Application Title Identification Number Application Status: UNSUBMITTED Project Overview City of Buckeye McDowell Road Reconstruction BKY-26-ARRP-003 Project Description Briefly provide a general description of the project Project Type What type of project is this? Project Phases What project phases is the agency seeking funding for? Project Location Provide information about where your project is located Project Details The proposed project along McDowell Road, an arterial roadway, consists of the complete removal and reconstruction of asphalt paving for McDowell Road from Tonopah Salome Highway east to Sun Valley Parkway (an arterial roadway that connects to Interstate-10 (I-10)). The project will reconstruct a 28- foot-wide road that flares to match the existing cattle guard, and the curb returns on Sun Valley Parkway. The existing pavement turns onto Tonopah Salome Highway, and then the road turns to gravel. This project would only replace the area that is on McDowell Road and 100 yards around the turn. The road beyond the 100 yards would be milled but not repaved. Any millings available will be placed to the west on the gravel road. The current roadway surface is very poor, with a Pavement Condition Index (PCI) number of 35. The PCI rating system has a scale of 0 to 100, with 0 being “failing” and 100 being “good”. The PCI number of 35 falls within the “very poor” rating. If this roadway does not undergo the proposed reconstruction, the rating will continue to worsen to the point where the roadway may be considered “serious” or “failed”. All striping will comply with the Manual on Uniform Traffic Control Devices (MUTCD) standards. All construction shall be according to the City of Buckeye (City) and Maricopa Association of Governments (MAG) standards and shall utilize City-approved mix designs. This roadway reconstruction will improve roadway safety through improved vehicle handling, increased road durability and longevity, and promote regional roadway connectivity and integrity. Roadway Reconstruct... v Check all that apply Scoping Design Right of Way Utilities Y Construction Upload a map (PDF) showing the location of the project Select file... ft Aerial Map - McDowell - Tonopah Salome Highway to Sun Valley Pkwy.pdf por | 243.00 KB Project Limits Provide the project limits. The listing should be in the Roadway: Termini A to Termini B format. McDowell Road: From Tonopah Salome Highway east to Sun Valley Parkway Project Length (in miles) Provide the project length Posted Speed Limit (MPH) Number of Travel Lanes Please indicate the number of travel lanes in each direction. Roadway surface condition Provide a narrative description of the current roadway surface. Scoping 0.25 45 The current roadway surface is “very poor” with a Pavement Condition Index (PCI) number of 35. The roadway is currently experiencing several high severity potholes, alligator pattern cracking, block cracking with fatigue cracking in the wheel paths, rutting, raveling, and several longitudinal cracking areas, causing safety concerns for all roadway users. Project Scoping Please describe any scoping done to date. Design The goal of this project is to reconstruct the section of roadway on McDowell Road from Tonopah Salome Highway eastbound to Sun Valley Parkway. This area has been identified and rated as being in “very poor” condition, showing a PCI number of 35. The roadway is currently experiencing several high- severity potholes, alligator pattern cracking, block cracking with fatigue cracking in the wheel paths, rutting, raveling, and several longitudinal cracking areas, causing safety concerns for all roadway users. It is the City’s goal to completely rehabilitate this roadway through reconstruction. The immediate area this project serves includes commercial and residential traffic. The proposed project along McDowell Road, an arterial roadway, consists of the complete removal and reconstruction of asphalt paving for McDowell Road from Tonopah Salome Highway east to Sun Valley Parkway (an arterial roadway that connects to Interstate-10 (I-10)). The project will reconstruct a 28-foot-wide road that flares to match the existing cattle guard, and the curb returns on Sun Valley Parkway. The existing pavement turns onto Tonopah Salome Highway, and then the road turns to gravel. This project would only replace the area that is on McDowell Road and 100 yards around the turn. The road beyond the 100 yards would be milled but not repaved. Any millings available will be placed to the west on the gravel road. All striping will comply with MUTCD standards. Roadway reconstruction will ensure proper drainage to prevent standing water and reduce hydroplaning during a rain event. All construction shall be according to the City and MAG standards and shall utilize City-approved mix designs. This roadway reconstruction will improve roadway safety through improved vehicle handling, increased road durability and longevity, and promote regional roadway connectivity and integrity. This roadway is an access point directly off of Sun Valley Parkway, a super arterial roadway in Buckeye. Project Design Please describe any design done to date. The design of this project is covered through the existing City design standards and the Maricopa Association of Governments’ Public Works design standards. Buckeye considers this reconstruction project a “like-for-like” and does not have engineered plans. Buckeye will address and prioritize Americans with Disabilities Act (ADA)-compliant features that may be available, needed, and/or required. Road Safety Assessment (RSA) If an RSA has been done for the project, please describe. Environmental A Road Safety Assessment was completed and determined the PCI number to be 35, which is considered “very poor”. City staff have repaired numerous potholes and cracks on this section of roadway. The repairs are no longer effective, and the roadway is failing in multiple locations. Environmental The federal process requires an environmental clearance. If any fields other than 'None' were selected, please describe the environmental clearance process and any issues. Right of Way None v N/A Right of Way The federal process requires a right of way clearance. If any fields other than 'Agency owns all ROW needed' were selected, please describe. Agency owns all ROW... v Please describe the ROW acquisition plan and