMP including PAD/CMP with overlays 
2,855 
Rezone from obsolete zoning district – from Planned Residential (PR) zoning to any 
new single family zoning district and from General Commerce (GC) to any industrial 
zoning district from PR zoning to any new single family zoning district and from GC 
to any zoning district (except for 1-2) 
0 
SITE PLAN 
Site Plan: base fee 
3,517 
Site Plan: per acre 
50 
Concept Site Plan Review (AREOD) 
2,943 
Amendment to Site Plan 
1,870 
Amendment to Site Plan: per acre 
50 
DIVISION OF PROPERTY 
Abandonment of Right-of-Way 
1,710 
Map of Dedication  
2,540 
Corrective Plat or Affidavit (Applicant initiated) 
1,160 
Lot Split/Lot Combination 
1,340 
Minor Subdivision 
1,875 
PRELIMINARY PLAT 
Preliminary Plats: base application fee 
3,940 
Preliminary Plats; per lot Fee 
35 
FINAL PLAT 
Final Plat: base fee 
3,000 
Final Plat: plus per lot 
35

8 
May 5, 2026 
SECTION 1: PLANNING 
User Fee Description 
User Fee ($) 
RE-PLATS 
Re-plat Administrative* 
* If the replat creates more than 10 lots, the replat will be assessed the final plat 
fee. 
1,760 
VARIANCES  
Variance Fee 
2,190

9 
May 5, 2026 
SECTION 2: ENGINEERING REVIEW 
Fee Structure: All engineering reviews are fee based as detailed below. 
1. All engineering construction plans and reports required for project completion must be submitted 
initially together as a “Complete Submittal”. The following is an example list of engineering plans and 
reports: 
A. Grading and Drainage Plans including SWPPP 
B. Drainage Report 
C. Sewer Plans 
D. Sewer Report  
E. Water Plans 
F. Water Report 
G. Paving and Storm Drain Plans 
H. Signing and Striping Plans 
I. 
Street Light Plan 
J. 
Intelligent Transportation Systems (ITS) Plans 
K. Landscape Plans 
L. Address Map  
M. Final Plat 
N. Phase 1 Environmental Site Assessment (ESA) and any additional assessments as required and 
determined by the Phase 1 ESA 
O. Geotechnical Report 
P. Other required improvement plans and reports as determined by the development scope (i.e. 
Traffic Signals, bridges, RID/BWCDD, etc.) 
2. All fees per sheet are required to be paid at the time of submission. No plans will be accepted without 
payment. 
3. All hourly fees are required to be paid prior to the return of City reviewed documents. No hourly 
reviews will be returned prior to payment. 
4. Addressing Fees 
A. Addressing fees include addressing associated landscape and/or utility meters. 
5. Engineering Plan Review Fees 
A. All plan review fees are paid per plan sheet submitted. 
B. The initial per sheet fee includes the first, second, and third reviews of plans. 
C. Fourth and subsequent review fees are charged per redlined sheet for each review (redlined 
sheets charged based on per sheet fee). 
D. “Redlined sheet” means a comment has been added to a sheet that requires the Engineer to 
provide corrections. Redlined sheets must be attached to the subsequent resubmittal.

10 
May 5, 2026 
SECTION 2: ENGINEERING REVIEW 
6. Master Reports 
A. Master Reports are reports that cover more than one parcel, plan set or large geographical 
area, and may include Master Drainage Reports, Master Sewer Reports, Master Water 
Reports, Independent Design Reports, Independent Design Letters, Traffic Impact Analysis, 
Regional Reports, etc. 
B. Master reports are charged a base fee that includes up to 12 hours of review time. If needed, 
the review time after 12 hours will be charged on an hourly basis.  
7. CLOMR and/or LOMR 
A. As the Flood Control District of Maricopa County (FCDMC) is currently the Floodplain 
Administrator for the City, applicants will route all CLOMR and LOMR submittals through 
FCDMC for review and approval. The City, as the Community Floodplain Administrator, will be 
provided with a cursory review of the submittal. 
B. CLOMR and LOMR submittals will be charged a base fee that includes up to 2 hours of review 
time. If needed, the review time after 2 hours will be charged on an hourly basis. 
C. In the event that the City becomes the Floodplain Administrator, all CLOMR, LOMR, Floodplain 
Use submittals will be completed by the City and/or a consultant. If a consultant is utilized, 
the Consultant’s cost will be charged to the applicant on top of the base fee. 
8. Revised Engineering Plans  
A. Revised engineering plans are any engineering plans that require changes after City approval. 
B. Revised engineering plans are charged on a per revised plan sheet submitted. 
C. Chargeable sheets are only those sheets with revisions. 
D. For additional information and requirements regarding plan revisions, reference the 
Engineering Plan Revision Guide found on the City’s website. 
9. Revised Engineering Reports 
A. Revised engineering reports are any engineering reports that require changes after City 
approval. 
B. Revised engineering reports are charged a base fee that includes up to 2 hours of review time. 
Review time after 2 hours will be charged on an hourly basis. 
10. Expired Engineering Plans 
A. Approved engineering plans are considered expired if the plans have not been permitted 
within 2 years from the City approval date. 
B. Permitted engineering plans are considered expired if the permit has expired and the plans 
are beyond the 2-year maximum allowance. 
C. For additional information regarding expired engineering plans and reports, refer to the 
Expired Engineering Plan and Report Guide on the City’s website. 
11. Included in engineering fees are all associated with clerical costs for processing and maintaining City 
records, preparation of various correspondence from the City Engineer’s office, scheduling meetings 
regarding review comments, staff time, and all other associated clerical fees associated with 
engineering reviews.

