CITY OF BUCKEYE
Finance Department
530 E Monroe Ave. • Buckeye, Arizona 85326
Phone 623-349-6165 • www.buckeyeaz.gov
Community Development Block Grant Contract number: C-22-25-014-X-00 Amendment #1 -
Summary Recap
Project Description
The City of Buckeye Council has previously approved the $605,413 grant award from the Community
Development Block Grant through Maricopa County to pave downtown Buckeye’s 10th Street and
Alleyways. Amendment #1 increases the award amount from $605,413.00 to $634,983.25. The
improvements will reduce dust emissions and sediment loading onto alleyways, roadways, and
stormwater retention basins by installing asphalt paving, sidewalks, landscaping, lighting, utility
adjustments, and a storm drain system.
Project Cost
$ 634,983.25
Financial Impact Statement
The Federal grant portion is $634,983.25, with $0 match from the City of Buckeye. Any additional
expenses in excess of $634,983.25 will need to be paid by the City of Buckeye. Additionally, any required
maintenance will also become a part of Buckeye’s Public Works Department’s annual budget.
Grant Amount
$ 634,983.25
Future Action
No future action contemplated
Objectives and Expected Outcomes
The approval of Amendment #1 will ensure all project costs are covered by the grant, mitigating the need
to utilize general funds to pave downtown Buckeye’s 10th Street and Alleyways to reduce dust emissions
and sediment loading onto alleyways, roadways, and stormwater retention basins by installing asphalt
paving, sidewalks, landscaping, lighting, utility adjustments, and a storm drain system.
Fiscal Year
2025 and 2026