Southern MAG Rehab Application Submitted 5.1.25.pdf
Extracted text (via ocr_local)
17085 characters
Application Title Identification Number Application Status: UNSUBMITTED Project Overview City of Buckeye Southern Avenue Reconstruction BKY-26-ARRP-001 Project Description Briefly provide a general description of the project Project Type What type of project is this? Project Phases What project phases is the agency seeking funding for? Project Location Provide information about where your project is located Project Details The proposed project along Southern Avenue, an arterial roadway, consists of the complete removal and reconstruction of asphalt paving for Southern Avenue from the “Ross Dress for Less” warehouse property line, just east of 231st Avenue, going east to the intersection of Rainbow Road and Southern Avenue. The project also includes the complete removal and replacement of the asphalt paving within this intersection, which will include 150 feet of removal and replacement from the intersection on the South, North, and East legs. The project includes the addition of left turn lanes to this stop-controlled intersection. All striping will comply with the Manual on Uniform Traffic Control Devices (MUTCD) standards. All construction shall be according to the City of Buckeye (City) and Maricopa Association of Governments (MAG) standards and shall utilize City-approved mix designs. This roadway reconstruction will improve roadway safety through improved vehicle handling, increase road durability and longevity, and promote regional roadway connectivity and integrity. Roadway Reconstruct... v Check all that apply Scoping Design Right of Way Utilities Y Construction Upload a map (PDF) showing the location of the project Select file... f Aerial Map - Southern Ave - Ross Property Line to Rainbow Rd.pdf POF 241.22 KB Project Limits Provide the project limits. The listing should be in the Roadway: Termini A to Termini B format. Project Length (in miles) Provide the project length Posted Speed Limit (MPH) Number of Travel Lanes Please indicate the number of travel lanes in each direction. Roadway surface condition Provide a narrative description of the current roadway surface. Scoping Southern Avenue: From the East Property Line of the “Ross Dress for Less” Warehouse Property east to the intersection of Rainbow Road. 0.40 45 The current roadway surface is “very poor”, with a Pavement Condition Index (PCI) number of 28. The roadway is currently experiencing alligator pattern cracking, block cracking with fatigue cracking in the wheel paths, rutting, and several longitudinal cracking areas, causing safety concerns for all roadway users. Project Scoping Please describe any scoping done to date. Design The goal of this project is to reconstruct the section of roadway on Southern Avenue from the east end of the “Ross Dress for Less” Warehouse property line eastbound to Rainbow Road. This area has been identified and rated as being in “very poor” condition, showing a Pavement Condition Index number of 28. The roadway is currently experiencing alligator pattern cracking, block cracking with fatigue cracking in the wheel paths, rutting, and several longitudinal cracking areas, causing safety concerns for all roadway users. It is the City’s goal to completely rehabilitate this roadway through reconstruction. The immediate area this project serves includes warehouses, commercial, and residential traffic. The proposed project along Southern Avenue, an arterial roadway, consists of the complete removal and reconstruction of asphalt paving for Southern Avenue from the “Ross Dress for Less” Warehouse property line just east of 231st Avenue, going east to the intersection of Rainbow Road and Southern Avenue. The project also includes the complete removal and replacement of the asphalt paving within this intersection, which will include 150 feet of removal and replacement from the intersection on the South, North, and East legs. The project includes the addition of left turn lanes to this stop-controlled intersection. All striping will comply with MUTCD standards. Roadway reconstruction will ensure proper drainage to prevent standing water and reduce hydroplaning during a rain event. All construction shall be according to the City and MAG standards and shall utilize City-approved mix designs. This roadway reconstruction will improve roadway safety through improved vehicle handling, increase road durability and longevity, and promote regional roadway connectivity and integrity. Project Design Please describe any design done to date. Road Safety Assessment (RSA) If an RSA has been done for the project, please describe. Environmental The design of this project is covered by existing City design standards and the Maricopa Association of Governments’ Public Works design standards. Buckeye considers this reconstruction project a “like-for- like” and does not have engineered plans. Buckeye will address and prioritize Americans with Disabilities Act (ADA)-compliant features that may be available, needed, and/or required. A Road Safety Assessment was completed and determined the PCI number to be 28, which is considered “very poor”. The PCI rating system ranges from 0-100 with 100 being the best condition. The roadway is currently experiencing alligator pattern cracking, block cracking with fatigue cracking in the wheel paths, rutting, and several longitudinal cracking areas, causing safety concerns for all roadway users. Additionally, it was determined that to meet the increased needs of the community, a turn lane will need to be added to this existing two-lane roadway at the intersections to handle the increase in residential, commercial, and industrial traffic loads. Environmental The federal process requires an environmental clearance. If any fields other than 'None' were selected, please describe the environmental clearance process and any issues. Right of Way None v N/A Right of Way The federal process requires a right of way clearance. If any fields other than ‘Agency owns all ROW needed' were selected, please describe. Utilities ROW to be acquired v Please describe the ROW acquisition plan and describe any right of way issues. The East and South of the return radii at the Rainbow Road and Southern Intersection is the Maricopa County Department of Transportation's (MCDOT) right of way (ROW). A ROW permit will be required or a letter from the City of Buckeye’s Development Services Department (DSD) to annex the area of work that is in MCDOT's ROW, and the subsequent annexation of the ROW will be needed. Utilities The federal process requires a utility clearance. If any fields other than 'None' were selected, please describe the utility relocation plan and describe any issues. None Vv Construction Phase Only N/A Safety Considerations Please describe how safety factors were incorporated in the project design? Pavement Conditions The ARRP Policies and Procedures require an applicant to identify how safety factors were incorporated into the project. The expectation is the agency conducted an RSA, or equivalent, during the project development process. Safety is the number one reason for this roadway reconstruction. Buckeye wants to ensure that the integrity of the roadway is improved to handle the anticipated increase in traffic, not only for residential vehicles but also commercial and industrial vehicles. The addition of turn lanes in each direction at the intersection of Southern Avenue and Rainbow Road will improve traffic flow at the four-way intersection and ensure adequate turning radii for large commercial truck traffic, which frequents this intersection due to the warehouses along Southern Avenue. Installation of pavement markings and roadway signs that meet MUTCD retro reflectivity requirements will improve lane visibility. Roadway reconstruction will ensure proper drainage to prevent standing water and reduce hydroplaning during a rain event. Removal of alligator pattern cracking, block cracking with fatigue cracking in the wheel paths, rutting, and several longitudinal cracking areas will improve vehicular handling. Upon completion of this reconstruction project, the roadway will move to a rating of “good” from its current rating of “very poor”. Buckeye will address and prioritize ADA- compliant features that may be available, needed, and/or required. Note: MAG cannot commit to assessing additional data submitted and cannot guarantee that the data in this section will be accepted for scoring. Agency Provided Pavement Rating Name or Description of Rating System Used - e.g. PCI, PSR, etc.. Rating System Scale Please describe the scale used in the rating system. Date of Rating Rating 28 PCI. The PCI is calculated using detailed data related to the distresses in the pavement surface observed by pavement condition surveys. e.g. it ranges from 1 to 100 with 100 being the best condition The PCI rating system ranges from 0 to 100, with 100 being the best condition. 1/27/2025 Ga Very Poor Pavement Roughness Qualitative Factors Alignment with ARRP Goals The current roadway has frequent large cracks, alligator cracking, rutting, visible patchwork, surface deformation, and deterioration. Describe how this project aligns with the ARRP goals outlined in the ARRP Policies and Procedures. Unique Attributes This project aligns with all 4 of the ARRP goals: - Improve overall roadway safety with well-maintained road surfaces. - Provide for the safety and security of pedestrians, bicyclists, drivers, and other roadway users. - Promote safe and efficient mobility by prioritizing ADA-compliant features. - Maintain the region’s transportation infrastructure to protect existing investments for the future. This roadway improvement will promote safe and efficient mobility by eliminating roadway surfaces that are in “very poor” condition and improving vehicular handling. This provides safety and security to drivers, vehicles, and other roadway users. The City of Buckeye is committed to well-maintained road surfaces, which improve overall roadway safety and maintain the region's transportation infrastructure on this arterial roadway. Buckeye will address and prioritize ADA-compliant features that may be available, needed, and/or required. The current roadway condition poses a hazard to all roadway users, and the project seeks to eliminate this hazard and improve roadway safety with well-maintained road surfaces through the reconstruction of the roadway. The roadway reconstruction protects existing investments for the future within the region's transportation infrastructure by preventing the roadway from further deterioration. The City of Buckeye ensures fiscal integrity in each of its pavement management projects, including accounting and reporting practices, adherence to state, local, and/or county procurement procedures, and each project is outlined via signed contracts. Routine inspections of the contractor's work are conducted by staff. Due to the fast-paced growth of the City, it is imperative that we keep up with the demand to provide drivable roadways, not only for our residential or commercial stakeholders, but we must ensure safe travel for our emergency response and Public Works teams. The City of Buckeye is a MAG member agency. Buckeye will be responsible for all