PLZS-22-00039 Sun City Festival Planning Area 3 PUP E Parcel 88 - Project Narrative.pdf
Extracted text (via pymupdf)
8957 characters
Civil Engineering Water Resources Land Survey Construction Management 2051 W Northern Ave #100 Phoenix AZ 85021 P: 602.335.8500 F: 602.335.8580 www.woodpatel.com Michael T. Young, PE Darin L. Moore, PE Jeffrey R. Minch, PE, CFM Robert D. Gofonia, PE, RLS Nicholas E. Brown, PE Daniel W. Matthews, PE Ronald J. Barbala, PLS, CFedS Ethan A. Boyle, PE Frank M. Koo, PE Gabriel S. Rios, RLS John G. Ritchie, PE Derek C. Nichols, PE John M. Bulka, PE Daniel J. Cronin, PMP James G. Taillon, CFM Joseph C. Daconta, PE, CFM, PH, PMP Steven C. McKee, PE Brian J. Diehl, RLS Matthew R. Pruitt, PE, CFM Isaac J. Thomas, PE, CFM Wilson Begay, RLS Anthony K. Humphrey, PE Zachary Radovich, PE Venkata S. Bayareddy, PE, CFM Aaron K. Feldberg, PE Joseph R. Davis, RLS Robert Knott, RLS Jett M. Thies, PE Clint Morris, PE Lane Thompson, PE EMERITUS Darrel E. Wood, PE, RLS Ashok C. Patel, PE, RLS September 8, 2025 PROJECT NARRATIVE FESTIVAL RANCH PLANNING AREA 3 PUP E - PARCEL 88 FINAL PLAT – PLZS-22-00039 WP# 215235 The Festival Ranch Community Master Plan (CMP) is comprised of approximately 10,357 acres. The property is located in the northern portion of the City of Buckeye. The CMP is bounded on the west by the Hassayampa River and by State Lands on the north and east. The south edge of the property is partially bisected by the Sun Valley Parkway and is bounded by a small portion of the White Tank Mountains, State Lands, and private landowners. The original Festival Ranch CMP consisted of six (6) Planning Units, identified as Planning Units A through F. Portions of the original Planning Units E and F are presently identified as Planning Area One, Planning Area Two and Planning Area Three of the Festival Ranch Development. This Preliminary Plat is a portion of Festival Ranch Planning Unit E and Planning Area Three. The subject site is located in the most western portion of Planning Unit E. The site is bounded to the north by the Beardsley Parkway, to the south and east by Wagner Wash, and to the west by future Parcel 88 in Planning Unit E. Zoning The property is zoned Planned Community (PC) per the Festival Ranch CMP as approved by City Council in September of 2000. The Festival Ranch PUP E identifies the parcels as active adult Residential Development with Option 2 R1-4.5 with density of 2-5 du/ac. Final Plat This Final Plat is for Parcel 88 in PUP E. This parcel contains a total of 126 lots with two (2) typical residential lot widths of 53 and 65 feet. All lots will have a minimum depth of 115 feet. Street Improvements Parcel 88 is bordered by Beardsley Parkway to the north. Beardsley Parkway will be improved as part of the adjacent Parcels 33 and 35 to the north. All residential streets have a 44-foot right of way. The local streets will be 32-feet wide from back-of-curb to back-of-curb as approved in the Festival Ranch CMP on September of 2000. Standard street light design with LED lighting will be used in Parcel 88. 4R PLZSP-22-00039 RECEIVED SEPT 8 2025 WD Utilities There is one (1) existing 15-inch trunk sewer main is located along Tonopah Drive alignment. It originates at the existing treatment facility south of Sun Valley Parkway and continues east in Beardsley Parkway to Planning Area 1. The future Beardsley Parkway improvements will include a 16-inch water line connects to a 16-inch water line in Desert Oasis Boulevard. There is another 16-inch waterline that originates at Desert Oasis Boulevard and runs along the south side of Parcel T1 and crosses Wagner Wash towards the subject site. Communications Cox Communications will provide video, high-speed data and telephone services to Festival Ranch. Cox is currently constructing or has facilities within Festival Ranch to serve this project. Cox is aware of the development timeline for Festival Ranch and they have both expressed their ability to provide communications services in accordance with the project’s needs. Natural Gas Pulte Homes has negotiated an agreement with Southwest Gas to provide natural gas service to Festival Ranch. Electricity Pulte Homes has worked with Arizona Public Service (APS) to provide electrical service to Festival Ranch. APS has installed a 69-kV, overhead transmission line that runs from approximately Bell Road and Cotton Lane west along