26-0011590-Dist NC-City of Buckeye-F0879-01D 02D 02C-FINAL.pdf
Extracted text (via pymupdf)
20425 characters
Page 1 of 10
ADOT CAR No.: IGA 26-0011590-I
AG Contract No.: P0012026000168
Project Location/Name: SR85: Broadway
Rd, Baseline Rd and Southern Ave
Type of Work: Intersection Improvement
Federal-aid No.: NA
ADOT Project No.: F0879 01D/02D/02C
TIP/STIP No.:
ALN: 20.205 - Highway Planning and
Construction
Budget Source Item No.: 44811
INTERGOVERNMENTAL AGREEMENT
BETWEEN
THE STATE OF ARIZONA
AND
THE CITY OF BUCKEYE
THIS AGREEMENT (“Agreement”) is entered into this date ________________________________, pursuant
to the Arizona Revised Statutes (“A.R.S.”) §§ 11-951 through 11-954, as amended, between the
STATE OF ARIZONA, acting by and through its DEPARTMENT OF TRANSPORTATION (the “State” or
“ADOT”) and the CITY OF BUCKEYE, acting by and through its MAYOR and CITY COUNCIL (the
“City” or “Local Agency”). The State and the Local Agency are each individually referred to as a
“Party” and are collectively referred to as the “Parties.”
I.
RECITALS
1. The State is empowered by A.R.S. § 28-401 to enter into this Agreement and has delegated
to the undersigned the authority to execute this Agreement on behalf of the State.
2. The Local Agency is empowered by A.R.S. § 48-572 to enter into this Agreement and has by
resolution, if required, a copy of which is attached and made a part of, resolved to enter into
this Agreement and has authorized the undersigned to execute this Agreement on behalf of
the Local Agency.
3. The State will design, advertise, award and administer construction of intersection
improvements on State Route 85 (SR85) and Broadway Road and SR85 and Baseline Road,
(the “State’s Project”). At the request of the Local Agency, the State will also administer the
design and construction of intersection improvements on SR85 and Southern Avenue, (the
“City's Project”). The City’s Project includes the installation of two traffic signals and
crossroad widening. The City's Project cost is estimated at $12,500,000, shown in Exhibit A.
The Local Agency will be responsible for actual costs of the City’s Project. The City’s Project
is all within State right of way and the State will assume operations and maintenance of the
City’s Project upon completion. The State’s Project and the City's Project are collectively
referred to as the “Project.”
IGA 26-0011590-I
Page 2 of 10
4. The foregoing Recitals and Exhibit A shall be incorporated into this Agreement.
In consideration of the mutual terms expressed herein, the Parties agree as follows:
II. SCOPE OF WORK
1. The Parties agree:
a. To perform their responsibilities consistent with this Agreement; any change or
modification to the City’s Project will only occur with the mutual written consent of
both Parties.
b. The Local Agency will be solely responsible for the costs associated with the City’s
Project, estimated at $12,500,000.
c. Any future modifications within the City’s Project limits required for transportation
purposes and resulting in the removal or alteration of the City’s Project will have
precedence over the City’s Project and there will be no compensation owed to the Local
Agency.
d. Should the design completion of the City’s Project not be completed at the same time as
the State’s Project, the City’s Project will not be advertised for construction and the
agreement could be canceled in compliance with Paragraph III.4, Cancellation.
2. The State will:
a. Execute this Agreement and be the Local Agency’s designated agent for the City’s
Project.
b. After this Agreement is executed, and prior to performing or authorizing any work,
invoice the Local Agency for the initial Project Development Administration (PDA)
costs, estimated at $100,000 and the Local Agency’s share of the Project design costs,
estimated at $900,000. If PDA costs exceed the estimate during the development of
design, notify the Local Agency, obtain concurrence prior to continuing with the
development of design, and invoice as determined by ADOT and the Local Agency for
additional costs to complete PDA for the Project. If design costs exceed the estimate
prior to completion of design, invoice the Local Agency for Project costs exceeding
design. After the Project costs are finalized, invoice or reimburse the Local Agency for
the difference between actual costs and the amount the Local Agency has paid for PDA
and design.
c. Prepare and provide the design plans, specifications and other such documents and
services required for the construction bidding and construction of the City’s Project and
incorporate comments from the Local Agency as appropriate.
d. After completion of design and prior to bid advertisement, invoice the Local Agency for
the actual PDA costs, as applicable, and the Local Agency’s share of the Project
construction costs, estimated at $11,500,000. After the Project costs for construction are
IGA 26-0011590-I
Page 3 of 10
finalized, the State will either invoice or reimburse the Local Agency for the difference
between estimated and actual costs. De-obligate or otherwise release any remaining
federal funds from the scoping/design phase of the Project.
e. Utilize ADOT standard equipment for the signal and lighting at SR85 and Southern Ave.
