Floreo CFD SARB Sr. 2025 - Engineer's Estimated Costs (009)(6.9.25)(6487379.9).pdf
City of Buckeye — Joint Community Facilities Districts (2025-07-01)
Extracted text (via pymupdf)
545 characters
6487379.9 ENGINEER’S ESTIMATED COSTS ESTIMATED COSTS Cost of Public Infrastructure $9,993,637.50 Debt Service Reserve Fund 976,362.50 Incidental Expenses 404,000.00 Total Cost $11,374,000.00 (Less Owner Contribution) ($404,000.00) Net Cost $10,970,000.00 Total Cost shall not exceed the District Engineer’s Estimate; provided that the total Assessment is limited in the Waiver Agreement to not exceed the product of $10,000 times the number of projected developable lots located within the Assessment District.