Council to take action on a one-time budget transfer of $867,200 between General Obligation Bond reconstruction projects to accommodate vendor quotes on the projects. Summary: Staff recommends Council
Extracted text (via pymupdf)
2235 characters
4.N CITY OF BUCKEYE Regular Council Meeting COUNCIL ACTION REPORT MEETING DATE: 10/07/25 AGENDA ITEM: 4.N. PW – Lower Buckeye Road Reconstruction, Watson Road to 247th Avenue GL Fund Transfer DATE PREPARED: 10/02/25 DISTRICT NO.: STAFF LIAISON: Amy Murray, Public Works Director, amurray@buckeyeaz.gov, (623) 349-6835 DEPARTMENT: Public Works AGENDA ITEM TYPE: Consent Agenda Items / New Business ACTION/MOTION: (This language identifies the formal motion to be made by the Council) Council to take action on a one-time budget transfer of $867,200 between General Obligation Bond reconstruction projects to accommodate vendor quotes on the projects. SUMMARY PROJECT DESCRIPTION: On the evaluated roadway, age, weather and traffic elements have caused pavement deterioration and full depth repairs along with subgrade reconstruction are required. The Public Works, Streets Department, has recommended that the identified damaged pavement location be repaired by removing the damaged asphaltic concrete, replacing the subgrade, then replacing it with new asphaltic concrete. ADA (American Disabilities Act) Curb Ramp Retro fits and ADA (American Disabilities Act) driveway modifications will be addressed prior to pavement reconstruction activities. BENEFITS: This pavement reconstruction projects addresses underlying structural issues by removing and repairing the existing subgrade and base layer degradation. This project will significantly reduce the risk to the traveling public by addressing the degradation and displacement of existing pavement. In addition to improving safety, this project will enhance the overall quality of the travel experience, and the pavement restoration will reduce maintenance costs for the city. FUTURE ACTION: N/A FINANCIAL IMPACT STATEMENT: The net impact of the transfer will be $0. 50223170-543261 has a current budget of $2,600,000 and 50223170-543265 has a current budget of $2,788,000. The transfer of $867,200 between the projects will allow both to be completed as quoted. CURRENT FISCAL YEAR TOTAL COST: $0 BUDGETED: Yes FISCAL YEAR: 2026 FUND/DEPARTMENT: Public Works Items related to a project or facility location must include an attached vicinity map for Council Review. ATTACHMENTS: