City of Buckeye
2025 Integrated Water
Master Plan - Executive Summary
Final / November 2025
2
Planning for Rapid Development is a
Key Driver for the 2025 Integrated
Water Master Plan
Estimate of growth, water and
wastewater flow projections.
Water resource strategies.
Water infrastructure plan.
Wastewater infrastructure plan.
Reclaimed water
infrastructure plan.
This Executive Summary
presents an overview of
the 2025 Integrated Water
Master Plan containing the
following information:
Master Planned Developments in Buckeye
as of 2025
The City is experiencing growth in large developments
and in infill areas that require careful planning to provide
adequate water supply and wastewater services.
The 2025 Integrated Water Master Plan (2025 IWMP)
contains the infrastructure plan recommendations
for the 2030, 2035, and 2040 planning periods.
urg
Circle City
Wittmann
10
10
Dixie
Allenville
Palo Verde
Buckeye
60
Liberty
16
26
5
34
23
27
28
7
9
19
8
29
11
32
17
22
24
6
33
2
31
30
4
3
21
15
18
13
25
10
12
20
14
1
Legend
Buckeye Planning Area
DevelopmentName
1 - Algodon
2 - Blue Horizons
3 - Buckeye 252
4 - Cipriani
5 - Copper Falls
6 - Desert Creek
7 - Elianto
8 - Festival Ranch
9 - Floreo at Terravalis
10 - Former Cemex Sand
and Gravel Quarry
11 - Henry Park
12 - Jackrabbit Crossing
13 - Marwest
14 - Mayfield
15 - Miller Crossings
16 - Monte Verde
17 - Montiere
18 - Mountain View
Business Center
19 - North Star Ranch
20 - Paloma Vista
21 - Parkman Ranch
22 - Sienna Hills
23 - Silver Rock
24 - Sun Valley South
25 - Sun Valley Villages I
and II
26 - Sundance
27 - Tartesso
28 - Tartesso West
29 - Teravalis
30 - Valle Del Rio
31 - Valle Del Sol
32 - Verrado
33 - Westpark
34 - Westwind
Other Planned
Developments, Outside of
MPCs
To develop the infrastructure plan, water demand projections were
established for land areas that have legal water resources and
therefore can develop. Then, water and wastewater hydraulic models
were prepared to evaluate the capacity of existing infrastructure and
determine the infrastructure requirements for future development.
Infrastructure projects were defined and assigned to planning
periods with growth related triggers where appropriate. The City
will determine which projects go into the City’s Capital Improvement
Program (CIP) and which projects will be funded for by developers.
The City will determine the costs of projects in the CIP.
3
Water Resources Strategies that Develop
Renewable Supplies are Critical for the
City to Continue to Grow
Designation of Assured Water Supply (DAWS)
The City has a goal to obtain a DAWS in one or more Water Planning
Areas (WPA) in the City. A DAWS provides assurance to developers
that the City has taken responsibility to provide a water supply to the
development for the next 100 years. The City is pursuing an alternative
approach (called an ADAWS) provided by ADWR to satisfy the five
requirements to obtain a DAWS.
Additional water supplies may come from one
or more of the following sources:
• The Harquahala Groundwater
Basin.
• Reclaimed water in the form of:
» Non-potable reuse (NPR), ie.,
used for irrigation.
» Indirect potable reuse (IPR), ie.,
aquifer storage and
potable water recovery.
» Advanced water treatment.
• Roosevelt Irrigation District (RID).
• Buckeye Water Conservation
and Drainage District (BWCDD).
• Ag to Urban program.
• Buckeye waterlogged area
(BWLA).
• Priority 3 or 4 Colorado River
water.
• Verde River Sediment Mitigation
Project (raising the Bartlet Dam).
• Long-term storage credits
(LTSC).
• Colorado River Indian Tribe
(CRIT).
• Partnerships with other
communities.
• Regional projects.
• Groundwater.
• Central Arizona Project (CAP) water.
• Reclaimed water.
• Long-term storage credits derived
from reclaimed water.
Buckeye’s water resources
portfolio includes the
following:
Developments secure water resources by obtaining
a Certificate of Assured Water Supply (CAWS) from
the Arizona Department of Water Resources (ADWR).