11 
May 5, 2026 
SECTION 2: ENGINEERING REVIEW 
12. Construction permit fee calculations are completed upon approval of plans. 
13. For expired permits, the permit fee will be based upon an engineer’s certification of remaining 
quantities to be constructed. For expired grading permits, the permit fee is based upon the original 
project acreage. 
User Fee Description 
Unit 
User Fee ($) 
GENERAL FEES 
Expedited Turnaround Fees (2 Times Review Fees). *Expedited 
plan review services are based on resource availability* 
All Submittals 
2X 
Cancellation Fee 
All Submittals 
55 
Engineering Design Standards Variance Request: flat fee (if 
required) 
All Submittals 
245 
ADDRESSING FEES 
Residential Address Map: base fee up to 50 lots 
1st, 2nd, and 3rd 
1,040 
Residential Address Map: plus per lot above 50 lots 
All Submittals 
11 
Street Name Exhibit 
1st, 2nd, and 3rd 
230 
Commercial Site Plan Addressing 
1st, 2nd, and 3rd 
160 
Additional Submittals 
4th and beyond 
40 
Addressing Multi-Family BTR: base fee up to 50 units 
Base fee 
1,040 
Addressing Multi-Family BTR: plus per unit above 50 units 
Per unit 
11 
Addressing Multi-Family: base fee 
Base fee 
470 
Addressing Multi-Family: plus per dwelling unit 
Per unit 
11 
Single Address 
EA 
80 
PLAN REVIEW – ENGINEERING 
Engineering Plans: per sheet 
1st, 2nd, and 3rd 
345 
Additional Submittals, including supporting report review: per 
sheet 
4th and beyond 
160 
Revised Engineering Plans: per sheet 
All Submittals 
180

12 
May 5, 2026 
SECTION 2: ENGINEERING REVIEW 
 
 
User Fee Description 
Unit 
User Fee ($)  
Major Infrastructure Plan Review 
 
 
: Water and Sewer: per hour 
All Submittals 
130 
: Bridges, Signals, and all other Major Infrastructure 
All Submittals 
130 
Dry Utility Plan Review: per sheet 
All Submittals 
180 
REPORT REVIEW – ENGINEERING 
Master Reports (Master Water, Master Sewer, Regional Report, 
etc.: base fee up to 12 hours 
All Submittals 
1,600 
Master Reports: hourly after 12 hours 
All Submittals 
130 
Revised Master Reports: base fee up to 2 hours 
All Submittals 
300 
Revised Master Reports: hourly after 2 hours 
All Submittals 
130 
Engineering Reports: base fee for up to 7 hours 
1st, 2nd, and 3rd 
940 
Engineering Reports: hourly after 7 hours or 3 reviews 
4th and beyond 
130 
Engineering Letters/Memos: base fee up to 2 hours 
All Submittals 
260 
Engineering Letters/Memos: hourly after 2 hours 
All Submittals 
130 
Phase 1 Environmental Studies / Geotechnical Studies 
All Submittals 
No Fee 
Conditional Letter of Map Review (CLOMR): base fee up to 2 
hours  
All Submittals 
270 
Letter of Map Review (LOMR): base fee up to 2 hours 
All Submittals 
270 
CLOMR/LOMR: hourly after 2 hours 
All Submittals 
130 
CLOMR/LOMR (Outside Consultant on top of base fee) 
All Submittals 
Actual Cost 
Other Report Review - Not Listed Above, per hour 
All Submittals 
130 
 
TRAFFIC REVIEW FEES 
Traffic Impact Analysis 
EA 
1,600 
 
Traffic Impact Statement 
EA 
530

13 
May 5, 2026 
SECTION 2: ENGINEERING REVIEW 
User Fee Description 
Unit 
User Fee ($)  
SLIDs AND MIDs 
Street Light Improvement District (SLID) - Per Ordinance 43-05, Chapter 20 of 
Buckeye City Code 
EA 
1,425 
Street Light Improvement District (SLID) Modification 
EA 
1,425 
Maintenance Improvement District (MID) - Per Ordinance 42-06, Chapter 20 of 
Buckeye City Code 
EA 
1,425 
Advertising Fee for MIDs and SLIDs that have more than one property owner and 
are required to be posted 
EA  
1,500 
Posting Fee for those MIDs and SLIDs that have more than one property owner 
and are required to be posted, per each 300 LF of ROW 
EA 
100 
Legal fees outside of the MID and/or SLID application fee for those MIDs and 
SLIDs that have more than one property owner and are required to be posted 
EA 
As Billed by 
City Attorney 
SPECIALIZED REVIEW 
Outsourced Specialized Engineering Review 
 All Submittals 
Actual Cost + 10% 
Reviews by discipline (i.e., Structural) 
 
