FEASIBILITY REPORT
FOR THE ISSUANCE
OF
NOT TO EXCEED
$6,000,000 PRINCIPAL AMOUNT OF
FESTIVAL RANCH COMMUNITY FACILITIES DISTRICT
(CITY OF BUCKEYE, ARIZONA)
GENERAL OBLIGATION BONDS,
SERIES 2025
Date of Public Hearing: May 20, 2025
TABLE OF CONTENTS
SECTION
Introduction; Purpose of Feasibility
Report and General Description of District ........................................................................ ONE
Description, Estimate of Cost and Timetable
for Completion of Public Infrastructure ............................................................................. TWO
Maps of the District ............................................................................................................. THREE
Plan of Finance and Preliminary Debt Service Schedule ....................................................... FOUR
APPENDIX
Legal Description of Festival Ranch Community Facilities District (City of Buckeye, Arizona) A
SECTION ONE
INTRODUCTION; PURPOSE OF FEASIBILITY REPORT
AND GENERAL DESCRIPTION OF DISTRICT
1-1
INTRODUCTION
This Feasibility Report (this “Report”) has been prepared for presentation to the District Board of the Festival
Ranch Community Facilities District (City of Buckeye, Arizona) (the “District”) in connection with the proposed
issuance by the District of its General Obligation Bonds, Series 2025 (the “Bonds”), in an aggregate principal amount
not to exceed $6,000,000. The Bonds will be issued pursuant to the Community Facilities District Act of 1988, Title
48, Chapter 4, Article 6, Arizona Revised Statutes (the “Act”). The District is authorized to issue not-to-exceed
$175,000,000 in principal amount of general obligation bonds pursuant to an election held on May 25, 2005. To date,
the District has issued $800,000 aggregate principal amount of District General Obligation Bonds, Series 2006;
$1,535,000 aggregate principal amount of District General Obligation Bonds, Series 2007; $7,600,000 aggregate
principal amount of District General Obligation Bonds, Series 2009; $5,400,000 aggregate principal amount of
District General Obligation Bonds, Series 2012; $1,800,000 aggregate principal amount of General Obligation Bonds,
Series 2013; $5,410,000 aggregate principal amount of General Obligation Bonds, Series 2016; $3,665,000
aggregate principal amount of General Obligation Bonds, Series 2017; $2,940,000 aggregate principal amount of
General Obligation Refunding Bonds, Series 2017; $3,335,000 aggregate principal amount of General Obligation
Bonds, Series 2018; $5,715,000 aggregate principal amount of General Obligation Bonds, Series 2019; $3,885,000
aggregate principal amount of General Obligation Refunding Bonds, Series 2019; $5,315,000 aggregate principal
amount of General Obligation Bonds, Series 2020; $5,790,000 aggregate principal amount of General Obligation
Bonds, Series 2021; $6,075,000 aggregate principal amount of General Obligation Bonds, Series 2022; $3,985,000
aggregate principal amount of General Obligation Bonds, Series 2023, $10,075,000 aggregate principal amount of
General Obligation Bonds, Series 2024 and $2,995,000 aggregate principal amount of General Obligation Refunding
Bonds, Series 2024 for a total amount of $76,320,000 of general obligation bonds issued. Proceeds from the sale of
the Bonds will be used to acquire the public infrastructure listed in Section Two and to pay a portion of the costs of
issuance of the Bonds.
PURPOSE OF FEASIBILITY REPORT
This Report has been prepared for consideration of the feasibility and benefits of certain public infrastructure
(as defined in Section 48-701, Arizona Revised Statutes) (collectively, the “Public Infrastructure”), to be financed by
the Bonds, if any are issued, and of the plan for financing the Public Infrastructure in accordance with the provisions
of Section 48-715, Arizona Revised Statutes. Pursuant to Section 48-715, Arizona Revised Statutes, this Report
includes (i) a description of the Public Infrastructure, an estimate of cost and a timetable to acquire the Public
Infrastructure (see Section Two); (ii) a map showing, in general, the location of the Public Infrastructure and area to
be benefited by the Public Infrastructure (see Section Three); and (iii) a plan of finance for the Public Infrastructure
(see Section Four).