Certificates are associated to a specific lot, cannot
be transferred, and will not expire. Certificates that
have already been issued for undeveloped lots
provide significant growth potential for the City.
Water Resource Recommendations
The following recommendations are made for water resource planning and to obtain a DAWS:
1. Maximize underground water storage near
recovery wells.
2. Develop reclaimed water recharge and recovery
projects to use all reclaimed water.
3. Obtain a surface water supply from the Verde River
Sediment Mitigation Project.
4. Pursue water exchanges with Priority 3 or 4 CAP
water or CRIT leases.
5. Bring Harquahala groundwater to the City.
6. Exchange water resources with
neighboring communities.
7. Negotiate with RID and BWCDD for water supply
and conveyance opportunities.
8. Require developments to bring renewable
supplies to develop.
9. Strengthen the City’s water conservation program,
through public policy to reduce demand.
10. Implement actions to obtain a DAWS in part of the
City, working with ADWR to implement alternative
approaches.
Criteria to obtain a DAWS:
• Physical, continuous, legal water
availability.
• Adequate water quality.
• Financial capability.
• Demonstrate consistency with the
management goal of the Phoenix
Active Management Area.
• Meet water conservation
requirements of the
Phoenix AMA.
4
Demand Projections Were Prepared for Land
that has the Water Resources to Develop
Lands must have a water resource before platting and development can occur. Lands are classified below to identify
where development can occur under current water resource regulations:
• Grandfathered – land that was developed before the
1980 Groundwater Management Act.
• Developed – Developed land that has a water
resource.
• Developing – Land with recorded, undeveloped lots
from a CAWS.
• CAWS not required – Land assumed to not be
subdivided into six or more lots, usually commercial or
industrial land.
• No water resource – Land that does not have a water
resource identified.
In the 2025 IWMP, land that is projected to develop
in each planning period will come primarily from the
Developing and CAWS not Required categories. Land
areas in WPA 4A and 4B can now develop under the
recently approved Ag to Urban program. If an ADAWS is
approved by ADWR then additional lands may develop.
Developable Land Classified by Water
Resource Classification
Development through 2040 will be on lands with
committed water resources or that do not require
a water resource plus lands in the Ag to Urban
program or a future ADAWS..
City of Buckeye Land use Classifications
The City’s land use plan defines the type of
development that will be built. Unit water demands
are assigned based on land use categories.
Legend
Water Planning
Area
Water Resource
Classification
CAWS but not
developed
Developed
Developing
Grandfathered
CAWS not required
No water resource
Legend
Land Use
Commercial
High Density
Residential
Industrial
Low Density
Residential
Medium Density
Residential
Open Space
Turf
No Water Use
Buckeye Planning
Area
5
0
50,000
100,000
150,000
200,000
250,000
1990
2000
2010
2020
2030
2040
2050
Population
Year
Historical Population
Projected Population
Projected Demands and Planned
Infrastructure are Arranged by Planning
Period and Water Planning Area
tersburg
Circle City
Wittmann
10
10
Dixie
Allenville
Palo Verde
Buckeye
60
Liberty
3
Q
3
Q
3
Q
3
Q
3
Q
3
Q
3
Q
3
Q
3
Q
3
Q
3
Q
3
Q
WPA 1
WPA 3
WPA 5
WPA 2
WPA 4A
WPA 4B
Festival
Ranch
Festival
Ranch
Teravalis
Sun Valley
Villages
I and II
North Star
Ranch
Farallon
WTP 5
WTP 11
Westpark WTP
Floreo WTP
Tartesso WTP
Cipriani WTP
Sun City
Festival WTP
Grand
View WTP
Sundance
North Airport
Jackie A.
Meck WC
O
0
3
1.5
Miles
Disclaimer: Features shown in this
figure are for planning purposes and
represent approximate locations.
Engineering and/or survey accuracy
is not implied.
Data Sources: City of Buckeye.
3
Q
Proposed WTP
Projected Development Phase
Existing
2030
2035
2040
Post 2040
Master Planned
Community
Tartesso West
Elianto
West Phoenix Estates
Sun Valley South
Buckeye Canal
RID Canal
Development Timing for Land
with Water Resources
To aid in planning infrastructure and water supplies,
the City was divided into WPA 1, 2, 3, 4A, and 4B.
Development timing has been estimated based on
development plans for new development areas and
proximity to developed infrastructure for infill.
