1 | P a g e
DEACTIVATION AGREEMENT
THIS AGREEMENT is made and entered into on the last date on which the
parties complete execution of this Deactivation Agreement, by and between MARICOPA
COUNTY, a political subdivision of the State of Arizona, hereinafter called the
“COUNTY,” and the Salt River Project Agricultural Improvement and Power District
(“District”) and Salt River Valley Water Users’ Association (“Association”); collectively,
“SRP”)
WITNESSETH:
WHEREAS, the COUNTY proposes to improve the intersection of 51st Ave and
W. Olney Ave, which intersection, in Section 8; Township 1S; Range 2E (the
“Intersection”), is located within existing Maricopa County Right-of-Way, and;
WHEREAS, the improvements to the intersection, being performed in conjunction
with Developer work at the southwest corner of the Intersection, necessitates the removal
of SRP irrigation delivery structure 7-14.0-12 (the “Facility”) located within the
Intersection, and;
WHEREAS, the Facility is not presently in service;
NOW, THEREFORE, in consideration of the mutual covenants and agreements
hereinafter set forth, it is agreed as follows:
1. SRP shall abandon all use of the Facility;
2. COUNTY shall cause the removal of the Facility at the Developer’s sole
expense as noted above;
3. If at any time, any SRP shareholder entitled to irrigation delivery to this
abandoned Facility demonstrates adequate capability to deliver irrigation water
from this Facility to the property entitled to receive irrigation water delivery, as
reasonably determined by SRP, then the COUNTY shall, upon request by SRP,
provide an easement for, and pay all costs associated with the design and
construction of a replacement facility sufficient to accomplish the water
delivery to the land entitled to receive such delivery.
4. SRP shall assume responsibility for design and construction of the replacement
Facility, if required, at the COUNTY’S expense, and shall at all times hold the
COUNTY harmless for any loss or damage arising out of the design,
construction, or SRP’s use of any new replacement Facility.
DocuSign Envelope ID: 9E84FF99-24C4-4C85-99C3-0C6AC776AC27
2 | P a g e
3/17/2023
5. All notices, demands or requests upon any party to this Agreement shall be in
writing and shall be delivered or sent by mail addresses as follows:
If to COUNTY: COUNTY of MARICOPA
Attention: MARICOPA COUNTY DOT Utility
Engineering
Utility Engineering Branch Manager
2901 W Durango Street
Phoenix, AZ 85009
If to SRP:
Salt River Project
Water Engineering
Mail Station: SSW303
P.O. Box 52025
Phoenix, Arizona 85072-2025
6. This Agreement is subject to cancelation pursuant to A.R.S. § 38-511.
(SIGNATURE SHEET ON NEXT PAGE)
DocuSign Envelope ID: 9E84FF99-24C4-4C85-99C3-0C6AC776AC27
3 | P a g e
3/17/2023
IN WITNESS WHEREOF, the parties hereto have executed this Contract on the day and
year as stated below.
THE COUNTY OF MARICOPA
a political subdivision of the State of
Arizona
By: ________________________
_____________________________
COUNTY CLERK
Date: ________________________
APPROVED AS TO FORM:
_____________________________
OFFICE OF THE COUNTY ATTORNEY
COUNTY of MARICOPA
By: Senior Assistant COUNTY Attorney
SALT RIVER PROJECT AGRICULTURAL
IMPROVEMENT AND POWER DISTRICT
(“DISTRICT”), AND SALT RIVER WATER
USERS’ ASSOCIATION (“ASSOCIATION”;
COLLECTIVELY “SRP”)
By _______________________
Robert F. Pane
Director Water Engineering &
Transmission
Date ________________________
DocuSign Envelope ID: 9E84FF99-24C4-4C85-99C3-0C6AC776AC27
3/23/2023