Actual Cost + 10%

14 
May 5, 2026 
SECTION 3: ENGINEERING, UTILITIES, ROW, HORIZONTAL 
CONSTRUCTION 
Fee Structure: All fees charged as detailed below. 
1. Fees are based on Construction Permit Type (i.e., grading, drainage, sewer, water, street lighting, 
concrete, paving landscaping, dry utility, etc.).   
2. Fees are paid at the time of permit issuance. 
3. Item/Quantity fee-based calculation. All plans shall show a quantity breakdown in accordance with 
this fee schedule and the sections shown below. 
4. Class Permit Descriptions are listed in the City Code. 
5. Services described in this section are for customary and usual inspection services and inspection 
periods of time, additional fees may be required for services beyond what is considered customary 
and usual. 
Services Included with Construction Permit Fee Payment: 
1. Pre-Construction Meeting, project coordination, and project closeout. 
2. Construction coordination / project management. 
3. Approval of Maintenance and Performance Bonds and follow-up. 
4. Inspections, Field Directives, and Utility Testing. 
5. Material Submittal reviews. 
6. As-Built Plan Reviews: 
A. Three (3) reviews included in base permit fee. 
B. 4th and subsequent reviews charged on a per sheet basis for redlined sheets only (see Section 
2: Engineering Review fees). 
7. Project Close-out Process: 
A. Meetings and communications regarding Close-out of Project, Final Walk, Punch List 
Inspection, Punch List Follow-up, Bond Reductions or Bond Exonerations, Distribution, and 
archiving Project Record Documents. 
B. Warranty Walk  
C. Conveyance 
8. Clerical Services: 
A. Scheduling meetings, preparing/processing correspondence, and e-mail communications. 
9. Public Infrastructure Assurance Agreements: 
A. Meetings with Developer, production, and processing. 
10. Certificates of Insurance compliance review. 
11. Project Stipulations tracking review and verification. 
12. Private improvement reductions shown apply to private utilities (water, sewer, and storm water) and 
all onsite improvements. 
Pavement Cuts 
1. All pavement cuts in taxation district streets or other financed streets require a mill and overlay as 
required by the City Engineer.

15 
May 5, 2026 
SECTION 3: ENGINEERING, UTILITIES, ROW, HORIZONTAL CONSTRUCTION  
2. Per City Code, pavement cuts in streets that have been overlaid or paved within the last four (4) years 
require a mill and overlay as required by the City Engineer. 
3. All other pavement cuts are to pay the pavement restoration fees. 
Haul Permits 
1. Offsite hauling permits are required for hauling fill or excavation exceeding 10,000 cubic yards. 
2. All offsite hauling permits may be required to include the following documents as requested by the 
City: PM10, SWPPP, sweeping schedule and routing, traffic control, uniformed officers, haul quantities, 
and/or truck types showing the number of loads as well as gross truck weights. 
3. Oversized haul permits are required for routes that include city streets. Permits may include time 
restrictions depending upon the route. 
User Fee Description 
Unit 
User Fee ($)  
GRADING CONSTRUCTION PERMITS 
Base Fee, plus (Includes Clear and Grub) 
EA 
165 
 
: Less than 5 Acres 
AC 
285 
 
: 5 Acres or Greater, less than 20 Acres 
 
Fee for the first 5 acres 
EA 
1,600 
Fee for each additional acre over 5 acres 
AC 
265 
 
: 20 Acres or Greater, less than 50 Acres 
  
  
Fee for the first 20 acres 
EA 
5,740 
Fee for each additional acre over 20 acres 
AC 
235 
 
: 50 Acres or Greater, less than 200 Acres 
 
 
Fee for the first 50 acres 
EA 
13,250 
Fee for each additional acre over 50 acres 
AC 
150 
 
: 200 Acres or Greater, less than 500 Acres 
 
 
Fee for the first 200 acres 
EA 
42,100 
Fee for each additional acre over 200 acres 
AC 
140 
 
: 500 Acres or Greater  
 
 
Fee for the first 500 acres 
EA 
51,370 
Fee for each additional acre is over 500 acres 
AC 
65

16 
May 5, 2026 
SECTION 3: ENGINEERING, UTILITIES, ROW, HORIZONTAL CONSTRUCTION  
 
 
User Fee Description 
Unit 
User Fee ($)  
Clear and Grub (only without Grading) 
EA 
50 
DRAINAGE CONSTRUCTION PERMITS 
Base Permit Fee, plus 
EA 
50 
: Storm Drain and Irrigation Pipe 
LF 
1.10 
: Storm Drain and Irrigation Manhole 
EA 
80 
: Underground Retention 
CF 
0.30 
: Headwall / Handrail 
EA 
80 
: Catch Basin  
EA 
120 
: Scuppers (Includes Spillway / Handrail) 
EA 
120 
: Spillway 
EA 
65 
: Drywells or Trench Drains with Standard Treatment Chamber  
EA 
500 
: Drywells with Specialized Treatment Chamber  
EA 
1,000 
: Specialized Treatment Chamber (Stand-alone) 
EA 
500 
: Slope Protection (Rip-Rap, Gabions, Gunnite, etc.) 
SY 
0.65 
SEWER CONSTRUCTION PERMITS 
Base Permit Fee, plus 
EA 
50 
: Sewer Line 
LF 
1.10 
: Sewer Service (New Main) 
EA 
23 
: Sewer Tap to Existing Main 
EA 
80 
: Cleanout 
EA 
50 
: Main Tie-in Fee 
EA 
350 
: Manhole 
EA 
185 
: Drop Connection 
EA 
60 
: Air / Vacuum Release Manhole / Value 
EA 
400 
: Force Main 
LF 
1.50

17 
May 5, 2026 
 
SECTION 3: ENGINEERING, UTILITIES, ROW, HORIZONTAL CONSTRUCTION 
User Fee Description 
Unit 
User Fee ($)  
: Pipe Encasement 
LF 
30 
: Monitoring Vault and Special Structures 
EA 
1,500 
Private Improvements - 20% Reduction 
 