City of Buckeye Historical and Projected Population.
Rapid population growth is
expected to continue through the
2025 IWMP Planning Periods of
2030, 2035, and 2040. The
projected average growth
rate through 2040 is between
4% and 5%. The growth rate
within each development varies.
Demand Projections by
Water Planning Area (WPA) (mgd)
WPA
2023
2025
2030
2035
2040
Buildout
1
2
2
3
3
4
76
2
1
1
2
2
3
39
3
4
6
9
10
11
24
4A
2
3
5
6
6
21
4B
1
1
1
1
2
16
5
0
0
0
0
0
0
Total
10
13
20
22
26
176
Other assumptions in the flow projections include:
1. Non-Revenue water use is 8%.
2. Water peaking factors are taken from the City’s
design standards.
3. The wastewater to water ratio is 0.56.
4. The reclaimed water to wastewater factor is 0.93
Note: Water Planning Area 5 is mostly served
by EPCOR and Arizona Water Co.
6
Water, Wastewater, and Reclaimed Water
Infrastructure Plan by Water Planning Areas
through 2040
Sun City Festival
The Sun City Festival Development is located in WPA 1 just south of the CAP canal. The development is
approximately half developed and has stand-alone water, wastewater, and reclaimed water systems.
Water
Although Sun City Festival is currently supplied by wells, in the future it could be supplied by a surface water
treatment plant that takes water from the CAP canal if the City obtains water resources that will be delivered via the
CAP canal. If constructed, the surface water treatment plant will likely also serve developments farther south. The
following water infrastructure projects are recommended:
2030 Planning Period
• 12-inch mains – 2,900 ft.
• 16-inch mains – 4,400 ft.
• Land for surface water
treatment plant.
2035 Planning Period
• 12-inch mains – 6,700 ft.
• 16-inch mains – 24,700 ft.
2040 Planning Period
• Surface water treatment plant.
• Raw water pipeline from the
CAP canal to the surface water
treatment plant.
Wastewater
The wastewater collection system infrastructure that is planned through 2040 consists of expanding the Sun City
Festival Water Reclamation Facility (WRF) and adding gravity sewer mains. The following wastewater infrastructure
projects are recommended:
2030 Planning Period
• 15-inch gravity sewer mains to
prevent future capacity limitation –
7,900 ft.
• Festival Ranch WRF expansion to
2 mgd.
• 15-inch gravity sewer mains –
10,500 ft.
2035 Planning Period
• 15-inch gravity sewer mains –
7,600 ft.
2040 Planning Period
• 15-inch gravity sewer mains –
8,000 ft.
Reclaimed Water
The current reclaimed water system consists of a pump station and pipeline that delivers reclaimed water to an
irrigation system. Excess reclaimed water is delivered to the Wagner Wash for recharge with no long term storage
credit. In the future, reclaimed water will be delivered to a recharge facility and underground storage facility
(collectively referred to as a USF) to accrue LTSCs. The following reclaimed water infrastructure projects are
recommended:
2030 Planning Period
• Sun City Festival water reclamation facility and USF – 2,000 afy.
• 16-inch pipeline from the CAP canal to the recharge facility – 1,700 ft.
• 6 mgd reclaimed water booster station at the Sun City Festival WRF.
• 16-inch pipeline from the Sun City Festival WRF to the underground storage facility.
The IWMP does not replace engineering design in compliance with Buckeye
Engineering Design Standards and code requirements.
7
!ã
!ã
!ã
!ã
U
T"
=)
3
Q
3
Q
WR F
WR F
!ã
!ã
!ã
!ã
WR F
Sun City Festival Water System in 2040.
Sun City Festival Wastewater Collection System in 2040.
Sun City Festival Reclaimed Water System in 2040.
Location Map
g
WR F
WRF
WR F
WRF Improvement
Gravity Sewer Main (inches)
≤8
10 - 15
16 - 24
30
Gravity Sewer Main
Improvement
Proposed Gravity Sewer
Main (inches)
12
15
Reclaimed Water Main (inches)
2
12
16
18
Proposed Reclaimed Water Main
(inches)
Diameter
16
8
Floreo at Teravalis (Floreo)
The Floreo development is located in WPA1. The first phase of the development is currently being constructed.
