DSD - Development User Fees Presentation 4_21_26.pptx

City of Buckeye — Regular Council Meeting (2026-04-21)

View PDF Meeting page

Extracted text (via pymupdf) 6983 characters
Development User Fee 
Update
City Council Meeting: April 21, 2026
Brian Craig, Director
Development Services Department
1

Agenda
Existing Fee Schedule
User Fee Update Process
West Valley Comparisons
Significant Changes
Updates Since 60-day Notice
2

Current Fee Schedule: Effective 
July 18, 2018
The picture can't be displayed.
Section 0: 
General 
Requirements
The picture can't be displayed.
Section 1: 
Planning
The picture can't be displayed.
Section 2: Civil 
Engineering 
Review
The picture can't be displayed.
Section 3: Civil, 
Utilities, ROW, 
Horizontal 
Construction
The picture can't be displayed.
Section 4: 
Building Safety, 
Vertical 
Construction
The picture can't be displayed.
Section 5: Fire 
Safety
The picture can't be displayed.
Section 6: 
Business License
The picture can't be displayed.
Section 7: 
Incentive 
District
3

Guiding Philosophies
The picture can't be displayed.
Council Strategic 
Plan: Develop a User 
Fee/Cost Recovery 
Philosophy
The picture can't be displayed.
Incorporate 
continuous 
improvement process 
gains in fee amount  
The picture can't be displayed.
Move fees toward 100% cost 
recovery
4

Building Valuations
Building Valuation Data (BVD) is a table average of construction costs per 
square foot for various construction types and occupancy groups 
Published by International Code Council (ICC) twice a year (February & 
August)
Used by jurisdictions to set permit and plan review fees
Represents about 90% of development revenue in Buckeye
Currently on 2017 BVD in Buckeye
Recommendation is to update to the February edition annually (as with most 
nearby jurisdictions)
5

6
Development User Fee Steps
The picture can't be displayed.
Establish Fee Categories (Existing, Proposed, 
Removed)
The picture can't be displayed.
Allocate Task Time to Fee Types
The picture can't be displayed.
Municipal Comparisons
6

Allocating Task 
Time and 
Setting Fees
Position
Hours
Deputy Director of 
Planning
2.00
Development Services 
Project Coordinator
6.25
Planner I/II
7.00
Project Engineer
3.00
Principal/Senior Planner
7.00
City Engineer 
(Engineering Support)
0.50
Fire Marshal / Fire Plan 
Reviewer
1.00
Police
1.00
Water
1.00
Public Works
1.00
IT / GIS Analyst
1.00
Planning Manager
2.00
Assistant City Attorney
3.00
Major Site Plan
Fee = Total 
Hours × Sta
ff Rate
7

Activity
Buckeye 
Propose
d Fee
West 
Valley 
Average
Buckeye 
Current 
Fee
Avondal
e
Goodyea
r
Peoria
Surpris
e
Site Plan
$3,514
$4,842
$3,785
$5,600
$5,825
$6,000
$3,000
Certificate of 
Occupancy
$140
$365
$100
$100
$500
$150
$75
Plan Review
$344
$322
$430
$375
$145
$360
$300
Traffic Control 
Plans
$50
$334
New
$150
$264
$173
$750
Comparisons
Avondale, Goodyear, Peoria, and 
Surprise
8

Significant Changes
Description
Curren
t
Propose
d
Differen
ce
MIDS/SLIDS
$3,900
$1,395
64%
Planning 
Unit Plan 
Amendments
$5,280
$4,165
21%
Description
Current Proposed
Differen
ce
Grading Permit
$1,000
$3,312
231%
Concept Site 
Plan Review
$970
$2,940
203%
Variance Fee
$915
$2,190
140%
No Fee Exceeds a 100% Recovery in the Proposed Fee 
Update
9

Case Study - Business 
Licenses
Existing Fees
Proposed New 
Fees
Proposed Fee Type
Application Fee
Annual Fee
All General Category Application Fees
$25
$50
Specialty Fee Type 
Application Fee
Annual Fee
Marijuana Dispensary
$1,000
$100
Sexually Oriented Business
$1,000
$100
17 fees ranging from $0 to 
$1,000
*Liquor License Fees remain the same*
10