This Report has been prepared for consideration by the District Board. It is not intended or anticipated that
this Report will be relied upon by other persons, including, but not limited to, purchasers of the Bonds. This Report
does not attempt to address the quality of the Bonds as investments or the likelihood of repayment of the Bonds, if
any are issued. In preparing this Report, employees of Pulte Home Company LLC (“Pulte”), the master developer
of the property within the District, the underwriter, the financial advisor, bond counsel, staff of the City of Buckeye,
Arizona (the “City”) that provide services to the District, and other persons and experts have been consulted as
deemed appropriate.
1-2
GENERAL DESCRIPTION OF DISTRICT
Formation of the District was approved by the City on April 19, 2005, on the request of all of the landowners
within the District. The District consists of approximately 4,015 acres within the approximately 10,354 acre master-
planned community called Festival Ranch (the “Project”). The Project is located along the Sun Valley Parkway
generally between 259th Avenue and the 291st Avenue alignments. Single-family residential units are planned for
approximately 3,190 acres within the Project. As of March 31, 2024, Pulte has closed 4,342 residential homes at Sun
City Festival (age restricted) and 1,274 homes at Festival Foothills (non-age restricted), for a total of 5,616 residential
homes.
In addition to residential development, several community amenities have been constructed within the
District. Currently, a 27-hole golf course is completed along with a 15,000 square foot golf clubhouse, a 30,000
square foot recreation center, a 24,000 square foot recreation center, an 8,000 square foot arts and crafts building, a
softball complex, a pet park, a pickleball complex and a community park.
Total Project
Approximate
District
Acres
Single Family Residential Units
3,190
Two Golf Courses
400
Commercial
350
Recreation Centers
75
Total
4,015
The District was created to finance the construction or acquisition of Public Infrastructure within the District.
See Section Two for a description of the Public Infrastructure. A legal description of the District is included in
Appendix A. Maps of the District are included in Section Three. The acquisition of the Public Infrastructure as
defined in this Report is consistent with and in furtherance of the approved General Plan of the District.
SECTION TWO
DESCRIPTION, ESTIMATE OF COST AND TIMETABLE FOR
COMPLETION OF PUBLIC INFRASTRUCTURE
2-2
DESCRIPTION OF PUBLIC INFRASTRUCTURE
The Public Infrastructure, which has been publicly bid and constructed pursuant to State of Arizona (the
“State”) statutes and the acquisition of which is to be financed by the Bonds, consists of the following:
Project Descriptions
Total Estimated
Costs
Certified
Engineer’s
Costs
Paid by Prior
Bonds
To be Paid by
Series 2025
Bonds
Eligible for
funding from
Future
Bonds
1.
Festival Ranch Wastewater Infrastructure
Trunk Sewer Lines - installation of approx.
11,121 linear feet of sewer lines including
engineering, survey, permits and fees, and other
labor, tools, and equipment.
$3,220,619
$3,220,619
$3,220,619
$0
$0
2.
Sun City Festival Phase I Roadways and
Landscaping (Canyon Springs, Desert Oasis,
Mountain Ridge & Sun Valley Parkway) -
installation of approx. 4,874 linear feet of
Arterial Roadway and ROW Landscaping and
5,942 of Collector Roadway and ROW
Landscaping including concrete, paving, storm
drainage, landscaping, engineering, survey,
permits and fees, and other labor, tools, and
equipment.
$7,416,732
$7,416,732
$7,416,732
$0
$0
3.
Sun City Festival Phase I Infrastructure
Water (Parcel A1, B1, C1 & V1) - installation
of approx. 25,600 linear feet of water lines
including engineering, survey, permits and
fees, and other labor, tools, and equipment.
$1,841,756
$1,841,756
$1,841,756
$0
$0
4.
Festival Ranch Water Reclamation Facility -
installation of a 1 MG Water Reclamation
Facility including engineering, survey, permits
and fees, and other labor, tools, and equipment.
