Section 1-2 As-Built Requirements 2026.pdf
Extracted text (via pymupdf)
34512 characters
CHAPTER 1: GENERAL INFORMATION SECTION 2: AS-BUILT REQUIREMENTS Engineering Design Standards City of Buckeye, Arizona January 2026 1-2 As-Built Requirements City of Buckeye 2026 Summary of 2026 Section 1-2 Updates The following list summarizes notable updates to Section 1-2, however not all changes may be documented in this summary. Applicants are encouraged to familiarize themselves with the document in its entirety. 1-2.000 General Information 1-2.003 General Requirements • Reordered subsections • Created new subsections E, H, and I 1-2.100 Grading and Drainage As-Builts 1-2.102 To Pave As-Built Requirements • Revised subsection A.5 to clarify the dimension is to storm drain 1-2.103 Final As-Built Requirements • Created new subsections listing specific items to as-built for Retention (Surface Basins) and Retention (Underground) • Overhauled subsection covering retention certification letters by clarifying and adding new requirements for the memo 1-2.400 Paving and Storm Drain As-Builts 1-2.403 Final As-Built Requirements • Added a cross reference for where to find storm drain as-built requirements 1-2.500 Traffic Signal As-Builts 1-2.503 Final As-Built Requirements • Removed subsection note regarding acceptance of record drawings in relation to bond release 1-2 As-Built Requirements City of Buckeye 2026 Table of Contents 1-2.000 General Information ........................................................................................... 2 1-2.001 Overview ................................................................................................................................................... 2 1-2.002 Definitions and Abbreviations ................................................................................................... 2 1-2.003 General Requirements ................................................................................................................... 3 1-2.004 To Pave Declaration / As-Built Drawings .......................................................................... 4 1-2.005 “For Final” or “Final” As-Built Drawings ................................................................................ 5 1-2.006 Tolerances and Corrections ....................................................................................................... 6 1-2.100 Grading and Drainage As-Builts ..................................................................... 6 1-2.101 Overview ................................................................................................................................................... 6 1-2.102 To Pave As-Built Requirements ................................................................................................ 6 1-2.103 Final As-Built Requirements ........................................................................................................ 7 1-2.200 Sewer As-Builts ...................................................................................................9 1-2.201 Overview ................................................................................................................................................... 9 1-2.202 To Pave As-Built Requirements ................................................................................................ 9 1-2.203 Final As-Built Requirements ....................................................................................................... 9 1-2.300 Water As-Builts .................................................................................................. 11 1-2.301 Overview ................................................................................................................................................... 11 1-2.302 To Pave As-Built Requirements ................................................................................................ 11 1-2.303 Final As-Built Requirements ...................................................................................................... 12 1-2.400 Paving and Storm Drain As-Builts ................................................................. 14 1-2.401 Overview .................................................................................................................................................. 14 1-2.402 To Pave As-Built Requirements ............................................................................................... 14 1-2.403 Final As-Built Requirements ...................................................................................................... 14 1-2.500 Traffic Signals As-Builts ................................................................................... 15 1-2.501 Overview .................................................................................................................................................. 15 1-2.502 To Pave As-Built Requirements ............................................................................................... 15 1-2 As-Built Requirements City of Buckeye 2026 1-2.503 Final As-Built Requirements ...................................................................................................... 15 1-2.600 Signing and Marking As-Builts ....................................................................... 15 1-2.601 Overview .................................................................................................................................................. 