Complete Application and 3 quotes.pdf
Extracted text (via ocr_local)
19758 characters
City of Buckeye Economic Development Catalyst Program Application BUCKEYE, AZ GROW BUCKEYE Applicant/Business name, LIQUOr Corral | Dhya Noor Property/Building Owner mroject aderesstocaton, 22 &- Monroe Ave. Buckeye, AZ 85326 Downtown Commercial 400-26-025 Parcel Number(s) Current Zoning District 1998 Year Purchased Year Built Liquor Corral Name of Tenant: Lease Expiration Date Total Anticipated Budget: 52,498.98 Total Anticipated Financial request! 3 H OSS er Ox Will this proyect require any City permits? x Yes No please describe S@@ Project Narrative (For permit information, please contact the City of Buckeye at (623) 349-6200) if you are not the building owner, do you have permission from the bullding owner to make the described improvements? Yes No Estimated start date ASAP Estimated completion date. ASAP Dhya Noor contractor, COIS Rounds Rounds Construction Applicant Name" Liquor Corral Company/Business* Company’ COB Business tlcense Number: Az/Buckeye License Number, oroe 0297986-5011 none, 002-677-6692 ema ANOOLS7 @hotmail.com emay CfOUNds@roundsconstruction.com addres 429 E. Monroe Ave address Q“O0 E. Monroe Ave. cy, BUCKeye sg AZ, 85326 cm, Buckeye. AZ, 85326 *Site Plan may be required City of Buckeye BUCKEYE, AD Economic Development GROW BUCKEYE Catalyst Program Application Project Narrative: (provide additional sheets as needed) Install new LED backlight sign in place of existing sign on North building elevation (Same size, Same location) Refurbish (2) existing signs no changes to design or location Install Metal Cladding on covered entry to match existing entry wall Rebulb existing building lighting to LED. Install LED lighting on underside of covered entry to enhance the wall design Install Ready Serve window at drive thru Paint exterior walls (No color change) Description of Work: (provide additional sheets as needed) City of Buckeye 7 Economic Development BUCKEYE, AZ ao pa GROW BUCKEYE Catalyst Program Application BUDGET (Anticipated, including soft costs, hard costs and in-kind labor if applicable) ACTIVITY ESTIMATED COST Attached Estimate from Rounds Construction 52498.98 “oo mnabo bondss aglie, bushes, dea. Ys Obs Metal Cladding on Existing Posts and Beam 4000 00 New Sliding Service Window 7000.00 Rebulb Existing Strip Lighting to LED 2000.00 Repaint Exterior Walls 6,000.00 Design Fees 000 00 General Conditions 163.03 Project Management ? 500,00 $ $ $ TOTAL ANTICIPATED AWARD: $ 52,498.98 PLEASE ATTACH THREE (3) COMPARABLE WRITTEN BIDS FOR THE PROJECT (Bids for grant requests less than $4,999 not required but are encouraged) City of Buckeye a ‘ Economic Development BUCKEYE, AZ dec pint GROW BUCKEYE Catalyst Program Application The City of Buckeye will review all Applications. Awards are approved at the sole discretion of the Mayor and City Council. L, Dhya Noor , hereby make an Application to the City of Buckeye for the Economic Development Catalyst Program Award in the anticipated amount of $. Oo. | understand that the city must approve my application. | further understand that these monies are NOT GUARANTEED and if | fail to meet any of the rules, regulations, or guidelines outlined in the Economic Development Catalyst Program Process Guide, | forfeit the right to receive reimbursement for any and all work performed on my property. If approved, | understand that all work performed must comply with all City of Buckeye Building and Development Codes, as amended. awe oe 01/14/2026 Applicant Signature Date Te 01/14/0226 : Property Owner Signature Date Please return the completed Application to: City of Buckeye 945 N. 215" Ave, Suite 137 Buckeye, AZ 85326 Phone: (602) 350-4225 spena@buckeyeaz.gov roy ROUNDS CONSTRUCTION LLC 905 E Monroe Ave., Ste D Buckeye, AZ 85326 PROPOSAL SUBMITTED TO: ROUNDS CONSTRUCTION LLC Date Liquor Corral Attn. Tonu Noor 905 E Monroe Ave., Ste E 1/13/2026 STREET BUCKEYE, AZ 85326 429 E. Monroe Ave CELL: 602-677-6692 CITY, STATE AND ZIP CODE FAX: 623-399-1122 Buckeye, Az 85326 ROG# KB-01 200042 Scope of work: Labor and Materials to Install New LED Backlight Liquor Corral Sign - Refurbish Existing (2) Sign to Original Condition $15,000.00 Labor and Materials to Install Metal Cladding on Existing Posts and Beam Front Entry $4,000.00 Labor and Materials to Install New CRL Bullet Resistant Sliding Service Window Drive Through $7,000.00 Labor and Materials to Rebulb Existing Strip Lighting to LED Bulbs $2,000.00 Labor and Materails to Repaint Exterior Walls $6,000 00 Design - Plans and Permits $4,000.00 General Conditions $1,163.63 Project Management, Coordination and Supervision $1,800.00 Inclusions: Subtotal $40,963 63 As noted above. O&P $8,192.73 Tax $3,342 63 Total $52,498.98 Exclusions Permits IWE PROPOSE hereby to furnish material and labor -- complete in accordance with above description, for the sum