CHAPTER 1: GENERAL INFORMATION 
 
 
 
 
SECTION 1: ENGINEERING SUBMITTAL 
REQUIREMENTS  
 
Engineering Design Standards 
City of Buckeye, Arizona 
January 2026

1-1 Engineering Submittal Requirements 
 
 
City of Buckeye 
2026 
  
Summary of 2026 Section 1-1 Updates 
The following list summarizes notable updates to Section 1-1, however not all changes may 
be documented in this summary. Applicants are encouraged to familiarize themselves 
with the document in its entirety.  
General 
• 
Added references in the body of the text to the Standard Details at the end of the section 
1-1.100 
General Information 
1-1.001 
Overview  
• 
Revised subsection L by clarifying dust control permit source and applicability 
1-1.100 
Design Plans 
1-1.101 
Standard Plan Sheets  
• 
Revised subsection C.1.F to include a reference to the City Benchmark GIS 
location on the website. The onsite benchmark was also made optional. 
• 
Add subsection C.1.N for the Civil Design Certification 
• 
Removed subsection under C.2 that related to Storm Water Draiange 
Certificate 
• 
Clarified under subsection C.2.A that the entities listed are not exhaustive.  
1-1.102 
Design Plan Requirements  
• 
Revised subsection P to include road centerlines. 
1-1.700 
Construction Plan Notes 
1-1.705 
Intelligent Transportation Systems (ITS) Construction Notes  
• 
Created this new section covering construction notes to be placed on the 
second sheet of ITS plans

1-1 Engineering Submittal Requirements 
City of Buckeye 
2026 
Table of Contents 
1-1.000 
General Information ........................................................................................... 2 
1-1.001 
Overview ................................................................................................................................................... 2 
1-1.002 
Definitions and Abbreviations ................................................................................................... 3 
1-1.100 
Design Plans ........................................................................................................ 4 
1-1.101 
Standard Plan Sheets ...................................................................................................................... 4 
1-1.102 
Design Plan Requirements ........................................................................................................... 7 
1-1.103 
Submittal Requirements ............................................................................................................... 8 
1-1.200 
Dry Utility Plan Submittals ............................................................................... 10 
1-1.300 
Material Submittals ........................................................................................... 11 
1-1.400 
Field Directives / Plan Revisions ...................................................................... 11 
1-1.500 
As-Built Drawings ............................................................................................. 12 
1-1.501 
General Requirements .................................................................................................................. 12 
1-1.600 
Final Closeout Package Submittal ................................................................. 12 
1-1.700 
Construction Plan Notes .................................................................................. 13 
1-1.701 
General Construction Notes ...................................................................................................... 13 
1-1.702 
Grading and Drainage Construction Notes ................................................................... 18 
1-1.703 
Wastewater Construction Notes ............................................................................................ 19 
1-1.704 
Water Construction Notes ......................................................................................................... 22 
1-1.705 
Intelligent Transportation Systems (ITS) Construction Notes ........................ 25 
1-1.706 
Paving Construction Notes....................................................................................................... 28 
1-1.707 
Traffic Signal Construction Notes ........................................................................................ 30 
1-1.708 
Streetlight Construction Notes ............................................................................................... 32 
1-1.709 
Signing and Marking Construction Notes ...................................................................... 33 
1-1.710 
Landscape Construction Notes ............................................................................................ 36

1-1 Engineering Submittal Requirements 
City of Buckeye 
2026 
Appendices 
Appendix A – Standard Details

1-1 Engineering Submittal Requirements 
City of Buckeye 
2026 
 1 
1-1 – Engineering Submittal Requirements 
This section of the Engineering Design Standards (EDS) is developed by the City of Buckeye 
(COB) to serve as a comprehensive set of criteria to standardize submittals for review. This 
guiding document is intended for engineers, developers, and contractors, providing clarity 
and uniformity in the submission and review process. 
The City Engineer is required, pursuant to Chapter 23, Article 23-2, of the City Code, to develop 
standards and details regarding improvements to be constructed within the city. The 
standards, design criteria, and policy set forth in this section were developed and 
recommended by the City Engineer pursuant to Chapter 23, Article 23-2, and adopted by the 
City Council in Resolution No. 04-26 on 1/20/2026. 
Implementation: The requirements of this section shall become effective in accordance with 
City Code. The standards and requirements of this section shall apply to all new plans, 
including plans seeking a new City Engineer’s signature or a re-approval from the City 
Engineer, submitted to the City following the effective date of the City Council’s adoption of 
the resolution approving the standards and requirements of this section. 
Modification Authority: The City Engineer or designee may approve variances to the 
requirements of this section. A Variance Process Guide and Variance Application can be 
found on the City website.

1-1 Engineering Submittal Requirements 
City of Buckeye 
2026 
 2 
1-1 Engineering Submittal Requirements 
1-1.000 General Information 
1-1.001 
Overview 
A. This section is to aid the engineering customers in developing civil 
engineering plans and construction related documents for submittal to the 
City of Buckeye (COB). 
B. All standards herein apply to all infrastructure plans submitted to the COB for 
review and approval. This includes but is not limited to improvement plans 
for: Grading, Drainage, Sewer, Water, Concrete, Paving, Signing and Striping, 
Improvement, Site Improvement, Street Lighting, and Landscaping Plans. 
C. There shall be only one utility design per plan set for utility improvements 
within COB right-of-way. 
D. Plans shall not be phased. If a project is phased there shall be a plan set that 
is specifically designed for each phase. 
E. There shall be one construction permit issued for each construction plan set. 
F. All plans submitted to the COB for review shall be 100 percent complete and 
properly sealed by the Engineer of Record (EOR). Any plan the COB deems 
incomplete (not 100 percent designed) may be returned without being fully 
reviewed. The plans may be re-submitted to the City for first review once the 
plans are complete. 
G. Design plans submitted to the City for review must be prepared by a 
registered professional engineer in the State of Arizona. 
H. Plans labelled as “preliminary” or “conceptual” affixed to them will not be 
accepted for review. 
I. 
Percentage complete plans are allowed for major infrastructure items and 
other agency reviews. 
J. All plans must comply with the Federal, State, and local environmental laws 
and requirements, including, but not limited to, stormwater requirements. 
K. An approved SWPPP or Best Management Practices (BMP) Plan is required 
prior to a permit being issued for any plan set. 
L. A Maricopa County dust control permit is required prior to a permit being 
issued for any plan set disturbing an area equal to or greater than 0.10 acres.

1-1 Engineering Submittal Requirements 
City of Buckeye 
2026 
 3 
M. All plans shall be at a scale not less than 1-inch equals 40 feet. 
1-1.002 Definitions and Abbreviations  
• 
APN – Assessor Parcel Number 
• 
CFD – Community Facilities District 
• 
Dtl - Detail 
• 
Developer – Shall also be interpreted to mean Landowner; including 
development 
companies 
authorized 
to 
act 
on 
behalf 
of 
the 
Developer/Landowner. 
• 
Field Directive – A plan change that can be summarized on an 8 ½ x 11 or 11 x 
17 size paper sealed by a licensed engineer and submitted for review and 
approval by the City. Use of field directives are subject to City determination 
based upon the scope of the proposed plan modification. If the modification 
is determined to be beyond a field directive, a plan revision shall be 
completed – refer to plan revision definition below. 
• 
Landowner – Shall mean the owner of the land in the City on which 
Development occurs. “Landowner” shall also be interpreted to mean 
Contractor and/or Developer; including Development companies authorized 
to act on behalf of the Developer/Landowner. 
• 
MAG 
– 
Maricopa 
Association 
of 
Governments 
Uniform 
Standard 
Specifications and Details for Public Works Construction current edition. 
• 
Plan(s) – Design drawings that are 100 percent complete and sealed by a 
registered professional engineer. 
• 
Plan Revision – A plan modification that requires original plan sheets (24 x 36) 
to be revised. Revised plans are required to include clouding of proposed 
modifications, delta revision number and description, resealed by a licensed 
engineer, and submitted to the City for review and reapproval of plan set. 
Additional information on plan revisions can be accessed on the City of 
Buckeye Website. 
• 
Construction Inspector – A City employee or contracted consultant with a 
primary responsibility of monitoring the construction of improvements for 
conformance to City requirements. 
• 
PUE – Public Utility Easement 
• 
ROW – Rights-of-Way

1-1 Engineering Submittal Requirements 
City of Buckeye 
2026 
 4 
• 
Spec - Specification 
• 
Std - Standard 
1-1.100 
Design Plans 
1-1.101 
Standard Plan Sheets 
A. All plans submitted to the COB for review shall use the Standard Cover Sheet, 
Standard Second Sheet as well as the layout on the Standard Plan Sheet. All 
of these are shown in the standards details for this section. 
B. The standard plan sheets are available on the COB website. 
C. See COB Standard Detail 11100 for Standard Cover Sheet layout. Most items 
shown on the standard cover sheet are required on all plan sets; other items 
are specific to different types of plans. 
1. 
Required items that shall be on every cover sheet: 
a. All title information, 
i. 
If plan set is within a Community Facilities District, CFD shall be 
added to the title. 
b. All maps as indicated, 
i. 
Vicinity Map - Displays the Township within which the project is 
located. Township lines shall be properly labeled, and the 
development shall be shaded. 
ii. Location Map - Displays the Section within which the project is 
located. Sections shall be properly labeled, major streets labeled, 
and the development shown. 
iii. Development Map - Displays the overall development. Major cross 
streets shall be labeled and legible, include additional street 
names while maintaining a legible map. 
c. 
All Owner, Developer, and Engineer information, 
i. 
Company Name, Contact Name, Address, Phone Number, and 
Email Address. 
d. Sheet Index, 
e. 
Include Area of Disturbance,

1-1 Engineering Submittal Requirements 
City of Buckeye 
2026 
 5 
f. 
List one City of Buckeye approved benchmark. City of Buckeye 
benchmarks can be found in GIS on the City website under the 
Survey Control Map. An onsite benchmark may additionally be listed 
for reference.  
g. The Basis of Bearing information, 
h. 
As-Built Certification, 
i. 
Utility Conflict Notification, 
i. 
Date provided in utility conflict notification block shall represent 
the latest date the plans have been submitted to the utility 
company noted. 
ii. Coordination dates are valid for one year. If the dates expire, the 
plans are required to be resubmitted to the utility companies and 
new coordination dates are to be noted. 
j. 
Summary of Quantities table, 
k. 
FEMA Flood Zone information, 
l. 
General Permitting Notes, 
m. City Engineer signature block with City Disclaimer,  
n. 
Civil Design Certification – This is required to be signed and dated. 
o. 
Update the title block with required project and/or plan information 
in applicable areas. Modifications of the title block shall only be 
completed in areas requiring project and/or plan information. 
2. 
Required items that shall be on specific plan cover sheets: 
a. Any external agency required to review, approve, or permit plans 
shall be provided a signature line on the plans if proposed 
improvements impact or cross that agencies property, right-of-way, 
or easements. If external agency does not sign plan cover sheets, 
please add language to signature line specifying to “Refer to [Agency 
Name] Permit #” or “Refer to Letter” with the date of the referenced 
document. The following list is not exhaustive of all entities whose 
approval may be required to be documented. 
i. 
Maricopa County Environmental Service Department (MCESD) 
signature line - Required on plans that require MCESD review and 
approval according to MCESD requirements. MCESD signature line