15 1-2.602 Final As-Built Requirements ...................................................................................................... 15 1-2.600 Intelligent Transportation Systems (ITS)...................................................... 16 1-2.601 Overview .................................................................................................................................................. 16 1-2.602 Final As-Built Requirements ...................................................................................................... 16 1-2.700 Streetlight As-Builts ......................................................................................... 16 1-2.701 Overview .................................................................................................................................................. 16 1-2.702 Final As-Built Requirements ...................................................................................................... 17 1-2 As-Built Requirements City of Buckeye 2026 1 1-2 – As-Built Requirements This section of the Engineering Design Standards (EDS) is developed by the City of Buckeye (COB) to serve as a comprehensive set of criteria to standardize as-built civil engineering plans for submittal to the City of Buckeye (COB). This guiding document is intended for engineers, developers, and contractors, providing clarity and uniformity in the submission and review process. The City Engineer is required, pursuant to Chapter 23, Article 23-2, of the City Code, to develop standards and details regarding improvements to be constructed within the city. The standards, design criteria, and policy set forth in this section were developed and recommended by the City Engineer pursuant to Chapter 23, Article 23-2, and adopted by the City Council in Resolution No. 04-26 on 1/20/2026. Implementation: The requirements of this section shall become effective in accordance with City Code. The standards and requirements of this section shall apply to all new plans, including plans seeking a new City Engineer’s signature or a re-approval from the City Engineer, submitted to the City following the effective date of the City Council’s adoption of the resolution approving the standards and requirements of this section. Modification Authority: The City Engineer or designee may approve variances to the requirements of this section. A Variance Process Guide and Variance Application can be found on the City website. 1-2 As-Built Requirements City of Buckeye 2026 2 1-2 As-Built Requirements 1-2.000 General Information 1-2.001 Overview A. This section is to aid the engineering customers in developing as-built civil engineering plans for submittal to the City of Buckeye (COB). B. All standards herein apply to all infrastructure plans submitted to the COB for review and approval. This includes but is not limited to as-built plans for: Grading, Drainage, Sewer, Water, Concrete, Paving, Signing and Striping, Improvement, Site Improvement, Street Lighting, and Landscaping Plans. 1-2.002 Definitions and Abbreviations • AB – As-built • Field Directive – A plan change that can be summarized on an 8 ½ x 11 or 11 x 17 size paper sealed by a licensed engineer and submitted for review and approval by the City. Use of field directives are subject to City determination based upon the scope of the proposed plan modification. If the modification is determined to be beyond a field directive, a plan revision shall be completed – refer to plan revision definition below. • Plan(s) – Design drawings that are 100 percent complete and sealed by a registered professional engineer. • Plan Revision – A plan modification that requires original plan sheets (24 x 36) to be revised. Revised plans are required to include clouding of proposed modifications, delta revision number and description, resealed by a licensed engineer, and submitted to the City for review and reapproval of plan set. Additional information on plan revisions can be accessed on the City of Buckeye Website. • Construction Inspector – A City employee or contracted consultant with a primary responsibility of monitoring the construction of improvements for conformance to City requirements. • PUE – Public Utility Easement • ROW – Right(s)-of-Way 1-2 As-Built Requirements City of Buckeye 2026 3 1-2.003 General Requirements A. All as-built drawings shall be notated on the most current approved plan set bearing all the City's approval stamps. B. If any of the original approvals are missing, or the as-built drawings are not notated on the current set of approved plans on file at the COB, they shall be considered invalid and will be returned un-reviewed. C. The as-built drawings submitted to the City shall bear the original design engineer’s seal from the time of City approval. D. All as-built drawings shall have the surveyor’s certification signed in the appropriate location on the cover sheet and all as-built sheets shall each be additionally stamped by the engineer or surveyor who is responsible for the as-built information. The surveyor or engineer shall be a registered professional in the State of Arizona. Lack of this signature and certification shall cause rejection of the as-built drawings. E. Place “As-Built” stamp on the lower right corner of all sheets. F. As-built drawings shall be provided to the City as a complete representation of that constructed in the field. G. All elevations, dimensions, and changes shall be accurately shown. H. Items built exactly per plan shall have the original approved plan information notated with parenthesis and marked “AB”. Example: (123-XYZ) AB. I. Items not built exactly per plan shall have the original approved plan information crossed out, the new as-built information printed next to the crossed-out data, and an “AB” next to the new as-built information. When writing the new information, if there is insufficient space to make the text 0.1 inch in height, use a leader line from the crossed-out data to the new information. Never completely obscure or erase original approved plan information. J. Any change in structure or pipe location of more than 10 feet shall require the moved item to be redrawn and represented legibly and accurately at the as- built location. K. All field directives that were approved during construction shall be incorporated into the drawings. 