Verrado 
Highlands Phase 1 – Parcel 1 Replat 
Project Narrative 
 
Background and Project Overview 
Highlands Phase 1 is an approved subdivision under development within Verrado.  Highlands 
Phase 1 was designed with approximately 219 single family detached lots on approximately 49.44 
acres of residential land area and is located West of Verrado Way and Victory District Phase 1 
and north of Tractor Wash and the Regent Hills neighborhood. The proposed plat includes 50’, 
60’ and 70’ wide residential lots on desert foothills terrain ranging from 2.5% to 3.5% with 
increasing slope to the west.  To the north and west of Highlands Phase 1 are significant mountain 
ridges and dramatic settings.  It is with these dramatic settings, challenging topography and a 
desire to create more exclusive, higher end production residential neighborhoods that Highlands 
will create residential enclaves that transition from the near-town neighborhoods of Phases 1 
and 2 of Verrado Main Street into a more organic desert adaptive foothills setting within the 
Highlands District.  
Request 
With the approval of Highlands Phase 1, the City of Buckeye (“City”) and DMB White Tank LLC 
agreed to dedicate a parcel near the main entrance to Highlands Phase 1, just west of Verrado 
Way.  Since the original approval of this subdivision in 2015, the City decided against placing their 
fire station within this location of the Verrado/Victory development.  The request is to approve 
a replat of the approximately 31,500 square foot parcel into three (3) lots and two (2) tracts.  The 
proposed CMP development option for these new lots will be the Residential Low Medium 
development option.   
Pre-Annexation Development Agreement and Community Master Plan 
The Pre-Annexation and Development Agreement (“PADA”) and Community Master Plan 
(“CMP”) for Verrado were approved by the Town Council in November of 1999 encompassing 
8,800 acres.  In January 2004, the Town Council amended the CMP to include an additional 
sixteen (16) acres.  Currently, the CMP, as amended, allows for 14,080 residential dwelling units, 
1,000 resort rooms, and more than 4.2 million square feet of commercial/mixed-use space 
throughout the entire development.  Verrado is divided into Planning Units and provides for a 
master Land Use Budget to determine where the residential density and commercial/mixed-use 
intensity can locate within the community.   
1R PLZV-25-0010 RECEIVED MAY 28 2025 AL

Current Condition of the Site 
Highlands Phase 1 has developed in and around this parcel based off the original preliminary and 
final plat approvals in 2015.  Many of the homes within Phase 1 are built and occupied.  The first 
phase of Highlands is framed by two (2) washes on the north and south side with mountain views 
to the north and west and valley views to the south and east. 
Current General Plan Designation 
Verrado is designated as a Master Planned Community on the Town’s General Plan.  In addition, 
because of the major washes that traverse Verrado, the General Plan land use map has several 
‘Floodway Transitional Areas’ designated including portions of Phase 3 South. 
Current Zoning Designation 
Verrado is zoned Planned Community (“PC”).  Verrado entitlements consist of the Pre-
Annexation and Development Agreement, recorded 11/26/1999 (the “Development 
Agreement”) and the Community Master Plan (“CMP”), approved November 17, 1999. 
Verrado’s Design Guidelines 
Verrado’s Design Guidelines have consistently been more restrictive than the Town’s residential 
design guidelines.  Within Highlands, several lots sizes and street layouts and a more organic 
street and lotting layout create unique neighborhoods within the foothills area of Verrado.  The 
various parcels create small unique neighborhoods surrounding small usable parks and in close 
proximity to a larger open space.  The enclaves provide for park fronting and wash backing lots.  
With the use of the design guidelines such as alternating front yard setbacks, single-family home 
design criteria and a mixture of lots within Highlands, this replat will allow for three (3) more 
homes in this phase within Verrado. 
Traffic and Roadways 
Highlands access is from Verrado Way on the east and connections to the west and south through 
Regent Hills.  The Verrado Way connection and roads within Phase 1 are built to the approved 
roadway standards.  The road in front of the replat is completed.   
Water Management Plan 
EPCOR is the water service provider for Verrado. The water distribution system will be extended 
into Highlands from Verrado Way from the east. Water storage is provided by the Zone 3 South 
reservoirs, located adjacent to the Raven Golf Course.

Wastewater Management Plan 
EPCOR is the wastewater service provider for Verrado.  Highlands wastewater will be handled by 
connections to the main line in Verrado Way. The trunk sewers convey wastewater to the existing 
water reclamation facility located in the southeast portion of the Verrado Community.   
Fire Protection 
The existing Verrado Fire Station at the southwest corner of Thomas Road and Verrado Way will 
be the primary provider for fire protection for this area of Verrado.  Working in collaboration 
with the Fire Department, a parcel along Indian School Road at Acacia Way will be Verrado’s 
second fire station.   
Police Protection 
The fire station at the southwest corner of Thomas Road and Verrado Way is a joint fire/police 
facility.  The police may have use of a portion of the facility proposed for the fire station at Indian 
School Road and Acacia Way.   
Impact on Local Schools 
Highlands is within portions of Planning Units IV and V were approved for a combined 3,575 
residential units.  The Request to add three (3) single-family residential lots will not affect the 
school system that serves Verrado and surrounding communities.