Capital Improvement Program FY24 - FY28 Capital Projects Fund PROJECT NO. : 101760 PROJECT NAME : ITS - Miller Road - I-10 to Southern Avenue DEPARTMENT : 134-ENGINEERING DEPARTMENT PRIORITY : High PROJECT TYPE : Public Works-Infrastructure FISCAL YEAR : 2023 DISTRICT : 1 REVENUE SOURCE : 1000 - General fund,9999 - Unknown DESCRIPTION AND SCOPE Install a conduit duct bank on west side of Miller Road between Monroe Avenue and Lower Buckeye Road where conduit doesn't currently exist splice vaults located adjacent to each traffic signal controller cabinets (NW corners). PURPOSE AND NEED Conduit will exist on the east side of Miller Road from Lower Buckeye Road to I-10. Install splice vaults every half-mile. Install conduit between the splice vaults and the traffic signal controller cabinets. Install 2-single mode fiber optic cables in the duct bank. Install a Gator Patch in the splice vaults with a single mode fiber optic cable running to the traffic signal controller. LOCATION East side of Miller Road from Lower Buckeye Road to I-10 CAPITAL EXPENDITURES FY24 FY25 FY26 FY27 FY28 PLANNING & DESIGN |$ 100,000 $0 $0 $0 $0 LAND |$ 200,000 $0 $0 $0 $0 SITE IMPROVEMENTS |$ 0 $0 $0 $0 $0 CONSTRUCTION |$ 0 $0 $0 $0 $0 DIRECT EQUIPMENT |$ 0 $0 $0 $0 $0 VEHICLE REPLACEMENT |$ 0 SO $0 $0 $0 OTHER PROJECT COSTS |$ 0 $0 $0 $0 $0 FURNITURE AND FIXTURES |$ 0 SO $0 $0 $0 TOTAL REQUEST |$ 300,000 $0 $0 $0 $0 94| Page