Additional Study: Municipal Airport
Based on 
market rates 
not staff 
labor
Findings are 
54% lower 
than peers
Proposed Service
Current Fee
Proposed Fee
Notes
Airport Hourly Rate $50
$80
2-hour minimum
Overtime Hourly 
Rate
$100
$160
2-hour minimum
Banner Towing
$10
$50
Fee increase
Commercial 
Photography
$200
$50
Fee reduction
Helicopter Tie-Down 
(Monthly)
Varies
$36
Flat rate per 
helicopter
Helicopter Tie-Down 
(Daily)
Varies
$9
Flat rate per 
helicopter

Additional Study: Municipal Airport
Proposed New Fees
Service
Fee
Notes
Non-Airworthy 
Aircraft Hangar 
Fee
2x hangar fee
Based on 
applicable hangar 
rate
Gate Access Device
$25
Per device
Gate Access Device 
Replacement
$40
As needed
Temporary Permit 
Fee
$5
As needed

Additional Study: Public Works
*Public Works Fees include a 4.0% annual escalator for 5 years.
This will match the 
current solid waste rates enacted by Council and matches solid waste financial 
indices
Service Description
Fee
Status
Residential Household 
Hazardous Waste (HHW) 
Drop-off (Non-
Homeowner)
$40.00
New Service
Freon-Containing White 
Goods Disposal (Drop-
off)
$25.00
New Service
Key Replacement
$40.00
Existing/Other
Proposed New Fees

Unsupervised Facility Access | Basic Education 
Classes
Human Services | Nature Programs
| Library | 
Events
Aquatic Center | Joe Foss | Transit 
Senior Meal Program | Summer Recreation 
Program 
Introductory & Skill Based 
Activities 
Youth Sports | Swim Lessons 
| Swim Team
Private Swim Lessons
Adult Sports | Sports 
Camps
Licensed Care Programs
Certification Courses
Rentals
Permits
Sales
Field Trips
100% +
70 – 100%
30 – 70%
10 – 30%
0 – 10%
Additional Study: 
CSD

Cost Recovery by Program 
Category
Program Category
Example Programs
Cost Recovery 
Percentage
MGT Study 
(FY24)
Open Access
Parks, trails, playgrounds, etc.
0%
NA
Human Services
Memory Café, Senior Center Meal Programs
0-10%
NA
Events
Air Fair, 4th of July, Spring Celebration, Halloween 
Carnival, Buckeye Marathon, Movies and Concerts in the 
Park, etc.
0-10%
13%
Enrichment, Education & Culture 
Activities
Storytime, local history programs, summer reading 
program, Teen Training, technology classes, nature 
programs,  etc.
10-30%
35%
Drop-In Access
Library, Aquatic Center, Joe Foss, Museum, Summer 
Rec, Transit, etc.
10-30%
29%
Introductory Level - Skill Based 
Activities
Youth sports, dance classes, martial arts, swim lessons, 
CPR, etc.
30-70%
44%
Advanced Level - Skill Based 
Activities
Intermediate and advanced classes, sports camps, 
Lifeguard Classes, Adult Sports
70-100%
26%
Sepcialized Business Services
After School Programs, full-day summer programs, 
preschool, private swim lessons, etc.
70-100%
64%
Rentals & Permits
Field, facility, ramada and campsite rentals
100%+
44%
Sales
Concessions, merchandise, targets, clays, etc.
100%+
105%
Additional Study: 
CSD

Timeline
Council 
Workshop 
December 
2025
60-Day 
Notice and 
Comment 
Period 
January -
March 2026
Comment 
Review
March 2026
Council 
Final 
Considerat
ion  
April 2026
16

Updates Post 60-Day Notice
• Corrected (lowered) Building Safety per hour to 
$130 (from $246)
• Third review and beyond
• Revised plans post approval
• Clarified per hour costs with proper labels to 
distinguish from flat fee charges
• Reduced after hours inspection to 3 hour minimum 
(from 4 hour)
• Clarified expiration period of TCOs per code (60 
days)
• Changed Water Damage Repair permits from 
“calculated” to “stated” value-based fees
• Removed the Curbside HHW Collection Fee
17

Questions
The picture can't be displayed.
18