oft $ 52,498.98 [Payment to be made as follows iThis proposal is good for 30 days Authorized Signature ACCEPTANCE OF PROPOSAL The above prices, specifications and conditions are satisfactory and are hereby pled You are to do the work as, yyment vail be made as oullined above Authorized to Proceed Date of Acceptance / of Signature Rounds Construction LLG 205 H Monroe, Ste D, Buckeye, Arizona S5326 (GO2) G677-6G92 *** (G22) 399-1122 (fax) Fagense mo. Roc 200012 trade Cost per Break. Saift Qty UM Unit down Total cost Labor and Materials to Instail New LED Backlight Liquor Corral Sign - Refurbish Existing (2) Sign to Original Condition $15,000 00 $600 Labor and Materials to install New LED Backlight Liquor Corral Sign - Refurbish Existing (2) Sign to Orginal Condition 1 Is $15,000.00 $15,000.00 Labor and Materials to Install Metal Cladding on Existing Posts and Beam Front Entry $4,000.00 $1 60 Labor and Materials to Install Metal Cladding on Existing Posts and Beam Front Entry 4 Is $4,000 00 $4,000 00 Labor and Materials to Install New CRL Bullet Resistant Sliding Service Window Drive Through $7,000.00 $2 80 Labor and Materials to Install New CRL Bullet Resistant Sliding Service Window Drive Through 4 Is $7,000 00 $7,000 00 Labor and Materials to Rebulb Existing Strip Lighting to LED Bulbs $2,000.00 $0.80 Labor and Materials to Rebulb Existing Strip Lighting to LED Bulbs. 4 Is $2,000 00 $2,000.00 Labor and Materails to Repaint Exterior Walls $6,000.00 $2.40 Labor and Materails to Repaint Exterior Walls 1 Is $6,000 00 $6,000 00 Design - Plans and Permits $4,000.00 $160 General Conditions $14,163.63 $0.47 Temporary Restrooms wk $75 00 $0 00 Dumpster ea $395 00 $0 00 Casual labor ea $125.00 $0.00 Builders Risk ea $375 00 $0 00 Bathroom signage ea $35 00 $0 00 General Conditions 1 Is $900 00 $900 00 Final clean sf $0 24 $0.00 Equipment rental ea $360.00 $0 00 Bonding Cost Is $0 00 $0 00 Office general conditions 05 is $527 25 $263 63 —— Sub total $39,163.63 $1567 Project Management, Coordination and Supervision 1 wks $1,800,00 $1,800.00 $072 Overhead 5 00% $2,048.18 $0 82 Profit 16 00% $6,144.54 $246 $49,156.35 $1966 Tax @ 5 27% 6 80% $3,342.63 $1 34 Total $52,498.98 $2100 Inclusions. As noted above Total sq/ft 2600 Exclusions: Permits Add Alternates Revised Liquor Corral Sign & Exterior Work 01-13-2026 - Copy xis 4of1 1/13/2026 ROC #346835 General Contractors Group LLC 602-551-3602 CONTRACT PROPOSAL & AGREEMENT contactanos@somosphoenix.com Date) O04 09 2025 Name Dhya Noor Address 499 E Monroe sity Buckeye State AZ Zip 85326 Phone #: Cell #: Dear Dhya, We are pleased to present you with the following estimate for the complete exterlor renovation project at your Liquor Store, Please review the details below. Exterior Building Painting -Painting of 4 walls, each measuring 43 ft x 13 ft -Includes surface preparation, painting, and sealing Heavy-Duty Window Replacement -Removal and replacement of an entire heavy-duty window -Dimensions. 45" x 38" (including frame, glass, and sealing) Post Replacement and Installation -Replacement of existing posts and installation of new posts -New post dimensions: 90" (length) x 5.5" (diameter) with a width of 3.5" -Includes proper mounting, painting, and secure anchoring Installation of Neon Illuminated Letters -Installation of a neon illuminated sign -Dimensions: 30 in x 20 ft -Includes electrical work required for activation Acrylic Lexan Sign Replacement -Replacement of 2 acrylic Lexan signs, each measuring 8 ft x 10 ft -Additional replacement of 2 acrylic Lexan signs, each measuring 8 ft x 24 5 ft -Includes removal of existing signs and installation of new ones Total Estimated Cost (materials and labor), $65,000 00 This estimate covers all costs associated with the materials, labor, and Installation as described. We appreciate the opportunity to work with you on this project and are confident that our team will deliver exceptional quality and service. conditions as stated, for the sum of: Dollars $ ~ B WE PROPOSE’ to furnish material and labor ---- complete in accordance with specified above, according to the terms and Payment Is to be made as follows: \_ This proposal Is open for acceptance until'----- All material ts guaranteed to be as specified All work to be completed in a workmanlike manner according to standard practices. Any alteration or deviation from above specifications involving extra costs will be executed only upon written orders, and will become an extra charge over and above the estimate Date. Authorized Signature C NOT INCLUDED: This Proposal does not include: Date. Authorized Signature D ACCEPTANCE OF PROPOSAL. The above prices, specifications, conditions and payment terms are herby accepted, You are authorized to proceed and do the work as specified. Payments will be made as outlined above, In case of cancellation there will be a charge of 20% of the cost after being approved