GFT Ready Mix Concrete – Conditional Use Permit - PLZU-25-0006 
Page 1 of 7 
 
Conditional Use Permit 
Report to the Planning and Zoning Commission 
 
 
CASE NUMBER: 
PLZU-25-0006 
TITLE: 
GFT Ready Mix Concrete 
MEETING DATE: 
March 24, 2026 
 
Applicants: 
Jeff Blilie and Marcela Mora-Yatko, Gilbert Blilie PLLC 
Owner: 
MP Hazen Sand & Rock LLC 
Request: 
Conditional Use Permit for aggregate sand and gravel excavation 
and ancillary batch plant. 
 
District 
Location: 
Council District 2 
Generally located 1,300’ east of the southeast corner of Rooks 
Road and Hazen Road 
 
Site size: 
Approximately 77 acres 
Public input: 
None received 
Recommendation: 
Approve subject to conditions “a” through “t”

GFT Ready Mix Concrete – Conditional Use Permit - PLZU-25-0006 
Page 2 of 7 
 
PROJECT DESCRIPTION 
 
1. 
The applicant is seeking a Conditional Use Permit to operate an aggregate (sand and 
gravel) extraction operation and ancillary cement batch plant on approximately 63 acres 
of a 77-acre site located approximately 1,300 feet east of the southeast corner of Rooks 
Road and Hazen Road.  
2. 
The site will be mined over an approximate 20-year period.  During the life of the mining 
operation, ancillary structures, equipment, and parking will be periodically moved 
around the site to allow for excavation on different parts of the property.  Site 
operations will typically run 24 hours a day, depending on varying demand.  The site will 
be illuminated with portable lights that will be required to meet all development code 
requirements.  The operations on site will be wet aggregate mining which consists of a 
large, excavated pit that will fill with natural ground water. 
3. 
The site is currently farmland.  The narrative states that a portion of the eastern half of 
the site will remain agricultural land until mining operations transition to that portion of 
the site.  The site will provide a landscape buffer along Hazen Road, which will initially 
only cover the western portion of the site.  To allow the irrigation ditch to remain in 
place so the eastern portion of the site can be farmed, the landscape buffer on the 
eastern portion of Hazen Road will not be installed until such time that mining moves to 
the eastern portion of the site.  The applicant will be required to obtain all appropriate 
permits prior to expansion to the eastern portion of the site. 
4. 
The subject site is within the Rural Residential zoning district, which is identified as an 
obsolete zoning district within the Development Code.  While aggregate extraction is 
not listed as a use in Appendix C. Obsolete Districts Permissible Uses, it is categorized as 
a Conditional Use within the Agricultural zoning district, a commensurate non-obsolete 
district to the Rural Residential zoning district.  As such, staff interpreted the proposed 
use to be a conditionally allowed use within the existing Rural Residential zoning district.  
AREA CONTEXT 
 
5. 
Table 1: Existing Land Use, General Plan Designation, and Zoning District 
 
 
LAND USE 
GENERAL PLAN 
ZONING 
Subject 
Property 
Agriculture 
Neighborhood 
Rural Residential 
North 
Future APS Substation 
Neighborhood 
Planned Residential 
South 
Gila River 
Open Space 
Rural-43 (Maricopa County)

GFT Ready Mix Concrete – Conditional Use Permit - PLZU-25-0006 
Page 3 of 7 
 
 
PUBLIC PARTICIPATION SUMMARY: 
 
6. 
An advertised neighborhood meeting was held at the Buckeye Valley Chamber of 
Commerce on December 18, 2025.  With the exception of City staff and the applicant 
team, no persons attended the neighborhood meeting.  
7. 
The applicant team completed all required mailing, publishing, and posting 
requirements of this public hearing, as outlined within the Buckeye Development Code, 
as follows:   
 
BACKGROUND: 
 
8. 
June 2006: The subject property was annexed into the city via Ordinance No. 51-06 and 
assigned Rural Residential (RR) zoning.  
 