1. The field directives can be as-built and added onto extra sheets at the end of the as-built drawings, if the sheet index is updated. 1-2 As-Built Requirements City of Buckeye 2026 4 L. Minor changes can be drawn schematically on the plans for ease of identification. M. All drawings submitted shall be neat and legible. Any drawing that is not neat or legible is subject to rejection and the as-built information will have to be redrawn and resubmitted. The City Engineer will determine if the plans will be rejected. N. The COB has an optional two-step as-built drawing review process. The contractor can submit To Pave as-built drawings in lieu of completing a To Pave Declaration and shall be responsible for providing a “For Final” as-built drawing review submittal. 1-2.004 To Pave Declaration / As-Built Drawings A. A To Pave Declaration can be completed and utilized to certify the developer and contractor confirm the proposed underground improvements have been completed and installed per the City approved plans, applicable City of Buckeye Engineering Design Standards, MAG specifications and standards, and that they comply with as-built requirements as identified in water, sewer, and storm drain standards. 1. By completing and signing a To Pave Declaration, the developer affirms the required certifications and declarations outlined in the To Pave Declaration. The developer understands and agrees that a failure to comply with plans, standards, or requirements as certified in the declaration will result in remediation by the developer of any issues. B. If a To Pave Declaration is not desired to be completed by the developer, To Pave as-built drawings may be submitted. To Pave as-built reviews require additional lead time prior to paving due to City review timeframes and potential resubmission for subsequent reviews. This as-built review identifies any underground issues that may have been missed during construction. These issues can more easily be fixed prior to the placement of the pavement; therefore, To Pave as-built drawings are an option prior to paving. 1. To Pave as-built drawings required for submittal: a. Grading and Drainage Plan – Storm Drain Review, b. Sewer Plan, c. Water Plan, and 1-2 As-Built Requirements City of Buckeye 2026 5 d. Any underground construction that falls within the limits of proposed paving. 2. To Pave As-Built Drawing Requirements: a. The To Pave submittal is required after all underground construction is completed. b. This submittal is to verify the correctness of construction prior to allowing any permanent paving to be placed. c. Minimum requirements are that all design elevations, stationing, offsets, and dimensions are shown on the plans. d. See each individual design section for additional as-built drawing requirements. 3. To Pave as-built submittals shall be submitted within 30 days of the completion of construction of the underground utility. C. Street paving shall not be permitted to start prior to the receipt of a completed and signed To Pave Declaration or approval of To Pave as-built drawings. 1-2.005 “For Final” or “Final” As-Built Drawings A. This review is a final review of the underground and surface improvements. All red-line comments on this review shall be addressed and or work corrected prior to the plan set acceptance. B. Once approved, these drawings are the as-builts that the developer/landowner will use as part of the final project closeout package. C. If final as-built drawings are not completed on the appropriate plans the as- built drawings shall be returned un-reviewed. D. Final As-Built Drawing Requirements: 1. Submitted as an electronic PDF review. 2. As-built all aspects of the original design to prove construction was completed as the design engineer intended. 3. All monuments and brass caps shall be as-built as these tie all the as- built drawings together. The monuments and brass caps shall be as-built the same on all plan sets. 4. See each individual design section for additional final as-built drawing requirements. 1-2 As-Built Requirements City of Buckeye 2026 6 1-2.006 Tolerances and Corrections A. All tolerances shall be per MAG unless modified by the City. B. Certain deviations may be approved on a case-by-case basis as determined by the City. C. If any of the submitted and reviewed as-built information results in concerns with life, safety, and/or welfare, the City has the authority to require the issue be resolved and brought into compliance with any applicable Federal, State, or local laws, ordinances, or standards. Required corrections shall be completed at the Contractor’s, Developer’s, and/or Landowner’s expense. D. See each individual design section for additional tolerance and correction requirements. 