1-1 Engineering Submittal Requirements 
City of Buckeye 
2026 
 6 
shall include a line for the DWR and/or WWR numbers to be 
included, 
ii. Maricopa 
County Department 
of 
Transportation 
(MCDOT) 
signature line - Required on all plans that require work to be done 
within MCDOT ROW, 
iii. Private Water Provider signature line - Required on all plans that 
fall within a water provider’s service area other than the COB, 
iv. Private Sewer Provider signature line - Required on all plans that 
fall within a sewer provider’s service area other than the COB, 
v. Western Area Power Administration (WAPA) signature line – All 
plans that impact or cross a WAPA facility and/or easement 
require WAPA’s approval, 
vi. Flood Control District of Maricopa County (FCDMC) signature line 
– All plans that impact or cross a floodplain, flood control facilities, 
and/or easement/right-of-way require FCDMC approval, 
vii. Roosevelt Irrigation District (RID) signature line - All plans that 
impact or cross a RID facility require RID’s approval, and 
viii. Buckeye Water Conservation and Drainage District (BWCDD) 
signature line. All plans that impact or cross a BWCDD facility 
require BWCDD’s approval. 
3. 
Depending on the area the plan covers and what type of utility or 
construction is being proposed the City may require additional items 
and/or approvals on the standard cover sheet. 
D. See COB Standard Detail 11101 for Standard Second Sheet requirements. The 
standard second sheet shall contain the City general notes and applicable 
engineering discipline plan notes (refer to the plan notes section identified in 
the table of contents), a key map for the plan set and the legend. Legend shall 
include all symbols per MAG Standard Detail 110 (unless otherwise approved 
by the City), acronyms and abbreviations utilized on the plans. The title block 
as shown shall be as complete as possible. 
E. See COB Standard Detail 11102 for Standard Plan Sheet layout. The plan sheet 
is used as a typical design sheet. 
1. 
All construction notes shall be listed down the right side of the sheet.

1-1 Engineering Submittal Requirements 
City of Buckeye 
2026 
 7 
2. 
All construction notes shall have the same call out number throughout 
the entire plan set. 
3. 
This sheet is shown as plan and profile but can be used for plan view only 
by removing to profile view. 
4. 
If this sheet is being used for details, sections or other pages without 
construction notes the “notes” section can be removed and used as 
additional space. 
5. 
Depending on the area the design plan covers and what type of utility or 
construction is being proposed the City may require additional items on 
this sheet. 
1-1.102 
Design Plan Requirements 
A. All plans shall be neat and legible. 
B. All plans shall be drawn to scale. 
1. 
Horizontal scale shall not be smaller than 1:40 feet on plan views. 
2. 
Vertical scale shall not be smaller than 1:4 feet on profile views unless 
otherwise approved by the City Engineer. 
C. Plans shall have north orientated to the top or the right side of the plan sheet. 
D. Minimum height of all text shall be 0.10 inch. 
E. All lettering, numbering, and line work must be uniform and legible. 
F. Provide cross-referencing between all plan sheets that have details, detail 
call-outs, notes, cross sections, adjacent permit numbers, etc. 
G. Match lines shall include stations (if applicable) and sheet references must 
be shown. 
H. Plans shall be prepared on 24-inch by 36-inch PDF sheets with a minimum 2-
inch left border and minimum 1-inch border on other sides.  
I. 
Scale bar and north arrows are required on all plan and profile sheets of the 
submittal. 
J. Solid hatching and/or fill is not permitted. Light crosshatch may be allowed if 
the construction notes are not obscured. 
K. Stations and elevations shall be labeled along the perimeter of the profile. 
L. Street name shall be located between the plan and profile view in the center 
of the sheet.

1-1 Engineering Submittal Requirements 
City of Buckeye 
2026 
 8 
M. Symbols and line types shall be appropriately labeled and reflective of the 
item the plan is defining in accordance with MAG Standard Detail 110 unless 
otherwise approved by the City based on the legend provided on the plan. 
N. Dimensioning shall be in accordance with MAG Standard Detail 112. 
O. Accuracy of all numbers shall be as follows: 
1. 
All elevations shall be to the nearest hundredth of a foot (0.01), 
2. 
All sewer stationing shall be to the nearest foot, 
3. 
All monument/brass cap stationing shall be to the nearest hundredth of 
a foot (0.01), 
4. 
Dimensioning of horizontals to the nearest foot and verticals to the 
nearest hundredth of a foot (0.01), and 
5. 
The accuracies listed are to be considered general in nature. If a specific 
item on the plans requires greater accuracy the City may require it. 
P. All plan views shall contain the following information: 
1. 
ROW lines, property lines, section lines, road centerlines, PUE’s, other 
easements impacting the property, all roadway features, lot numbers, 
County APN’s along with Owner names, 
2. 
All existing and proposed utilities labeled accordingly, 
3. 
All construction callouts shall be shown, and 
4. 
All labeling of existing items and special notes to the contractor shall be 
shown. 
Q. See each individual design section for additional plan requirements. 
1-1.103 
Submittal Requirements 
A. Plan Review Submittals: 
1. 
Plan review submittal process can be found on the City of Buckeye 
Website. Please reference the City of Buckeye engineering plan review 
submittal process guide for additional information. 
2. 
Subsequent submittals after any City review shall provide a summary of 
non-redline design changes made by the EOR. Non-redline design 
changes require the City to be notified of the design change in order to 
review the proposed modification to the plan.

1-1 Engineering Submittal Requirements 
City of Buckeye 
2026 
 9 
3. 
Delta revisions shall not be used prior to the City Engineer’s approval and 
shall only be used for each subsequent approval being requested from 
the COB. 
B. Plan Approval Submittal: 
1. 
Plans for construction cannot be approved by the COB for construction 
until all necessary easements and ROW, other than what is being 
dedicated on a Final Plat or Map of Dedication, are established in 
accordance with City requirements and recorded. 
2. 
All outside agencies, where applicable, are required to approve the plans 
prior to the City Engineer's approval and signature. If the outside agency 
does not sign plans, a letter of approval, permit, license agreement, 
and/or any document representing agency approval of the project will 
be sufficient for the City to approve plans. 
3. 
PDFs (24 x 36 inch) are required for plan approval. 
4. 
A physical electronic copy with the following items is required to gain City 
approval: 
a. Base map for the area on the plans seeking approval including all 
property lines, ROW, PUE’s, easements etc., 
b. Benchmarks and section corner tied to the base map, 
c. 
All utilities and appurtenances per the design shall be shown, 
d. All the information shall be shown on a single map, not cut sheets like 
the plans, and located on reasonable layers in CAD, 
e. 
All information shall be in an AutoCAD format that is no older than 
three years of the current released AutoCAD version, 
f. 
All 
line 
work 
and 
annotation 
must 
be 
georeferenced 
to 
“NAD_1983_HARN_STATEPLANE_ARIZONA_CENTRAL_FIPS_0202_FEET
_INTL” with North facing up, 
g. PLSS Section lines should be included, 
h. 
No X-REFs (Single Base File), 
i. 
CAD drawings must be in model space, and 
j. 
Use the following naming convention: “year-daymonth-file name”.

1-1 Engineering Submittal Requirements 
City of Buckeye 
2026 
 10 
C. Plan Revisions and Plan Expirations: 
1. 
Refer to the COB website for informational guides on plan design revision 
requirements and plan expiration requirements. 
D. Refer to specific design sections for additional submittal requirements. 
1-1.200 Dry Utility Plan Submittals 
A. Dry utility plans are not required to utilize the City of Buckeye title block due to 
utility agencies requiring specific title blocks and layouts for plans. Use of the 
City title block is highly recommended and may be required for utilities that 
do not have an official title block adopted.  
B. The cover sheet of the dry utility plan shall include the quantities of 
improvements within the City of Buckeye right-of-way (ROW). Quantity shall 
be labeled as City ROW. 
C. Blue Stake contact information shall be included on the cover sheet of the 
utility plan. Refer to General Construction notes for contact information. 
D. Standard dry utility permit notes are required on the cover or second sheet of 
the plan set. The required standard dry utility notes are as follows: 
1. 
All utilities and supporting structures shall be installed within the PUE or 
ROW as permitted. 
2. 
Where feasible, co-location of utilities in a joint trench shall be utilized. 
3. 
Crossing of private drives or alleys shall be coordinated with all affected 
property owners. 
4. 
Permittee shall work with COB inspectors to resolve any issues with errors 
or omissions at cost of permittee. 
E. The General Construction notes are required on the cover or second sheet of 
the plan set. Refer to the Construction Plan Note section of these standards 
for the required notes. 
F. A plan legend that includes all symbols, linework, acronyms, and 
abbreviations shall be provided on the cover or second sheet of the plan set. 
G. Existing and proposed right-of-way, public utility easements, easements, and 
required land information shall be shown, labeled, and/or dimensioned on 
design plan sheets.  
H. Plan sheets shall clearly identify existing infrastructure locations and 
proposed utility locations.

1-1 Engineering Submittal Requirements 
City of Buckeye 
2026 
 11 
1. 
Any proposed utilities that cross the City right-of-way shall show and 
identify all utilities existing (water, sewer, etc.) within the right-of-way. 
I. 
Dry utility plans are allowed to utilize colored linework for additional clarity and 
identification of improvements. Proposed colors for linework shall be distinctly 
different, reproducible, legible, and identified within the plan legend. 
J. All utility locations along a roadway shall have proposed utility locations 
offset and dimensioned from centerline with stationing.  
K. Proposed utility locations shall be located within a Public Utility Easements 
(PUE) or Limited Purpose Public Utility Easements (LPPUE) where a PUE/LPPUE 
exists or is proposed. 
1-1.300 Material Submittals 
A. Material submittals are only required for proposed materials not on the City 
approved material product list. Refer to COB website to review approved 
material product list. 
B. If any materials that are not on the approved list are proposed for 
improvements within the City ROW or improvements to be dedicated to the 
City, the City shall require material submittals to be submitted, reviewed, and 
approved by the City. 
C. City approved technical material/manufacturer data is required for all pipe 
materials and appurtenances used on the project before work commences. 
D. All delivered materials shall match the approved technical data or they will 
be rejected.  
E. All work installed prior to approval of submittals is subject to rejection by the 
City.  
F. A copy of the approved material submittals shall be on the jobsite at all times. 
G. Each of the submittals shall clearly show the manufacturer and have 
comprehensive technical data for the proposed product. 
H. All material submittals shall be submitted at or before the pre-construction 
meeting for review and approval by the City. 
1-1.400 Field Directives / Plan Revisions 
A. Modifications to plans require field directives or plan revisions submitted to 
the City for review and approval prior to proposed revisions being constructed 
on the project.