ANALYSIS: 
 
9. 
Most sand and rock extraction operations occur on unincorporated properties, as 
Arizona statute gives these types of operations wide exemptions from county zoning 
and building authority. These exemptions are limited to unincorporated parcels and do 
not extend to an incorporated city’s governing authority. As such, all City of Buckeye 
Development Code regulations and requirements are applicable to this property. 
Unaware that City requirements would apply, the operator of the proposed facility 
began bringing equipment to the site in June 2025 prior to seeking guidance from City 
staff on the required path forward.  
10. 
Realizing the unique circumstances, City staff allowed the applicant to seek a Temporary 
Use Permit (TUP) for storage of the equipment that was already on site while they 
worked towards preparing submittal for a Conditional Use Permit.  The TUP (SE-25-
East 
Equestrian  
Neighborhood 
Rural Residential 
West 
Aggregate Extraction 
Neighborhood 
Rural-43 (Maricopa County) 
Notification Element 
Date 
Published in AZ Central 
March 7, 2026 
Site Posted 
March 9, 2026 
Mailing to Property Owners w/in 300’ 
March 9, 2026

GFT Ready Mix Concrete – Conditional Use Permit - PLZU-25-0006 
Page 4 of 7 
 
0028), which allows only for temporary storage of equipment but does not permit 
commencement of mining operations, was approved on October 30th, 2025. 
11. 
The subject site is in an area that is currently rural in nature but is located only about a 
thousand feet west of the southwestern border of the Downtown Specific Area Plan 
(DSAP).  As such staff had some initial concern over long-term quasi-industrial use of the 
property that may be incompatible with planned future uses identified within the DSAP.  
Upon further review, however, staff determined that the facility will be compatible with 
surrounding uses, including an existing aggregate/earth product site and a large 
equestrian facility to the west and east, a future APS substation to the north and the 
Gila River to the south.  
12. 
As noted, this type of use is uncommon within incorporated areas, as such operations 
are typically located on unincorporated land with certain regulatory exemptions. Staff 
worked with the applicant to ensure compliance with applicable code requirements 
while maintaining the site’s functionality as an aggregate extraction operation. 
Landscaping illustrates this balance. Interior landscaping is not feasible due to future 
excavation, and full installation along Hazen Road at project outset is constrained by 
continued agricultural use on the eastern portion of the site. However, required 
landscaping will be installed in phases along Hazen Road and will serve both aesthetic 
and screening functions. Staff therefore recommends condition “b,” allowing 
landscaping along the eastern frontage to be deferred until extraction activities 
commence in that area. The applicant is in agreement with this condition.  
13. 
Staff identified potential lighting impacts as a concern, as mining operations often utilize 
lighting that does not comply with Development Code standards. The applicant’s 
examples included portable lighting that would not meet code requirements. Staff notes 
that the Development Code applies to all exterior lighting, not just permanent fixtures. 
Given that lighting will move throughout the site over time, staff recommends condition 
“c” to clarify that all exterior lighting, including portable lighting stacks, must comply 
with code requirements for the duration of the operation. The applicant is in agreement 
with this condition.  
14. 
Upon conclusion of the use, in approximately 20 years, the mining pit will be filled with 
water. Staff believes that the resulting pond will pose a great opportunity for the site to 
be redeveloped as a natural, water-based amenity that will be an asset to future 
downtown residents. The proposal to convert the future pit into a pond aligns with the 
City of Buckeye Sand and Gravel Reclamation Guidelines. 
RECOMMENDATION:

GFT Ready Mix Concrete – Conditional Use Permit - PLZU-25-0006 
Page 5 of 7 
 
15. Staff recommends the Planning and Zoning Commission motion for approval with 
conditions “a” – “t” of PLZU-25-0006 for the following reasons: 
 
The proposed use of the property is an allowed conditional use within the 
existing zoning district on the subject property (Rural Residential), which is 
consistent with the General Plan future land use designation. 
 
The proposed conditional use is compatible with existing adjacent land uses and 
will be compatible with planned future land uses in the area.  The proposed use 
is not anticipated to negatively impact neighboring parcels.  
 
There are no outstanding issues for reviewing departments. 
 
The applicant has provided documentation that all relevant State, County, and 
Federal permits and approvals have been obtained. 
 