WATER CONSTRUCTION PERMITS 
Base Permit Fee, plus 
 
50 
: Waterline 
LF 
1.10 
: Water Service, (New Main) 
EA 
23 
: Water Service Tap to Existing Main, less than 2 inches 
EA 
80 
: Water Service Tap to Existing Main, greater than 2 inch – less than 6 inches 
EA 
160 
: Tapping Sleeve and Valve / Tie-in 
EA 
300 
: Flush / Curb Stop / Blow-off 
EA 
25 
: Mainline / Lateral / Fire Hydrant Valve 
EA 
30 
: Fire Line 
LF 
1.10 
: Fire Hydrant 
EA 
60 
: Backflow Device up to and including 3 inches 
EA 
80 
: Backflow Device greater than 3 inches 
EA 
150 
: Sampling Station / Air Release Valve 
EA 
90 
Private Improvements - 20% Reduction 
 
STREET LIGHTING CONSTRUCTION PERMITS 
Base Permit Fee, plus 
 
50 
: Streetlight 
EA 
50

18 
May 5, 2026 
SECTION 3: ENGINEERING, UTILITIES, ROW, HORIZONTAL CONSTRUCTION 
User Fee Description 
Unit 
User Fee ($)  
CONCRETE CONSTRUCTION PERMITS 
Base Permit Fee, plus 
 
50 
: Sidewalk and Bicycle Path and Trail 
SF 
0.05 
: Sidewalk Ramps and Truncated Domes: per Ramp 
EA 
80 
: Curb and Gutter / Ribbon Curb 
LF 
0.25 
: Valley Gutter / Apron 
SF 
0.40 
: Driveway / Alley Apron 
EA 
55 
: Return Style Driveway, Commercial Driveway and Bus Bay 
SF 
0.30 
: Cut-off Wall 
LF 
1.50 
Private Improvements - 20% Reduction 
 
PAVING CONSTRUCTION PERMITS 
 
Base Permit Fee, plus 
 
50 
: Paving A/C (Per Lift - Includes Striping) 
SY 
0.45 
: Concrete Paving 
SY 
0.50 
: Mill and Overlay 
SY 
0.30 
: Slurry / Micro Seal 
SY 
0.10 
: Adjustments:  Manholes, Blow-offs, Water Valves, Gas Valves, Utility    Adjustment, 
Clean-outs, Survey Monument Hand Holes, etc. 
EA 
60 
: Survey Monument 
 
 
: Type A 
EA 
25 
: Type B 
EA 
15 
: Street Sign 
EA 
25 
: Barricade / Guardrail 
LF 
4 
: Pavement Utility Pothole 
EA 
65 
Private Improvements - 20% Reduction

19 
May 5, 2026 
SECTION 3: ENGINEERING, UTILITIES, ROW, HORIZONTAL CONSTRUCTION 
 
 
User Fee Description 
Unit 
User Fee ($)  
LANDSCAPING PERMITS 
 
 
Base Permit Fee, plus 
 
50 
: Landscaping 
SF 
0.05 
Private Improvements - 20% Reduction 
 
 
DRY UTILITY PERMITS (RIGHT-OF-WAY ONLY) 
: Utility Vaults / Manholes 
EA 
95 
: Utility Splice / Repair Pits  
EA 
75 
: Utility Valves 
EA 
30 
: Utility Trench (includes microtrenching) 
LF 
0.80 
TEMPORARY TRAFFIC CONTROL FEES 
Application Fee – Per each traffic control configuration 
EA 
50 
High-Volume Road Closure (Greater than 5,000 vehicles per day) 
Per Day 
2,500 
Nighttime – High Volume Arterial Road Closure (7 pm to 6 am only) 
Per Day 
500 
Low-Volume Road Closure (less than 5,000 vehicles per day) 
Per Day 
500 
Nighttime Low Volume Arterial Road Closure (7 pm to 6 am only) 
Per Day 
250 
Lane Restriction  
Per Day 
100 
Left Turn Restriction at Signal 
Per Day 
100 
Sidewalk Closure 
Per Day 
40 
OTHER (INCLUDES BASE APPLICATION FEE AND RIGHT-OF-WAY PERMIT FEE, IF APPLICABLE) 
Engineer Cost Estimate or Executed Construction Contract required for fee calculation.   
Structures (Bridges, Flood Retarding Structures, Flood Walls, Channel Energy 
Dissipation Structures, Box Culverts, Wing Walls, etc.) 
Cost 
3.0% 
Water (Booster Stations, In-line Boosters, Wells, Pressure Reducing Stations, etc.) 
Cost 
3.0% 
Sewer (Lift Station) 
Cost 
3.0% 
Traffic Signal 
Cost 
3.0% 
Traffic Signal Box Art Fee 
EA 
4,500

20 
May 5, 2026 
SECTION 3: ENGINEERING, UTILITIES, ROW, HORIZONTAL CONSTRUCTION 
User Fee Description 
Unit 
User Fee ($)  
Other 
Cost 
3.0% 
PAVEMENT RESTORATION FEES 
 
 
 
: 1 to 99 SY, plus 
SY 
26 
 
 
 
: 100 to 499 SY, plus 
SY 
7 
 
 
 
: 500 to 1,759 SY, plus 
SY 
2 
 
 
 
: 1,760 SY or greater 
SY 
0.80 
NOTE: Other Utility Items - refer to individual utility fees for additional items 
 
 
OFFSITE HAULING 
Base Permit Fee, greater than 10,000 cubic yards, plus 
EA 
140 
: Each additional 10,000 cubic yards or fraction thereof 
EA 
50 
OVERSIZED LOAD HAULING 
Permit Fee 
EA 
50 
MISCELLANEOUS INSPECTION FEES 
 
 
After Hours Inspection fee minimum of 4 hours 
EA 
560 
Hourly Inspection Fees 
HR 
140 
CLASS PERMITS 
Class 1 Permit: Minor Encroachment Permit (Block Party - Police Department)  
: Permit Process Fee 
 