Water
The following water infrastructure projects are recommended:
2030 Planning Period
• Four groundwater wells –
800 gpm.
• 8-inch raw water pipelines from
wells to the central groundwater
treatment facility – 9,950 ft.
• Arsenic treatment facility.
• Groundwater storage tank –
3.2 MG.
• Pump station – 8.5 MGD.
• 12-inch water mains – 20,400 ft.
• 16-inch water mains – 12,250 ft.
2035 Planning Period
• Three groundwater wells –
800 gpm.
• 8-inch raw water pipelines from
wells to the central groundwater
treatment facility – 9,100 ft.
2040 Planning Period
• 12-inch water mains – 19,750 ft.
• 16-inch water mains – 13,400 ft.
• 24-inch water main from the CAP
WTP to Floreo – 21,700 ft.
• One groundwater well - 800 gpm.
• 8-inch raw water pipelines from
wells to the central groundwater
treatment facility - 3,100 ft.
Wastewater
The Floreo wastewater treatment strategy begins with a vault and haul to another WRF. When flows are high enough,
a package wastewater treatment plant will be used until flows are high enough for a permanent membrane bio
reactor (MBR) WRF. The following wastewater infrastructure projects are recommended:
2030 Planning Period
• 15-inch gravity sewer mains –
2,500 ft.
• 18-inch gravity sewer mains –
400 ft.
• 24-inch gravity sewer mains –
4,800 ft.
• 0.3 mgd package wastewater
treatment plant.
• 1.2 mgd WRF.
2035 Planning Period
• 12-inch gravity sewer mains -
3,700 ft.
2040 Planning Period
• 15-inch gravity sewer mains –
9,600 ft.
Reclaimed Water
A spreading basin to recharge reclaimed water from the Floreo WRF will be constructed. The location of the
recharge facility will be close to potable wells where possible to maximize the LTSCs that can be obtained
from the recharge facility. The following reclaimed water infrastructure projects are recommended:
2035 Planning Period
• 540 gpm USF.
• 12-inch reclaimed water pipeline – 5,370 ft.
• 2-mgd pump station.
9
!ã
!ã
!ã
!ã
!ã
!ã
!ã
U
T"
=)3
Q
WR F
!ã
!ã
!ã
!ã
!ã
!ã
!ã
WR F
Floreo Water System in 2040.
Floreo Wastewater System in 2040.
Floreo Reclaimed Water System in 2040.
Location Map
Proposed Gravity Sewer Main
(inches)
15
18
24
30
36 p
Proposed USF
Proposed Reclaimed Water Main
(inches)
12
Water main from
CAP WTP.
10
Tartesso
Tartesso is a stand-alone development located in WPA2. The development is currently being served by
three wells, a fluoride treatment facility, and ground storage tank. Multiple developments are planned to
the north and east of the existing development. The water and wastewater systems are planned to serve
the adjacent developments. The West Phoenix Estates development to the south of Tartesso may some
day be connected to Tartesso.
Water
The following water infrastructure projects are recommended:
2030 Planning Period
• 3 wells – 1,200 gpm each.
• 8-inch raw water mains – 12,200 ft.
• 2 PRV stations with 6-inch PRV
is the larger of two PRVs in the
station.
• 12-inch water mains –
25,131 ft.
• 16-inch water mains –
5,850 ft.
2035 Planning Period
• 4 MG storage facility at the
Tartesso or other facility.
• 3,000 gpm pump station at the
Tartesso or other facility.
• Groundwater treatment facility –
3 mgd at the Tartesso or other
facility.
• 12-inch water mains –
29,500 ft.
• 16-inch water mains –
16,650 ft.
2040 Planning Period
• 12-inch water main – 12,400 ft.
Wastewater
The Tartesso wastewater collection system and treatment facility will be expanded to serve additional adjacent
developments. The following wastewater infrastructure projects are recommended:
2030 Planning Period
• 15-inch gravity sewer mains –
6,000 ft.
• 24-inch gravity sewer mains –
6,000 ft.
• 36-inch gravity sewer mains –
15,700 ft.
2035 Planning Period
• 1.25 mgd expansion of the
Tartesso WRF.
• 24-inch gravity sewer mains –
3,300 ft.
• 30-inch gravity sewer mains –
5,200 ft.
