Lower Buckeye MAG Rehab Application Submitted 5.1.25.pdf
Extracted text (via ocr_local)
17134 characters
Application Title Identification Number Application Status: UNSUBMITTED Project Overview City of Buckeye Lower Buckeye Reconstruction BKY-26-ARRP-002 Project Description Briefly provide a general description of the project Project Type What type of project is this? Project Phases What project phases is the agency seeking funding for? Project Location Provide information about where your project is located Project Details The proposed project along Lower Buckeye Road, an arterial roadway, consists of milling the entire existing asphalt thickness, repairing any base failure issues found, re-compacting the base, and repaving with 6 inches of asphalt for Lower Buckeye Road from 247th Ave. east to Watson Rd (an arterial roadway that connects to Interstate 10 (I-10)). Along Lower Buckeye Rd. is Youngker High School, and the John S. McCain III Elementary School is located 0.25 miles south of Lower Buckeye Rd. along 247th Ave. These two schools draw large traffic volumes on Lower Buckeye Rd. between 247th Ave. and Watson Rd. The project will also complete all utility adjustments needed and retrofit fourteen (14) existing Americans with Disabilities Act (ADA) ramps with a dome system to bring the ramps into ADA compliance. This project aligns with all four of the Arterial Rehabilitation and Reconstruction Program (ARRP) goals as it will improve safety for all roadway users through well-maintained roadway surfaces, protect existing investments for the future through maintaining the region's transportation infrastructure, and promote efficient and safe mobility through the prioritization of ADA-compliant features. The current roadway surface is “very poor”, with a Pavement Condition Index (PCI) number of 36. The PCI rating system has a scale of 0 to 100, with 0 being “failing” and 100 being “good”. The PCI number of 36 falls within the “very poor” rating. If this roadway does not undergo the proposed reconstruction, the rating will continue to worsen to the point where the roadway may be considered “serious” or “failed”. This roadway reconstruction will improve roadway safety through improved vehicle handling, increase road durability and longevity, and promote regional roadway connectivity and integrity. Additionally, the proposed ADA-compliant features are essential for the safety of all roadway users. Roadway Reconstruct... v Check all that apply Scoping Design Right of Way Utilities v Construction Upload a map (PDF) showing the location of the project Select file... iT Aerial Map - Lower Buckeye - 247th Ave to Watson Rd.pdf por | 254,99 KB Project Limits Provide the project limits. The listing should be in the Roadway: Termini A to Termini B format. Project Length (in miles) Provide the project length Posted Speed Limit (MPH) Number of Travel Lanes Please indicate the number of travel lanes in each direction. Roadway surface condition Provide a narrative description of the current roadway surface. Scoping Lower Buckeye Road: From 247th Ave. east to Watson Rd. 1.75 35 The current roadway surface is “very poor”, with a Pavement Condition Index (PCI) number of 36. The PCI rating system has a scale of 0 to 100, with 0 being “failing” and 100 being “good”. The PCI number of 36 falls within the “very poor" rating. The roadway is currently experiencing alligator pattern cracking, block cracking with fatigue cracking in the wheel paths, and several longitudinal cracking areas that have been repaired numerous times by Buckeye staff. Unfortunately, these repairs are no longer effective, and the roadway is now failing in multiple locations, causing safety concerns for all roadway users. Project Scoping Please describe any scoping done to date. Design The goal of this project is to reconstruct the section of the roadway on Lower Buckeye Road from 247th Avenue east to Watson Road. This area has been identified and rated as being in “very poor” condition, showing a PCI number of 36. It is the City of Buckeye’s (City) goal to completely rehabilitate this roadway through reconstruction. The reconstruction consists of milling the entire existing asphalt thickness, repairing any base failure issues found, re-compacting the base, and repaving with 6 inches of asphalt. The project also includes the retrofit of fourteen (14) existing Americans with Disabilities Act (ADA) ramps with a truncated dome system to bring the ramps into ADA compliance, improving safety for all roadway users. This project will also include pavement markings and roadway signs that meet the Manual on Uniform Traffic Control Devices (MUTCD) retro reflectivity requirements to improve lane visibility. Roadway reconstruction will ensure proper drainage to prevent standing water and reduce hydroplaning during a rain event. This roadway reconstruction will improve roadway safety through improved vehicle handling, increase road durability and longevity, and promote regional roadway connectivity and integrity. Project Design Please describe any design done to date. Road Safety Assessment (RSA) If an RSA has been done for the project, please describe. Environmental The design of this project is covered through existing City design standards and the Maricopa Association of Governments (MAG) Public Works design standards. Buckeye considers this reconstruction project a “like-for-like” and does not have engineered plans. The reconstruction consists of milling the entire existing asphalt thickness, repairing any base failure issues found, re-compacting the base, and repaving with 6 inches of asphalt. The project also includes the retrofit of fourteen (14) existing Americans with Disabilities Act (ADA) ramps with a truncated dome system to bring the ramps into ADA compliance, improving safety for all roadway users. A Road Safety Assessment was completed and included a PCI determination of 36, which is considered “very poor”. City staff have repaired numerous potholes and cracks. The repairs are no longer effective, and the roadway is failing in multiple locations, causing safety concerns for all roadway users. Additionally, the project also includes the retrofit of fourteen (14) existing Americans with Disabilities Act (ADA) ramps with a truncated dome system to bring the ramps into ADA compliance, improving safety for all roadway users. These ramps are currently not ADA compliant, which is a safety concern. Environmental The federal process requires an environmental clearance. If any fields other than 'None' were selected, please describe the environmental clearance process and any issues. Right of Way None Vv N/A Right of Way The federal process requires a right of way clearance. If any fields other than ‘Agency owns all ROW needed' were selected, please describe. Agency owns all ROW... v Please describe the ROW acquisition plan and describe any right of way issues. N/A Utilities Utilities The federal process requires a utility clearance. If any fields other than 'None' were selected, please describe the utility relocation plan and describe any issues. Construction Phase Only None v N/A Safety Considerations Please describe how safety factors were incorporated in the project design? Pavement Conditions The ARRP Policies and Procedures require an applicant to identify how safety factors were incorporated into the project. The expectation is the agency conducted an RSA, or equivalent, during the project development process. Vehicular and pedestrian safety is the number one reason for the roadway reconstruction. The City of Buckeye wants to ensure the integrity of the roadway is improved to handle the anticipated increase in traffic, not only from residential vehicles but also commercial and industrial vehicles. This area is adjacent to a school zone, and when in session, the school serves over 2,000 students and faculty. This project also includes fourteen (14) ADA ramp improvements, bringing these ramps into compliance. These ramps are currently not ADA compliant, proving to be a safety hazard for all roadway users. This project will also include pavement markings and roadway signs that meet the MUTCD retro reflectivity requirements to improve lane visibility. Roadway reconstruction will ensure proper drainage to prevent standing water and reduce hydroplaning during a rain event. Removal of alligator pattern cracking, block cracking with fatigue cracking in the wheel paths, rutting, and several longitudinal cracking areas will improve vehicular handling. Upon completion of this reconstruction project, the roadway will move to a rating of “good” from its current rating of “very poor”. Note: MAG cannot commit to assessing additional data submitted and cannot guarantee that the data in this section will be accepted for scoring. Agency Provided Pavement Rating Name or Description of Rating System Used - e.g. PCI, PSR, etc... Rating System Scale Please describe the scale used in the rating system. Date of Rating 36 PCI. The PCI is calculated using detailed data related to the distresses in the pavement surface observed by pavement condition surveys. e.g. it ranges from 1 to 100 with 100 being the best condition The PCI rating system ranges from 0 to 100, with 100 being the best condition. 1/27/2025 & Rating Pavement Roughness Qualitative Factors Alignment with ARRP Goals Very Poor The current roadway has frequent cracks, potholes, visible patchwork, surface deformation, and deterioration. Describe how this project aligns with the ARRP goals outlined in the ARRP Policies and Procedures. Unique Attributes This project aligns with all 4 of the ARRP goals: - Improve overall roadway safety with well-maintained road surfaces. - Provide for the safety and security of pedestrians, bicyclists, drivers, and other roadway users. - Promote safe and efficient mobility by prioritizing ADA-compliant features. - Maintain the region's transportation infrastructure to protect existing investments for the future. The current roadway condition poses a hazard to all roadway users, and the project seeks to eliminate this hazard and improve roadway safety with well-maintained road surfaces through the reconstruction of the roadway. The roadway reconstruction also protects existing investments for the future within the region's transportation infrastructure by preventing the roadway from further deterioration. The proposed project will retrofit fourteen (14) existing ADA ramps with a dome system to bring the ramps into ADA compliance. The City of Buckeye ensures fiscal integrity in each of its pavement management projects, including accounting and reporting practices, adherence to state, local, and/or county procurement procedures, and each project is outlined via signed contracts; routine inspections of the contractor's work are conducted by City staff. Due to the fast-paced growth of the City, it is imperative that Buckeye keeps up with the demand to provide drivable roadways, not only for residential or commercial stakeholders, but the City must ensure safe travel for emergency response and Public Works teams. The City of Buckeye is a MAG member agency. Buckeye will be responsible for all aspects of the project's implementation, including, but not limited to, project management, financing, risk management, public involvement, construction, inspection, and warranty periods. Buckeye