RES 05-25 - Festival Ranch CFD GO Bonds Ser 2025 - Resolution of Intention (005)(5.5.25) (6491886.5).docx
City of Buckeye — Joint Community Facilities Districts (2025-05-20)
Extracted text (via pymupdf)
22371 characters
6491886.5 1 RESOLUTION NO. 05-25 (Festival Ranch) A RESOLUTION OF THE BOARD OF DIRECTORS OF FESTIVAL RANCH COMMUNITY FACILITIES DISTRICT (CITY OF BUCKEYE, ARIZONA), ACCEPTING AND APPROVING THE FEASIBILITY REPORT RELATING TO THE ACQUISITION AND FINANCING OF CERTAIN IMPROVEMENTS BENEFITING THE DISTRICT; AND DECLARING ITS PRELIMINARY INTENTION TO ISSUE NOT TO EXCEED $6,000,000 PRINCIPAL AMOUNT OF GENERAL OBLIGATION BONDS TO FINANCE THE ACQUISITION OF CERTAIN IMPROVEMENTS AS DESCRIBED IN THE FEASIBILITY REPORT RELATING TO SUCH IMPROVEMENTS PURSUANT TO THE PROVISIONS OF TITLE 48, CHAPTER 4, ARTICLE 6, ARIZONA REVISED STATUTES, AND ALL AMENDMENTS THERETO. WHEREAS, pursuant to Arizona Revised Statutes (“A.R.S.”) § 48-715, as amended, the Board of Directors of Festival Ranch Community Facilities District (City of Buckeye, Arizona) has caused a Report to be prepared, which Report is a study of the feasibility and benefits of the Project (as such terms and all other initially capitalized terms are defined hereinafter) relating to certain public infrastructure (as defined in the Act) provided for in the General Plan of the District to be financed with the proceeds of the sale of general obligation bonds of the District, which Report includes, among other things, a description of certain public infrastructure to be acquired and all other information useful to understand the Project, an estimate of the cost to acquire, operate and maintain the Project, information concerning the completion of the Project, a map or description of the area to be benefited by the Project and a plan for financing the Project, a copy of which is on file with the District Clerk; and WHEREAS, pursuant to A.R.S. § 48-715, as amended, a public hearing on the Report was held on the date hereof, after provision for publication and mailing of notice thereof as provided by law. NOW, THEREFORE, BE IT RESOLVED by the Board of Directors of Festival Ranch Community Facilities District (City of Buckeye, Arizona) as follows: Section 1. Definitions. In this resolution, the following terms shall have the following meanings: “Act” shall mean A.R.S. Title 48, Chapter 4, Article 6, as amended. “Board” shall mean the Board of Directors of the District. “Bonds” shall mean the District’s General Obligation Bonds, Series 2025. “District” shall mean Festival Ranch Community Facilities District (City of Buckeye, Arizona). 6491886.5 2 “District Clerk” shall mean the Clerk of the District. “Project” shall mean the acquisition of public infrastructure (as such term is defined in the Act) described in the Report, including particularly the acquisition by the District of the improvements described on Exhibit A hereto. “Report” shall mean the Feasibility Report dated May 20, 2025, pertaining to the Project on file with the District Clerk prior to the date and time hereof, discussing the matters required by A.R.S. § 48-715, as amended, as such matters relate to the Project. Section 2. Approval of Feasibility Report. Published notice of the public hearing on the Report has been provided by the District Clerk not less than 10 days in advance of the date of the public hearing on the Report and such publication is hereby ratified and approved. The District Clerk has provided the Report and notice of public hearing on the Report to the governing body of the City of Buckeye, Arizona (the “City”), not less than 10 days in advance of the date of the public hearing. Based on the review by the Board and the presentation of the Report at the public hearing on May 20, 2025, the Report is hereby accepted, adopted and approved in the form submitted to the Board. Section 3. Resolution of Intent. Pursuant to A.R.S. § 48-715, as amended, the Board hereby identifies the public infrastructure of the Project, the areas benefited, the expected method of financing and the system of providing revenues to operate and maintain the Project, all as identified and provided for in the Report, for any and all purposes of the Act. Any portion of the costs of the Project not financed by the proceeds of the Bonds shall remain eligible to be financed through the sale of future bonds of the District. Section 4. Preliminary