2040 Planning Period
• 15-inch gravity sewer mains –
8,800 ft.
Reclaimed Water
The Tartesso recharge facility needs to be expanded to handle the additional reclaimed water flows.
The following reclaimed water infrastructure projects are recommended:
2040 Planning Period
• 1,000 gpm recharge facility located near potable
wells to preserve groundwater physical availability.
• 4-mgd pump station.
• 16-inch pressurized mains – 9,000 ft.
11
WR F
WR F
!ã
!ã
!ã
!ã
!ã
WR F
Fi
6 8 T t
R
d d R
l i
d W t
S
t
I f
t
t
!ã
!ã
!ã
!ã
!ã
!ã
!ã
!ã
U
T"
=)
U
T"
=)
3
Q
,
p
_
y
p
Fi
4 10 T t
W t
R
d d Di t ib ti
I f
t
t
Tartesso Water System in 2040.
Tartesso Wastewater System in 2040.
Tartesso Reclaimed Water System in 2040.
Location Map
15
18
21
24
30
36
g
WR F
WRF
WR F
WRF Improvement
Gravity Sewer Main (inches)
≤ 8
10 - 12
18
30
36
48
60
Existing USF
Proposed USF
Proposed Reclaimed Water Main
(inches)
16
Proposed Gravity Sewer Main
(inches)
12
Central
10
sayampa
Palo Verde
10
Sundance Golf
Club
Raven Golf Club
at Verrado
Gila River
85
10
Robbins Butte
Wildlife Area
Valencia
Allenville
Conger
Buckeye
10
10
Loop 303
McMicken
Gila River
Liberty
!ã
!ã
!ã
!ã
!ã !ã
!ã!ã
!ã
!ã !ã
!ã
!ã
!ã
!ã
!ã
!ã
!ã
!ã
!ã
!ã
!ã
!ã
!ã
!ã
!ã
!ã
!ã
!ã
!ã
!ã
!ã !ã
!ã
!ã
!ã
!ã
!ã
!ã
!ã
!ã
!ã
!ã
!ã
!ã
!ã
!ã
!ã
!ã
!ã
!ã
!ã
!ã
U
T"
=)
U
T"
=)
U
T"
=)
U
T"
=)
U
T"
=)
3
Q
3
Q
3
Q
3
Q
3
Q
3
Q
3
Q
3
Q
3
Q
3
Q
3
Q
3
Q
3
Q
3
Q
3
Q
Beloat Rd
Baseline Rd
Southern Ave
Broadway Rd
Lower
Buckeye Rd
Yuma Rd
Van Buren St
McDowell Rd
Thomas Rd
Indian
School Rd
Perryville Rd
195th Ave
Airport Rd
Dean Rd
Rainbow Rd
Watson Rd
Apache Rd
Miller Rd
Rooks Rd
Oglesby Rd
Turner Rd
Wilson Ave
Palo Verde Rd
Bruner Rd
Johnson Rd
Sundance
North Airport
Farallon WC
Jackie A.
Meck WC
WTP 5
WTP 11
Grand
View WTP
Westpark WTP
Water
The Central area comprises WPAs 3, 4A, and 4B and is the largest developed area in Buckeye. The Central Buckeye
water system is interconnected except for the airport and Bulfer areas. However, the Cipriani area is planned to start
developing in the next several years and will initially be a separate water system. The Central area is expected to be
supplied by wells through 2040.
The following water infrastructure projects are recommended:
2030 Planning Period
• 12-inch water mains – 15,800 ft.
• 16-inch water mains – 98,300 ft.
• 8 mgd RO treatment at the
Farallon water production facility.
• Arsenic treatment capacity
expansion at the Airport water
production facility. Capacity not
determined.
• 13 potable wells.
• 8-inch raw water mains –
52,250 ft.
• Pump Station at Farallon –
8.5 mgd.
• Groundwater storage at Farallon
– 2 MG.
• Groundwater treatment facility at
Site 11 – 4.25 mgd.
• Groundwater Treatment Facility at
Westpark
2035 Planning Period
• 7 potable wells – 850 gpm each.
• 12-inch water mains – 29,000 ft.
• 16-inch water mains – 85,650 ft.
• 8-inch raw water mains from wells
to treatment facilities – 25,750 ft.