$8,966,703
$8,966,703
$8,966,703
$0
$0
5.
Sun City Festival Phase 1 Offsite Sewer
(Alignment through Parcels D1, E1, S1 &
T1) - installation of approximately 8,663 linear
feet of sewer lines including engineering,
survey, permits and fees, and other labor, tools,
and equipment.
$997,203
$997,203
$997,203
$0
$0
6.
Sun City Festival Water Plant #1, Well #1,
Well #2 - installation of 1.2 MG storage tank
and booster pumps at Water Plant #1, and the
drilling and equipping of Well #1 and Well #2
producing 6,150 GPM, including the eligible
costs for engineering, survey, permit fees, and
other required labor, tools, and equipment.
$6,754,018
$6,754,018
$6,754,018
$0
$0
7.
Festival
Foothills
Phase
I
Water
Infrastructure Desert Vista Boulevard and
Beardsley Parkway
(East of CSB) - installation of approximately
5,400 linear feet of water lines including
engineering, survey, permits and fees, and
other labor, tools, and equipment.
$418,657
$418,657
$418,657
$0
$0
2-3
Project Descriptions
Total Estimated
Costs
Certified
Engineer’s
Costs
Paid by Prior
Bonds
To be Paid by
Series 2025
Bonds
Eligible for
funding from
Future
Bonds
8.
Festival Foothills Phase I Roadways
Desert Vista Blvd & Beardsley Parkway
(East of the CSB) -installation of
approximately 1,340 linear feet of Arterial
Roadway and 4,050 linear feet of
Collector Roadway including grading,
concrete,
paving,
storm
drainage,
engineering, survey, permits and fees, and
other labor, tools, and equipment.
$2,383,180
$2,383,180
$2,383,180
$0
$0
9.
Sun
City
Festival
Phase
II
Infrastructure Water, Sewer (Phase 1),
Storm Drain and reclaimed Waterline
Phase I- installation of approximately
7,782 linear feet of waterlines, 1,596 linear
feet of sewer, 15,892 linear feet of
reclaimed waterline and 1,361 linear feet
of storm drain for Mountain Ridge
Boulevard, Desert Oasis Boulevard and
Canyon
Spring
Boulevard
including
engineering, survey, permits and fees, and
other labor, tools, and equipment.
$2,325,837
$2,325,837
$2,325,837
$0
$0
10.
Sun City Festival Phase II Concrete and
Paving Infrastructure to serve Desert
Oasis Boulevard and Mountain Ridge
Boulevard to serve Parcels D 1-H 1 -
installation of approximately 3,640 linear
feet of arterial roadway and 2,100 of
collector
roadway
including
paving,
engineering, survey, permits and fees, and
other labor, tools, and equipment.
$2,537,569
$2,537,569
$2,537,569
$0
$0
11.
Sun City Festival Phase 2 Offsite Sewer
– installation of approximately 6,082
linear feet of 15 inch sewer including
engineering, survey, permits and fees, and
other labor, tools, and equipment.
$ 781,133
$ 781,133
$781,133
$0
$0
12.
Desert
Vista
Boulevard
Water
Transmission Main – installation of
approximately 3,083 linear feet of water
transmission main including engineering,
survey, permits and fees, and other labor,
tools, and equipment.
$845,216
$ 845,216
$845,216
$0
$0
13.
Sun City Festival Well # 3 –
equipping of Well #3 including the eligible
costs for engineering, survey, permit fees,
and other required labor, tools, and
equipment.
$1,680,547
$1,680,547
$1,680,547
$0
$0
2-4
Project Descriptions
Total Estimated
Costs
Certified
Engineer’s
Costs
Paid by Prior
Bonds
To be Paid by
Series 2025
Bonds
Eligible for
funding from
Future
Bonds
14.
Sun City Festival Revised Abraham
Lane Water Line (Portion within Parcel
N1) – installation of approximately 2,898
linear feet of 12 inch water including the
eligible costs for engineering, survey,
permit fees, and other required labor, tools
and equipment.
$212,935
$212,935
$212,935
$0
$0
15.
Sun City Festival Phase 2 Infrastructure
Phase 3 Water Line and Desert Vista
Boulevard Water Line - installation of
approximately 4,048 linear feet 16 inch
water and approximately 770 linear feet of
12 inch water including the eligible costs
for engineering, survey, permit fees, and
other required labor, tools and equipment.
$402,514
$402,514
$402,514
$0
$0
16.
Desert
Vista
Boulevard,
Wagner
Complex
Drive
and
Phase
II
Infrastructure
Phase
3
Roadway
Concrete,
Paving
and
Landscape
Improvements
–
installation
of
approximately 4,209 linear feet of arterial
roadway and 3,000 linear feet of collector
roadway including concrete, paving and
right of way landscaping including the
eligible costs for design, engineering,
survey, permits and fees, and other labor,
tools, and equipment.
$4,941,129
$4,941,129
$4,941,129
$0
$0
17.
Sun City Festival – Phase 3 Offsite
Sewer – installation of approximately
3,700 linear feet of 15” ES VCP truck
sewer including the eligible costs for
design, engineering, survey, permits and
fees, and other labor, tools, and equipment.
$678,358
$678,358
$678,358
$0
$0
18.
City of Buckeye Firehouse # 705 –
construction of fire station including the
eligible costs for design, engineering,
survey, permits and fees, and other labor,
tools, and equipment.
$3,351,485
$3,351,485
$3,351,485
$0
$0
19.
Sun City Festival Water Plant #1
Expansion – installation of 1.2 MG
storage tank and booster pumps at Water
Plant #1, including the eligible costs for
engineering, survey, permit fees, and other
required labor, tools, and equipment.
$2,654,932
$2,654,932
$2,654,932
$0
$0
20.
Sun City Festival Water Well #4 –the
drilling, installation and equipping of Well
#4 producing an estimated 2,500 GPM,
including
the
eligible
costs
for
engineering, survey, permit fees, and other
required labor, tools, and equipment.
$5,000,000
[to be
determined]
$0
$0
[to be
determined]
2-5
Project Descriptions
Total Estimated
Costs
Certified
Engineer’s
Costs
Paid by Prior
Bonds
To be Paid by
Series 2025
Bonds
Eligible for
funding from
Future
Bonds
21.
Festival Ranch Water Reclamation
Facility Expansion - the installation of a
0.5 MGD Water Reclamation Facility
Expansion, including the eligible costs for
engineering, survey, permit fees, and other
required labor, tools, and equipment.
$31,000,000
[to be
determined]
$0
$0
[to be
determined]
22.
Festival
Ranch
Arsenic
Treatment
Facility - the installation of a Water
Treatment Facility, including the eligible
costs for transmission mains, engineering,
survey, permit fees, and other required
labor, tools, and equipment.
$14,000,000
[to be
determined]
$0
$0
[to be
determined]
23.
Sun City Festival Ranch Planning Area
2 Canyon Springs Blvd and Parcel A2
Concrete and Paving Improvements –
installation of approximately 4,400 linear
feet of arterial roadway and parcel
roadways including concrete and paving
including the eligible costs for design,
engineering, survey, permits and fees, and
other labor, tools, and equipment.
$2,180,613
$2,180,613
$2,180,613
$0
$0
24.
Sun City Festival Ranch Planning Area
2 Parcel D2 Concrete and Paving
Improvements–
installation
of
approximately 6,500 linear feet of roadway
including concrete and paving including
the eligible costs for design, engineering,
survey, permits and fees, and other labor,
tools, and equipment.
$1,316,658
$1,316,658
$1,316,658
$0
$0
25.
Sun City Festival Ranch Planning Area
2 Parcel C2 Concrete and Paving
Improvements
–
installation
of
approximately 5,400 linear feet of roadway
including concrete and paving including
the eligible costs for design, engineering,
survey, permits and fees, and other labor,
tools, and equipment.
$1,048,802
$1,048,802
$1,048,802
$0
$0
26.
Festival Ranch Sun City Festival - Parcel
S1 16 inch Waterline – installation of
approximately
1,600
linear
feet
of
waterline including the eligible costs for
design, engineering, survey, permits and
fees, and other labor, tools, and equipment.