1-1 Engineering Submittal Requirements 
City of Buckeye 
2026 
 12 
B. Utilization of a field directive versus requiring a plan revision shall be 
determined by the City Project Engineer. In general, field directives shall be for 
minor modifications and plan revisions shall be for major modifications. 
C. Field directives shall be submitted per the requirements outlined in the field 
directive guide. Field directive guide is available on the COB website for 
reference. 
D. Plan revisions shall be submitted per the requirements outlined in the plan 
revision guide. Plan revision guide is available on the COB website for 
reference. 
1-1.500 As-Built Drawings 
1-1.501 
General Requirements 
A. Refer to COB EDS Section 1-2 for as-built requirements. 
1-1.600 Final Closeout Package Submittal 
A. All construction projects within the City shall go through a construction 
closeout process. This process includes: 
1. 
Scheduling and conducting a Final Walk, 
2. Addressing all punch list items from the Final Walk, 
3. Review and approval of all required as-built drawings, 
4. Completion of a Final Closeout Package Submittal, and 
5. Acceptance and start of Warranty. 
a. 
No warranty shall commence until Final Closeout Package Submittal 
has been reviewed and accepted by the City. The start date of the 
warranty shall be per the Acceptance and Warranty Letter issued 
upon acceptance of the Final Closeout Package Submittal. 
b. 
The contractor shall guarantee all work for the period stated in the 
Warranty Letter against imperfect workmanship, failure, malfunction 
of materials and/or equipment due to faulty or imperfect 
workmanship.  Work found to be defective within the warranty period 
shall be replaced without cost to the City. 
c. 
A Warranty Punch List will be generated by the city at the end of the 
warranty period. A Warranty Walk to review the acceptance of any

1-1 Engineering Submittal Requirements 
City of Buckeye 
2026 
 13 
corrected punch list items will be required before the project is 
conveyed to the city. 
1-1.700 
Construction Plan Notes 
1-1.701 
General Construction Notes 
A. All construction plans within the City of Buckeye (COB) shall include the 
following general construction notes on the standard second sheet: 
1. 
All design and construction must be in accordance with the Uniform 
Standard Specifications and Details for Public Works Construction 
published by the Maricopa Association of Governments (MAG) except as 
amended by the City of Buckeye Standard Construction Details. All 
improvements within the development, including offsite improvements 
shall be in accordance with the latest City of Buckeye Engineering Design 
Standards. 
2. A permit from the COB is required for all construction within the Rights-of-
Way (ROW) and any on-site civil construction improvements. 
3. A pre-construction meeting is required prior to starting any work or new 
phase of work. The Contractor, key Sub-Contractors, and COB Inspector 
shall attend this meeting. 
4. All material submittals incorporated into the project shall be submitted at 
or before the pre-construction meeting for review and approval by the 
City. 
5. The City of Buckeye shall be notified 24 hours in advance of any on-site or 
off-site construction. Email enginspections@buckeyeaz.gov, or use the 
web-based 
permit 
portal 
to 
schedule 
an 
inspection 
(www.buckeyeaz.gov). 
6. An approved, current set of plans and a right-of-way permit shall be 
always maintained on the job site while work is in progress. If the plans and 
permits are not on site, the work shall be stopped until the approved plans 
are provided. Deviation from the plans shall not be allowed without the 
COB's written approval. 
7. Any work performed without COB approval and/or not in conformance 
with the specifications is subject to removal and replacement at the 
Contractor's expense.

1-1 Engineering Submittal Requirements 
City of Buckeye 
2026 
 14 
8. Arrangements for construction water can be made by calling the City of 
Buckeye Water Resources Department at 623-349-6100. 
9. Traffic control shall be provided and maintained in accordance with the 
latest edition of the Manual of Uniform Traffic Control Devices, the City of 
Phoenix 
Barricading 
Manual, 
Maricopa 
County 
Department 
of 
Transportation and COB requirements. The Contractor is required to 
submit a Traffic Control Plan and Barricade Plan to the COB for approval 
where the construction of the new improvements are adjacent to or 
connecting to any existing roadway or pedestrian facilities. The Traffic 
Control Plan and Barricade Plan must be approved before a permit for the 
work will be issued. The Contractor shall install approved barricading and 
traffic control, as approved by the COB before work can commence. All 
overnight barricades shall be lit and functioning. A uniformed Buckeye 
Police Officer shall be present during any work within 300 feet of an 
energized intersection. 
10. The Contractor is responsible to call Blue Stake prior to starting any 
construction. No work shall begin until Blue Stake is completed. Contact 
Blue Stake by calling 811 or going to Arizona811.com. 
11. The Contractor will locate, or have located, all existing underground 
utilities (electric, telephone, pipeline, etc.) and structures in advance of 
construction and will eliminate all conflicts prior to start of construction. 
12. The Contractor shall expose all existing utility lines being tied in to verify 
their location. 
13. Disposal of excess material without a permit within the COB limits is 
prohibited. A use permit is required for disposal or stockpiling of materials 
within a residential area. Stockpiling of excavated material shall not 
exceed a height of 6 feet above the natural ground elevation. The slopes 
on all sides of the stockpiled excavated material shall not exceed a 4:1 ratio 
of length to height. 
14. Excavation contractors must identify the intended location(s) for 
disposing of excess excavation material along with a letter from the land 
owner, granting permission for dumping prior to starting any construction. 
15. A haul plan for material import or export shall be required for COB review 
and approval prior to the start of hauling. The Contractor is responsible for 
daily and final clean-up operations of adjacent, existing paved streets

1-1 Engineering Submittal Requirements 
City of Buckeye 
2026 
 15 
used by construction traffic. This work includes street sweeping, power 
broom, and water application as needed or directed by the COB. 
16. Environmental Requirements: 
a. 
The Contractor shall be responsible for dust control and obtain a dust 
control permit from MCESD related to the project construction. 
Contractor shall take whatever measures are necessary to control 
any abnormal conditions. 
b. 
Per City Code, Chapter 9, Air Quality Controls, during construction and 
during general operation, all property access will be paved or 
otherwise 
dust-proofed, 
including 
track-out 
controls 
and 
management. 
c. 
The Contractor shall provide adequate means for cleaning trucks 
and other equipment of mud before entering public streets, and take 
whatever means are necessary to ensure that all roads are 
maintained in a clean, mud and dust free condition at all times. 
d. The Contractor is responsible for daily and final clean-up operations 
of adjacent, existing paved streets used by construction traffic. 
e. 
Temporary drainage control measures may be required during and 
after construction until final project build-out in accordance with the 
approved plans and in accordance with any established or required 
Best Management Practices (BMP) as part of the Arizona Pollution 
Discharge Elimination System (AZPDES) permit requirements. It is the 
Contractor's responsibility to meet all requirements. 
f. 
During construction and general operation, storm water best 
management practices shall be maintained to keep materials, 
stockpiles, and wastes under control in accordance with City Code 
Chapters 9, 10, 16, 19, and 20. 
g. The Contractor is responsible to obtain all Air Quality Permits. 
h. 
The Contractor shall submit to the COB a copy of their approved 
County (Air Quality) dust control plan, erosion control plan (SWPPP), 
and permit prior to the start of work. 
i. 
All Contractors shall contract for trash pickup through a licensed City 
of Buckeye solid waste hauler and disposed of at the Southwest 
Regional Landfill in Buckeye.

1-1 Engineering Submittal Requirements 
City of Buckeye 
2026 
 16 
17. Road Cuts: The pavement replacement for all longitudinal and transverse 
trenches located in an existing paved road shall be constructed in 
accordance with MAG Std Detail 200-1 “T-Top”. Additional measures may 
apply according to the road age below: 
a. Roads paved more than 2 years ago: Pavement restoration fees will 
apply. 
b. Roads paved more than 2 years ago and trench cuts greater than 
300 feet in length: The entire area shall be slurry seal coated. The seal 
coat shall extend from the edge of pavement or lip of gutter to the 
road centerline except that on local roads where the pavement 
patch straddles the centerline, the entire width of road shall be seal 
coated. Pavement restoration fees will also apply. 
c. 
Roads paved within the last two years or Community Facilities District 
(CFD) roads with outstanding debt: These roads cannot be cut into 
unless 
approved 
by 
the 
City 
Engineer 
for 
extraordinary 
circumstances. If allowed, the roads shall be milled and overlaid a 
minimum of 20 feet on either side of the trench walls. Pavement 
restoration fees will also apply.  
18. Open trenches across driveways, roads and cross-roads shall be plated 
for overnight, weekend or extended periods, per MAG Std Detail 211. 
19. Longitudinal trench final backfill in existing paved roads, or adjacent to the 
existing road (when the trench excavation falls within 2 feet of edge of 
pavement) shall require 1/2 sack CLSM per MAG Spec Section 728 full depth 
or ABC full depth as directed by the COB. ABC backfill compaction shall be 
by an approved mechanical method. 
20. Transverse trench final backfill in all existing roads shall require 100% full 
depth 1/2 sack CLSM per MAG Spec Section 728. 
21. All ABC shall be from an Arizona Department of Transportation (ADOT) 
approved source list. 
22. Potholing: No potholing shall be done on any road newer than 2 years old. 
Potholing in existing streets shall be done using water/air/vacuum type 
method. Removal material cannot be used for backfill. The contractor shall 
use 1/2 sack CLSM per MAG Spec Section 728. If the existing asphalt is less 
than 5-years old or is in good condition, the keyhole method per MAG Spec 
Section 355 is acceptable if approved by the City inspector. Otherwise, the 
pavement section shall be fully replaced in a two feet by two feet section

1-1 Engineering Submittal Requirements 
City of Buckeye 
2026 
 17 
over the pothole location. Pavement replacement shall be by approved 
hot mix asphalt only. Joints to be filled with hot crack sealant. 
23. Damage to any and all items caused by construction or construction 
related work shall be replaced or repaired to the same or better condition, 
at the Contractor's expense. 
24. All project construction access locations are subject to the City's approval. 
The Contractor is responsible for maintaining proper and adequate 
access roads throughout the project, allowing for inspection accessibility. 
This includes grading, gravel fill and/or trench plates as required. 
25. The Contractor agrees to assume sole and complete responsibility for job 
site conditions during the course of construction of this project including 
safety of all persons and property. This requirement shall apply 
continuously and is not limited to normal working hours. The Contractor 
shall defend, indemnify and hold the COB and the COB Consultants 
harmless from any and all liability, real or alleged, in connection with the 
performance of work on this project, excepting for liability arising from the 
sole negligence of the COB. 
26. The COB shall not be responsible for construction means, methods, 
techniques, sequences or procedures utilized in connection with the work. 
The COB will not be responsible for the Contractor's failure to carry out the 
work in accordance with the contract documents complying with MAG or 
COB requirements. 
27. The COB is not responsible for liability accrued due to delays and/or 
damages to utilities in conjunction with this construction. The City will not 
participate in the cost of construction or relocation of utilities. 
28. The Contractor shall be responsible for submitting certified as-built record 
documents to the COB for review and approval. No final acceptance shall 
be issued until "as-built" plans certified by the Project Engineer/Land 
Surveyor have been submitted and accepted by the COB. Final 
construction acceptance or the release of Certificate of Occupancies shall 
not be issued until all as-built drawings and other required documents per 
the COB's Final Project Submittal Checklist, have been reviewed and 
approved by the City.

