Location: +/- 1,921 acres at the southeast corner of Dean Road and Broadway Road 
Case #: PLZM-24-0089 
Prepared By: Norris Design 
First Submittal Date: September 25, 2024 
Second Submittal Date: January 8, 2025 
 
 
 
 
 
 
 
 
 
 
 
 
2R PLZM-24-0089 RECEIVED JAN 08 2025 AL
Exhibit D

INTRODUCTION 
On behalf of Grand View Buckeye, LLC (“GVB’”), Norris Design (the “Applicant”) is pleased to present this 
annexation request for the approximately 1,921-acre property generally located between Dean Road on the 
west, Broadway Road on the north, Jackrabbit Trail on the east, and MC 85 on the south (the “Property”). An 
aerial map demonstrating the location of the Property is attached hereto as Exhibit 1. The Property is currently 
utilized for agricultural purposes, a historical condition that has existed at the Property since the early 1930s, 
according to Maricopa County Historic Aerial Photography.  
 
The Property is part of an approximately 2,271-acre development area controlled by GVB that is envisioned to 
be developed as a major regional employment center, referred to as Grand View, with an anticipated mix of 
advanced manufacturing, distribution, data center, battery storage, office, commercial, industrial, residential 
and ancillary facilities. Exhibit 1 also depicts the portions of Grand View within the existing City limits (see areas 
in grey). Approval of this annexation will facilitate the development of Grand View and support the City’s 
economic development objectives by creating a new opportunity to attract one or more large employers that 
will provide new jobs, significant tax revenues and a sense of corporate citizenship within the City.  
 
The current zoning of the Property in Maricopa County is “Rural-43 – One Acre Per Dwelling Unit” (“RU-43”). 
Upon approval of this annexation request, the City will establish “equivalent zoning” for the Property. It is 
understood that the “equivalent zoning” would not support the proposed development of the Property as a 
major employment center. As a result, GVB intends to work with the City to rezone the larger Grand View 
development area to a zoning district that supports a flexible mix of residential and employment land uses that 
respond to changing market conditions and demands. The City and GVB are currently negotiating a pre-
annexation development agreement and a CMP rezoning has been submitted concurrently with this 
annexation application.  
 
I. IMPACT TO CITY SERVICES 
 
a. WATER & SEWER  
A preliminary analysis of water and wastewater demand was conducted based upon an anticipated 
mix of uses for the larger Grand View development area. Based upon this preliminary analysis, a 
regional water campus is being designed to serve approximately 5,000 acres, to include the entire 
Grand View development and approximately 2,500 additional acres of neighboring parcels in the 
service area. This water campus will be located within Grand View along the west side of Verrado Way, 
south of the Union Pacific Railroad and north of the Buckeye Irrigation District Canal. This location 
allows the water campus to serve an area that covers portions of three separate service areas 
identified in the 2017 IWMP, thereby optimizing system operations. Water supply to the proposed 
water campus will initially be from wells in the vicinity of the water campus that are owned by the 
Property’s current landowner. Additional wells and/or other water supplies (as applicable) will be 
brought online as the larger region develops and demands increase over time. 
 
Through recent discussions with the City, it has been determined that a new regional water 
reclamation facility (WRF) will be constructed within the Property a short distance east of Dean Road, 
between the Union Pacific Railroad and the Buckeye Irrigation District Canal, immediately west of the 
proposed water campus.  Over time, as the larger area develops and as an offsite sewer trunk main is 
extended further west by others to the City’s Central WRF, the new regional WRF within Grand View 
may be converted to a scalping plant. The City has indicated that if initial flows are small (e.g., typical 
of flows from light industrial, warehousing, etc.), the initial parcels may be served by one or more 
septic systems. As the wastewater flows increase with continued development, the regional gravity 
sewer mains will be installed and the regional WRF will be constructed.

Refer to the concurrent Grand View Community Master Plan proposal for more information regarding 
anticipated water and wastewater system improvements. Further evaluation of the demand for water 
and wastewater services and confirmation of the recommendations provided within the preliminary 
water and wastewater reports will occur at the time a specific development proposal is prepared for 
the Property.  
 
b. ACCESSIBILITY AND CIRCULATION 
A master traffic impact analysis was conducted based upon an anticipated mix of uses for the larger 
Grand View development area. The initial traffic impact analysis concluded that the proposed 
development is anticipated to generate 193,548 weekday daily trips, 18,278 trips during the AM peak 
hour, and 21,026 trips during the PM peak hour. The traffic impact analysis also evaluated the operation 
and level of service of intersections after the first phase opening year (2030) based on both build and 
no-build scenarios. In summary, the intersections of (i) Verrado Way and MC 85, (ii) Verrado Way and 
Lower Buckeye Road, (iii) Verrado Way and Yuma Road, (iv) Jackrabbit Trail and Lower Buckeye 
Road, and (v) Perryville Road and MC 85 are expected to operate with the same overall level of service 
in both the no-build and build scenarios. Because of this, mitigation was not considered.  
 
Further evaluation of estimated trip generation and confirmation of the recommendations provided 
within the preliminary traffic impact study will occur at the time a specific development proposal is 
prepared for the Property. 
 
c. IMPACT ON LOCAL SCHOOLS, PARKS, ETC. 
Industrial development within the proposed annexation area will not directly impact any local schools, 
planned open space, parks or other similar recreational amenities. Development of the Property will, 
however, generate significant revenue that will enhance the City’s ability to preserve and/or develop 
such amenities for residents and visitors to enjoy for many years. 
 
Refer to the concurrent Grand View Community Master Plan proposal for more information regarding 
school demand, particularly in a partially residential development scenario. Further evaluation of the 
demand for such services can be completed at a future date when a conceptual site plan for an 
identified user or development is prepared for the Project site. 
 
d. FIRE AND POLICE PROTECTION 
The proposed annexation should not significantly impact the demand for fire and police protection 
services. Further evaluation of the demand for such services can be assessed at a future date when a 
conceptual site plan for an identified user or development is prepared for the Project site.     
 
EXHIBITS:  
 
1. 
Annexation Map

ANNEXATION TO BE COMPLETED BY OTHERS
GRAND VIEW 2,500 
ANNEXATION BOUNDARY
VERRADO WAY
VERRADO WAY
PERRYVILLE ROAD
PERRYVILLE ROAD
BUCKEYE CANAL
BUCKEYE CANAL
WATSON ROAD
WATSON ROAD
LOWER BUCKEYE ROAD
LOWER BUCKEYE ROAD
BROADWAY ROAD
BROADWAY ROAD
SOUTHERN AVENUE
SOUTHERN AVENUE
BELOAT ROAD
BELOAT ROAD
DEAN ROAD
DEAN ROAD
RAINBOW ROAD
RAINBOW ROAD
JACKRABBIT TRAIL
JACKRABBIT TRAIL
EXHIBIT 1 | ANNEXATION MAP
201
201ST
ST AVENUE
 AVENUE
GRAND VIEW 2,500 
(IN CITY LIMITS)