Free 
: Roadside Memorials 
 
Free 
CLASS 1 PERMIT: MINOR ENCROACHMENT PERMIT (PUBLIC TELEPHONES, NEWS RACKS, PLACING 
TEMPORARY TRAFFIC BARRICADES IN STREET, PLACING MERCHANDISE ON SIDEWALK FOR TEMPORARY SALE, 
CURB ADDRESS PAINTING)  
: Permit Fee 
EA 
50 
CLASS 2 PERMIT: ENCROACHMENT PERMIT FOR SIDEWALK FURNITURE (TABLES, CHAIRS, UMBRELLAS, 
BENCHES, PLANTERS, FLOWERPOTS)  
: Permit Fee 
EA 
50

21 
May 5, 2026 
SECTION 3: ENGINEERING, UTILITIES, ROW, HORIZONTAL CONSTRUCTION 
User Fee Description 
Unit 
User Fee ($)  
CLASS 3 PERMIT: ENCROACHMENT PERMIT FOR LANDSCAPE MAINTENANCE 
: Permit Fee, Annual Fee 
EA, annually 
175 
CLASS 4 PERMIT: ENCROACHMENT PERMIT FOR TELECOMMUNICATIONS 
: License Application Fee 
EA 
3,500 
: Utility, Line Fee, Annual Use Rate (Without Franchise Agreement) 
LF, annually 
3.18 
: Permit Fee 
EA 
175 
CLASS 5 PERMIT: ENCROACHMENT PERMIT FOR FIBER OPTIC CABLE, INTERSTATE SERVICES AND OTHER 
COMMUNICATION FACILITIES EXCLUDED FROM THE DEFINITION OF “TELECOMMUNICATION” 
: License Application Fee 
EA 
3,500 
: Utility, Line Fee, Annual Use Rate (Without Franchise Agreement) 
LF, annually 
3.18 
: Permit Fee 
EA 
175 
CLASS 6 PERMIT: ENCROACHMENT PERMIT FOR CABLE TELEVISION 
: License Application Fee 
EA 
3,500 
: Utility, Line Fee, Annual Use Rate (Without Franchise Agreement) 
LF, annually 
3.18 
: Permit Fee 
EA 
175 
CLASS 7 PERMIT: ENCROACHMENT PERMIT FOR UTILITIES 
: License Application Fee 
EA 
3,500 
: Utility, Line Fee, Annual Use Rate (Without Franchise Agreement) 
LF, annually 
3.18 
: Permit Fee 
EA 
175 
CLASS 8 PERMIT: ENCROACHMENT PERMIT FOR STREET EXCAVATION 
 
: Permit Application Fee 
EA 
175 
NOTE: Application and permit fees for class permits apply to all work within the City ROW unless otherwise 
governed by a franchise agreement.

22 
May 5, 2026 
SECTION 3: ENGINEERING, UTILITIES, ROW, HORIZONTAL CONSTRUCTION 
User Fee Description 
Unit 
User Fee ($)  
MISCELLANEOUS 
Other Public Works Services 
HR 
100 
Street Clean-up Fee [20-7-3] 
HR 
100 
Streetlight Back-shield 
EA 
250 
WIRELESS FACILITIES, IN ROW; FEES AND RATES, (PER HB 2365) 
Annual Use Fees  
ROW Use Fee, ($50 per Year x Number of SWFs) 
YR 
50 
ROW Use Fee for Monopoles and Associated Wireless Facilities 
Limited to not more than the 
direct and actual cost of 
managing the ROW 
APPLICATION FOR COLLOCATING SWFS, (EXISTING WITH NO MODIFICATIONS) 
SWF Collocation 
  
  
: 1 to 5 Applications, per Batch 
EA 
100 
: 6 through 25 Applications, per Batch 
EA 
50 
SWFs can be Batched up to 25 SWFs per Batch. 
: The First 5 are Charged at $100 each to Equal $500 
: The Next 20 are Charged at $50 each to Equal $1,000 
: The Total for a Batch of 25 Applications will be $1,500 
 
 
APPLICATION FOR UTILITY POLE AND MONOPOLE, (NEW OR EXISTING WITH MODIFICATIONS) 
New, Replacement or Modified Utility Poles NOT Subject to Zoning Review 
EA 
750 
New, Replacement or Modified Monopoles and Utility Poles and Collocation or 
Wireless Facilities Subject to Zoning Review 
EA 
1,000 
INSPECTION FEES 
 
 
: Inspection Fees for Small Wireless Facilities 
HR 
140 
SY = Square Yard      EA = Each        LF = Lineal Feet       CF = Cubic Feet      AC = Acre      YR = Year      HR = Hour

23 
May 5, 2026 
SECTION 4: BUILDING SAFETY, VERTICAL CONSTRUCTION 
Fee Structure: All fees charged as detailed below. 
1. Per services listed in Building Safety section. 
2. Fees are Based on Stated Value (BOSV), Calculated Value (BOCV), or Flat Fee as listed in the User Fee 
Description. (See Valuation Chart and Table 1-A). 
A. All BOV Plan Review Fees shall be 65% of the calculated Permit Fee and are in addition to the 
Permit Fee. 
B. All applicable Plan Review Fee payments are required at the time of submittal for all BOV 
permits. 
C. All Flat Fee permit fees are due at the time of submittal. 
D. Revised BOV permits will be charged with permit revision and a plan review fee of $130 per 
hour. 
3. All Subsequent Reviews, 3rd review and beyond, will be charged on an hourly basis at $130 per hour.  
4. Expired permit fees are calculated as new permit fees.  
Services Included under User Fee Schedule 
1. Associated clerical costs for processing and maintaining City records and archiving, preparation of 
various correspondences, scheduling meetings, etc. 
User Fee Description 
User Fee ($) 
ADMINISTRATIVE FEES 
Subsequent Reviews (3rd review and beyond), per hour 
130 
Revised BOV, per hour 
130 
Building Board of Appeals, Per Appeal 
3,680 
Building Code Modifications or Alternative 
608 
Inspections (Outside Normal Business Hours {$140 per hour, 3 hours minimum})  
420 
Permit Revision Fee 
232 
Re-inspection Fees (minimum 24 hour wait prior to request for re-inspection) 
106 
Permit Cancellation Fee - Processing Fee 
47 
PLAN REVIEW FEES - FEE-BASED OR BASED ON VALUATION 
Plot (Site) Plan Review for Residential Homes, Per Plot Plan 
54 
Preliminary Fee for Review of Plans, Per Standards Plan (65% of Building Per Fee per 
ICC) - Residential Standard Plan Review 
*BOCV