1-1 Engineering Submittal Requirements 
City of Buckeye 
2026 
 18 
1-1.702 
Grading and Drainage Construction Notes 
A. All grading and drainage plans within the City of Buckeye (COB) shall include 
the following grading and drainage construction notes on the standard 
second sheet: 
1. 
No grading shall begin without a permit from the City of Buckeye. 
2. Offsite construction requires a separate permit from the City of Buckeye. 
3. Contractor shall notify the COB assigned inspector at least 24 hours in 
advance of any required construction inspection. 
4. The Contractor is responsible to call Blue Stake prior to starting any 
construction. No work shall begin until blue stake is completed. Contact 
Blue Stake by calling 811 or going to Arizona811.com. 
5. It is the responsibility of the developer and their agent in coordinating the 
relocation of power poles from the applicable utility company.  
6. No minimum finished floor elevation shall be altered, unless approved by 
City of Buckeye and the developer's civil engineer. 
7. All staking, including finished floor elevations, is the sole responsibility of 
the developer's registered civil engineer and land surveyor. Submission of 
certified pad elevation is required prior to final acceptance. 
8. Drilling logs for drywells at 5-foot intervals including lithology changes will 
be furnished to the City of Buckeye prior to final acceptance. 
9. Percolation tests will be required for completed drywells prior to 
acceptance.  Should existing soil conditions be encountered which lack 
sufficient percolation rates, additional drywells or an alternate method of 
storm water run-off disposal will be required.  Final certified percolation 
test rates from ASTM D3385 shall be submitted at the time of As-Builts, with 
the required 50% reduction factor. 
10. Drywell construction shall be done only by a contractor licensed by the 
Arizona Department of Environmental Quality with the approved 
registration for each drywell.  The approved drywell registration shall be 
submitted to the City by the developer or his/her civil engineer at the time 
As-Builts are submitted. 
11. Contractor shall comply with the provisions for Work Zone Safety and 
Traffic Control protection as indicated in Part IV of the Manual on Uniform 
Traffic Control Devices (MUTCD Most Current Edition) and where

1-1 Engineering Submittal Requirements 
City of Buckeye 
2026 
 19 
applicable across jurisdictional authorities but within the City of Buckeye, 
MCDOT, and ADOT's Traffic Control Manual for Highway Construction and 
Maintenance (most current edition). 
12. All retention basins must drain any storm event up to and including the 
100-year 2-hour storm within 36 hours. Owner(s) of any basin failing to 
meet this requirement must take corrective action to bring the basin into 
compliance. 
13. The contractor shall not disturb existing survey monuments or 
benchmarks noted on the plans.  Removal and replacement shall be done 
by a Registered Professional Surveyor only. 
14. The contractor shall have sufficient means to provide dust control.  Dust 
shall be controlled in accordance with Maricopa County Environmental 
Services Department. 
15. Perimeter wall fences are required to have soil compacted to no less than 
95% by the contractor. 
16. The contractor shall provide adequate means for the elimination of mud 
and dust accumulation in public streets by trucks leaving the site (track 
out devices). Public right-of-ways shall be kept clean and free of debris 
from construction sites. 
17. Disposal of excess material within the City's limits is prohibited. A use 
permit is required for disposal and/or stockpiling materials within a 
residential area. 
18. Approved construction plans shall be kept on the jobsite at all times. 
Deviation from the plans is not acceptable unless an approved plan 
revision or field directive has been granted by City of Buckeye. 
1-1.703 
Wastewater Construction Notes 
A. All sewer plans within the City of Buckeye (COB) shall include the following 
sewer construction notes on the standard second sheet: 
1. 
Backfilling shall not be started until all piping is inspected and approved 
by the COB inspector.  
2. All sewer mains shall be pressure tested and mandrel tested (for flexible 
pipe) per MAG specifications. For flexible pipe, Contractor shall not 
commence testing within 30-days of installation.

1-1 Engineering Submittal Requirements 
City of Buckeye 
2026 
 20 
3. For flexible pipe, upon completion of testing and flushing, all sewer lines 
shall be video inspected no sooner than 30 days following backfill with the 
electronic files being provided to the City.  
4. Steps shall not be allowed in manholes. 
5. All manhole rings and covers to be cast iron per MAG.  Manhole lids shall 
have the COB logo imprinted on it. 
6. All new service taps shall be a wye type.  Taps to existing mains shall be 
wye or "T" type.  
7. All taps to existing mains shall be core drilled or hole sawed with a COB 
approved bit.  No chop sawing or breaking out of the main is allowed.  A 
COB representative from the Water Resources Department shall be on site 
during ANY tapping of existing mains.  A COB approved saddle shall be 
used for the tap connection.  
8. All sewer line compaction shall be MAG Backfill Type 1 per MAG section 601 
and include compaction of the bedding to 95%.  Backfill around manholes 
shall be MAG Backfill Type 3 backfill per MAG Spec Section 601. 
9. All sewer service connections shall be extended a sufficient distance 
beyond the Public Utility Easement (PUE) to clear all facilities to be installed 
in the PUE, which parallel the street right of way. 
10. All manhole structures in major streets (major collectors, arterials, and 
major arterials), or on public sewer mains that are 15” or larger in diameter, 
shall utilize the following details and materials: 
a. Polymer Concrete Sewer Manhole per MAG Std Dtl 419-3 
b. Precast Polymer Concrete Manhole Base per MAG Std Dtl 419-2 and 
419-3 
c. 
Manhole Frame and Cover Adjustment – Type “B” Corrosion-
Resistant Rings per MAG Std Dtl 422-2 
11. COB approved manhole coating/lining systems shall be spray-on and 
comply with the City Approved Product List.  All coatings not on the 
Approved Product List shall be reviewed and approved by the COB. 
12. All manhole bases shall be precast per COB details.  Cast-in-Place 
Manhole Bases will only be allowed with approval by the City. 
13. No ferrous material shall be used on the interior of the manhole unless 
completely coated with a COB approved coating.

1-1 Engineering Submittal Requirements 
City of Buckeye 
2026 
 21 
14. All manholes shall be vacuum tested in accordance with Arizona 
Administrative Code.  Vacuum testing shall only commence after final 
paving and final adjustment of the ring and cover. 
15. Where manholes are located outside of the street or sidewalk there shall 
be a class “B” concrete ring 6 inches thick and 12 inches wide with fiber 
mesh placed around the manhole frame and cover flush with the top of 
the frame. The manhole frame shall be set 6 to 12 inches above finish 
grade.  There shall be a #4 rebar centered in the concrete.  A green 
carsonite marker shall be installed. 
16. All manholes greater than 10 feet deep from rim to the lowest invert shall 
be 5 feet in diameter. 
17. All materials shall be new and undamaged.  Any pipe showing evidence 
of degradation shall not be accepted.  All rejected material shall be 
removed from the site immediately, or a cease work order will be issued. 
18. All underground utilities shall be installed and completely backfilled prior 
to the testing of the COB infrastructure.  In the event private and/or public 
utilities need to be re-excavated, the prior test of the COB facilities will be 
considered null and void and retesting will be at the Contractors expense. 
19. No upstream sewer construction shall start until the downstream sewer 
main is completed and approved by the COB inspector.  Pipe laying shall 
commence at the proposed project outfall on the existing COB sewer and 
proceed upstream.  Any exceptions to this shall be approved in writing by 
the City. 
20. A MAG Std Detail 427 plug shall be installed in the furthest downstream 
manhole and remain in place until all sewer testing and cleaning is 
completed.  Removal of the plug shall only be done with the supervision of 
the COB inspector.  Under no circumstances shall the plug be removed 
prior to COB inspection.  In the event that the plug is removed, the 
contractor shall at his expense, clean with a hydro-vac the sewer main 
downstream to a location approved by the COB inspector to adequately 
remove all debris carried into the COB main. Should the sewer plug fail 
prior to the COB inspection the contractor shall at his expense, clean with 
a hydro-vac the sewer main downstream to a location approved by the 
COB inspector to adequately remove all debris carried into the COB main.  
A video inspection after cleaning will also be required of the existing main 
and all expenses will be paid by the Contractor.  Any damages or cleaning 
expenses at affected lift stations and levied fines shall be paid for by the

1-1 Engineering Submittal Requirements 
City of Buckeye 
2026 
 22 
Contractor.  The Contractor shall also be liable for any damage to private 
property and/or environmental damage/clean up. 
21. Any curb and gutter removed with utility markings shall be replaced and 
the utility marking shall be re-stamped in the curb. 
22. Proposed materials that are not on the City Approved Product List shall be 
submitted at or before the pre-construction meeting and are required to 
include: 
a. 
24" and 30" Frame and Cover  
b. 
48", 60", and 72" Manhole Shaft and Cone  
c. 
48", 60", and 72" Manhole Precast Base  
d. Manhole Adjusting Rings  
e. 
Manhole Lining System  
f. 
MAG Spec. ABC  
g. Precast Manhole Base Gasket System  
h. 
Manhole Joint Sealant  
i. 
Cast In Place Manhole Base Concrete  
j. 
Water Stop Gaskets  
k. 
Sewer Pipe Fittings  
l. 
Couplings 
m. Pipe Zone Material: ABC, #57 Rock, 1/2 Sack Slurry, 1 Sack Slurry  
n. 
Adjusting Ring Concrete  
o. 
Marker Balls 
p. Steel Casing 
q. Casing Spacers 
r. 
Casing End Seal 
s. 
Pipe Material 
1-1.704 
Water Construction Notes 
A. All water plans within the City of Buckeye (COB) shall include the following 
water construction notes on the standard second sheet:

1-1 Engineering Submittal Requirements 
City of Buckeye 
2026 
 23 
1. 
All plans submitted to the City for water main installation, shall include the 
technical data for the following items, for review and approval by the City, 
prior to construction (submittal requirements shall not be limited by the 
following): 
a. 
Pipe material including all fittings, valves, gaskets, tapping sleeves, 
couplings, corporation stops, copper pipe, meter stops, fire hydrants, 
blow-offs, air release valves, copper fittings, meter boxes, valve boxes, 
tracer wire, ABC, concrete, and all other items as requested by the 
City. 
2. Contractor shall provide adequate cut/elevation construction staking for 
all water line installations, to allow for proper depth installation and 
inspections.  Minimum staking locations include all mechanical fittings 
and valves. 
3. Shutdowns and night tie-ins shall be approved and scheduled with the 
City of Buckeye Water Resources Department. 
4. Refer to COB Std Detail 31200 for unauthorized water valve shutoff 
requirements. 
5. Utilization of size on size tapping sleeves is prohibited.  
6. All DIP shall be poly-wrapped and cement mortar lined. 
7. All waterline fittings shall be ductile iron with mechanical joints. 
8. Fire hydrants shall be per the City Approved Product List and shall be 
furnished by the Contractor per COB and MAG details. 
9. All valves shall be resilient wedge gate type and open to the left. 
10. All valve boxes shall be MAG Std Detail 391-2 and manufactured by Tyler 
Union, Sigma heavy duty rated, or City approved equal.   
11. All service lines shall be type "K" copper pipe from the City main to meter 
(through 2” size). Service connections shall conform to the COB Std Detail 
31330. 
12. 1-inch water meter curb stops shall be set 8-inches below the bottom of 
meter box lid.  All water services shall be 1-inch or larger. 
13. Backfilling shall not be started until all piping is inspected and approved 
by the COB Inspector. 
14. All backfilling of excavations made for installing water mains and/or 
laterals shall be in accordance with COB Std Detail 31380.