1-2.100 Grading and Drainage As-Builts 1-2.101 Overview A. After completion of grading and storm water drainage improvements, an As- Built final grading and drainage plan shall be submitted to the City for review and approval. B. All plans shall comply with general requirements outlined in Section 1-2.000. 1-2.102 To Pave As-Built Requirements A. To Pave As-Built submittal shall include the following items and comply with applicable tolerances listed in the Final As-Built Requirements section (if storm drains are included on grading plan): 1. Manhole stations, including offsets 2. All plan inverts shown 3. All utility crossing dimensions and separations (outside of utility to outside of utility) 4. All pipe length, pipe slope, pipe sizes and pipe material 5. Dimensions shown from centerline to storm drain are to be as-built 6. Storm drain manhole rim elevations to be as-built on the “Final” As-Builts after paving and adjustments are completed 1-2 As-Built Requirements City of Buckeye 2026 7 1-2.103 Final As-Built Requirements A. As-built information shall be completed for the following items: 1. Top of curb elevations a. In lieu of completing as-built information, a top of curb certification letter by the Surveyor or Engineer of Record can be signed, sealed, and submitted to the City. i. Letter shall be submitted with 1st submittal of final as-built drawings. 2. PAD elevations a. PAD elevation deviations in excess of 0.1’ lower than the designed PAD elevation shall be corrected. i. Corrections shall be at the Contractor’s, Developer’s, or Landowner’s expense. 3. Retaining wall elevations shall include the following as-built information: a. Top and bottom of wall elevations b. At changes in elevation, ends of walls, or as needed to provide a clear and reasonable depiction of elevations of / along walls. c. In lieu of completing as-built information, a retaining wall certification letter by the Surveyor or Engineer of Record can be signed, sealed, and submitted to the City. i. Letter shall be submitted with 1st submittal of final as-built drawings. 4. Storm drains shall include the following as-built information (if storm drains are included on grading plan): a. Invert elevations b. Pipe lengths c. Pipe slopes d. Pipe sizes e. Pipe material 5. Retention (Surface Basins) a. Volume Provided (Based on HW shown) 1-2 As-Built Requirements City of Buckeye 2026 8 b. Basin bottom elevation c. Basin freeboard elevation d. Basin emergency outfall elevation e. Basin side slopes f. Contour layout (if basin footprint is modified) 6. Retention (Underground) a. Length of pipe b. Volume Provided 7. Drywells a. Rim elevations b. Northing and eastings 8. Channel and swale a. Elevations b. Slopes 9. Stormwater storage percolation certification memos are required to demonstrate 36-hour stormwater disposal time and shall contain the following information: a. Professional Engineers seal. b. Summary of all surface and underground retention basins with the following information for each facility: 1. Storage Facility identifier as consistent with the as-builts. 2. Required stormwater event volume as consistent with the approved plans and drainage report. 3. List of installed drywells with identifiers as consistent with percolation test results. 4. Volume disposal calculations using derated percolation test results. See COB EDS Section 5-1 for additional information on post construction requirements. Final facility disposal time shall be provided. c. Percolation test results for drywells and basin bottoms with exhibit illustrating drywell numbering and location. 1-2 As-Built Requirements City of Buckeye 2026 9 d. Drywell drilling logs at five-foot intervals including lithology changes. e. The approved drywell registration from the Underground Injection Control program regulator shall be provided. A tabulation showing all drywell numbers and registration numbers shall be provided. 10. Ultimate outfall elevation 1-2.200 Sewer As-Builts 1-2.201 Overview A. After completion of sewer improvements, an as-built sewer plan shall be submitted to the City for review and approval. B. All plans shall comply with general requirements outlined in Section 1-2.000. 1-2.202 To Pave As-Built Requirements A. To Pave as-built submittal shall include the following items and comply with applicable tolerances listed in the Final As-Built Requirements section: 1. Manhole stations, including offsets 2. All plan inverts shown 3. All utility crossing dimensions and separations (outside of utility to outside of utility) 4. All pipe length, pipe slope, pipe sizes, and pipe material 5. All service stationing and dimensions 6. Horizontal location of the sewer, including dimensioning from center line 7. All sewer services located 8. All offset dimensions to the property line shall be as-built 9. Dimensions shown from centerline to sewer line are to be as-built 1-2.203 Final As-Built Requirements A. As-built information shall be completed for the following items: 1. All utility crossing dimensions and separations (outside of utility to outside of utility). a. Unacceptable crossing dimensions and separations: 1-2 As-Built Requirements City of Buckeye 2026 10 i. Separation from water main that violate the MAG Zone “A” tolerances. ii. Constructed sewer and water crossings that deviate and result in non-compliance will require the sewer and water to be relocated at the Contractor’s, Developer’s, and/or Landowner’s expense. 2. Sewer mains and pipes shall include the following as-built information: a. Invert elevations b. Pipe lengths c. Pipe slopes i. Unacceptable sewer slopes are as follows: 1. 8-inch sewer slope: 0.0030 ft/ft or lower 2. 10-inch sewer slope: 0.0018 ft/ft or lower 3. 