24 
May 5, 2026 
SECTION 4: BUILDING SAFETY, VERTICAL CONSTRUCTION 
User Fee Description 
User Fee ($) 
Swimming Pool Standard Plan Review 
293 
SINGLE FAMILY RESIDENCE 
: Truss (Deferred) Calculation Review, Residential, 1st and 2nd Review, Per Structure 
280 
: Custom Homes (65% of Building Permit Fee per ICC) 
BOCV* 
NOTE: *BOCV: Based on Calculated Valuation (See Table 1-A) 
COMMERCIAL BUILDING  
Commercial Building (65% of Building Permit Fee per ICC), 1st and 2nd Review 
BOCV* 
Racking Review, Commercial, 1st and 2nd Review, Per Facility 
BOSV* 
Truss Calculation Review, Commercial, 1st and 2nd Review, Per Structure 
652 
Tenant Improvements 
BOSV* 
Other (as defined by Building Official) 
BOSV* 
UTILITY PERMIT FEES (ELECTRICAL, MECHANICAL, HVAC, PLUMBING, GAS, ETC.) 
 
AC Unit, Replace or Upgrade, Commercial or Residential (per unit) 
109 
Backflow Preventer, Commercial 
109 
Electrical, (Includes Clearance) 
 
: Meter Clearance (Up to 400 AMP) 
153 
: Service Entrance Section (Up to 400 AMP), Per Meter  
276 
: Electrical Meter or Service Section Upgrade (Above 400 AMP) per Meter (includes 
clearance) 
BOSV* 
: Electrical Sub Panel  
206 
: Panel De-rate, Residential 
260 
: Power Pedestal, Per Meter  
260 
Electrical 
 
: Commercial, Misc.  
BOSV* 
: Residential, Misc.  
153 
: Temporary 
153

25 
May 5, 2026 
SECTION 4: BUILDING SAFETY, VERTICAL CONSTRUCTION 
User Fee Description 
User Fee ($) 
: Temporary Electrical Service 
188 
: Temporary, Overhead Service 
260 
Plumbing 
 
: Commercial, Misc. 
BOSV* 
: Residential, Misc. 
BOSV* 
Gas Line 
 
: Commercial, Misc. 
BOSV* 
: Commercial, Meter Clearance (only) 
126 
: Residential, Misc. 
153 
: Residential, Meter Clearance (only) 
170 
Generators 
 
: Permanent, Per Generator 
BOSV* 
: Temporary (10,000 Watts and Above), Per Generator 
153 
Photovoltaic System, Residential 
250 
Panel De-Rate, Residential 
276 
Residential Battery Storage 
250 
Non-Residential Battery Storage 
BOSV* 
Water Heater 
 
: Gas to Electric or Electric to Gas 
223 
OCCUPANCY PERMIT FEES 
Certificate of Completion 
87 
Certificate of Occupancy 
140 
Change of Occupancy Permit, Each 
228 
Change of Occupant Permit, Each 
166 
Stock and Train 
163

26 
May 5, 2026 
SECTION 4: BUILDING SAFETY, VERTICAL CONSTRUCTION 
User Fee Description 
User Fee ($) 
Temporary Certificate of Occupancy (expires in 60 days) 
140 
First Extension of TCO (61 to 120 days) 10% of Original Building Permit Fee 
BOSV* 
Second Extension of TCO (121 to 180 Days) 20% of Original Building Permit Fee 
BOSV* 
Third Extension of TCO (181 to 240 Days) 30% of Original Building Permit Fee 
BOSV* 
NOTE: *BOSV: Based on Standard Valuation (See Table 1-A) 
MISCELLANEOUS PERMIT FEES - BASED ON VALUATION (SEE TABLE 1-A) 
Patios, Decks, Ramadas, etc. 
BOSV* 
Remodel Fee 
BOSV* 
Sign Permit 
BOSV* 
Commercial Walls- Themed, Retaining, and Perimeter  
BOSV* 
Water Damage 
BOSV* 
Product/Manufacturing Equipment Hookups (MP&E, etc.) 
BOSV* 
Product/Material Handling 
BOSV* 
Temporary Batch Plant 
BOSV* 
Tanks/Silos/Process Piping 
BOSV* 
Solar Farm/COMM PV 
BOSV* 
MISCELLANEOUS PERMIT FEES – FEE BASED 
Building Demolitions 
 
: Residential Accessory, Per Structure 
179 
: Structures Other than Single Family Residence 
260 
: Single Family Residence, Per Structure 
232 
Building Moving, Per Structure 
3,000 
Fences 
 