1-1 Engineering Submittal Requirements 
City of Buckeye 
2026 
 24 
15. All waterline compaction shall be Type 1 per MAG Specification Section 601. 
16. Water jetting per MAG Spec Section 601.4 is allowed only for waterline 
trench backfill in new, local, and collector street roadways within new 
developments.  Water consolidation shall not be allowed for backfill and 
compaction of water line trenches in or adjacent to existing roadways or 
new arterial street roadways.  Trench flooding is not allowed. 
17. Tracer wire shall be installed according to MAG Std Detail 399. 
18. Non-detectable plastic warning tape shall be placed above all water lines.  
The tape shall be 6-inches wide, blue, and have a permanent marking: 
"CAUTION BURIED WATER LINE BELOW," spaced every 36-inches. 
19. Water line testing shall be in conformance with MAG Spec Section 610.15. 
One hundred (100%) percent of all new waterlines, services, and 
appurtenances shall be pressure tested.  Disinfection shall be in 
accordance with MAG Spec Section 611. 
20. Contractor shall mark all meter locations with a 2" x 4" metal stud marker, 
painted blue, placed 3-feet below grade and 2-feet above grade.  All 
meter locations shall also be reference marked with blue paint on 
adjacent concrete as directed by the COB Inspector. 
21. Meter boxes and lids shall be supplied by the Developer and installed 
facing the lot. Adjustment to final grade shall be by Developer or its 
Contractor.  
22. All water meters shall be purchased from the City Water Resources 
Department.  Private development project water meters shall be installed 
by the City Water Resources Department. Capital Improvement Project 
(CIP) residential water meters shall be installed by the City Water 
Resources Department and all other non-residential water meters shall be 
installed 
by 
the 
assigned 
party 
per 
the 
CIP 
contract 
(Developer/Landowner or Water Resources Department). All meters and 
boxes shall be in accordance with City standards and shall be compatible 
with AMR system.  
23. All backflow preventers shall have AWWA certification. Prior to occupancy, 
Contractor or Owner shall provide testing by a certified tester for all 
backflow preventers. Testing shall be witnessed by the COB Inspector. A 
copy of the test reports shall be provided to the City Inspector.

1-1 Engineering Submittal Requirements 
City of Buckeye 
2026 
 25 
24. The jumper used to fill new water mains for filling, flushing and testing shall 
be a minimum of 6-inches in diameter including meter, backflow 
assembly, necessary pipe and fittings. 
1-1.705 
Intelligent Transportation Systems (ITS) Construction Notes 
A. All ITS plans within the City of Buckeye (COB) shall include the following ITS 
construction notes on the standard second sheet: 
1. 
The conduit notes only show those cables that are affected by this project. 
The contractor is cautioned that there may be other cables in the conduit 
that are not shown and shall remain undisturbed. 
2. All proposed conduit shall be installed by means of open trenching, except 
where directional drilling is specifically called for on the plans. The 
installation method called for has been selected based on the best 
available information at the time of design and the designer's judgement. 
The contractor may elect to alter the installation method, at no additional 
cost to the City, if the contractor believes an alternate method would be 
more appropriate or cost effective at any given location given the current 
conditions. If the conduit installation is to be other than as shown on the 
plans, the method shall be approved by the Engineer prior to ordering of 
materials and commencement of work activity at the subject location. 
3. All conduit shall be placed in trenches according to COB Standard Detail 
62102 as indicated on plan sheets. Exact conduit route to be verified with 
and approved by the Engineer prior to excavation to account for field 
conditions. All conduit and cable (communication and electrical) shall be 
installed according to the latest Edition of The National Electrical Code. 
4. If the conduit encased in select excavated backfill must deviate from a 
tangent path to avoid obstructions, the contractor shall route the conduit 
curvature (both horizontally and vertically) of 1 inch deflection per foot of 
length as shown on the plans. Elbows shall not be permitted except as 
specified in the plans. 
5. The plans show the general path and location of conduit and equipment 
in relation to major physical features. The location of utility poles, fire 
hydrants, irrigation devices, vegetation and other stationary objects along 
the conduit path may not be shown but shall be identified by the 
contractor as the conduit route is marked just prior to trenching. The 
contractor shall place all conduit in a manner that minimizes bending 
both horizontally and vertically, thus minimizing induced stresses on

1-1 Engineering Submittal Requirements 
City of Buckeye 
2026 
 26 
cables during installation. All locations shall be approved by the Engineer 
prior to trenching. 
6. When shown, dimensional distances for conduit locations are provided to 
assist the contractor in conduit placement. The contractor is responsible 
for field locating all conduit around existing utilities and obstructions. 
7. All work shall be performed within City right-of-way.  
8. The information shown on the drawings concerning the type and location 
of existing underground and overhead utilities is approximate. The 
contractor shall determine the exact location of all existing utilities before 
commencing work, and agrees to be fully responsible for any and all 
damages which might result from the contractor's failure to exactly locate 
and preserve any and all underground and overhead utilities. The repairs 
to existing utility infrastructure damaged by the contractor's activities 
shall be performed at no additional cost to the City.  
9. The horizontal locations of existing utilities are shown in their approximate 
location. The vertical locations of existing utilities are shown only where 
verified by field survey methods. The contractor shall be responsible to 
adhere to all current Arizona 811 laws and Section 107 of the MAG Standard 
Specifications. 
10. All landscape repair and restoration work and materials required as a 
result of conduit installation shall conform to the requirements of Section 
430 of the MAG Standard Specifications and the project Special Provisions. 
All irrigation repair and restoration work and materials required as a result 
of conduit installation shall conform to the requirements of Section 440 of 
the MAG Standard Specifications and the project Special Provisions at no 
cost to the City. 
11. All existing plant material 3 feet or less from the centerline of the trench 
that is disturbed during the construction phase shall be replaced with 
identical plant species and shall be planted and staked per the original 
plans to the approval of the Engineer. Replacement plant material shall be 
5 gallon container size for all trees and 1 gallon container size for all shrubs. 
Plantings shall be planted at their original location or at a minimum 
distance of 3 feet from the centerline of the trench, whichever is a greater 
distance. 
12. All existing landscape shall not be without existing irrigation system 
supplied water for periods longer than 24 hours. The contractor shall be

1-1 Engineering Submittal Requirements 
City of Buckeye 
2026 
 27 
responsible for maintaining all existing plant material in healthy condition 
and proper function of the water and electrical services affected during 
construction. 
13. Plant material may be pruned to provide construction access. The pruning 
shall be performed by trained and experienced landscape personnel. The 
pruning methods shall be approved by the Engineer prior to any pruning. 
14. All damage caused by construction activities to the irrigation system shall 
be repaired, flushed and tested for leaks in the system. Testing shall be 
completed at operating pressure within 24 hours of the completion of work 
at the subject location. The irrigation system shall be repaired with 
comparable materials and installation methods as per original plans and 
to the approval of the Engineer at no cost to the City. 
15. Existing survey monuments and property corner monuments may be 
encountered during construction. The contractor shall identify, flag, and 
avoid disturbing any such monuments. 
16. Where proposed conduit is shown routed to an existing pull box, all 
proposed conduits shall be intercepted by the existing box. New conduits 
shall be installed in accordance with the details shown on the plans and 
these Special Provisions. 
17. A 50-foot service loop of all fiber optic cables shall be coiled in each No. 8 
pull box with extension. 
18. In all locations where fiber enters a No. 9 or No. 9B pull box (existing and 
new), cable slack shall be loosely looped using the rack and hook system. 
A 100 feet of cable slack for all cables entering the pull box shall be 
provided. 
19. City of Buckeye's Approved Products List for ITS components can be found 
at www.buckeyeaz.gov. Any proposed materials not on the Approved 
Product List shall be submitted to the City for review and approval. 
20. Traffic control shall conform to the MUTCD, City of Phoenix Traffic Barricade 
Manual, and/or as directed by the City Inspector.  
21. It is required any ITS infrastructure construction, maintenance, or 
operation, private or public, be performed by a minimum of one certified 
IMSA Level II Signal Technician on site at all times. All personnel (employees 
or contractors) working on City of Buckeye Traffic Signals shall be 
International Municipal Signal Association (IMSA) certified Traffic Signal 
Technicians, including all Work Zone Safety certifications.  All personnel

1-1 Engineering Submittal Requirements 
City of Buckeye 
2026 
 28 
(employees or contractors) working on City of Buckeye fiber in the rights 
of way shall be IMSA certified Fiber Optics Technicians, including all Work 
Zone Safety certifications and other pre-requisites. Contractors, in 
addition to being IMSA certified shall have current registration with the 
Arizona Registrar of Contractors.  All the testing and installation shall be 
overseen by the City. 
22. Contractor shall follow all testing procedures outlined in COB EDS Section 
6-2.400. 
23. Pictures of each splice shall be provided to the City with the matching 
latitude/longitude coordinates.  All micro ducts shall have a sponge blown 
through, then bi-directionally tested with a BB that is 80% of the micro duct 
ID.  Once complete, the duct shall be sealed on both ends with micro-end 
caps. All conduit testing shall be monitored by a City inspector and 
approved. 
1-1.706 
Paving Construction Notes 
A. All paving plans within the City of Buckeye (COB) shall include the following 
paving construction notes on the standard second sheet: 
1. 
Location of all valves and manholes must be referenced at all times by the 
Contractor during construction. 
2. Subgrade and paving operations shall not begin until all utility frame and 
cover locations have been properly referenced to facilitate adjustments. 
3. Base course shall not be placed on subgrade until all subgrade 
requirements have been completed and approved by the COB Inspector. 
4. No paving construction shall commence until all underground utilities 
within the roadway are completed, tested, approved and the To Pave 
Declaration is executed or To Pave as built drawings are reviewed and 
approved by the City. 
5. Base course shall not be placed on subgrade until base requirements 
have been completed tested and approved by the City. 
6. All return type driveways with concrete pavement shall utilize MAG class A 
concrete for all construction within the right-of-way. 
7. Asphalt and gutters shall be water tested in the presence of the COB 
Inspector to ensure proper drainage, prior to final approval by the City. 
Water shall not pond more that ¼ of an inch. At the contractor’s expense,