12-inch sewer slope: 0.0015 ft/ft or lower 4. 15-inch sewer slope: 0.0012 ft/ft or lower 5. 18-inch sewer slope: 0.0009 ft/ft or lower ii. Constructed sewer slopes that deviate and result in non- compliance will require the sewer to be removed and replaced at the Contractor’s, Developer’s, and/or Landowner’s expense. d. Pipe sizes e. Pipe material f. Pipe depth 3. Sewer services shall be located and include the following as-built information: a. Stationing b. Dimensions i. Unacceptable sewer service locations are as follows: 1. Sewer services not constructed to the designated property ii. Constructed sewer services that deviate and result in non- compliance will require the sewer services to be removed and replaced at the Contractor’s, Developer’s, and/or Landowner’s expense. 1-2 As-Built Requirements City of Buckeye 2026 11 4. Sewer manholes shall include the following as-built information: a. Stations b. Offsets i. Unacceptable sewer manhole locations are as follows: 1. Manholes located within one (1) foot of the lip of gutter or street centerline ii. Constructed sewer manholes that deviate and result in non- compliance will require the sewer manhole to be removed and replaced at the Contractor’s, Developer’s, and/or Landowner’s expense. c. Rim elevations d. Invert elevations i. Unacceptable sewer manhole invert elevations are as follows: 1. Manhole flow lines with a negative grade 2. Manhole as-built invert elevations outside of MAG tolerances 5. Horizontal locations of sewer, including dimension from centerline a. Sewer mains outside of ROW or City easements shall be removed and replaced. b. All sewer mains within five feet of the edge of the easement shall be removed and replaced. 6. Offset dimensions from property line shall be as-built 1-2.300 Water As-Builts 1-2.301 Overview A. After completion of water improvements, an as-built water plan shall be submitted to the City for review and approval. B. All plans shall comply with general requirements outlined in Section 1-2.000. 1-2.302 To Pave As-Built Requirements A. To Pave As-Built submittal shall include the following items and comply with applicable tolerances listed in the Final As-Built Requirements section: 1. All stations and offsets 1-2 As-Built Requirements City of Buckeye 2026 12 2. All plan inverts shown 3. All utility crossing dimensions and separations (outside of utility to outside of utility) 4. All pipe length, pipe slope, pipe sizes, and pipe material 5. All service stationing and dimensions 6. Horizontal location of the water, including dimensioning from center line 7. All water services located 8. All offset dimensions to the property line shall be as-built 9. Dimensions shown from centerline to water main are to be as-built 1-2.303 Final As-Built Requirements A. As-built information shall be completed for the following items: 1. All utility crossing dimensions and separations (outside of utility to outside of utility). a. Unacceptable crossing dimensions and separations: i. Separation from sewer or other non-potable that violate the MAG Zone “A” tolerances. ii. Constructed sewer / non-potable and water crossings that deviate and result in non-compliance will require the sewer and water to be relocated at the Contractor’s, Developer’s, and/or Landowner’s expense. 2. Water mains and pipes shall include the following as-built information: a. Invert elevations b. Pipe lengths c. Pipe slopes i. Creation of high points that did not exist in the design or that does not have a proper way to bleed air is unacceptable. Creation of high points that result in non-compliance will require the water main to be removed and replaced at the Contractor’s, Developer’s, and/or Landowner’s expense. d. Pipe sizes e. Pipe material 1-2 As-Built Requirements City of Buckeye 2026 13 f. Pipe depth i. If the City minimum cover decreases by six inches or greater the water main shall be removed and replaced. 3. Water services shall be located and include the following as-built information: a. Stationing b. Dimensions i. Unacceptable water service locations are as follows: 1. Water services not constructed to the designated property ii. Constructed water services that deviate and result in non- compliance will require the sewer services to be removed and replaced at the Contractor’s, Developer’s, and/or Landowner’s expense. 4. Water valves shall include the following as-built information: a. Stations b. Offsets i. Unacceptable water valve locations are as follows: 1. Water valves located within one (1) foot of the lip of gutter or street centerline ii. Constructed water valves that deviate and result in non- compliance will require the water valves to be removed and replaced at the Contractor’s, Developer’s, and/or Landowner’s expense. c. Valve adjustments shall be verified 5. Fire hydrants shall include the following As-Built information: a. Stations b. Offsets 6. New sample stations shall be verified 7. Air release valve stations shall be as-built 8. Horizontal locations of water, including dimension from centerline 1-2 As-Built Requirements City of Buckeye 2026 14 a. Water mains outside of ROW or City easements shall be removed and replaced. b. All water mains within five feet of the edge of the easement shall be removed and replaced. 9. Offset dimensions from property line shall be as-built 1-2.400 Paving and Storm Drain As-Builts 1-2.401 Overview A. After completion of paving and storm drain improvements, an as-built paving and storm drain plan shall be submitted to the City for review and approval. B. All plans shall comply with general requirements outlined in Section 1-2.000. 