ARIZONA DEPARTMENT OF TRANSPORTATION CONSTRUCTION COST ESTIMATE ITS - Miller Rd & Monroe Ave Kimley »Horn TRACS No: T0630 01D Location: Miller Rd & Monroe Ave Project Manager: Chris Rodriguez Description: Pima St to Monroe Ave along Miller Rd & Miller Rd to Eason Ave along Monroe Ave Stage IV Apor Bid ITEM DESCRIPTION UNIT DATE: 10/20/25 quantity | unirerice | ‘AMOUNT 7016030 BARRICADE (TYPE 1, TYPE 2, VERT.PANEL, TUBULAR MARKER) EACH-DAY 8,190 $ 0.40 $3,276.00 7016031 BARRICADE (TYPE 3, HIGH LEVEL FLAG TREE) EACH-DAY 18 $ 1.70 $30.60 7016033 PORTABLE SIGN STAND (SPRING TYPE) EACH-DAY 13,550 $ 2.50 $33,875.00 7016035 WARNING LIGHT (TYPE A) EACH-DAY 13,550 $ 0.40 $5,420.00 7016037 WARNING LIGHT (TYPE C) EACH-DAY 8,300 $ 0.35 $2,905.00 7016050 TRUCK-MOUNTED ATTENUATOR EACH-DAY 93 $ 1,200.00 $111,600.00 7016051 (TEMPORARY SIGN (LESS THAN 10 S.F.) EACH-DAY 270 $ 1.15 $310.50 7016052 TEMPORARY SIGN (10 S.F. OR MORE) EACH-DAY 13,280 |$ 0.80 $10,624.00 7016061 FLASHING ARROW PANEL EACH-DAY 28 $ 40.00 $1,120.00 7016067 ICHANGEABLE MESSAGE BOARD (CONTRACTOR FURNISHED) EACH-DAY 20 $ 65.00 $1,300.00 7016079 FLAGGING SERVICES (UNIFORMED OFFICER) HOUR 192 $ 130.00 $24,960.00 7320788 ISINGLE MODE FIBER OPTIC CABLE (12 COUNT) LFT. 960 $ 5.00 $4,800.00 9240144 MISCELLANEOUS WORK (2, 7-WAY MICRO-DUCT) (DTL 1) (DIRECTIONAL DRILL) LFT. 9,857 $ 45.00 $443,565.00 9240145 MISCELLANEOUS WORK (2, 7-WAY MICRO-DUCT) (DTL A) (TRENCHED) LFT. 9,540 $ 30.00 $286,200.00 9240148 MISCELLANEOUS WORK (SINGLE MODE FIBER OPTIC CABLE) (LOOSE TUBE 288 FIBERS) LFT. 3,070 $ 4.50 $13,815.00 9240149 MISCELLANEOUS WORK (SINGLE MODE FIBER OPTIC CABLE) (MICRO CABLE 288 FIBERS) LFT. 24,234 (| $ 5.00 $121,170.00 9240172 MISCELLANEOUS WORK (NO. 8 PULL BOX, STD DTL H) EACH 7 $ 4,500.00 $31,500.00 9240173 MISCELLANEOUS WORK (NO. 9B PULL BOX, STD DTL F & G) EACH 4 $ 8,000.00 $32,000.00 9240174 MISCELLANEOUS WORK (TERMINATION PANEL) EACH "1 $ 750.00 $8,250.00 9240175 MISCELLANEOUS WORK (FIBER OPTIC SPLICE CLOSURE) EACH 9 $ 2,500.00 $22,500.00 9240176 MISCELLANEOUS WORK (FIELD HARDENED ETHERNET SWITCH) EACH 10 $ 10,000.00 $100,000.00 9240177 MISCELLANEOUS WORK (MODIFY EXISTING FIBER OPTIC SPLICE CLOSURE) EACH 1 $1,500.00 $1,500.00 $1,260,721.10 9010001 MOBILIZATION L.SUM 1 $ 130,000.00 $130,000.00 9240011 FORCE ACCOUNT WORK (PULL BOX AND CONDUIT RECONDITIONING) L.SUM 1 $ 20,000.00 $20,000.00 9240177 MISCELLANEOUS WORK (ITS RECORD DRAWINGS) EACH 1 $ 12,000.00 $12,000.00 9250001 ICONSTRUCTION SURVEYING AND LAYOUT L.SUM 1 $ 12,000.00 $12,000.00 TOTAL $174,000.00 SUBTOTAL: $1,434,721.10 CONSTRUCTION COST SUBTOTAL $1,434,721.10 Unidentified Item Allowance @ 10% $143,472.11 Construction Engineering @ 20% $286,944.22 Contingency @ 5% $71,736.06 SUBTOTAL $1,936,873.49 10/20/2025 10:40 AM [TOTAL cost $1,936,873.49] 10F1 E-T-FMS-TO630 - 95% RI s/Egr Est