1. Name and contact information of person for matters involving this application: First and last name*: Rob Roach Title*: Grant Program Manager Phone*: 623-349-6165 Email*: rroach@buckeyeaz.gov 2. Entity name, address, and website: Organization/Entity Name*: City of Buckeye Address (#, street - no P.O. box numbers)*: 530 E. Monroe Ave. City*: Buckeye State*: Arizona Zip Code*: 85326 Website address, if applicable: www.buckeyeaz.gov 3. Employer/Taxpayer Identification Number (EIN/TIN)*: 86-6000236 4. Organization/entity Unique Entity Identifier (UEI) assigned by SAM.gov*: WYJHKKNHLA38 5. Enter the congressional district(s) the entity/organization headquarters is in: 9 Enter the congressional district(s) the project is in*: 9 6. Below is a list of eligible entities for this program. Please select the one option that describes your eligibility*: (For local governments, political subdivisions, or states: Refer to NOFO Section II. A: Eligible Applicants and Section II. E Definition of Rural Areas for qualification.) A unit of local government or political subdivision seeking to advance a project that is located outside of an urbanized area that has a population of more than 150,000 residents 7. Project title*: (Descriptive title of project for which you seek funding) Sun Valley Parkway – Interstate 10 Interchange Planning Project to enhance operational capacities to accommodate projected future traffic volumes. 8. Project location*: Must be listed as either street address, including city and state, or as latitude/longitude. (Note: For Indian Tribes, the project location does not have to meet the non-urban area requirement.) Address (#, street- no P.O. box numbers): City: State: Zip Code: OR Latitude: 33.2620 Longitude: -112.4038 9. Briefly describe the overall project (no more than 500 words)*: Include project type (i.e., bridge, roadway, transit service), features to be constructed, project schedule, and estimated total project cost. The City of Buckeye (Buckeye) requests $495,000 for the creation of a roadway Design Concept Report (DCR) for the Sun Valley Parkway (SVP) and Interstate 10 (I-10) interchange. Buckeye’s planning area of 640 square miles is located in the western Phoenix Metropolitan Area. Buckeye is within the region’s Metropolitan Planning Organization (MPO), specifically the Maricopa Association of Governments (MAG). Buckeye is fast-growing with 119,000 people, as of 2025, and projected to be 295,400 by 2040 (Buckeye, Arizona Population 2025),(Few cities in America are growing as rapidly as Buckeye - Axios Phoenix). SVP and I-10 interchange is the lone freeway interchange that services this area for several miles in each direction, with 2024 Arizona Department of Transportation (ADOT) Average Daily Traffic (AADT) of over 58,000 vehicles. A 2023 traffic survey determined that the interchange was nearing capacity and that the following improvements should be completed: install a traffic signal by 2026, adjust traffic signal timing and modify striping to add lanes by 2028, and reconstruct the interchange by 2032. Buckeye requests this grant funding to complete the design and planning for this recommended work by the completion of a DCR for $495,000. The DCR can be completed within twelve months. There are no east-west roadways in the area due to the White Tank Mountains to the east and the Hassayampa River to the west. All traffic in the area must go south to I-10 or north/east into the City of Surprise. Additionally, the SVP interchange is the only interchange on I-10 west between the SR 85 freeway interchange and the Hassayampa River (8 miles). The SVP/I-10 interchange falls under the ADOT jurisdiction and is located within the planning area of MAG. It is currently an unsignalized interchange with off-ramp traffic controlled by STOP signs. In discussions with ADOT and MAG, neither has planned improvements or installation of a traffic signal at the interchange within the next 5-10 years. The SVP Corridor is projected to have over 250,000 homes in several master-planned communities in the next 5 years. Most of this traffic will travel south on SVP to the I-10. In anticipation of growth and increased traffic volumes at the interchange, in 2023, Buckeye requested a traffic analysis to determine when the current SVP/I-10 interchange would reach operational capacity and identify improvements to accommodate projected future traffic volumes. Due to this study, Buckeye requests this grant for planning of the following: Install a traffic signal in 2025-26. Adjust traffic signal timing and modify striping (provide additional lanes) in 2027- 28. Reconstruct the interchange in 2031-32. Buckeye needs a DCR to improve the existing SVP/I-10 interchange based on the following: Only interchange with a local roadway along I-10 for 8 miles. Developments along the SVP Corridor are constructing homes, substantially increasing traffic on this interchange. The 2023 study indicated that the existing configuration will not accommodate project traffic volumes. Recent City traffic signal warrant evaluation confirmed a traffic signal is warranted for installation. 9a. Estimated total project cost*: $495,000 10. Is the applicant delinquent on any federal debt? * No 11. Appropriateness of services requested*: (See Section VI. B. Criterion #1 of the NOFO for your review and evaluation information.) a. Please describe the activities/advisory services for which you are seeking program funds and how these activities will materially advance your overall project. (no more than 400 words)* The City of Buckeye is requesting $495,000 for the development of a Design Concept Report (DCR) for the Sun Valley Parkway (SVP) and Interstate 10 (I-10) interchange. The project is estimated to cost $495,000. The SVP Corridor is projected to have over 250,000 homes in several master- planned communities. Tartesso is one of those communities that plans to construct an additional 2,000 homes in the next 5 years. North of Tartesso is the community of Teravalis, which is currently in its first phase, with approximately 3,000 homes planned in the next 5 years. Most of this traffic will travel south on SVP to the I-10. In anticipation of growth and increased traffic volumes at the interchange, in 2023, Buckeye requested a traffic analysis to determine when the current SVP/I- 10 interchange would reach operational capacity and to identify needed improvements to accommodate projected future traffic volumes. The study identified the following: Install a traffic signal in 2025-26. Adjust