• Groundwater storage facilities at
North Airport Road, Sundance, and
Jackie Meck– 4 MG each.
• Groundwater treatment facility at
Grand View
2040 Planning Period
• Groundwater storage at Jackie
Meck – 4 MG.
• 12-inch water mains – 21,050 ft.
• 16-inch water mains – 57,000 ft.
Central Buckeye Water System in 2040.
13
Wastewater
The Central Wastewater system currently includes the Central and Sundance WRFs. A future WRF called WRF 3
is planned to treat wastewater that originates west of SR 85. In the future, a package wastewater treatment plant
may be located in Cipriani until the industrial growth in this development can be connected to WRF 3. A WRF 4
(Grand View) east of SR 85 is an option that the may be constructed.
The following wastewater infrastructure projects are recommended:
2030 Planning Period
• 2 mgd lift station in Basin 3,
located west of SR 85.
• 8-inch force main – 8,000 ft.
• Central WRF expansion,
from 4.5 to 6.0 mgd.
• Sundance WRF expansion,
from 3.6 to 6.0 mgd.
• 100 gpm lift station on 313th Ave
and Lower Buckeye Road.
• 0.6 mgd package wastewater
treatment plant at Southern Ave
and Johnson Road, Option 1.
• Lift station at Johnson Road and
the Roosevelt Canal – 6 mgd.
• 15-inch gravity sewer mains –
27,600 ft.
• 18-inch gravity sewer mains –
6,500 ft.
• 21-inch gravity sewer mains –
9,400 ft.
• 24-inch gravity sewer mains –
1,300 ft.
• 30-inch gravity sewer mains –
14,900 ft.
• 33-inch gravity sewer mains –
1,500 ft.
• 36-inch gravity sewer mains –
300 ft.
• 42-inch gravity sewer mains –
800 ft.
• 18-inch force main on Johnson Rd.
across the RID canal - 500 ft.
2035 Planning Period
• Lift station at Southern Av. and
Johnson Rd. – 5 mgd, Option 1.
• Lift station at Palo Verde Rd. and
the RID canal – 2 mgd.
• Lift station at Hazen Rd. and
Turner Rd. – 1 mgd.
• 4-inch force main on Turner Rd.
From Hazen to Buckeye Canal Rd.
– 5,100 ft.
• Lift station at Baseline and Dean
Rd. – 2 mgd, Option 1.
• Lift station at Baseline and Dean
Rd. – 1 mgd, Option 2.
• 8-inch force main from Baseline
Rd. to 10th Lane – 22,600 ft.,
Option 1.
• 8-inch force main on Dean Rd.
from Baseline Rd. to Southern
Avenue., Option 2.
• WRF 3 on South 287th Avenue
and Buckeye Canal Road, 2 mgd.
• Lift station at Rainbow Road and
Broadway Road, 200 gpm.
• 4-inch force main on Broadway Rd
from Rainbow Road to 230th Ave.
• WRF 4 near the Buckeye Canal,
1 mgd, Option 2.
• Lift Station at Turner Road and the
Roosevelt Canal – 2 mgd.
• 8-inch force main on Turner Road
from the Roosevelt Canal to Wier
Avenue - 1,300 ft.
• Lift station at Union Pacific Railroad
and Dean Road – 2 mgd.
• 18-inch force main from the
Roosevelt Canal to 271 St. Ave. –
400 ft.
• 12-inch force main on Southern
from Johnson to Bruner - 6,300 ft.
• 21-inch gravity sewer along the
Roosevelt Canal from turner Road
to Broadway - 4,800 ft.
• 15-inch gravity sewer mains –
66,500 ft.
• 18-inch gravity sewer mains –
18,200 ft.
• 24-inch gravity sewer mains –
16,700 ft.
• 30-inch gravity sewer mains –
30,200 ft.
• 33-inch gravity sewer mains –
7,300 ft.
• 36-inch gravity sewer mains –
32,500 ft.
• 42-inch gravity sewer mains –
7,700 ft.
• 60-inch gravity sewer mains –
3,800 ft.
• WRF 3 expansion from 2 to 4 mgd.
2040 Planning Period
• Central WRF expansion, from 6 to
8 mgd.
• 15-inch gravity sewer mains –
50,300 ft.
• 18-inch gravity sewer mains –
21,400 ft.