: Pool Barrier 
223 
Fire Repair / Restoration, Per Inspection Trip 
106 
SECTION 4: BUILDING SAFETY, VERTICAL CONSTRUCTION

27 
May 5, 2026 
User Fee Description 
User Fee ($) 
Manufactured Home Set  
350 
Flagpole (30 ft and over) 
162 
Model Home Complex, Per Application (Fee Combined with Planning Fee) 
263 
Model Home Sales Trailer/Other Sales Trailers, Per Trailer  
153 
: Garage Conversion 
209 
: Garage Conversion Restoration 
288 
Spas/Hot Tubs/Pools (Single Family Residence) All other: BOV* 
 
Existing Roof Covering Replacement 
BOSV* 
: Above-Ground (Pool or Spa) 
223 
: In-Ground Spa 
 
: Prefabricated 
276 
: Site Built 
452 
: In-Ground Pool (With Approved Standard Plan) 
329 
: In-Ground Spa / Pool Combination (With Approved Standard Plan) 
329 
Trailers, Temporary (example, Construction Trailers) 
276 
Window Replacement (when larger than existing is being replaced) 
BOSV* 
Miscellaneous Inspections or Service for which no fee is specifically indicated (hourly 
rate) 
116 
Annual Facilities Permit 
820 
TABLE 1-A 
Total Valuation 
Fee 
Total Valuation $1.00 to $500.00 
$72 
Total Valuation $500.01 to $2,000.00  
$270 for the first $500 plus $15 for each additional $100 or 
fraction thereof, to and including $2,000 
Total Valuation $2,000.01 to $25,000.00 
$490 for the first $2,000 plus $9 for each additional $1,000 or 
fraction thereof, to and including $25,000 
Total Valuation $25,000.01 to $50,000.00 
$690 for the first $25,000 plus $35 for each additional $1,000 
or fraction thereof, to and including $50,000

28 
May 5, 2026 
Total Valuation $50,000.01 to $100,000.00 
$1,570 for the first $50,000 plus $16.50 for each additional 
$1,000 or fraction thereof, to and including $100,000 
Total Valuation $100,000.01 to $500,000.00 
$2,405 for the first $100,000 plus $13.00 for each additional 
$1,000 or fraction thereof, to and including $500,000 
Total Valuation $500,000.01 to $1,000,000.00 
$7,630 for the first $500,000 plus $18.50 for each additional 
$1,000 or fraction thereof, to and including $1,000,000 
Total Valuation $1,000,000.01 and up 
$16,864 for the first $1,000,000 plus $5 for each additional 
$1,000 or fraction thereof 
** The Building Valuation Data chart shall be updated annually using the most current ICC-published figures, 
in compliance with applicable Building Standards**

29 
May 5, 2026 
SECTION 5: FIRE SAFETY 
 
Fee Structure: All fire fees listed are flat fees unless otherwise indicated. 
Services Included under User Fee Schedule 
1. Associated clerical costs for processing and maintaining City records and archiving, preparation 
of various correspondences, scheduling meetings, etc. 
2. Expired permit fees are calculated as new permit fees. 
User Fee Description 
User Fee ($) 
FEE TYPE 
Alarms, Per Facility 
590 
Alarms, Tenant Improvements 
305 
Alarm Modification 
305 
Sprinklers, Per Facility 
 
: Tenant Improvements 
330 
: Residential 
315 
Sprinkler Standard Plan Review 
160 
Sprinklers, Per Facility 
 
: Commercial – Less than 30,000 sq. ft. 
590 
: Commercial - 30,000 sq. ft. or greater and up to 90,000 sq. ft. 
775 
: Commercial - 90,000 sq. ft. or greater and up to 120,000 sq. ft. 
945 
: Commercial - 120,000 sq. ft. or greater 
1,460 
Sprinklers Modification 
350 
Flow Test 
100 
Automatic Kitchen Hood System 
340 
Propane Tank 
 
: Tank Cage (Each) 
260 
: Commercial and Residential LPG (Propane) Above Ground (Per Tank) 
305 
: Commercial and Residential LPG (Propane) Underground (Per Tank) 
420 
Tent / Canopy, Temporary, Per Tent greater than 200 sq. ft. 
275

30 
May 5, 2026 
 
SECTION 5: FIRE SAFETY 
User Fee Description 
User Fee ($) 
Fire Access Gates, Knox Box, Knox Locks, Knox Key Switch or Opticom 
100 
Alternative Fire Extinguishing System 
510 
Fire Pump Inspection (Each) 
680 
Fire Pump Modification 
500 
Annual Hazardous Materials Operational Permit 
410 
License Inspections 
 
: Educational Facilities 
340 
: Daycare - Residential 
270 
: Daycare - Commercial 
340 
: Licensed Adult Care Facilities - Commercial 
340 
: Licensed Adult Care Facilities - Residential 
270 
: Outpatient Services 
305 
Blasting Operations (Per Blasting - 30 Day Permit Expiration) 
560 
Fireworks 
 
: Fireworks (0 to 30 Shells, per show - shell diameter less than 3 inches) 
100 
: Fireworks (31 Shells and up, per show) 
250 
Consumer Fireworks Retail Sales – 30 Day 
410 
Residential Compressed Gas 
340 
Temporary Fuel Tank, (permit issued for 180 days) 
330

31 
May 5, 2026 
SECTION 6: BUSINESS LICENSES 
SUMMARY 
1. Business licenses are issued for a period of one year. Notices are emailed the month prior, providing 
30-45 days’ notice to renew the license.  
2. The application fee for a General Fee Category is $25.00, and the annual fee for a new business 
registration or renewal is $50.00. 
3. Other Categories Fees are identified below.  
4. Late fees will be assessed if payment is not received by the due date. 
 