$300,728
$ 300,728
$300,728
$0
$0
2-6
Project Descriptions
Total
Estimated
Costs
Certified
Engineer’s
Costs
Paid by Prior
Bonds
To be Paid by
Series 2025
Bonds
Eligible for
funding from
Future
Bonds
27.
Festival Ranch Sun City Festival -
Parcel
HH1-1
&
HH1-2
Water
Transmission Mains – installation of
approximately 2,500 linear feet of water
transmission main including the eligible
costs for design, engineering, survey,
permits and fees, and other labor, tools,
and equipment.
$214,263
$214,263
$214,263
$0
$0
28.
Sun City Festival Ranch Planning Area
2 Parcel B2 Concrete and Paving
Improvements
–
installation
of
approximately 4,600 linear feet of minor
collector roadway and parcel roadways
including concrete and paving including
the eligible costs for design, engineering,
survey, permits and fees, and other labor,
tools, and equipment.
$1,271,807
$1,271,807
$1,271,807
$0
$0
29.
Sun City Festival Ranch Planning Area
1 Parcel Q1 Phase 1 and Phase 2
Concrete and Paving Improvements–
installation of approximately 8,400 linear
feet of major collector and parcel
roadways including concrete and paving
including the eligible costs for design,
engineering, survey, permits and fees, and
other labor, tools, and equipment.
$2,212,211
$2,212,211
$1,527,000
$685,211
$0
30.
Sun City Festival Ranch Planning Area
1 Parcel T1 Concrete and Paving
Improvements
–
installation
of
approximately 5,900 linear feet of parcel
roadway including concrete and paving
including the eligible costs for design,
engineering, survey, permits and fees, and
other labor, tools, and equipment.
$1,817,706 (a)
[to be
determined]
Completed
Project Binder
not yet prepared
$0
$1,817,706 (a)
[to be
determined]
31.
Festival Ranch Sun City Festival -
Parcel T1 16 inch Waterline –
installation of approximately 2,700 linear
feet of waterline including the eligible
costs for design, engineering, survey,
permits and fees, and other labor, tools,
and equipment.
$524,078
[to be
determined]
Completed
Project Binder
not yet prepared
$0
$0
[to be
determined]
32.
Sun City Festival Ranch Planning Area
2 Parcel L2 Concrete and Paving
Improvements
–
installation
of
approximately 1,000 linear feet of parcel
roadway including concrete and paving
including the eligible costs for design,
engineering, survey, permits and fees, and
other labor, tools, and equipment.
$529,754
[to be
determined]
Completed
Project Binder
not yet prepared
$0
$0
[to be
determined]
2-7
Project Descriptions
Total Estimated
Costs
Certified
Engineer’s
Costs
Paid by Prior
Bonds
To be Paid by
Series 2025
Bonds
Eligible for
funding from
Future
Bonds
33.
Festival Ranch Groundwater Recharge
Facility - the installation of a Groundwater
Recharge Facility, including the eligible
costs for pump station, transmission mains,
engineering, survey, permit fees, and other
required labor, tools, and equipment.
$3,500,000
[to be
determined]
$0
$0
[to be
determined]
34.
Sun City Festival Ranch Planning Area
2 Parcel E2 Infrastructure Sewer
Improvements
–
installation
of
approximately 2,599 linear feet of sewer
line including the eligible costs for design,
engineering, survey, permits and fees, and
other labor, tools, and equipment.
$488,885
[to be
determined]
$0
$0
[to be
determined]
35.
Sun City Festival Ranch Planning Area
2 Parcel F2 Concrete and Paving
Improvements
–
installation
of
approximately 6,960 linear feet of arterial,
collector and parcel roadway concrete and
paving including the eligible costs for
design, engineering, survey, permits and
fees, and other labor, tools, and equipment.
$3,256,663
$3,256,663
$3,256,663
$0
$0
36.