Project Specific Conditions/Stipulations 
a) A landscape plan depicting location of each plant and tree type must be submitted with 
civil permits.  Landscaping along Hazen Road must consist of a minimum of one tree and 
five other plantings per every 30 linear feet.  
b) Landscaping along the eastern portion of the site, as delineated on the site plan, may be 
deferred until the cessation of farming operations on site.  Prior to commencement of 
mining operations on the eastern portion of the site, the operator must obtain all 
applicable permits which shall include landscaping plans for the eastern site frontage 
along Hazen Road.  Landscaping must be installed along entire Hazen Road frontage 
prior to expansion of operations to the eastern portion of the site. 
c) All exterior lighting, whether fixed in place or on portable equipment, must comply with 
all City development code requirements including shielding, correlated light 
temperature, and maximum light trespass requirements.  At no time may lighting be 
positioned in a manner that makes the illumination source visible offsite.  
d) Site plan approval includes all boundaries, locations, easements, and other information 
depicted on the ALTA survey.  
e) Per Chapter 9 of the COB Development Code, proper dust control measures shall be taken 
throughout the operation of the Site.  
f) Civil Construction Plans for the Hazen Road improvements including tapers and right and 
left turn lanes shall be submitted to the City for review, approval and permitting. Tapers 
and turn lanes shall be designed in accordance with COB, AASHTO and MUTCD Standards. 
g) Right turn lanes serving industrial developments shall be constructed of 9” thick, fiber 
strand reinforced, Class ‘A’ Concrete.  
h) The Irrigation canal along the north end of the site shall be undergrounded the length of 
the right turn lane. If adjacent sites develop and underground the irrigation canal, the 
canal shall be removed and placed underground along the entire length of the site.

GFT Ready Mix Concrete – Conditional Use Permit - PLZU-25-0006 
Page 6 of 7 
 
i) A Fee in Lieu for the required half street improvements to Hazen Road shall be collected 
when Hazen Road is improved by either the City or adjacent developers to the east, west 
or north of the site. 
General 
j) Development of the property shall be in general conformance with the Site Plan titled 
“GFT Plant 4”, consisting of “3” pages, dated “February 25, 2026”, and stamp received 
“February 26, 2026”, except as modified by the following conditions/stipulations.  
k) This project is subject to a Street Light Improvement District (SLID) in accordance with 
City of Buckeye Ordinance 43-05. This shall be established prior to the issuance of the first 
permit for the property. This will include a gross boundary legal and exhibit of the 
ownership parcels for the following APN 400-37-003L.  Please contact Jennifer Traynor, 
Project Engineer, jtraynor@buckeyeaz.gov to complete the SLID process.  
l) All existing overhead power lines less than 69 kV capacity, or any other overhead utilities 
within the project area or along its boundaries, shall be installed underground. 
m) Any irrigation District-owned facilities to be located within the right-of-way shall be 
located near the rear of the right-of-way and the right-of-way shall be extended at least 
five (5) feet, unless otherwise determined by the City.  Any additional easements for 
District-owned facilities shall be placed outside of the right-of-way and the public utilities 
easement.  
n) The property owner/s and their successor waive any and all claims for diminution in 
value of the property with regard to any action taken by City of Buckeye as a result of 
this approval.  
o) All trash, and construction debris, shall be collected through a private waste hauler that 
has a City of Buckeye business license to haul trash.   
Drainage 
p) The project shall be constructed in accordance with Floodplain Use Permit SG2500004, 
approved July 1st, 2025. 
Streets 
q) The Property Owner/Developer shall submit a Minor Subdivision Plat or City approved 
road conveyance instrument to the City of Buckeye for dedication of twenty seven-foot 
Roadway Easement to support a sixty-foot half road section for Hazen Road and an 
additional five feet of additional Roadway Easement at right turn lanes along with a 
parallel eight foot PUE.  Roadway Easements shall be dedicated to the City at no cost to 
the City. Roadway Easements shall be dedicated prior to permit issuance for Hazen Road 
Improvements.   
r) At the time of need, as determined by the City, the Road Easement property held by the 
owner and/or successor’s shall be granted to the City for ROW by means determined by 
the City at no cost to the City.

GFT Ready Mix Concrete – Conditional Use Permit - PLZU-25-0006 
Page 7 of 7 
 
s) It has been determined that a portion of the required improvements may not be 
constructed as part of this Development. The Developer shall be responsible to design all 
of the required improvements, including landscaped medians and/or gateway signage in 
accordance with the Buckeye Arterial Gateway Guide, if applicable, and then coordinate 
with the City to define the portion of improvements that will not be constructed as part 
of the development. Hazen Road is classified as a Nature River Theme Tier 2 per the 
Arterial Gateway Guide. A fee-in-lieu agreement will need to be completed to cover the 
omitted improvements, and the Property Owner/Developer will be required to provide 
payment to the City to cover the costs prior to Project Closeout. 
Water / Wastewater 
t) The Property Owner/Developer shall allocate any surface water rights to the City prior to 
the issuance of any building permits.  
ATTACHMENTS: 
Exhibit A – Vicinity Map 
Exhibit B – General Plan Land Use Map 
Exhibit C – Existing Zoning Map 
Exhibit D – Narrative 
Exhibit E – Citizen Participation Report 
 
Prepared By: 
Joseph Mueller, Senior Planner 
 
Reviewed By: 