Intent to Issue and Sell Bonds. The Board hereby declares its intent to proceed with the financing of the Project in substantially the manner presented in the Report, and if such financing is consummated, to acquire the Project. Nothing contained in this Resolution shall be construed to limit the Board’s sole, unfettered discretion in making its final decision to issue bonds to finance the Project. [Signatures on following page] 6491886.1 PASSED AND ADOPTED by the Board of Directors of the Festival Ranch Community Facilities District (City of Buckeye, Arizona), on May 20, 2025. FESTIVAL RANCH COMMUNITY FACILITIES DISTRICT (CITY OF BUCKEYE, ARIZONA) District Chair ATTEST: District Clerk APPROVED AS TO FORM: Gust Rosenfeld P.L.C. Bond Counsel CERTIFICATE I, Lucinda J. Aja, the duly appointed District Clerk of the Festival Ranch Community Facilities District (City of Buckeye, Arizona), do hereby certify that the above and foregoing Resolution No. 05-25 (Festival Ranch), was duly passed by the Board of Directors of Festival Ranch Community Facilities District (City of Buckeye, Arizona), at a regular meeting held on May 20, 2025, and the vote was ____ aye’s, ____ nay’s, ____ abstained and ____ were absent, and that the Chair and ___ Board Members were present thereat. DATED: May 20, 2025. Lucinda J. Aja, District Clerk 6491886.5 A-1 EXHIBIT A TO RESOLUTION 05-25 [Description of Public Infrastructure] See following pages. 6491886.5 A-2 DESCRIPTION OF PUBLIC INFRASTRUCTURE The Public Infrastructure, which has been publicly bid and constructed pursuant to State statutes and the acquisition of which is to be financed by the Bonds, consists of the following: Project Descriptions Total Estimated Costs Certified Engineer’s Costs Paid by Prior Bonds To be Paid by Series 2025 Bonds Eligible for funding from Future Bonds 1. Festival Ranch Wastewater Infrastructure Trunk Sewer Lines - installation of approx. 11,121 linear feet of sewer lines including engineering, survey, permits and fees, and other labor, tools, and equipment. $3,220,619 $3,220,619 $3,220,619 $0 $0 2. Sun City Festival Phase I Roadways and Landscaping (Canyon Springs, Desert Oasis, Mountain Ridge & Sun Valley Parkway) - installation of approx. 4,874 linear feet of Arterial Roadway and ROW Landscaping and 5,942 of Collector Roadway and ROW Landscaping including concrete, paving, storm drainage, landscaping, engineering, survey, permits and fees, and other labor, tools, and equipment. $7,416,732 $7,416,732 $7,416,732 $0 $0 3. Sun City Festival Phase I Infrastructure Water (Parcel A1, B1, C1 & V1) - installation of approx. 25,600 linear feet of water lines including engineering, survey, permits and fees, and other labor, tools, and equipment. $1,841,756 $1,841,756 $1,841,756 $0 $0 4. Festival Ranch Water Reclamation Facility - installation of a 1 MG Water Reclamation Facility including engineering, survey, permits and fees, and other labor, tools, and equipment. $8,966,703 $8,966,703 $8,966,703 $0 $0 5. Sun City Festival Phase 1 Offsite Sewer (Alignment through Parcels D1, E1, S1 & T1) - installation of approximately 8,663 linear feet of sewer lines including engineering, survey, permits and fees, and other labor, tools, and equipment. $997,203 $997,203 $997,203 $0 $0 6. Sun City Festival Water Plant #1, Well #1, Well #2 - installation of 1.2 MG storage tank and booster pumps at Water Plant #1, and the drilling and equipping of Well #1 and Well #2 producing 6,150 GPM, including the eligible costs for engineering, survey, permit fees, and other required labor, tools, and equipment. $6,754,018 $6,754,018 $6,754,018 $0 $0 7. Festival Foothills Phase I Water Infrastructure Desert Vista Boulevard and Beardsley Parkway (East of CSB) - installation of approximately 5,400 linear feet of water lines including engineering, survey, permits and fees, and other labor, tools, and equipment. $418,657 $418,657 $418,657 $0 $0 6491886.5 A-3 Project Descriptions Total Estimated Costs Certified Engineer’s Costs Paid by Prior Bonds To be Paid by Series 2025 Bonds Eligible for funding from Future Bonds 8. Festival Foothills Phase I Roadways Desert Vista Blvd & Beardsley Parkway (East of the CSB) -installation of approximately 1,340 linear feet of Arterial Roadway and 4,050 linear feet of Collector Roadway including grading, concrete, paving, storm drainage, engineering, survey, permits and fees, and other labor, tools, and