SWISS ARMY REMODEL & RESTORATION Licensed, Insured & Bonded ROC # 349228 4344 W Indian School Rd #100 Phoenix, AZ 85031 Date:03-30-26 Prepared by. Alex Rodriguez alex@swissarmyrestoration com 623-290-3786 Address: 423 E Monroe Buckeye AZ, 85326 SUBJECT:Paint/remodel PROPOSAL:25-0330-01-AR PROPOSAL SWISS ARMY REMODEL AND RESTORATION would like to thank you for the opportunity to present a lump sum estimate for the foresaid project. We understand the meaning of safety, timely schedules, and budgets. Scope of Work Metal bullding Painting 41'x41’ height varies from 12’-15' Cleaning the surface is crucial for paint adhesion. Remove dirt, grease, and any loose paint. Use a pressure washer for large areas or a scrub brush with soapy water for smaller spots, Rinse thoroughly and allow it to dry completely. Consider using a degreaser on particularly stubborn stains. This step ensures a clean foundation for the paint. Inspecting for damage helps identify any repairs before painting. Look for rust spots, dents, or cracks on the metal surface. Treat rust with a rust-inhibiting primer and use body filler for dents. Ensure that all repairs are dry and smooth before applying paint. This proactive approach prevents future issues and extends the lifespan of your paint Job Sand metal building and primer before paint. All paint used will be strictly Sherwin Williams DTM Replace Drive Thru window 48”x36” for commercial grade metal serving Window Remove All wood from Front of Store Floor All Front Porche pillars to be replaced and re-designed Cost will be Discussed with owner Refurbish Liquor store signage, Price on signage will have to be discussed according to design 18"x48” and 10°x20° TOTAL CONTRACT PRICING Total lump sum bid $38,649 Clarifications: A) Pricing is based on unrestricted access to the work area associated with this scope of work. Delays and remobilization costs associated with delays and restrictions to work access are to be invoiced as an extra. B) SWISS ARMY REMODEL AND RESTORATION is not responsible for damage to finished work after inspection and release of work areas. Schedule: 1) All work shall be performed based on the following schedule: 8 hours a day, 4-5 days per week (Monday- Friday) Invoicing: 1) 2) 3) 4) All invoicing will be done weekly after every phase is completed (Initials) If a tax exemption is claimed, taxes will be charged until our office receives a copy of the valid tax exemption certificate. In the State of Arizona, rental equipment is an exception to the exemption in most cases (Initials) All charges for the applicant’s material are due and payable fifteen (15) days for the invoice date. An invoice is considered past due at sixteen (16) days, and a FINANCE CHARGE OF ONE AND A ONE-HALF PERCENT (1.5%) per month on the unpaid balance, which is an ANNUAL RATE OF EIGHTEEN (18%) shall be charged on all past due amounts (Initials) This proposal shall serve as a binding agreement. It must be signed and initialed and customer P.O. number and/or reference number returned and accepted by SWISS ARMY REMODEL AND RESTORATION before scheduling or commencing work (Initials) No work shall begin on this project until a property executed agreement is returned and accepted by this office (Initials) SWISS ARMY REMODEL AND RESTORATION shall not be subjected to any retention or holdback from our payments for materials (Initials) A customer Purchase Order/Contract/Subcontract issuance will be considered as acknowledgement of the terms within (Initials) SWISS ARMY REMODEL AND RESTORATION will not be held responsible for meeting terms or conditions for contracts/purchase orders/subcontracts provided after the work has been executed (Initials) This proposal is valid for thirty (30) days from the date of this proposal. The customer acknowledges, by signature, all the terms and conditions of this proposal. If | can be of any further assistance, please do not hesitate to call me at 623-290-3786 or email alex@swissarmyrestoration com SWISS ARMY REMODEL AND RESTORATION Authorized Customer Representative Signature Signature Printed Printed Date Date SWISS ARMY REMODEL AND RESTORATION Agreement Terms: 1 SWISS ARMY REMODEL AND RESTORATION agrees to furnish all materials and labor per the details listed in the above proposal In timely and efficient manner. 2, Payment Terms - 50% deposit to start designs and to order material, job will be placed on construction schedule, this initial deposit (s) will be equally distributed to each line Item - Once a line item or task is completed, SWISS ARMY REMODEL AND RESTORATION. reserves the right to collect the remaining 50% balance of said line item when complete - SWISS ARMY REMODEL AND RESTORATION to provide the client a progress sign-off form for client approval when various line Items are completed. - Final Payment over 2% of the agreed contract will not be retained If there are small repairs or punch list items. Client to have the ability to retain 2% of agreed contract for final punch list items and repairs. - Change Orders are to be paid for in full at the time the change order Is approved. 3. Contractor is not responsible for a final clean or moving a customer's belongings, furniture, or appliances unless TOTAL $0.00 BALANCE DUE USD $0.00 Page 1 of 3 specifically stated above If the customer chooses to have us move their belongings, we will not be responsible for any damage to furniture, appliances, or belongings 4. Change Orders - If the scope of the job requires a change or additional work beyond the details listed above a change order will be sent to the customer for approval. The change may delay the job outside of our control depending upon the nature of the change. If the change order delays the job a $250 00 change fee will be applied. Change orders are to be paid for in full at the time they are accepted. Change orders will be required any time an item is added to or causing a change in the scope of work Please refer to your sales proposal scope of work as a complete sales order receipt. If anything is added to job scope, we will need to charge extra for the items. For example, if the proposal specifies 6 can lights and you wish to add a 7th you will be charged accordingly 5. If permits and HOA approval are needed it will be the responsibility of the client to obtain permits and HOA approval unless agreed otherwise. 6 This agreement ts governed by the laws of the State of Arizona 7. Alllabor will be guaranteed for a period of 2 years from the date of completion, Materials will have a warranty according to the manufacturer 8. Ifthe customer chooses to cancel this contract a $250.00 cancellation fee along with any costs incurred to the Contractor will be charged to the customer 9. 20% overhead fee for Deletion of scope items - If you wish to delete any items from your proposal/scope or work or already approved change orders after the proposal or change Is accepted you will be credited the said line- item amount minus a fee of 20% overhead fee that will remain as a cost on your job for the line item. 10, We are not responsible for damage or alterations needed to landscape, furniture, and belongings in the exterior of the home 11. While we take excellent measures to minimize and contain dust. Renovating will always create and leave behind dust so please remove anything you do not want dust to cling to It will not be our responsibility if you leave behind property or items that you had the opportunity to remove. 12, Any prep work needed to be done to ensure a flat level floor cannot be determined until the existing flooring has been removed and the concrete or wood subfloor has been exposed We will inspect the floors at that time and determine if extra costs are needed to prep the floor for Page 2 of 3 levelness or crack prevention. 13. We are not responsible for any hidden damage In walls or existing damage in property. When damage Is revealed, we will notify the homeowner as soon as possible. 14 15, 16. 17. 18 19 We are not a store or an interior design firm and will not be responsible for the design or choices of materials on the project. These are the client's responsibilities Our fees are not based on this type of service, and you understand this Is not our focus of profession or scope of work. We can refer you to designers upon your request if you would like this type of service. You are hiring us as a contractor to provide installation and labor services for materials you will be purchasing and will not be responsible for the materials you purchase While we may specifically provide Items such as construction-related materials such as a thin-set, lumber, drywall, etc “IF" listed in the details of this document. However, anything you have a choice to select such as finish products and fixtures not specifically listed In this quote will be your responsibility as the Client to purchase and provide those materials when they are needed to avold delays No warranty Is provided by SWISS ARMY REMODEL AND RESTORATION for materials that the client purchases, If you would rather purchase materials through US, the contractor we can refer you to one of our design centers that we are affiliated with, and we will provide pricing to you and include these items upon request. Cash or Check is the preferred payment method. Punch List / Repairs Definition - Punch list and repairs items to be defined in this agreement are to be Punch list and repairs mean that the task/item is complete and usable, except for a few minor deficiencies. You have 10 days to provide us with a punch list for a small remodel. 30 days for a new build property. We are not responsible for any unforeseen issues that may arise during the performance of work. If any issues arise, they will be communicated to the client and will be addressed, as necessary.