1-1 Engineering Submittal Requirements 
City of Buckeye 
2026 
 29 
removal and replacement of pavement and gutter will be required for any 
improvements that result in ponding exceeding ¼” limit.  
8. The exact point of matching, termination and overlay will be determined 
in the field by the City of Buckeye engineering department. 
9. No job will be considered complete until all curbs, pavement, and 
sidewalks have been swept clean of all dirt and debris.  All water service 
meter boxes shall be set to have the top of the box elevation match top of 
sidewalk elevation. 
10. All sleeving installed under new streets shall be done with SCH 50 PVC 
sleeving conduit unless otherwise specified. 
11. No grinding of concrete is allowed in the City of Buckeye. Reverse flow in 
curb gutter, and valley gutters will be removed and replaced at the 
contractor's expense. 
12. All joints shall be tack coated with a minimum of 95% coverage of the joint. 
13. Concrete repair will not be allowed in the City of Buckeye. All damaged 
concrete shall be removed and replaced to the nearest joint. 
14. All asphalt joints shall be sealed prior to the final walk through. 
15. Fiber mesh is required in all concrete aprons and valley gutters. 
16. All millings from public projects shall be given to the City of Buckeye Public 
Works Department. 
17. High spots in asphalt shall be removed and replaced. Reheating or 
burning of asphalt is not allowed. 
18. All asphalt shall be saw cut to a clean, true edge for the full face of the 
section prior to tying in. Milled edges will be evaluated by the COB 
Inspector for possible acceptance. 
19. An RLS certified as built plan of all new concrete curb and gutter, valley 
gutter, drainage control structures, survey monument locations and all 
signing and striping shall be submitted prior to acceptance of the 
completed right-of-way improvements. 
20. All improvement work shall be approved by the City inspector including 
utility adjustments, survey monuments, sign bases, parkway grading, and 
any repair or replacements.

1-1 Engineering Submittal Requirements 
City of Buckeye 
2026 
 30 
21. During all paving operations an additional lab technician shall be located 
at the asphalt production plant to ensure approved material is being used 
in the asphalt mix. 
22. No newly paved roadways can be opened to traffic without approval of 
the City Inspector. Material used in the asphalt provided to the City shall 
be 100% virgin from an approved pit. No recycled asphalt is allowed in the 
City of Buckeye. 
1-1.707 
Traffic Signal Construction Notes 
A. All traffic signal plans within the City of Buckeye shall include the following 
traffic signal construction notes on the standard second sheet: 
1. 
Traffic control plans shall conform to the City of Phoenix Traffic Barricade 
Manual and MUTCD Section 6. Traffic control plans shall be reviewed and 
approved by the City. 
2. Utility locations shown are based upon the best available information. The 
Contractor is responsible to call Blue Stake prior to starting any 
construction. No work shall begin until blue stake is completed. Contact 
Blue Stake by calling 811 or going to Arizona811.com. 
3. Traffic signal poles, mast arms and service cabinets shall be painted with 
two coats of white enamel paint meeting manufacture recommendations. 
4. All corner pull boxes shall be Number 7 with extension with 18-inch 
drainage, consisting of #57 rock, per ADOT spec. The median pull box shall 
be Number 5. 
5. A ground rod shall be installed within the customer side of the electrical 
service panel and in the control cabinet foundation and satisfy City’s 
Building Code requirements. 
6. Pavement replacement shall conform to COB Engineering Design 
Standard Section 6-3 Street Planning and Design Criteria manual. 
Sidewalk replacement shall conform to MAG Std Details 230, 231, 232, 233, 
and 234, as appropriate. 
7. Internally Illuminated Street Name Signs shall be provided and mounted 
on traffic signal mast arms for Trombone style poles and flag mounted on 
ADOT style poles in accordance with the City of Buckeye Traffic Signal 
Details.

1-1 Engineering Submittal Requirements 
City of Buckeye 
2026 
 31 
8. Applicable signal and pedestrian indications shall be wide-angle LED type 
lamps per the City Approved Product List. 
9. A fully functional Emergency Vehicle Pre-Emption (EVP) including device, 
cabling, phase selector, and mounting brackets shall be provided and 
installed.  The EVP shall be field-adjusted to optimize reception. EVP shall 
be per the City Approved Product List. 
10. All existing traffic control and streetlights shall remain in operation until 
new installations are energized and operational. Any traffic detectors 
disturbed during construction shall be replaced with temporary detectors 
until the final detection system is in place and operational. 
11. Any removed City equipment shall be salvaged and returned to the COB 
Public Works Department. All salvaged equipment shall be dismantled. 
12. The electrical service address is: [insert address here]. 
13. At the start of construction, the contractor shall contact the COB Public 
Works Department at 623-349-6800 to ensure the availability of the City 
Traffic Signal Technician and coordinate power authorization, cabinet set-
up, inspection requirements and the preconstruction meeting. The City’s 
Traffic Signal Technician shall be called 48-hours prior to all inspection 
points, as called for. 
14. At the start of construction, the contractor shall contact APS to confirm 
power to the location and to schedule an inspection. 
15. All wires shall be color coded with tape as shown in City Standard Detail 
64270. 
16. All signal foundations shall be flat, not dished or blocked/out. Foundations 
shall be no lower than back of sidewalk or future back of sidewalk. 
17. All traffic signal poles, new, borrowed or existing, shall be brought to “like 
new” condition, including unused holes welded, pole painted, wire 
upgraded to IMSA cable. 
18. Traffic Control Change Ahead warning signs shall be installed when traffic 
control type or operations have changed at an intersection. The 
contractor for a minimum of 60 days following the traffic control change 
shall install warnings.  When the warning stage is complete, the contractor 
shall remove temporary signs and deliver to the COB Public Works 
Department.

1-1 Engineering Submittal Requirements 
City of Buckeye 
2026 
 32 
1-1.708 
Streetlight Construction Notes 
A. All streetlight plans within the City of Buckeye shall include the following 
streetlight construction notes on the standard second sheet: 
1. 
All materials and construction shall conform to the requirements of the 
approved plans and streetlight specifications per the City Approval 
Product List. 
2. The foundation hole shall be augered and MAG Class "A" (3,000 psi) 
concrete, poured against undisturbed compacted earth. The concrete 
foundation shall be poured in drilled holes. Use of a minimum 18-inches 
deep sonotube at the top of the foundation is required to provide a 
uniform and controlled foundation. 
3. Unstable soil and / or a steep slope will require a deeper foundation. Refer 
to manufacture requirements, design plans, and special provisions for 
details. 
4. All welds shall be ground smooth, and all burrs and sharp edges shall be 
removed prior to any painting. 
5. All dimensions are nominal. 
6. At no time shall slip-base poles, bases, or direct bury poles be permitted 
for use. 
7. APS will provide pole numbers per the utility company's requirements. 
8. For median mounted poles, the hand hole shall be oriented perpendicular 
to the mast arms. For staggered poles, the hand hole shall be aligned 
opposite the mast arm.  
9. Rebar shall be per ASTM A 615 latest edition Grade 60 and shall be tied 
together. No tack welding allowed. 
10. The top of the pole foundation and pull boxes shall match existing sidewalk 
grade wherever possible. If no sidewalk exists then the pole foundation 
shall extend 1" above the finished grade or adjacent curb, whichever is 
higher. Pull boxes shall be set to match the existing slope. 
11. Pull boxes shall have bolts installed prior to energizing. The bolts shall be a 
security type requiring a specialized tool to remove. Minimum of penta-
head style bolts shall be required. 
12. Compaction beneath and around the pull boxes shall be a minimum of 95 
percent per MAG Spec Section 601.

1-1 Engineering Submittal Requirements 
City of Buckeye 
2026 
 33 
13. Pole location shall comply with the pole schedule and design plans. Field 
adjustments up to 10 feet may be permitted at the discretion of the city 
inspector or design engineer. Minimum offsets to curb and sidewalk shall 
be maintained. 
14. The use of conduit caps shall be required to keep the sweep free from dirt 
and debris during the foundation construction. DO NOT GLUE ON CAPS.  
15. If the streetlight is placed in a sidewalk, extend the anchor bolts to the 
maximum of 3 1/4" above the top of pole foundation. 
16. If streetlight pole foundations are to be placed in a concrete pad 
(sidewalk, handicap ramp) there shall be a 1/2" piece of expansion 
material between the foundation and the concrete pad. 
17. All streetlights shall be inspected by the COB Inspector. All streetlights 
must have a 3-day burn period prior to inspection. 
1-1.709 
Signing and Marking Construction Notes 
A. All signing and striping plans within the City of Buckeye (COB) shall include 
the following signing and striping construction notes on the standard second 
sheet: 
1. 
The City's inspector shall be notified 48 hours prior to starting any signing 
or striping work. 
2. Permanent thermoplastic striping shall not be placed any earlier than 30 
days after the permanent pavement has been placed. A temporary paint 
shall be used as an interim striping. If temporary paint is used, it shall be 
the Contractor’s responsibility to maintain the temporary striping until the 
permanent thermoplastic has been placed. 
3. Unless otherwise specified, all pavement marking and traffic control 
signing installations and removals shall conform to the requirements of 
the City of Buckeye and as set forth in the Arizona Department of 
Transportation (ADOT) Standard Drawings, Details and Specifications or 
the “Manual on Uniform Traffic Control Devices” (MUTCD) latest edition, or 
AASHTO requirements, as applicable. Sign requirements, guidelines and 
warrants shall be in accordance with the MUTCD's most current edition. 
4. Prior to pavement marking installation, the Contractor shall submit 
material certifications with material submittals for all marking materials 
certifying through supplier lab analysis that all paint and thermoplastics 
are free from any lead-based materials/components.

