Westpark CFD SARB Sr. 2025 - Engineer's Estimated Costs (006)(6.10.25)(6486170.6).pdf
City of Buckeye — Joint Community Facilities Districts (2025-07-01)
Extracted text (via pymupdf)
525 characters
6486170.6 ENGINEER’S ESTIMATED COSTS Cost of Public Infrastructure $1,424,440.00 Debt Service Reserve Fund 136,560.00 Incidental Expenses 215,000.00 Total Cost $1,776,000.00 (Less Owner Contribution) ($215,000.00) Net Cost $1,561,000.00 Total Cost shall not exceed the District Engineer’s Estimate; provided that the total Assessment is limited in the Waiver Agreement to not exceed the product of $3,500 times the number of projected developable lots located within the Assessment District.