equipment. $2,383,180 $2,383,180 $2,383,180 $0 $0 9. Sun City Festival Phase II Infrastructure Water, Sewer (Phase 1), Storm Drain and reclaimed Waterline Phase I- installation of approximately 7,782 linear feet of waterlines, 1,596 linear feet of sewer, 15,892 linear feet of reclaimed waterline and 1,361 linear feet of storm drain for Mountain Ridge Boulevard, Desert Oasis Boulevard and Canyon Spring Boulevard including engineering, survey, permits and fees, and other labor, tools, and equipment. $2,325,837 $2,325,837 $2,325,837 $0 $0 10. Sun City Festival Phase II Concrete and Paving Infrastructure to serve Desert Oasis Boulevard and Mountain Ridge Boulevard to serve Parcels D 1-H 1 - installation of approximately 3,640 linear feet of arterial roadway and 2,100 of collector roadway including paving, engineering, survey, permits and fees, and other labor, tools, and equipment. $2,537,569 $2,537,569 $2,537,569 $0 $0 11. Sun City Festival Phase 2 Offsite Sewer – installation of approximately 6,082 linear feet of 15 inch sewer including engineering, survey, permits and fees, and other labor, tools, and equipment. $781,133 $781,133 $781,133 $0 $0 12. Desert Vista Boulevard Water Transmission Main – installation of approximately 3,083 linear feet of water transmission main including engineering, survey, permits and fees, and other labor, tools, and equipment. $845,216 $845,216 $845,216 $0 $0 13. Sun City Festival Well # 3 – equipping of Well #3 including the eligible costs for engineering, survey, permit fees, and other required labor, tools, and equipment. $1,680,547 $1,680,547 $1,680,547 $0 $0 6491886.5 A-4 Project Descriptions Total Estimated Costs Certified Engineer’s Costs Paid by Prior Bonds To be Paid by Series 2025 Bonds Eligible for funding from Future Bonds 14. Sun City Festival Revised Abraham Lane Water Line (Portion within Parcel N1) – installation of approximately 2,898 linear feet of 12 inch water including the eligible costs for engineering, survey, permit fees, and other required labor, tools and equipment. $212,935 $212,935 $212,935 $0 $0 15. Sun City Festival Phase 2 Infrastructure Phase 3 Water Line and Desert Vista Boulevard Water Line - installation of approximately 4,048 linear feet 16 inch water and approximately 770 linear feet of 12 inch water including the eligible costs for engineering, survey, permit fees, and other required labor, tools and equipment. $402,514 $402,514 $402,514 $0 $0 16. Desert Vista Boulevard, Wagner Complex Drive and Phase II Infrastructure Phase 3 Roadway Concrete, Paving and Landscape Improvements – installation of approximately 4,209 linear feet of arterial roadway and 3,000 linear feet of collector roadway including concrete, paving and right of way landscaping including the eligible costs for design, engineering, survey, permits and fees, and other labor, tools, and equipment. $4,941,129 $4,941,129 $4,941,129 $0 $0 17. Sun City Festival – Phase 3 Offsite Sewer – installation of approximately 3,700 linear feet of 15” ES VCP truck sewer including the eligible costs for design, engineering, survey, permits and fees, and other labor, tools, and equipment. $678,358 $678,358 $678,358 $0 $0 18. City of Buckeye Firehouse # 705 – construction of fire station including the eligible costs for design, engineering, survey, permits and fees, and other labor, tools, and equipment. $3,351,485 $3,351,485 $3,351,485 $0 $0 19. Sun City Festival Water Plant #1 Expansion – installation of 1.2 MG storage tank and booster pumps at Water Plant #1, including the eligible costs for engineering, survey, permit fees, and other required labor, tools, and equipment. $2,654,932 $2,654,932 $2,654,932 $0 $0 20. Sun City Festival Water Well #4 –the drilling, installation and equipping of Well #4 producing an estimated 2,500 GPM, including the eligible costs for engineering, survey, permit fees, and other required labor, tools, and equipment. $5,000,000 [to be determined] $0 $0 [to be determined] 6491886.5 A-5 Project Descriptions Total Estimated Costs Certified Engineer’s Costs Paid by Prior Bonds To be Paid by Series 2025 Bonds Eligible for funding from Future Bonds 21. Festival Ranch Water Reclamation Facility Expansion - the installation of a 0.5 MGD Water Reclamation Facility Expansion, including the eligible costs for engineering, survey, permit fees, and other required labor, tools, and equipment. $31,000,000 [to