User Fee Description 
User Fee ($) 
FEE TYPE 
GENERAL CATEGORY: $25 APPLICATION FEE/$50 ANNUAL FEE 
 
Care Facilities 
25 Application Fee, 50 Annual Fee 
Contractors and Builders 
25 Application Fee, 50 Annual Fee 
Exempt (Non-Profit) 
25 Application Fee, 50 Annual Fee 
Massage Establishment 
25 Application Fee, 50 Annual Fee 
Mercantile Business – Wholesale and Retail 
25 Application Fee, 50 Annual Fee 
Mobile Food Vendors 
25 Application Fee, 50 Annual Fee 
Professional and Personal Services 
25 Application Fee, 50 Annual Fee 
Restaurant and Bars 
25 Application Fee, 50 Annual Fee 
Solicitors and Peddlers 
25 Application Fee, 50 Annual Fee 
Tattoo and/or Body Piercing Establishment 
25 Application Fee, 50 Annual Fee 
Waste Hauler 
25 Application Fee, 50 Annual Fee 
Late Fee 
25 
Reinstatement or Replacement Fee 
25 
OTHER CATEGORIES 
 
Marijuana Dispensaries 
1,000 Application Fee, 100 Annual 
Fee 
Sexually Oriented Business 
1,000 Application Fee, 100 Annual 
Fee

32 
May 5, 2026 
 
SECTION 6: BUSINESS LICENSE 
User Fee Description 
User Fee ($) 
FEE TYPE 
LIQUOR LICENSES 
 
In-State Producer – Series 1 
500 Application Fee, 1,000/Year 
Out-of-State Producer – Series 2 
500 Application Fee, 1,000/Year 
Domestic Brewery – Series 3 
500 Application Fee, 1,000/Year 
Wholesaler – Series 4 
500 Application Fee 
Government – Series 5 
500 Application Fee 
Bar (All Spiritous Liquor) – Series 6 
500 Application Fee, 500/Year 
Beer and Wine Bar Only – Series 7 
500 Application Fee, 400/Year 
Conveyance – Series 8 
500 Application Fee, 100/Year 
Liquor Store (All Spiritous Liquor) - Series 9 
500 Application Fee, 400/Year 
Beer & Wine Store Only - Series 10 
500 Application Fee, 400/Year 
Hotel/Motel (With Restaurant) – Series 11 
500 Application Fee, 400/Year 
Restaurant – Series 12 
500 Application Fee, 400/Year 
Domestic Farm Winery – Series 13 
500 Application Fee, 1000/Year 
Private Club – Series 14 
500 Application Fee, 200/Year 
Special Event (Temporary License) – Series 15 
0 
Wine Festival/Wine Fair – Series 16 
100 Annual Fee 
Direct Shipment Lease – Series 17 
100 Annual Fee

33 
May 5, 2026 
SECTION 7: INCENTIVE DISTRICT  
Fee Structure: All fees charged as detailed below. 
1. Downtown Incentive District 
A. This district is to incentivize the downtown Buckeye area for redevelopment and growth. 
B. The incentive for this area is a 75% reduction on all User Fees as identified in this document 
with the exception of items (c) and (d) below. 
C. The incentive does not apply to the following;  
i.  The Office of Manufactured Housing Set Fee  
ii. Business License Fees  
iii. All Class Permits, (Section 3)  
iv. MIDS and SLIDS, (Section 3)  
v. Annual Fees as listed under the Class Permits, (Section 3)  
vi. All fees adopted under other council action or other fees schedules such as;  
1.  Development Impact Fees  
2. Water Fees  
vii. Unincorporated land developed through Maricopa County  
D. Within Incentive Area B (as shown on the following map) the incentive does not apply to the 
following land uses. Note, there are no restricted land uses for Incentive Area A; 
i. Single-Family Residential  
ii. Multi-Family Residential with less than fifteen (15) dwelling units per acre net 
density  
iii. Mobile Home Park  
iv. Manufactured Home Subdivision  
v. Group Living Use Category uses  
vi. Marijuana related uses  
vii. Telecommunication Facility Use Category uses  
viii. Vehicle Storage  
ix. Resource Extraction  
x. Storage Yard  
xi. Waste and Salvage Use Category uses 
xii. Temporary Uses.  
E. Incentive Area B will be offered until December 31, 2035, unless modified by the City 
Council.  
F. Monroe Incentive Corridor (MIC). A 100% full reduction of fees, as excepted in this Section, 
will apply to properties with direct frontage on either Monroe Avenue between Miller Road 
(1st Street) and Baseline Road and/or 4th Street between Narramore Avenue and Irwin 
Avenue. The Monroe Incentive Corridor does not apply to properties with obsolete zoning 
and only applies to land uses allowed within the Downtown Commercial (DC) zoning district.  
G. The pictorial area for the Downtown Incentive Districts A and B, and the Monroe Incentive 
Corridor are identified on the following map. Incentive Districts A and B are not inclusive of 
each other – the boundaries are unique and distinct without overlapping. The MIC, however,

34 
May 5, 2026 
intersects Incentive District A in such a way that project failing to meet the MIC requirements 
may still qualify for the Incentive District A benefits.  
H. The Legal Description for the Downtown Incentive Districts are on the following pages. The 
MIC is defined in subsection f. above.

35 
May 5, 2026

36 
May 5, 2026

37 
May 5, 2026

38 
May 5, 2026

39 
May 5, 2026

40 
May 5, 2026

41 
May 5, 2026

42 
May 5, 2026

43 
May 5, 2026

44 
May 5, 2026