1-1 Engineering Submittal Requirements 
City of Buckeye 
2026 
 34 
5. The Contractor shall be responsible for the layout and installation of the 
permanent pavement markings following control points that have been 
set no more than 50 feet apart along the lines to be striped. Pavement 
marking dimensions are to center of the stripe for single line striping, and 
to the center of the space between the two lines for double line striping. 
Where curb and gutter is present, dimensions are to back of curb. 
6. The Contractor shall notify the City for field review of layout prior to any 
striping or markings of any kind. Any striping completed prior to the City's 
review may be subject to removal, re-layout and restriping at the 
Contractor’s expense. 
7. The pavement marking drawings are schematic only and not to scale. The 
contractor shall follow all dimensions, notes, details and standards when 
installing pavement striping, markings and markers. 
8. Temporary traffic control shall conform to the City of Phoenix “Traffic 
Barricade Manual”, the MUTCD and/or as directed by the City. 
9. Unless otherwise directed, all final location lane striping, including 
crosswalks and stop bars, shall be thermoplastic material applied at a 
minimum thickness of 60 mils for lane striping and 90 mils for crosswalks 
and stop bars. All pavement symbols, arrows, and lettering shall be 
thermoplastic, Type 1 (permanent) preformed pavement markings. Cold 
tape may be allowed subject to written request by the Contractor and 
approval by the City. Temporary pavement markings shall be reflectorized 
traffic paint. Temporary striping or half-street roadway striping shall be 
paint. 
10. All signs shall conform to the MUTCD and shall be made from 0.080 inch 
thick aluminum. Sign posts and extensions shall be galvanized square 
preformed steel tubing per City standards. Height requirements shall 
comply with the MUTCD. 
11. All traffic control sign faces shall be constructed to the City of Buckeye’s 
Engineering Design Standards requirements. 
12. All signs shall have a minimum clearance from the edge of sign to the face 
of the curb of at least 2 feet; or if no curb exists, it shall be at least 12-feet 
from the edge of the pavement. All signs shall be placed so as not to 
interfere with pedestrian movement. 
13. Any traffic control signage, including street name signs, which may be 
located within 10 feet of an existing streetlight pole, may be mounted to

1-1 Engineering Submittal Requirements 
City of Buckeye 
2026 
 35 
the pole by stainless steel banding with approval from the City. In no case 
shall the street name signs be stacked on top of each other, a separate 
bracket will be required for each sign. Sign locations and offsets may be 
adjusted by the City to improve visibility. 
14. All concrete median curb noses shall be painted with yellow reflective 
safety paint from the front of the bull nose back 10 feet with yellow or 
(where applicable) white Type G raised pavement markers on bull nose 
curb heads subject to field review and final acceptance for markers. 
15. All raised pavement markers shall be installed in accordance with ADOT 
Standard Drawing M-19. Two-way Type BB raised pavement markers shall 
be installed adjacent to fire hydrants per City standards. 
16. Any existing signage that is required to be relocated by the Contractor 
shall be removed, protected, and stored for reinstallation by the 
Contractor. Damaged signage shall be replaced at the Contractor's 
expense. Any existing signs required to be permanently removed by the 
Contractor shall be salvaged and returned to the City. 
17. The Contractor shall remove all existing pavement markings and striping 
in conflict with the final striping plan by ultra high-pressure water (36,000 
psi) or by sand blasting. All removal methods shall be done in 
conformance with EPA requirements. If the removal of striping causes a 
depression of 1/8 inch or greater in the pavement surface, the Contractor 
shall fill and slurry seal the area per MAG Specifications 713 and 715, Type 
II. Blackout paint will not be accepted, no exceptions. 
18. The Contractor shall clean the roadway surface to the satisfaction of the 
City by power broom, street sweeping, air jet blowing and/ or water 
jet/truck prior to placement of all pavement markings. The road pavement 
surface shall be absolutely dry. The air and pavement temperatures shall 
not be less than 55 degrees F and 61 degrees F for the placement of 
thermoplastic marking Type I marking tape, respectively. Temperature 
values shall be considered rising and taken within the shade. 
19. Street name signs located at all local, collector and arterial intersections 
shall have block numbers. Block numbers shall be assigned by the City. 
Block numbers shall be installed per City requirements. The Contractor 
shall provide material cut sheets of the sign panels for review by the City 
prior to installation.

1-1 Engineering Submittal Requirements 
City of Buckeye 
2026 
 36 
1-1.710 
Landscape Construction Notes 
A. All landscape plans within the City of Buckeye (COB) shall include the 
following landscape construction notes on the standard second sheet: 
1. 
All lighting, signs, walls, and ramadas and other structures require 
separate building approval and permits. 
2. All plant material is in compliance with the Arizona Department of Water 
Resources Low Water Use Plant List for the Phoenix Active Management 
Area. 
3. All plant material and specifications are to conform to the Arizona 
Nurseryman Association current standards. 
4. All plant material will be guaranteed for a minimum of 60 days from the 
date of final approval. Any plant material that has to be replaced under 
the terms of the guarantee shall be guaranteed for an additional 60 days 
from the date of replacement. 
5. All paving, sidewalk, and curb ramps shall meet the design and 
construction of Americans with Disabilities Act (ADA) requirements.  
6. Sidewalks are to be constructed per MAG standard details. 
7. A Maricopa County Dust Control Permit is required for all landscape work 
in residential, commercial and industrial subdivisions. 
8. Prior to acceptance of any backflow device, it must be tested by a state 
certified tester. 
9. All backflow devices shall be recertified yearly. 
10. Contractor shall ensure a 24-inch clearance between sidewalks and plant 
material. 
11. Sprinkler contractor must guarantee 100% coverage in all landscape 
areas. 
12. Erosion control shall be required at all inlet/outlet locations. 
13. An 18-gage, blue tracer wire shall be installed with 2 inch and larger main 
lines, 6 inches of which shall be coiled inside the controller. 
14. No vegetation shall be planted within drainage easements or tracts which 
would impede the flow of water over, under or through the drainage 
easements or tracts.

1-1 Engineering Submittal Requirements 
City of Buckeye 
2026 
 37 
15. Visibility restrictions:  Any object, wall, structure, mound or landscaping 
over 24” in height (mature) are not allowed within sight visibility triangles 
or sight distance line areas.  Tree canopies overhanging in the easement 
or triangles, or within public right-of-way shall be kept trimmed to a height 
of no less than 8’.   
16. Unless otherwise directed by the City, the homeowner’s association, 
property owners associate, property owner, or property maintenance 
company shall have the responsibility of maintaining all landscaped 
areas, including within all adjacent rights-of-way. 
17. Plans shall indicate method of dust, weed, and debris control on the 
undeveloped portions of the site. 
18. [The City of Buckeye, EPCOR, etc.] is the supplier/source of water for the 
irrigation system and the supply is (potable or non-potable). Add only if 
system is non-potable: Warning signs will be located at pedestrian 
entrance/access points and spaced not more than 100 yards apart along 
frontage. These signs will be at least 6 inches square with black lettering 
on a white background. They will be labeled “WARNING: RECLAIMED WATER 
- DO NOT DRINK”. Add only if system is non-potable: All valve boxes will be 
installed with purple covers and all irrigation pipe will be purple in color. 
19. Substitutions in type and/or deviations in size or quantity from this 
Landscape & Irrigation Plan shall not be permitted without prior written 
approval from the City of Buckeye (Contact the designated Planner 
regarding plant substitutions 623-349-6200). 
20. All existing landscape including trees, shrubs and irrigation systems that 
are designated to remain in the approved landscape plans, and are 
damaged or destroyed during construction, will be replaced in kind by the 
contractor. 
21. The City shall be notified 24 hours prior to any construction work and 
inspections 623-349-6200. 
22. All design and construction must be in accordance with the Uniform 
Standard Specifications and Details for Public Works Construction 
published by the Maricopa Association of Governments (MAG) except as 
amended by the City of Buckeye Standard Construction Details. All 
improvements within the development, including offsite improvements, 
shall be in accordance with the latest City of Buckeye Engineering Design 
Standards.

1-1 Engineering Submittal Requirements 
City of Buckeye 
2026 
 38 
23. This set of plans has been reviewed for compliance with City requirements 
prior to issuance of construction permits. However, such review shall not 
prevent the City from requiring correction of errors in plans found to be in 
violation of any law or ordinance. 
24. An approved set of plans shall be available on the job site at all times. 
25. Right-of-way improvements shall not be accepted until "As-Built" plans 
have been submitted and approved by the City (See As-Built 
requirements). 
26. The developer is responsible for the removal or relocation of all 
obstructions within the right-of-way prior to starting new construction. 
27. The developer is responsible for arranging the relocation and associated 
costs of all utilities. A utility relocation schedule shall be submitted prior to 
the issuance of permits. 
28. The developer is responsible for obtaining or dedicating all required 
rights-of-way and easements to the City prior to issuance of permits. 
29. The Contractor is responsible to call Blue Stake prior to starting any 
construction. No work shall begin until blue stake is completed. Contact 
Blue Stake by calling 811 or going to Arizona811.com. 
30. The contractor shall barricade construction sites at all times. When 
required by the City, a traffic control plan shall be submitted for approval 
in advance of construction. 
31. The contractor may request a fire hydrant meter for construction water 
from the Public Works Department 623-349-6800. This meter should be 
ordered two working days prior to the start of construction. The unlawful 
removal of water from a fire hydrant is a violation of the municipal code, 
punishable by fine and/or imprisonment. 
32. Private on-site water and sewer lines shall be constructed in accordance 
with the Uniform Plumbing Code, N.F.P.A. and the International Fire Code 
(with City amendments) as adopted by the City of Buckeye. 
33. Any above-ground mechanical units that are placed adjacent to City 
right-of-way shall be properly screened in accordance with the 
Development Code. 
 
[End of Section]

1-1 Engineering Submittal Requirements 
City of Buckeye 
2026 
 39 
Appendix A – Standard Details 
 