aspects of the project's implementation, including, but not limited to, project management, financing, risk management, public involvement, construction, inspection, and warranty periods. Buckeye understands the local match, ineligible expenditures, and reimbursement program guidelines. This project falls completely within the City of Buckeye’s jurisdiction and will comply with all applicable federal, state, county, and local requirements. Describe any unique attributes or circumstances related to this project. As of 2024, this portion of Southern Ave. experienced a raw average daily traffic count of 4,962 vehicles per day, inclusive of the Southern Ave. and Rainbow Rd. intersection traffic. Along Southern Ave. from Watson Road to Rainbow Road from 2019 to 2023, there were 27 crashes. Additionally, the 85th percentile speed eastbound was 55 miles per hour, and 54 miles per hour westbound. This portion of the roadway is a major route for commercial traffic that services the various warehouses located along Southern Avenue. Safety Data and Considerations Please describe any additional safety issues to be addressed by the project. Community Outreach The addition of the turn lanes in each direction will dramatically improve traffic control flow and improve vehicular safety at the four-way stop intersection of Southern Avenue at Rainbow Road by separating and restricting possible accident events. This reconstruction project includes the restriping and replacement of non-compliant MUTCD roadway striping and signage. Describe any community outreach that has been done prior to the submittal of this application. If no outreach has taken place, please describe plans to engage the community during project development. Buckeye provided and continues to provide educational outreach via its website, executive sessions with the City Council, and presentations to the community showing the roadway conditions and the need for repair. Since 2024, considerable time has been spent at various community outreach events discussing the need for substantial roadway maintenance activities throughout the City. Over the past 12 months, Buckeye has conducted 7 surveys, 6 online and in-person meetings, and 3 community events regarding transportation and safety. Additionally, the City of Buckeye was awarded a Safe Streets and Roads for All (SS4A) grant, which includes the planning for a citywide Transportation Safety Plan (TSP). The planning for this TSP includes a public survey for roadway users to express roadway safety concerns in Buckeye, including roads that are failing and need rehabilitation or reconstruction. Before commencement of the roadway improvement that is the subject of this request, public notices (written, digital, social) will be issued and will continue to be in effect throughout the length of the project. Cost Estimate Summary Buckeye provided and continues to provide educational outreach via its website, executive sessions with the City Council, and presentations to the community showing the roadway conditions and the need for repair. Since 2024, considerable time has been spent at various community outreach events discussing the need for substantial roadway maintenance activities throughout the City. Over the past 12 months, Buckeye has conducted 7 surveys, 6 online and in-person meetings, and 3 community events regarding transportation and safety. Additionally, the City of Buckeye was awarded a Safe Streets and Roads for All (SS4A) grant, which includes the planning for a citywide Transportation Safety Plan (TSP). The planning for this TSP includes a public survey for roadway users to express roadway safety concerns in Buckeye, including roads that are failing and need rehabilitation or reconstruction. Before commencement of the roadway improvement that is the subject of this request, public notices (written, digital, social) will be issued and will continue to be in effect throughout the length of the project. These activities will continue throughout the life of the project. View Full Cost Estimate(/ARRP/Application/2587) Program Phase Location Description Southern Avenue: From the East Property Line of the “Ross Dress for Design Less" Warehouse Property east to the intersection of Rainbow Road. Southern Avenue: From the East Property Line of the . “Ross Dress for Right of Way Less” Warehouse Property east to the intersection of Rainbow Road. Southern Avenue: From the East Property Line of the “Ross Dress for Utility Adjustments Utilities Less” Warehouse Property east to the intersection of Rainbow Road. Southern Avenue: From the East Property Line of the “Ross Dress for Less” Warehouse Property east to the intersection of Rainbow Road. Complete removal and reconstruction Construction asphalt paving Total Cost Signature Work Description Year To Program 2026 2026 of Funding Source Local Local STBGP. STBGP. Federal Amount Local Amount Total Amount Local Share 0.00 % 0.00 % $ 2,625.00 $ 1,125.00 $ 3,750.00 30.00% $ 1,150,376.50 $ 493,018.50 30.00 % 1,643,395.00 $ 1,153,001.50 $ 494,143.50 30.00 % 1,647,145.00 (o) (/ARRP/GetCostEstimateAreaSummaries/2587?costEstimateld=2587) Current Signature Applications must be signed before they can be considered. Printed Signature Sheet Optionally download a printable page for your records. Signatory Name Rob Roach Signed Date 4/29/2025 3:26:32 PM If you require a physical signature for your agency's internal records, a signature sheet can be downloaded here: Signature Sheet (https://callforprojects.azmag.gov/content/resources/Signature Attachment Page.pdf). MAG only requires the digital signature that is part of the online application process.