Sun City Festival Ranch Planning Area
1 Parcel HH1-3 Infrastructure Water
and Well Supply Line Improvements –
installation of approximately 4,800 linear
feet of water and well lines including the
eligible costs for design, engineering,
survey, permits and fees, and other labor,
tools, and equipment.
$424,000
[to be
determined]
$0
$0
[to be
determined]
37.
Sun City Festival Ranch Planning Area
2 Parcel K2/N2 Concrete and Paving
Improvements – installation parcel
roadway concrete and paving including
the eligible costs for design, engineering,
survey, permits and fees, and other labor,
tools, and equipment.
$1,246,825
$1,246,825
$1,132,405
$114,420
$0
38.
Sun City Festival Ranch Planning Area
2 Parcel H2 Phase 1 and 2 Concrete
and Paving Improvements – installation
parcel roadway concrete and paving
including the eligible costs for design,
engineering, survey, permits and fees, and
other labor, tools, and equipment.
$2,809,434
$2,524,056
$2,524,056
$285,378
$0
2-8
The Public Infrastructure described above was completed from 2006 to the date of this Report. Proceeds of the Bonds
will be used to finance the acquisition of a portion of the Public Infrastructure. Additional portions of public
infrastructure have been completed but are awaiting administrative approval by the District before such public
infrastructure is eligible for funding from future bonds. Additional public infrastructure as contemplated by the
District’s formational documents will be constructed in the future.
*
Subject to change.
(a)
Pending certification.
Project Descriptions
Total Estimated
Costs
Certified
Engineer’s
Costs
Paid by Prior
Bonds
To be Paid by
Series 2025
Bonds
Eligible for
funding from
Future
Bonds
39.
Sun City Festival Ranch Planning Area
2 Parcel G2/I2 Concrete and Paving
Improvements
–
installation
parcel
roadway concrete and paving including the
eligible costs for design, engineering,
survey, permits and fees, and other labor,
tools, and equipment.
$1,686,178
$1,686,178
$381,195
$1,304,983
$0
40.
Sun City Festival Ranch Planning Area
2 Parcel J2 Concrete and Paving
Improvements
–
installation
parcel
roadway concrete and paving including the
eligible costs for design, engineering,
survey, permits and fees, and other labor,
tools, and equipment.
$736,639
$736,639
$0
$736,639
$0
41.
Sun City Festival Ranch Parcel HH1-5
Concrete and Paving Improvements –
installation parcel roadway concrete and
paving including the eligible costs for
design, engineering, survey, permits and
fees, and other labor, tools, and equipment.
$1,144,847 (a)
[to be
determined]
$0
$355,663 (a)
[to be
determined]
42.
Festival Ranch Water Plant No. 1
Expansion Booster Pump # 4 -
installation of additional Booster Pump
including the elegiable costs for design,
engineering, survey, permits, fees, and
other labor, tools and equipment.
$2,016,559
[to be
determined]
$0
$0
[to be
determined]
43.
Festival Ranch Sun City Festival –
Planning Area 2 Kerry Lane and Offsite
Water Line Waterline – installation of
approximately
5,000
linear
feet
of
waterline including the eligible costs for
design, engineering, survey, permits and
fees, and other labor, tools, and equipment.
$1,072,792
[to be
determined]
$0
$0
[to be
determined]
$132,209,965*
$73,215,400*
$67,564,713
$5,300,000*
$ to be
determined*
SECTION THREE
MAPS OF THE DISTRICT
3-1
Location Map
3-2
Aerial Photograph of the District
SECTION FOUR
PLAN OF FINANCE AND PRELIMINARY
DEBT SERVICE SCHEDULE
4-1
PLAN OF FINANCE
This Plan of Finance is subject to modification to accommodate market conditions at the time of the
actual sale of the Bonds and to the extent necessary to comply with federal and State law.
(i)
Formation and Authorization:
In response to a petition from the owners of 100% of the property within the District, the City Council
formed the District on April 19, 2005. The District is authorized to issue not-to-exceed $175,000,000
in principal amount of general obligation bonds pursuant to an election held on May 25, 2005. The
remaining authorization prior to the issuance of the Bonds is $106,397,622.