11100  
Standard Cover Sheet  
11101  
Standard Second Sheet  
11102  
Standard Plan Sheet

STANDARD COVER SHEET
DETAIL NO:
REVISED:
11100
07-31-25
MANAGING ENGINEERING / SURVEYOR
PROJECT COORDINATOR
COB PERMITTING
APPROVED SEAL
COB ENGINEERING
APPROVED SEAL
DESIGN LAYOUT
DRAFTED
CHECKED
CHECKED
DRAFTED
FIELD SURVEY
DRAWING SCALES
PLAN TYPE
ENGINEER INFORMATION
PROJECT
COB PROJECT PLAN STICKER
REVISIONS
1
2
3
AS-BUILT SEAL
DESIGN SEAL
SUBMITTAL
COB PERMIT #
ORIGINAL PLAN DATE
LATEST REVISION DATE
SHEET NUMBER
PROJECT NUMBER
X of X
BASIS OF BEARING
BENCH MARK
I HEREBY CERTIFY THAT THE "AS - BUILT" INFORMATION
SHOWN HEREON WAS OBTAINED UNDER MY DIRECT
SUPERVISION AND IS CORRECT AND COMPLETE TO THE
BEST OF MY KNOWLEDGE AND BELIEF.
APPROVAL
1. THIS DESIGN IS BASED ON ACCURATE FIELD DATA, AND BOTH THE DESIGN AND DEPICTED EXISTING CONDITIONS
HAVE BEEN CHECKED IN THE FIELD PRIOR TO SUBMISSION OF THESE PLANS TO THE CITY FOR APPROVAL
     [ITEM NUMBER 1 REQUIRED FOR ALL PLANS]
2. THE DEVELOPMENT WILL PROVIDE FOR ON-SITE RETENTION FOR THE RUNOFF FROM A 100-YEAR [INSERT DESIGN
EVENT] HOUR STORM.
3. ALL FLOWS FROM THE 10-YEAR STORM WILL BE CONTAINED WITHIN THE STREET (FROM CURB TO CURB).
4. ALL STORM WATER RETENTION WILL BE DRAINED WITHIN 36-HOURS.  IF BASINS DO NOT DRAIN WITHIN 36-HOURS,
DEVELOPER/OWNER SHALL ENACT MEASURES TO CORRECT.
5. ALL DRAINAGE DESIGN WILL COMPLY WITH THE CITY OF BUCKEYE CURRENT GRADING AND DRAINAGE DESIGN
STANDARDS.
6. FINISH FLOOR ELEVATIONS MUST BE A MINIMUM OF 18-INCHES ABOVE THE OUTFALL TOP OF CURB ELEVATION AND
12-INCHES ABOVE THE COMPUTED 100-YEAR WATER ELEVATIONS AND 1-FOOT ABOVE THE EMERGENCY OUTFALL
ELEVATIONS AT ANY ADJACENT RETENTION BASIN, WHICH EVER IS GREATER.
7. ALL RETENTION BASINS SHALL HAVE A MINIMUM OF 1-FOOT OF FREEBOARD.
[ITEMS NUMBER 2-7 REQUIRED FOR ALL GRADING AND DRAINAGE PLANS]
A   PORTION  OF  THE ________________OF  SECTION __,
TOWNSHIP __________,  RANGE _________  OF  THE  GILA  AND
SALT  RIVER  BASE  AND  MERIDIAN,   MARICOPA  COUNTY,
ARIZONA.
COMPANY NAME
CONTACT NAME
ADDRESS
PHONE NUMBER
EMAIL ADDRESS
NOT TO SCALE
PHASE X
PARCEL X
PHASE X
PARCEL X
PHASE X
PARCEL X
NOT A PART
NOT A PART
PHASE X - PARCEL X
TYPE OF PLANS
PHASE X
PARCEL X
COMPANY NAME
CONTACT NAME
ADDRESS
PHONE NUMBER
EMAIL ADDRESS
COMPANY NAME
CONTACT NAME
ADDRESS
PHONE NUMBER
EMAIL ADDRESS
OWNER
DEVELOPER
ENGINEER
SHEET INDEX
SHEET 1
SHEET 2
SHEET 3
SHEET 4
DISCLAIMER:
THE CITY APPROVES THESE PLANS FOR CONCEPT ONLY AND
ACCEPTS NO LIABILITY FOR ERRORS AND OMISSIONS.
BY:
CITY OF BUCKEYE ENGINEER
BY:
BY:
FLOOD CONTROL DISTRICT MARICOPA COUNTY
MARICOPA COUNTY DEPARTMENT OF TRANSPORTATION
DATE
DATE
DATE
DATE
DATE
DATE
DATE
DATE
DATE
BY:
BY:
BY:
BY:
BY:
BY:
MARICOPA COUNTY ENVIRONMENTAL SERVICES DEPARTMENT
PRIVATE WATER
PRIVATE SEWER
ROOSEVELT IRRIGATION DISTRICT (RID)
WESTERN AREA POWER ADMINISTRATION (WAPA)
[OTHER SIGNATURE LINES AS REQUIRED]
AS-BUILT CERTIFICATION
ARIZONA REGISTERED LAND SURVEYOR             DATE
ARIZONA REGISTRATION NUMBER
TELEPHONE NUMBER
NAME OF DEVELOPMENT
STREET NAME
STREET NAME
STREET NAME
STREET NAME
OVERALL DEVELOPMENT
CIVIL DESIGN CERTIFICATION
BY:
REGISTERED CIVIL ENGINEER                                 DATE
SUMMARY OF QUANTITIES
PUBLIC
PRIVATE
ITEM
UNIT
QTY
ITEM
UNIT
QTY
T 02 N
T 01 N
T 01 N
T 01 S
R 02W
R 03W
R 04W
R 03W
VICINITY MAP
NOT TO SCALE
6
5
4
3
2
1
7
8
9
11
12
18
17
16
15
14
13
19
20
21
22
23
24
30
29
28
27
26
25
31
32
33
34
35
36
STREET NAME
STREET NAME
29
28
32
33
STREET NAME
STREET NAME
LOCATION MAP
NOT TO SCALE
FEMA FLOOD ZONE INFORMATION
COMMUNITY
NUMBER
PANEL #
PANEL DATE SUFFIX DATE OF FIRM
(INDEX DATE)
FIRM
ZONE
BASE FLOOD ELEV.
(IN AO ZONE
USE DEPTH)
ALL FLOOD ZONES ARE SHOWN IN THIS PLAN SET.
BUCKEYE WATER CONSERVATION & DRAINAGE DISTRICT
10
Contact Arizona 811 at least two full
working days before you begin excavation
Call 811 or click Arizona811.com
1. ALL CONSTRUCTION IN THE PUBLIC RIGHTS-OF-WAY OR IN EASEMENTS GRANTED FOR
PUBLIC USE MUST CONFORM TO THE LATEST MARICOPA ASSOCIATION OF GOVERNMENTS
(MAG) UNIFORM STANDARD SPECIFICATIONS AND UNIFORM STANDARD DETAILS FOR PUBLIC
WORKS CONSTRUCTION AS AMENDED BY THE LATEST VERSION OF THE CITY OF BUCKEYE
DESIGN STANDARDS.  IF THERE IS A CONFLICT, THE CITY OF BUCKEYE STANDARDS WILL
GOVERN.
2. CITY PERMITS ARE REQUIRED FOR ALL CIVIL IMPROVEMENTS AND CIVIL INFRASTRUCTURE. A
CITY PERMIT WILL BE ISSUED BY THE CITY ONLY AFTER ALL FEES HAVE BEEN PAID AND ALL
PREREQUISITE ITEMS FROM THE PERMIT CHECKLIST ARE PROVIDED.
3. A CITY OF BUCKEYE INSPECTOR WILL INSPECT ALL CIVIL IMPROVEMENTS WITHIN THE CITY
OF BUCKEYE. NOTIFY THE CITY 24 HOURS PRIOR TO THE INSPECTION BY EMAILING
ENGINSPECTIONS@BUCKEYEAZ.GOV OR BY CALLING (623) 745-5282.
4. COPIES OF ALL PERMITS AND MOST RECENT APPROVED PLANS MUST BE RETAINED ON-SITE
AND BE AVAILABLE FOR INSPECTION AT ALL TIMES.  FAILURE TO PRODUCE THE REQUIRED
PERMITS AND PLANS WILL RESULT IN IMMEDIATE SUSPENSION OF ALL WORK UNTIL PROPER
PERMIT DOCUMENTATION AND/OR PLANS ARE OBTAINED.  ALL OF THESE REQUIREMENTS
APPLY TO ONSITE GRADING AND IMPROVEMENT PLANS.
GENERAL PERMITTING NOTES
UTILITY CONFLICT NOTIFICATION
UTILITY
UTILITY COMPANY
DATE SUBMITTED
ELECTRIC
ARIZONA PUBLIC SERVICE
XX/XX/XXXX
TELEPHONE
CENTURYLINK
XX/XX/XXXX
CATV
COX COMMUNICATIONS
XX/XX/XXXX
WATER
XX/XX/XXXX
XX/XX/XXXX
SEWER
GAS
SOUTHWEST GAS
XX/XX/XXXX
XX/XX/XXXX
NAME OF UTILITY COMPANY
OTHER
PRIVATE WATER COMPANY
PRIVATE SEWER COMPANY
ENGINEER OF RECORD HEREBY CERTIFIES THAT THESE PLANS HAVE BEEN SUBMITTED TO
THE ABOVE UTILITY COMPANIES. WHERE THE PROPOSED IMPROVEMENTS CONFLICT WITH
ANY OF THESE UTILITIES, THE CONFLICTS SHALL BE RESOLVED AS NOTED IN THE PLANS,
SPECIAL PROVISIONS, OR PER UTILITY COMPANY REQUIREMENTS. CONFLICTS ARISING
DURING THE COURSE OF CONSTRUCTION FROM UNFORESEEN CIRCUMSTANCES, SHALL BE
REPORTED TO THE APPLICABLE UTILITY COMPANY, AND SHALL BE RESOLVED BY THAT
UTILITY COMPANY AND THE ENGINEER OF RECORD.

STANDARD SECOND SHEET
DETAIL NO:
REVISED:
11101
07-31-25
ENGINEER INFORMATION
LATEST REVISION DATE
DISPLAY SHEET LIMITS OVER DESIGN WITH THE FOLLOWING INFORMATION:
· PROJECT BOUNDARY
· SHEET NUMBERS
· MAJOR CROSS ROADS WITH ROAD NAMES
· ADJACENT PARCELS
· LOT NUMBERS
· TRACTS
[THESE ITEMS REQUIRED FOR ALL PLAN TYPES]
· SEWER LINE
· FLOW ARROWS
· MANHOLE LOCATIONS
· PIPE SIZE
[THESE ITEMS ADDITIONALLY REQUIRED FOR SEWER PLAN SETS]
· HYDRANT LOCATIONS
· PIPE SIZE
[THESE ITEMS ADDITIONALLY REQUIRED FOR WATER PLAN SETS]
· SITE OUTFALL
[THIS ITEM ADDITIONALLY REQUIRED FOR GRADING PLAN SETS]
SHOW:
· ALL SYMBOLS SHALL BE CONTAINED WITHIN THE
LEGEND
· ACRONYMS AND ABBREVIATIONS
REPRODUCE ALL APPLICABLE COB CONSTRUCTION NOTES  INCLUDING:
·
GENERAL CONSTRUCTION NOTES
·
GRADING AND DRAINAGE CONSTRUCTION NOTES
·
SEWER CONSTRUCTION NOTES
·
WATER CONSTRUCTION NOTES
·
PAVING CONSTRUCTION NOTES
·
SIGNING AND STRIPING CONSTRUCTION NOTES
·
TRAFFIC SIGNAL NOTES
·
STREETLIGHT NOTES
·
LANDSCAPE CONSTRUCTION NOTES
CITY OF BUCKEYE NOTES
KEY MAP
LEGEND
REVISIONS
1
2
3
PLAN NAME
COB PERMITTING
APPROVED SEAL
COB ENGINEERING
APPROVED SEAL
SUBMITTAL
COB PERMIT #
AS-BUILT SEAL
DESIGN SEAL
ORIGINAL PLAN DATE
PROJECT NUMBER
SHEET NUMBER
Contact Arizona 811 at least two full
working days before you begin excavation
Call 811 or click Arizona811.com
X of X

1
2
3
PLAN NAME
ENGINEER INFORMATION
COB PERMITTING
APPROVED SEAL
COB ENGINEERING
APPROVED SEAL
AS-BUILT SEAL
DESIGN SEAL
ORIGINAL PLAN DATE
LATEST REVISION DATE
PROJECT NUMBER
SHEET NUMBER
X of X
SUBMITTAL
REVISIONS
COB PERMIT #
STANDARD PLAN SHEET
DETAIL NO:
REVISED:
11102
07-31-25
1 inch =        ft.
( IN FEET )
GRAPHIC SCALE
0
PLAN VIEW
ALL CONSTRUCTION NOTES SHALL BE DOWN THE RIGHT
HAND SIDE OF PAGE.
CONSTRUCTION NOTES
PROFILE VIEW
0
0
0
000
0
0