be determined] $0 $0 [to be determined] 22. Festival Ranch Arsenic Treatment Facility - the installation of a Water Treatment Facility, including the eligible costs for transmission mains, engineering, survey, permit fees, and other required labor, tools, and equipment. $14,000,000 [to be determined] $0 $0 [to be determined] 23. Sun City Festival Ranch Planning Area 2 Canyon Springs Blvd and Parcel A2 Concrete and Paving Improvements – installation of approximately 4,400 linear feet of arterial roadway and parcel roadways including concrete and paving including the eligible costs for design, engineering, survey, permits and fees, and other labor, tools, and equipment. $2,180,613 $2,180,613 $2,180,613 $0 $0 24. Sun City Festival Ranch Planning Area 2 Parcel D2 Concrete and Paving Improvements– installation of approximately6,500 linearfeetof roadway including concrete and paving including the eligible costs for design, engineering, survey, permits and fees, and other labor, tools, and equipment. $1,316,658 $1,316,658 $1,316,658 $0 $0 25. Sun City Festival Ranch Planning Area 2 Parcel C2 Concrete and Paving Improvements – installation of approximately5,400 linearfeetof roadway including concrete and paving including the eligible costs for design, engineering, survey, permits and fees, and other labor, tools, and equipment. $1,048,802 $1,048,802 $1,048,802 $0 $0 26. Festival Ranch Sun City Festival - Parcel S1 16 inch Waterline – installation of approximately 1,600 linear feet of waterline including the eligible costs for design, engineering, survey, permits and fees, and other labor, tools, and equipment. $300,728 $300,728 $300,728 $0 $0 6491886.5 A-6 Project Descriptions Total Estimated Costs Certified Engineer’s Costs Paid by Prior Bonds To be Paid by Series 2025 Bonds Eligible for funding from Future Bonds 27. Festival Ranch Sun City Festival - Parcel HH1-1 & HH1-2 Water Transmission Mains – installation of approximately 2,500 linear feet of water transmission main including the eligible costs for design, engineering, survey, permits and fees, and other labor, tools, and equipment. $214,263 $214,263 $214,263 $0 $0 28. Sun City Festival Ranch Planning Area 2 Parcel B2 Concrete and Paving Improvements – installation of approximately 4,600 linear feet of minor collector roadway and parcel roadways including concrete and paving including the eligible costs for design, engineering, survey, permits and fees, and other labor, tools, and equipment. $1,271,807 $1,271,807 $1,271,807 $0 $0 29. Sun City Festival Ranch Planning Area 1 Parcel Q1 Phase 1 and Phase 2 Concrete and Paving Improvements– installation of approximately 8,400 linear feet of major collector and parcel roadways including concrete and paving including the eligible costs for design, engineering, survey, permits and fees, and other labor, tools, and equipment. $2,212,211 $2,212,211 $1,527,000 $685,211 $0 30. Sun City Festival Ranch Planning Area 1 Parcel T1 Concrete and Paving Improvements – installation of approximately 5,900 linear feet of parcel roadway including concrete and paving including the eligible costs for design, engineering, survey, permits and fees, and other labor, tools, and equipment. $1,817,706 (a) [to be determined] Completed Project Binder not yet prepared $0 $1,817,706 (a) [to be determined] 31. Festival Ranch Sun City Festival - Parcel T1 16 inch Waterline – installation of approximately 2,700 linear feet of waterline including the eligible costs for design, engineering, survey, permits and fees, and other labor, tools, and equipment. $524,078 [to be determined] Completed Project Binder not yet prepared $0 $0 [to be determined] 32. Sun City Festival Ranch Planning Area 2 Parcel L2 Concrete and Paving Improvements – installation of approximately 1,000 linear feet of parcel roadway including concrete and paving including the eligible costs for design, engineering, survey, permits and fees, and other labor, tools, and equipment. $529,754 [to be determined] Completed Project Binder not yet prepared $0 $0 [to be determined] 6491886.5 A-7 Project Descriptions Total Estimated Costs Certified Engineer’s Costs Paid by Prior Bonds To be Paid by Series 2025 Bonds Eligible for funding from Future Bonds 33. Festival Ranch Groundwater Recharge Facility - the installation of a Groundwater Recharge Facility, including the eligible costs for pump station, transmission