the Salt River Project corridor to service the project. Pulte Homes and APS have also constructed a substation on the Festival Ranch property to service the project. The delivery of electrical service will be timed to meet the project’s needs. Open Space and Recreation Parcel 88 is planned with various walking trails and open spaces spread throughout the development. Residents will also have access to the numerous amenities provided throughout Sun City Festival such as the Sage Recreation Center, the Saguaro Recreation Center, Sun City Festival Pet Park, Pickleball, Softball and Crafts Studio. In addition to the private HOA trails, two (2) public trails will be accessible from Parcel 88 an 8-ft granular trail will be located along the northside of Beardsley Parkway and a 10-foot concrete or approved alternative surface trail will be located along the north side of Wagner Wash. A golf cart route is planned to connect to the east and north though the existing culvert in Wagner Wash to provide golf cart connectivity to the existing 27-hole golf course and amenities to the north and east of these parcels. Offsite and Onsite Stormwater Control A master study of the storm water system was developed by Coe & Van Loo Consultants, Inc. The study has been recently updated as part of a Festival Ranch – Planning Unit 3 Master Drainage Study by Erie & Associates and excerpts from the report are included as part of the Drainage Report. Parcel 88 has been designed in accordance with the updated Master Study. (Dated April 12, 2021) Water Supply and Distribution A study of the water distribution system to serve the area was prepared by Wilson Engineers dated September 2021. The Sun City Festival potable water infrastructure consists of a system of water distribution mains, booster pump stations, pressure control valves, wells and storage tanks. The number of wells has been determined based on the maximum day demand and coincident irrigation and construction water use demands. Well production rates have been assumed to be 1,200 gpm, based on information from Errol Montgomery and Associates, Inc. Initially three (3) groundwater wells will be in operation. Two (2) of the wells currently serving Sun City Festival are located south of Beardsley Parkway and one (1) is located north of Beardsley Parkway. Future well #4 is located north of Beardsley Parkway. The existing and future wells will be of sufficient size and capacity to serve Parcel 88. Well #1 is in Parcel E1, Well #2 is within the confines of the water campus and Well #3 is located in Parcel N1. Well #4 is within Sun City Festival Parcel HH1-1. The booster pump stations have been designed to meet the greater of the maximum day demand plus fire flow or the peak hour demand. The storage tanks will supplement the source supply when demands exceed maximum day demand (i.e. peak hour and fire flow). Initial storage requirements are based on a four-hour commercial fire flow of maximum intensity and 50% maximum day demand equalization and emergency reserve. The parcels currently being developed are located within the City of Buckeye pressure zone 6 and have been found to have adequate pressure and supply to serve the associated parcels. Wastewater Collection and Treatment A study of the wastewater collection and treatment system to serve this area was prepared by Wilson Engineers (dated September 2021). Based on the natural topography, the wastewater collection infrastructure consists of an existing 15-inch gravity trunk sewer line that parallels the west side of Wagner Wash within the Tonopah Drive alignment. The trunk sewer follows street alignments and/or sewer easements, and has been internalized in the residential streets where possible. The trunk sewer discharges to the Festival Ranch Water Reclamation Facility (WRF), located at the southwest corner of the development, south of Sun Valley Parkway. Public Services Police and fire services will be provided for the community by the City of Buckeye. Emergency staff will be stationed at Buckeye Fire House No. 704. The Fire House is located along primary transportation corridors at the intersection of Beardsley Parkway and Desert Oasis Boulevard, to minimize response times. Sincerely, Wood, Patel & Associates, Inc. Frank M. Koo, PE Vice President Y:\WP\General Correspondence\215235 Festival Ranch Parcel 88 Final Plat Project Narrative 09-08-25.docx