The District has previously issued the following series of general obligation bonds:
$800,000, District General Obligation Bonds, Series 2006;
$1,535,000, District General Obligation Bonds, Series 2007;
$7,600,000, District General Obligation Bonds, Series 2009;
$5,400,000, District General Obligation Bonds, Series 2012;
$1,800,000, General Obligation Bonds, Series 2013;
$5,410,000, General Obligation Bonds, Series 2016;
$3,665,000, General Obligation Bonds, Series 2017;
$2,940,000, General Obligation Refunding Bonds, Series 2017;
$3,335,000, General Obligation Bonds, Series 2018;
$5,715,000, General Obligation Bonds, Series 2019;
$3,885,000, General Obligation Refunding Bonds, Series 2019;
$5,315,000, General Obligation Bonds, Series 2020;
$5,790,000, General Obligation Bonds, Series 2021;
$6,075,000, General Obligation Bonds, Series 2022;
$3,985,000, General Obligation Bonds, Series 2023;
$10,075,000, General Obligation Bonds, Series 2024; and
$2,995,000, General Obligation Refunding Bonds, Series 2024.
(ii)
Proposed Debt Issuance:
The Bonds are anticipated to be issued in September 2025. As indicated in Table One herein, it is
currently estimated that the Bonds will have a final maturity of approximately 20-years with principal
amortized such that when combined with the debt service on the previous issues referenced above, the
result will be aggregate level debt service along with a targeted secondary tax rate of not to exceed
$3.00 per $100 of net assessed limited property value (not including the tax of $0.30 per $100 of net
assessed limited property value levied to pay a portion of operation and maintenance expenses of the
District and of the public infrastructure financed by the District (the “Operation and Maintenance
Tax”)).
4-2
(iii)
Sources and Uses of Funds:
The estimated sources and uses of funds associated with the sale of the Bonds is as follows:
Sources of Funds:
Bonds
Principal Amount of Bonds (a)
$ 5,340,000.00
Pulte Contribution (b)
204,080.00
$ 5,544,080.00
Uses of Funds:
Cost of Public Infrastructure
$ 5,300,000.00
Costs of Issuance
140,000.00
Bond Insurance
37,173.47
Underwriting Fee
64,080.00
Deposit to the Debt Service Fund
2,826.53
$ 5,544,080.00
(a) Final par amount of the Bonds is subject to change based on market conditions.
(b) All costs of issuance and underwriter fees will be paid by Pulte.
(iv)
Disclosure of Taxes and Assessments:
Section 32-2181 et seq., Arizona Revised Statutes requires the disclosure of all property taxes and
assessments to be paid by a homeowner in the Arizona Department of Real Estate Subdivision Public
Report (the “Public Report”). Each homebuyer must be supplied a Public Report and, prior to any
home sale, the homebuyer must acknowledge by signature that they have read and accepted the Public
Report.
In addition, Pulte requires the homebuyer to sign an additional form that highlights and discloses the
additional taxes as a result of the District financing.
(v)
Operation and Maintenance Estimated Revenues and Expenditures:
The Public Infrastructure that may be acquired by the District has been dedicated to the City.
Some or all of the public infrastructure heretofore or hereafter constructed may be, and may continue
to be, supported by City monies (after acceptance of any such public infrastructure by the City), the
Operation and Maintenance Tax, Home Owner’s Association (“HOA”) fees, developer contributions,
or some combination of one or more of such revenue sources. Pursuant to a development agreement
among the Project property owners and the City, the master HOA is responsible for the operation and
maintenance costs of landscaping for the roadways, trails, and open space within the District. All
homeowners are required to participate in the HOA. Monthly fees for the HOA are approximately
$168 per home in Sun City Festival and $95 per home in Festival Foothills.
Pursuant to a development agreement among the Project property owners and the City, Pulte is
required to provide a warranty for all infrastructure comprised of streets, parkways and alleys and all
appurtenances thereto at its expense for a period of two years from the date the City accepts the
infrastructure. Such warranty requires repair actions reasonably necessary to correct defects according
to customary engineering industry standards for each item of the Public Infrastructure.