Be responsible for any costs associated with standard equipment or future upgrades
and modifications to the equipment.
f.
After receipt of the Local Agency’s estimated share of the City Project construction costs,
with FHWA authorization, proceed to administer construction: advertise, receive and
open bids, award, and enter into a contract with the firm for the construction of the
Project. Administer contract(s) for the Project and make all payments to the
contractor(s).
g. Notify the Local Agency of substantial completion of the Project.
h. After completion and final acceptance of the Project, agree to maintain and assume full
responsibility of the Project including all City's Project components.
3. The Local Agency will:
a. Designate the State as the Local Agency’s authorized agent for the Project.
b. Within 30 days of receipt of an invoice from the State, pay the initial PDA costs,
estimated at $100,000 and the City’s Project design costs, estimated at $900,000. Agree
to be responsible for actual PDA costs, if during the development of design, PDA costs
exceed the initial estimate. Be responsible and pay for the difference between the
estimated and actual PDA and design costs of the Project within 30 days of receipt of an
invoice.
c. Review the design documents required for construction of the Project and provide
comments to the State as appropriate. Work within the design timeframes set forth by
the State to not delay the State’s Project.
d. After completion of design, within 30 days of receipt of an invoice from the State and
prior to bid advertisement, pay to the State any outstanding PDA costs, the City’s Project
construction costs, estimated at $11,500,000, and if applicable, the difference between
the final and initial construction cost estimates. Be responsible for and pay the
difference between the estimated construction cost and Project bid amount prior to
award. After Project completion, be responsible for and pay any outstanding Project
costs, within 30 days of receipt of an invoice.
e. Be responsible for all City Project costs incurred in performing and accomplishing the
work as set forth under this Agreement; payment for these costs shall be made within
30 days of receipt of an invoice from the State.
f.
Certify that all necessary rights of way have been or will be acquired prior to
advertisement for bids and certify that all obstructions or unauthorized encroachments
of whatever nature, either above or below the surface of the Project area, have been
IGA 26-0011590-I
Page 4 of 10
removed from the proposed right of way, or will be removed prior to the start of
construction, in accordance with The Uniform Relocation Assistance and Real Property
Acquisition Policies Act of 1970 as amended; 49 CFR 24.102 Basic Acquisition Policies;
49 CFR 24.4 Assurances, Monitoring and Corrective Action, parts (a) & (b) and ADOT
Right of Way Procedures Manual: 8.02 Responsibilities, 8.03 Prime Functions, 9.06
Monitoring Process and 9.07 Certification of Compliance. Coordinate with the State’s
Right of Way personnel during any right of way process performed by the Local Agency,
if applicable.
g. Not permit or allow any encroachments upon or private use of the public right of way,
except those authorized by permit. Coordinate all authorized permits with ADOT prior
to construction. In the event of any unauthorized encroachment or improper use, the
Local Agency shall take all necessary steps to remove or prevent any such
encroachment or use.
h. Automatically grant to the State, by execution of this Agreement, its agents and/or
contractors, without cost, the temporary right to enter Local Agency rights of way, as
required, to conduct any and all construction and preconstruction related activities for
the Project, on, to and over said Local Agency rights of way. This temporary right will
expire with completion of the Project.
i.
Investigate and document utilities within the Project limits; submit findings to ADOT
determining prior rights or no prior rights; approve an easement within the final right
of way to re-establish the prior right location for those utilities with prior rights.
j.
Be obligated to incur any expenditure should unforeseen conditions or circumstances
increase City Project costs. Should the Local Agency request changes to the scope of
work of the City’s Project, be responsible for the cost of said Local Agency requested
changes. Such changes will require State and FHWA approval. Be responsible for any
contractor claims for additional compensation caused by Project delay attributable to
the Local Agency. Payment for these costs will be made to the State within 30 days of
receipt of an invoice from the State.
III. MISCELLANEOUS PROVISIONS
1. Effective Date. This Agreement shall become effective upon signing and dating of all Parties.
2. Amendments. Any change or modification to the Project will only occur with the mutual
written consent of both Parties.
