City Council Meeting Airport Master Plan Recommendations April 21, 2026 1 Agenda Topics • Overview of Airport Related Studies • Purpose of an Airport Master Plan • Recap of previous Airport Master Plan concept • Subsequent feedback • Revised Airport Master Plan recommendations • Outline next steps 2 Airport Related Studies • Airport Master Plan – Tonight’s discussion and possible action • Airport Long-Range Concept – Brief overview • Airport Specific Area Plan – Workshop topic 3 Airport Master Plan • 20-year capital development plan for an airport • Determines the extent, type, and timeline of future development • Required by FAA for funding and a decision-making tool 4 Recap of Previous Master Plan Concept • Two Public meetings - September 2024 & May 2025 • Council Workshop – September 2025 • Accommodates 20-year development plan • Runway 17-35 extension to 7,300 feet • Crosswind Runway 10-28 at 6,000 feet • Associated landside and hangar development 5 Subsequent Feedback • Property owner concerns raised in December 2025 • Primary concerned with impacts of crosswind runway on adjacent area development • Potential impacts of roadway realignments • Several additional development concepts around the airport • Limited FAA support for a crosswind runway potentially delaying approval 6 Reevaluation Criteria Understand better the concerns of adjacent property owners and developers Ability to meet FAA requirements for an approved Airport Master Plan Assure proposed forecast demand can be accommodated Allow for expansion beyond 20-year planning period to support a long-range vision Align with Luke AFB mission and the Airspace study 7 Revised Master Plan Recommendations • Remove crosswind runway and widen existing Runway 17-35 • Construct Runway 17-35 phased extensions to 7,300 feet • Adjust landside development to support revised runway layout 8 Revised Airport Master Plan Recommendations 9 PAL 1 Projects - Short-term (2025-2029) 10 PAL 2 Projects - Mid-term (2030-2034) 11 PAL 3 Projects - Long-term (2035-2044) 12 Capital Improvement Plan (20-year) TIMING TOTAL FEDERAL STATE CITY PRIVATE Short-term (2025-2029) $47.7M $23.5M $3.9M $8.4M $11.9M Mid-term (2030-2034) $50.8M $12.7M $0.6M $0.6M $36.8M Long-term (2035-2044) $37.1M $18.0M $0.9M $6.3M $11.9M TOTAL $135.6M $54.3M $5.4M $15.3M $60.6M Notes: 1. Estimated costs include planning, environmental, engineering, construction and land acquisition. 2. City’s Capital Improvement Program and budget does not reflect this level of funding. 13 Next Steps – Airport Master Plan • Finalize the Airport Master Plan Report based on tonight’s direction • Submit to FAA for review and approval 14 Next Steps – Remaining Airport Studies • Airport Long-Range Concept (ALRC) – City Document • Engage in additional analysis on development options beyond the Airport Master Plan • Conduct Stakeholder Outreach • Conduct a Public Meeting and Council Workshop • Council consideration of ALRC recommendations • Airport Specific Area Plan (ASAP) – City Document • Details as presented in today’s workshop 15 Staff Recommendation Council take action adopting the Airport Master Plan recommendations, and direct staff to incorporate recommendations into the Airport Master Plan report and submit to the Federal Aviation Administration for approval 16