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
TABLE ONE
Currently Outstanding
$5,340,000
General Obligation Bond
General Obligation Bonds, Series 2025
Debt Service
Dated: 10/1/25 (a)
Net Limited
Total
Projected
Fiscal
Assessed
New Bond
Aggregate
Bond
Year
Valuation (b)
Principal
Interest
Debt Service
Principal
Interest (c)
Debt Service
Debt Service
Tax Rate (d)
2024/25
$136,959,496
$1,995,000
$1,969,611
$3,964,611
$3,964,611
$2.8959
2025/26
147,128,666
2,005,000
2,098,681
4,103,681
$95,000
$210,633
$305,633
4,409,315
2.9969
2026/27
147,128,666
2,090,000
2,014,331
4,104,331
0
262,250
262,250
4,366,581
2.9679
2027/28
147,128,666
1,975,000
1,926,331
3,901,331
45,000
262,250
307,250
4,208,581
2.8605
2028/29
147,128,666
2,055,000
1,844,731
3,899,731
50,000
260,000
310,000
4,209,731
2.8613
2029/30
147,128,666
2,140,000
1,759,631
3,899,631
55,000
257,500
312,500
4,212,131
2.8629
2030/31
147,128,666
2,225,000
1,677,781
3,902,781
55,000
254,750
309,750
4,212,531
2.8632
2031/32
147,128,666
2,305,000
1,593,131
3,898,131
60,000
252,000
312,000
4,210,131
2.8615
2032/33
147,128,666
2,400,000
1,498,563
3,898,563
65,000
249,000
314,000
4,212,563
2.8632
2033/34
147,128,666
2,505,000
1,394,463
3,899,463
65,000
245,750
310,750
4,210,213
2.8616
2034/35
147,128,666
2,610,000
1,290,863
3,900,863
65,000
242,500
307,500
4,208,363
2.8603
2035/36
147,128,666
2,715,000
1,183,013
3,898,013
75,000
239,250
314,250
4,212,263
2.8630
2036/37
147,128,666
2,830,000
1,072,163
3,902,163
75,000
235,500
310,500
4,212,663
2.8633
2037/38
147,128,666
2,960,000
941,788
3,901,788
75,000
231,750
306,750
4,208,538
2.8604
2038/39
147,128,666
3,095,000
805,200
3,900,200
80,000
228,000
308,000
4,208,200
2.8602
2039/40
147,128,666
3,200,000
699,513
3,899,513
85,000
224,000
309,000
4,208,513
2.8604
2040/41
147,128,666
3,325,000
572,713
3,897,713
90,000
219,750
309,750
4,207,463
2.8597
2041/42
147,128,666
3,415,000
483,463
3,898,463
95,000
215,250
310,250
4,208,713
2.8606
2042/43
147,128,666
3,585,000
316,988
3,901,988
95,000
210,500
305,500
4,207,488
2.8597
2043/44
147,128,666
3,750,000
150,000
3,900,000
105,000
205,750
310,750
4,210,750
2.8620
2044/45
147,128,666
4,010,000
200,500
4,210,500
4,210,500
2.8618
$53,180,000
$5,340,000
$4,706,883
$10,046,883
(a) Closing date subject to change.
(c) Interest rate is estimated at 5.0%. Rates are subject to change based on a variety of economic and market factors.
(b) Fiscal year 2024/25 is actual and represents 12.2% growth. Fiscal Year 2025/26 is estimated and represents 7.42% growth. Subsequent years assume no growth.
(d) Fiscal year 2024/25 represents the actual secondary tax rate for debt service only.
The interest rate and rating assumptions assumed in this presentation are based on current market conditions and similar credits.
The Issuer's actual results may differ, and Stifel makes no commitment to underwrite at these levels.
Prepared by Stifel - 4/17/2025
Page 1 of 1
APPENDIX A
LEGAL DESCRIPTION OF FESTIVAL RANCH COMMUNITY
FACILITIES DISTRICT (CITY OF BUCKEYE, ARIZONA)