3. Duration. The terms, conditions and provisions of this Agreement shall remain in full force
and effect until completion of the Project and all related and/or reimbursements are made.
Any and all obligations of maintenance thereunder shall remain perpetual and shall survive
any termination hereof and the assignment or assumption of this Agreement or the Project
by another competent jurisdiction or entity.
4. Cancellation. This Agreement may be canceled at any time, so long as the canceling Party
provides at least 30 days’ written notice to the other Party. It is understood and agreed that,
IGA 26-0011590-I
Page 5 of 10
in the event the State terminates this Agreement, the State shall be responsible for all
agreed upon amounts up to the time of termination, but is in no way obligated to fund the
liaison position(s) past the termination date.
5. Indemnification. The Local Agency shall indemnify, defend, and hold harmless the State,
any of its departments, agencies, boards, commissions, officers or employees (collectively
referred to in this paragraph as the “State”) from any and all claims, demands, suits, actions,
proceedings, loss, cost and damages of every kind and description, including reasonable
attorneys' fees and/or litigation expenses (collectively referred to in this paragraph as the
“Claims”), which may be brought or made against or incurred by the State on account of loss
of or damage to any property or for injuries to or death of any person, to the extent caused
by, arising out of, or contributed to, by reasons of any alleged act, omission, professional
error, fault, mistake, or negligence of the Local Agency, its employees, officers, directors,
agents, representatives, or contractors, their employees, agents, or representatives in
connection with or incident to the performance of this Agreement. The Local Agency’s
obligations under this paragraph shall not extend to any Claims to the extent caused by the
negligence of the State, except the obligation does apply to any negligence of the Local
Agency which may be legally imputed to the State by virtue of the State’s ownership or
possession of land. The Local Agency’s obligations under this paragraph shall survive the
termination of this Agreement.
6. Third-Party Indemnification. The State shall include Section 107.13 of the 2021 version of
the Arizona Department of Transportation Standard Specifications for Road and Bridge
Construction, incorporated into this Agreement by reference, in the State’s contract with
any and all contractors, of which the Local Agency shall be specifically named as a third-
party beneficiary. This provision may not be amended without the approval of the Local
Agency.
7. Federal Funding Accountability and Transparency Act. The Parties warrant compliance with
the Federal Funding Accountability and Transparency Act of 2006 and associated 2008
Amendments (the “Act”). Additionally, in a timely manner, the Local Agency will provide
information that is requested by the State to enable the State to comply with the
requirements of the Act, as may be applicable.
8. Governing Law. This Agreement shall be governed by and construed in accordance with
Arizona laws.
9. Conflicts of Interest. This Agreement may be canceled in accordance with A.R.S. § 38-511.
10. Inspection and Audit. The Local Agency shall retain all books, accounts, reports, files and
other records relating to this Agreement which shall be subject at all reasonable times to
inspection and audit by the State for five years after completion of the Project. Such records
shall be produced by the Local Agency, electronically or at the State office as set forth in this
Agreement, at the request of ADOT.
11. Title VI. The Local Agency acknowledges and will comply with Title VI of the Civil Rights Act
Of 1964.
IGA 26-0011590-I
Page 6 of 10
12. Non-Discrimination. This Agreement is subject to all applicable provisions of the Americans
with Disabilities Act (Public Law 101-336, 42 U.S.C. 12101-12213) and all applicable federal
regulations under the Act, including 28 CFR Parts 35 and 36. The Parties to this Agreement
shall comply with Executive Order Number 2009-09, as amended by Executive Order 2023-
01, issued by the Governor of the State of Arizona and incorporated in this Agreement by
reference regarding “Non-Discrimination.”
13. Non-Availability of Funds. Every obligation of the State under this Agreement is conditioned
upon the availability of funds appropriated or allocated for the fulfillment of such
obligations. If funds are not allocated and available for the continuance of this Agreement,
this Agreement may be terminated by the State at the end of the period for which the funds
are available. No liability shall accrue to the State in the event this provision is exercised,
and the State shall not be obligated or liable for any future payments as a result of
termination under this paragraph.
14. Arbitration. In the event of any controversy, which may arise out of this Agreement, the
Parties agree to abide by arbitration as is set forth for public works contracts if required by
A.R.S. § 12-1518.