• 21-inch gravity sewer mains –
11,400 ft.
• 24-inch gravity sewer mains –
9,800 ft.
• 27-inch gravity sewer mains –
4,600 ft.
• 30-inch gravity sewer mains –
16,300 ft.
14
Reclaimed Water
The current reclaimed water system delivers reclaimed water for irrigation and to the RID canal to obtain LTSCs.
However, not all of the reclaimed water generated in Central Buckeye is beneficially reused because a portion
of the reclaimed water is discharged to the Arlington canal and this reclaimed water should be delivered to the
RID canal as a priority. The infrastructure improvements are planned so that Buckeye can fully benefit from the
reclaimed water generated in Central Buckeye.
The following reclaimed water infrastructure projects are recommended:
2030 Planning Period
• 8-inch reclaimed water mains –
4,600 ft.
• 12-inch reclaimed water mains –
1,300 ft.
• 16-inch reclaimed water mains –
21,600 ft.
• 20-inch reclaimed water main from
the Central WRF to the Buckeye
Canal – 35,800 ft.
• Central WRF reclaimed water
pump station – 4,800 gpm.
• Sundance pump station upgrade –
1,500 gpm.
• 16-inch reclaimed water mains –
6,400 ft.
• Seven Aquifer Storage and
Recovery (ASR) wells – 680 gpm
each.
• Pump station at the Tract A storage
tank – 1 mgd.
2035 Planning Period
• Five ASR wells – 680 gpm each.
• Pump station at WRF 3 – 4 mgd.
• 12-inch reclaimed water mains –
5,400 ft.
• 16-inch reclaimed water mains –
83,250 ft.
2040 Planning Period
• One ASR well – 680 gpm.
• 8-inch reclaimed water mains –
1,300 ft.
15
!ã
!ã
!ã
!ã
!ã
!ã
!ã
!ã
!ã
!ã
!ã
!ã
!ã
!ã
!ã
!ã
!ã
!ã
!ã
!ã
!ã
!ã
!ã
!ã
!ã!ã
!ã
!ã
!ã
!ã
!ã
!ã
!ã
!ã
!ã
!ã
!ã
!ã
!ã
WR F
WR F
WWPP
WR F
U
T
U
T
U
T
U
T
!ã
!ã
!ã
!ã
!ã
!ã
!ã
!ã
!ã
!ã
10
Hassayampa
River
Dixie
Hassayampa
Arlington
Palo Verde
10
Sundance Golf
Club
Raven Golf Club
at Verrado
Skyline
Regional Park
Gila River
85
10
Robbins B tte
Valencia
Allenville
Conger
Buckeye
10
10
10
McMicken
Gila River
P
Liberty
WR F
"
=)
"
=)
"
=)
WR F
"
=)
WWPP
WR F
"
=)
"
=)
"
=)
"
=)
"
=)
WR F
"
=)
"
=)
"
=)
"
=)
Beloat Rd
Baseline Rd
Southern Ave
Broadway Rd
Lower
Buckeye Rd
Yuma Rd
Van Buren St
McDowell Rd
Thomas Rd
Indian
School Rd
Camelback Rd
Bethany Home Rd
Perryville Rd
Ave
t Rd
Rd
w Rd
n Rd
e Rd
Rd
Rd
y Rd
Rd
Ave
de Rd
r Rd
n Rd
4
3
2
1
Central Buckeye Wastewater System in 2040.
Central Buckeye Reclaimed Water System in 2040.
Legend
"
=)
LS
"
=)
Proposed LS
FM
Proposed FM
WR F
WRF
WR F
Proposed WRF
WWPP
Proposed Package
Plant
Gravity Sewer Main (inches)
≤8
10 - 12
15 - 18
21 - 36
42 - 66
Proposed Gravity Sewer
Main (inches)
15 - 16
18 - 21
24 - 27
30-36
42 - 48
60 - 66
Collection Basins
1
2
3
4
5
Projected Development
Phase
2030
2035
2040
Existing
Post 2040
Reclaimed Water Users
U
T
Storage Tank
!ã
Well
!ã
Proposed Well
!ã
Proposed ASR Well
Canal
Reclaimed Water Main (inches)
6
8
10
12
20
21
Proposed Reclaimed Water Main
(inches)
8
12
16
24
Location Map