mains, engineering, survey, permit fees, and other required labor, tools, and equipment. $3,500,000 [to be determined] $0 $0 [to be determined] 34. Sun City Festival Ranch Planning Area 2 Parcel E2 Infrastructure Sewer Improvements – installation of approximately 2,599 linear feet of sewer line including the eligible costs for design, engineering, survey, permits and fees, and other labor, tools, and equipment. $488,885 [to be determined] $0 $0 [to be determined] 35. Sun City Festival Ranch Planning Area 2 Parcel F2 Concrete and Paving Improvements – installation of approximately 6,960 linear feet of arterial, collector and parcel roadway concrete and paving including the eligible costs for design, engineering, survey, permits and fees, and other labor, tools, and equipment. $3,256,663 $3,256,663 $3,256,663 $0 $0 36. Sun City Festival Ranch Planning Area 1 Parcel HH1-3 Infrastructure Water and Well Supply Line Improvements – installation of approximately 4,800 linear feet of water and well lines including the eligible costs for design, engineering, survey, permits and fees, and other labor, tools, and equipment. $424,000 [to be determined] $0 $0 [to be determined] 37. Sun City FestivalRanch Planning Area 2 Parcel K2/N2 Concrete and Paving Improvements – installation parcel roadway concrete and paving including the eligible costs for design, engineering, survey, permits and fees, and other labor, tools, and equipment. $1,246,825 $1,246,825 $1,132,405 $114,420 $0 38. Sun City Festival Ranch Planning Area 2 Parcel H2 Phase 1 and 2 Concrete and Paving Improvements – installation parcel roadway concrete and paving including the eligible costs for design, engineering, survey, permits and fees, and other labor, tools, and equipment. $2,809,434 $2,809,434 $2,524,056 $285,378 $0 6491886.5 A-8 Project Descriptions Total Estimated Costs Certified Engineer’s Costs Paid by Prior Bonds To be Paid by Series 2025 Bonds Eligible for funding from Future Bonds 39. Sun City Festival Ranch Planning Area 2 Parcel G2/I2 Concrete and Paving Improvements – installation parcel roadway concrete and paving including the eligible costs for design, engineering, survey, permits and fees, and other labor, tools, and equipment. $1,686,178 $1,686,178 $381,195 $1,304,983 $0 40. Sun City Festival Ranch Planning Area 2 Parcel J2 Concrete and Paving Improvements – installation parcel roadway concrete and paving including the eligible costs for design, engineering, survey, permits and fees, and other labor, tools, and equipment. $736,639 $736,639 $0 $736,639 $0 41. Sun City Festival Ranch Parcel HH1-5 Concrete and Paving Improvements – installation parcel roadway concrete and paving including the eligible costs for design, engineering, survey, permits and fees, and other labor, tools, and equipment. $1,144,847 (a) [to be determined] $0 $355,663 (a) [to be determined] 42. Festival Ranch Water Plant No. 1 Expansion Booster Pump # 4 - installation of additional Booster Pump including the elegiable costs for design, engineering, survey, permits, fees, and other labor, tools and equipment. $2,016,559 [to be determined] $0 $0 [to be determined] 43. Festival Ranch Sun City Festival – Planning Area 2 Kerry Lane and Offsite Water Line Waterline – installation of approximately 5,000 linear feet of waterline including the eligible costs for design, engineering, survey, permits and fees, and other labor, tools, and equipment. $1,072,792 [to be determined] $0 $0 [to be determined] $132,209,965* $70,691,344* $67,564,713 $5,300,000* $ to be determined* Proceeds of the Bonds are reasonably expected to be used to finance the acquisition of all or a portion of the Public Infrastructure upon acceptance by the District and the City of such Public Infrastructure pursuant to the terms of the various development agreements among the City, the District and the Developer, and the terms and provisions of all applicable laws, ordinances, codes and rules. All interests in such Public Infrastructure financed by the District will be dedicated or otherwise transferred to the City after acceptance. Additional portions of public infrastructure, as contemplated by the District’s formational documents, may be constructed and will be subject to administrative approval by the District before such additional public infrastructure is eligible for funding from future bonds, if any. * Subject to change. (a) Pending certification.