15. E-Verify. The Parties shall comply with the applicable requirements of A.R.S. § 41-4401.
16. Contractor Certifications. The Parties shall certify that all contractors comply with the
applicable requirements of A.R.S. §§ 35-393.01 and 35-394.
17. Other Applicable Laws. The Parties shall comply with all applicable laws, rules, regulations
and ordinances, as may be amended.
18. Notices. All notices or demands upon any Party to this Agreement shall be in writing and
shall be delivered electronically, in person, or sent by mail, addressed as follows:
For Agreement Administration:
Arizona Department of Transportation
Joint Project Agreement Group
205 S. 17th Avenue, Mail Drop 637E
Phoenix, AZ 85007
JPABranch@azdot.gov
For Project Administration:
Arizona Department of Transportation
Project Management Group
205 S. 17th Avenue, Mail Drop 614E
Phoenix, AZ 85007
PMG@azdot.gov
City of Buckeye
Attn: John Willett
945 N. 215th Avenue, Suite 137
Buckeye, AZ 85326
623.640.6317
jwillett@buckeyeaz.gov
City of Buckeye
Attn: John Willett
945 N. 215th Avenue, Suite 137
Buckeye, AZ 85326
623.640.6317
jwillett@buckeyeaz.gov
IGA 26-0011590-I
Page 7 of 10
For Financial Administration:
Arizona Department of Transportation
Project Management Group
205 S. 17th Avenue, Mail Drop 614E
Phoenix, AZ 85007
PMG@azdot.gov
City of Buckeye
Attn: John Willett
945 N. 215th Avenue, Suite 137
Buckeye, AZ 85326
623.640.6317
jwillett@buckeyeaz.gov
19. Revisions to Contacts. Any revisions to the names and addresses above may be updated
administratively by either Party with written notice to the other Party.
20. Legal Counsel Approval. In accordance with A.R.S. § 11-952 (D), the written determination
of each Party’s legal counsel providing that the Parties are authorized under the laws of this
State to enter into this Agreement and that the Agreement is in proper form as set forth
below.
21. Electronic Signatures. This Agreement may be signed in an electronic format including
DocuSign.
Remainder of this page is intentionally left blank.
(Signatures begin on the next page)
IGA 26-0011590-I
Page 8 of 10
IN WITNESS WHEREOF, the Parties have executed this Agreement to be effective upon the full
completion of signing and dating by all Parties to this Agreement.
CITY OF BUCKEYE
By _________________________________________________ Date________________
ERIC ORSBORN
Mayor
ATTEST:
By _________________________________________________ Date________________
LUCINDA AJA
City Clerk
I have reviewed the above referenced Intergovernmental Agreement between the State of
Arizona, acting by and through its Department of Transportation, and the City of Buckeye, an
agreement among public agencies which, has been reviewed pursuant to A.R.S. §§ 11-951
through 11-954 and A.R.S. § 48-572 and declare this Agreement to be in proper form and within
the powers and authority granted to the City under the laws of the State of Arizona.
No opinion is expressed as to the authority of the State to enter into this Agreement.
Approved as to Form:
By _________________________________________________ Date_________________
City Attorney
IGA 26-0011590-I
Page 9 of 10
ARIZONA DEPARTMENT OF TRANSPORTATION
By ________________________________________________ Date_________________
MATT MOUL, PE
Project Delivery and Operations
Division Director
This Agreement between public agencies, the State of Arizona and the City of Buckeye, has
been reviewed pursuant to A.R.S. §§ 11-951 through 11-954 and A.R.S. § 28-401, by the
undersigned Assistant Attorney General who has determined that it is in the proper form and
is within the powers and authority granted to the State of Arizona. No opinion is expressed as
to the authority of the remaining Parties, other than the State or its agencies, to enter into said
Agreement.
By ________________________________________________ Date_________________
Assistant Attorney General
IGA 26-0011590-I
Page 10 of 10
EXHIBIT A
Cost Estimate
F0879 01D/02D/02C
ADOT Project Development Administration (PDA) Cost, non-federal aid:
City’s Costs for City Project work @ 100%
$ 100,000
Design
City’s Costs for City Project work @ 100%
$ 900,000
Construction:*
City’s Costs for City Project work @ 100%
$ 11,500,000
Estimated TOTAL City Project Cost
$ 12,500,000
*Includes a minimum of 15% construction engineering (CE) and administration
cost (this percentage is subject to change, any change will require concurrence
from the Local Agency) and 5% Project contingencies