traffic signal timing and modify striping (provide additional lanes) in 2027-28. Reconstruct the interchange in 2031-32. The next step in addressing the growth and traffic concerns is the completion of a DCR. The DCR will aid Buckeye in planning the improvements to the existing SVP/I-10 interchange based on the following: Only interchange with a local roadway along I-10 for 8 miles. Developments along the SVP Corridor are constructing homes, increasing traffic in the area. The 2023 study indicated that the existing configuration will not accommodate projected traffic volumes. Recent Buckeye traffic signal warrant evaluation confirmed a traffic signal is warranted for installation. The DCR for this project will consist of the following key items: Establish a Technical Advisory Committee that includes ADOT and the Flood Control District of Maricopa County (which has property adjacent to the interchange) Utilize Build-Out Traffic Volumes from Buckeye’s soon-to-be-adopted Transportation Master Plan Update to develop ultimate interchange configurations to be evaluated, with a recommended configuration identified Work with developers along the corridor to determine approximate 2035 traffic volumes to develop an interim interchange configuration that is compatible with the ultimate configuration Identify any right-of-way needs Develop interim and final configuration costs – design, right-of-way, utility relocation, if any, and construction. Once the DCR has been completed, Buckeye will proceed with planning, design, right-of-way, utility relocation, if needed, and construction activities listed within the DCR. b. Requested funds from this program*: $495,000 c. Estimated cost of activities proposed*: $495,000 d. Describe what project-related development activities have been completed, if any. List N/A if none. Examples include: data or information that has been collected or activities conducted that are necessary to complete the activities funded through this Program. (no more than 250 words) * In anticipation of growth and increased traffic volumes at the interchange of SVP and I-10, Buckeye requested a traffic analysis to determine when the current SVP/I-10 interchange would reach operational capacity and identify needed improvements to accommodate projected future traffic volumes. The study, completed in 2023, identified the following: Install a traffic signal in 2025-26. Adjust traffic signal timing and modify striping (provide additional lanes) in 2027-28. Reconstruct the interchange in 2031-32. Additionally, Buckeye recently completed a traffic signal warrant for the interchange in July/August 2025, which indicated a traffic signal is warranted for installation. According to the Manual on Uniform Traffic Control Devices (MUTCD), a traffic signal warrant is the minimum criterion utilized to determine the need for a traffic signal at an intersection. Buckeye has contacted ADOT to develop a joint project that could install the traffic signal by early 2026. According to ADOT, the Average Annual Daily Traffic (AADT) at the SVP/I-10 interchange was over 58,000 in 2024 (2024-AADT-PUBLICATION_wformat20250606.xlsx). Buckeye anticipates the AADT for this interchange to increase due to the anticipated growth within the next 5 years. 12. Viability of grant services requested: (See Section VI. B. Criterion #2 of the NOFO for review and evaluation information.) a. Please describe the following: Either 1) your organization’s experience procuring advisory services or 2) your organization’s process for timely hiring of staff (i.e. defined job description, recruitment process). State if you have additional funds available to commit to this effort should grant funding provided prove insufficient to complete the proposed activities. If additional funds will be provided, include the amount and source of the local funding commitment. (no more than 400 words)* Buckeye will procure the advisory services of an experienced and certified consultant to execute the DCR project. Buckeye has an established selection process for procuring consultants that will be utilized in selecting the consultant for this project. This will allow the project to commence sooner, once funds are appropriated, rather than spending 3-4 months advertising and then selecting a consultant. The City of Buckeye has been a Technical Advisory Committee (TAC) member for three (3) recent DCRs completed by ADOT Consultants for locations along I-10 within Buckeye, which are similar to this project. The same TAC member, John Willett, from those projects is also involved with this application. John Willett is the Acting Project Management Deputy Director of Transportation and Transit, and a traffic Engineer of the City of Buckeye. John has experience in traffic engineering design, traffic signals, roadway lighting, roadway signage and marking, traffic control, traffic analysis, corridor studies, and transit planning. Buckeye is commencing two (2) similar DCR projects at other locations along I-10 that will be completed next summer. Based on these similar DCR projects, Buckeye was able to estimate the cost of the SVP/I-10 DCR. Buckeye estimates that the DCR will cost $495,000. However, if it costs more than $495,000, Buckeye will fund the excess from its general fund budget. If awarded this grant, this project will be included in the next Capital Improvement Plan. b. Applicants are encouraged to seek bids or quotes, or to estimate the amount of dedicated staff time for the services being requested to demonstrate the reasonableness of the requested funding in this application. Have you obtained a bid, quote, or estimate for the services requested in this application? * No. Buckeye has contracted for two (2) other similar DCR projects at other locations along I-10 that will be completed next summer. Based on these similar DCR projects, Buckeye was able to estimate the cost of the SVP/I-10 DCR. (provide statement of how you determined estimated cost of proposed activities) 13. By checking this box and submitting this application, I certify that the statements contained herein are true, complete, and accurate to the best of my knowledge. I also provide the required assurances and agree to comply with any resulting terms if I accept an award. I am aware that any false, fictitious, or fraudulent statements or claims may subject me to criminal, civil, or administrative penalties. (U.S. Code, Title 18, Section 1001)* ____________________________________________ __________ Signature (e-signature is sufficient)* Date