understands the local match, ineligible expenditures, and reimbursement program guidelines. This project falls completely within the City of Buckeye’s jurisdiction and will comply with all applicable federal, state, county, and local requirements. Describe any unique attributes or circumstances related to this project. Safety Data and Considerations There are fourteen (14) Americans with Disabilities Act (ADA) ramps that will be brought into compliance. The raw annual average daily traffic (AADT) count is 11,289 vehicles per day. Additionally, the proposed project area is adjacent to Youngker High School, which serves over 2,000 students and faculty, causing increased roadway traffic by all users, including pedestrians. Additionally, along 247th Ave., John S. McCain III Elementary School is located approximately 0.25 miles south of Lower Buckeye Road. This elementary school has an approximate student population of 700 students, for which parents may utilize Lower Buckeye Road to drop off and pick up their children from school. This project runs along Lower Buckeye Road from 247th Ave. east to Watson Rd. Watson Road is an arterial road that connects to the I-10 freeway. Please describe any additional safety issues to be addressed by the project. Community Outreach There are fourteen (14) Americans with Disabilities Act (ADA) ramps that will be brought into compliance through a truncated dome system, which includes detectable warning surfaces. The project will address all safety concerns for all roadway users through the milling of the entire existing asphalt thickness, repairing any base failure issues found, re-compacting the base, and repaving with 6 inches of asphalt. This reconstruction project includes the restriping and replacement of non-compliant MUTCD roadway striping and signage. Describe any community outreach that has been done prior to the submittal of this application. If no outreach has taken place, please describe plans to engage the community during project development. Buckeye provided and continues to provide educational outreach via its website, executive sessions with the City Council, and presentations to the community showing the roadway conditions and the need for repair. Since 2024, considerable time has been spent at various community outreach events discussing the need for substantial roadway maintenance activities throughout the City. Over the past 12 months, Buckeye has conducted 7 surveys, 6 online and in-person meetings, and 3 community events regarding transportation and safety. Additionally, the City of Buckeye was awarded a Safe Streets and Roads for All (SS4A) grant, which includes the planning for a citywide Transportation Safety Plan (TSP). The planning for this TSP includes a public survey for roadway users to express roadway safety concerns in Buckeye, including roads that are failing and need rehabilitation or reconstruction. Before commencement of the roadway improvement that is the subject of this request, public notices (written, digital, social) will be issued and will continue to be in effect throughout the length of the project. Cost Estimate Summary Buckeye provided and continues to provide educational outreach via its website, executive sessions with the City Council, and presentations to the community showing the roadway conditions and the need for repair. Since 2024, considerable time has been spent at various community outreach events discussing the need for substantial roadway maintenance activities throughout the City. Over the past 12 months, Buckeye has conducted 7 surveys, 6 online and in-person meetings, and 3 community events regarding transportation and safety. Additionally, the City of Buckeye was awarded a Safe Streets and Roads for All (SS4A) grant, which includes the planning for a citywide Transportation Safety Plan (TSP). The planning for this TSP includes a public survey for roadway users to express roadway safety concerns in Buckeye, including roads that are failing and need rehabilitation or reconstruction. Before commencement of the roadway improvement that is the subject of this request, public notices (written, digital, social) will be issued and will continue to be in effect throughout the length of the project. View Full Cost Estimate(/ARRP/Application/2590) Program Phase Location Description Work Description Year To Program FundingSource FederalAmount LocalAmount TotalAmount Local Share Lower Buckeye Road: From 247th Design Local $ - §$ - $ - 0,00 % Ave. east to Watson Rd. Lower Buckeye . Road: From 247th Right of Way Local $ - $ - $ - 0,00 % Ave. east to Watson Rd. Lower Buckeye cece Road: From 247th Utility Utilities 2026 STBGP $ 13,125.00 $ 5,625.00 $ 18,750.00 30.00% Ave. east to Watson Adjustments Rd. Milling the entire existing asphalt thickness, Lower Buckeye repairing any . Road: From 247th base failure $ Construction 2026 STBGP. $ 3,914,577.80 30.00 % Ave. east to Watson _ issues found, re- 1,677,676.20 5,592,254.00 Rd. compacting the base, and repaving with 6 inches of asphalt $ Total Cost $ 3,927,702.80 30.00 % 1,683,301.20 5,611,004.00 © (/ARRP/GetCostEstimateAreaSummaries/2590?costEstimateld=2590) Signature Current Signature Signatory Name Applications must be signed before they can be Rob Roach considered. Signed Date 4/29/2025 3:24:54 PM Printed Signature Sheet If you require a physical signature for your agency's internal records, a signature sheet can be downloaded here: Signature Sheet (https://callforprojects.azmag.gov/content/resources/Signature Attachment Page.pdf). MAG only requires the digital signature that is part of the online application process. Optionally download a printable page for your records.