1-2.402 To Pave As-Built Requirements A. To Pave As-Built submittal shall include the following items and comply with applicable tolerances listed in the Final As-Built Requirements section: 1. Manhole stations, including offsets 2. All plan inverts shown 3. All utility crossing dimensions and separations (outside of utility to outside of utility) 4. All pipe length, pipe slope, pipe sizes and pipe material 5. Dimensions shown from centerline to storm drain are to be as-built 6. Storm drain manhole rim elevations to be as-built on the “Final” As-Builts after paving and adjustments are completed. 1-2.403 Final As-Built Requirements A. As-built information shall be completed for the following items: 1. All valley gutter elevations 2. All utility adjustments 3. Monument stationing and elevation if a type a MAG 120-1 Type A, or just the stationing if a MAG 120-1 Type B monument. 4. Sidewalk ramps and driveways 5. All top of curb and gutter elevations 1-2 As-Built Requirements City of Buckeye 2026 15 6. All paving slopes shall be recalculated and shown 7. All paving elevations shown 8. All curb return slopes as-built and verified to be in compliance with ADA a. Any items constructed that does not meet ADA shall be removed and replaced in such a manner to meet all requirements of the ADA. 9. All median offsets and elevations 10. For storm drain requirements see Section 1-2.103.A.4. 1-2.500 Traffic Signals As-Builts 1-2.501 Overview A. After completion of traffic signal improvements, an as-built traffic signal plan shall be submitted to the City for review and approval. B. All plans shall comply with general requirements outlined in Section 1-2.000. 1-2.502 To Pave As-Built Requirements A. To Pave As-Built submittal shall include the following items and with applicable tolerances listed in the Final As-Built Requirements section: 1. Conduit locations 1-2.503 Final As-Built Requirements A. As-built information shall be completed for the following items: 1. Final record drawings required for submittal 2. Station and offsets for all poles, cabinets and pull boxes 1-2.600 Signing and Marking As-Builts 1-2.601 Overview A. After completion of signing and marking improvements, an as-built signing and marking plan shall be submitted to the City for review and approval. B. All plans shall comply with general requirements outlined in Section 1-2.000. 1-2.602 Final As-Built Requirements A. As-Built information shall be completed for the following items: 1-2 As-Built Requirements City of Buckeye 2026 16 1. All information in the sign table 2. All lane dimensions 3. All stationing of changes in marking 4. All striping and symbols a. All striping and symbols not in conformance with the plans shall be removed and replaced at the Developer's expense 5. Station and offsets on all signs a. All signs that are not within 2 feet of the design locations shall be moved at the Developer's expense 1-2.600 Intelligent Transportation Systems (ITS) 1-2.601 Overview A. After completion of ITS improvements, an as-built ITS plan shall be submitted to the City for review and approval. B. All plans shall comply with general requirements outlined in Section 1-2.000. 1-2.602 Final As-Built Requirements C. As-Built information shall be completed for the following items: 1. Stations and offsets and latitudes and longitudes on all ITS pull boxes and ITS equipment. a. Any City approved variations in conduit runs that are above the 24” minimum depth shall be noted from the beginning to the end of the variation. 2. Latitude and longitude for all 7-way conduit splice locations. 3. Conduit bore profiles, including latitude/longitude every 100’. 4. Elevations of all utilities exposed that cross the conduit are to be noted. 1-2.700 Streetlight As-Builts 1-2.701 Overview A. After completion of street light improvements, an as-built streetlight plan shall be submitted to the City for review and approval. B. All plans shall comply with general requirements outlined in Section 1-2.000. 1-2 As-Built Requirements City of Buckeye 2026 17 1-2.702 Final As-Built Requirements A. As-built information shall be completed for the following items: 1. Final as-built drawings required for submittal 2. All stations and offsets from back of curb or back of walk when adjacent shall be as-built a. Streetlights that have moved greater than 10 feet from their design locations shall have the photometric plan redone to ensure the lighting levels are still in conformance with the City requirements. b. If the streetlight is not in the location per plan and the City deems it a hazard, the Developer/Landowner shall move the light out of harm’s way to a location as approved by the City and new GPS coordinates provided. c. If a streetlight is determined by APS, SRP, WAPA, and/or CAP to be within the sag of clearances of high-power electrical lines, the development shall move or reduce the height of the pole to meet the requirements and new GPS coordinates provided if the pole is moved. d. If other improvements to the project have been modified for any reason (different site conditions, unknown utilities, construction errors, surveying errors, etc.) and the streetlight locations must be moved beyond acceptable tolerances, City approval will be required prior to installing streetlights in new locations. Failure to comply will result in removal of the streetlight(s) at the Developer/Landowner’s or Contractors expense. 3. All monuments shown shall be as-built 4. All GPS coordinates of streetlights shall be as-built 5. All asset I.D. numbers shall be as-built [End of Section]