describe any right of way issues. N/A Utilities Utilities None v The federal process requires a utility clearance. If any fields other than 'None' were selected, N/A please describe the utility relocation plan and describe any issues. Construction Phase Only Safety Considerations Please describe how safety factors were incorporated in the project design? The ARRP Policies and Procedures require an applicant to identify how safety factors were incorporated into the project. The expectation is the agency conducted an RSA, or equivalent, during the project development process. Pavement Conditions Safety is the number one reason for this roadway reconstruction. Buckeye wants to ensure the integrity of the roadway is improved to handle the increased traffic, not only from residential vehicles but also farming, commercial, and industrial vehicles. The installation of pavement markings and roadway signs that meet the MUTCD retro reflectivity requirements will improve lane visibility. Roadway reconstruction will ensure proper drainage to prevent standing water and reduce hydroplaning during a rain event. Removal of several high-severity potholes, alligator pattern cracking, block cracking with fatigue cracking in the wheel paths, rutting, raveling, and several longitudinal cracking areas will improve vehicular handling. Upon completion of this reconstruction project, the roadway will move to a rating of “good” from its current rating of “very poor”. Buckeye will address and prioritize ADA-compliant features that may be available, needed, and/or required. Note: MAG cannot commit to assessing additional data submitted and cannot guarantee that the data in this section will be accepted for scoring. Agency Provided Pavement Rating Name or Description of Rating System Used - e.g. PCI, PSR, etc.. Rating System Scale Please describe the scale used in the rating system. Date of Rating Rating Pavement Roughness Qualitative Factors Alignment with ARRP Goals 35 PCI. The PCI is calculated using detailed data related to the distresses in the pavement surface observed by pavement condition surveys. e.g. it ranges from 1 to 100 with 100 being the best condition The PCI rating system ranges from 0-100 with 100 being the best condition. 1/30/2025 & Very Poor The current roadway has cracks, potholes, visible patchwork, surface deformation, and deterioration. Describe how this project aligns with the ARRP goals outlined in the ARRP Policies and Procedures. Unique Attributes This project aligns with all 4 of the ARRP goals: - Improve overall roadway safety with well-maintained road surfaces. - Provide for the safety and security of pedestrians, bicyclists, drivers, and other roadway users. - Promote safe and efficient mobility by prioritizing ADA-compliant features. - Maintain the region's transportation infrastructure to protect existing investments for the future. The current roadway condition is “very poor” and poses a hazard to all roadway users, and the project seeks to eliminate this hazard and improve roadway safety with well-maintained road surfaces through the reconstruction of the roadway. The roadway reconstruction also protects existing investments for the future within the region's transportation infrastructure by preventing the roadway from further deterioration. Buckeye will address and prioritize ADA-compliant features that may be available, needed, and/or required. The City of Buckeye ensures fiscal integrity in each of its pavement management projects, including accounting and reporting practices, adherence to state, local, and/or county procurement procedures, and each project is outlined via signed contracts. Routine inspections of the contractor's work are conducted by staff. Due to the fast-paced growth of the City, it is imperative that Buckeye keeps up with the demand to provide drivable roadways, not only for residential or commercial stakeholders, but the City must ensure safe travel for emergency response and Public Works teams. The City of Buckeye is a MAG member agency. Buckeye will be responsible for all aspects of the project's implementation, including, but not limited to, project management, financing, risk management, public involvement, construction, inspection, and warranty periods. Buckeye understands the local match, ineligible expenditures, and reimbursement program guidelines. This project falls completely within the City of Buckeye’s jurisdiction and will comply with all applicable federal, state, county, and local requirements. Describe any unique attributes or circumstances related to this project. Safety Data and Considerations The raw annual average daily traffic (AADT) on McDowell Road from Tonopah Salome Highway east to Sun Valley Parkway is 11,203 vehicles per day, inclusive of the McDowell Road and Sun Valley Parkway intersection traffic. Please describe any additional safety issues to be addressed by the project. Community Outreach The roadway is failing in multiple locations, leading to increased safety concerns for the vehicular public. This roadway is also utilized for the annual Boston Marathon qualifier, in which runners utilize this roadway at the last stretch of the marathon. These roadway improvements will ensure runners are able to utilize a functioning roadway free of cracks, potholes, and uneven surfaces. This reconstruction project includes the restriping and replacement of non-compliant MUTCD roadway striping and signage. Describe any community outreach that has been done prior to the submittal of this application. If no outreach has taken place, please describe plans to engage the community during project development. Cost Estimate Summary Buckeye provided and continues to provide educational outreach via its website, executive sessions with the City Council, and presentations to the community showing the roadway conditions and the need for repair. Since 2024, considerable time has been spent at various community outreach events discussing the need for substantial roadway maintenance activities throughout the City. Over the past 12 months, Buckeye has conducted 7 surveys, 6 online and in-person meetings, and 3 community events regarding transportation and safety. Additionally, the City of Buckeye was awarded a Safe Streets and Roads for All (SS4A) grant, which includes the planning for a citywide Transportation Safety Plan (TSP). The planning for this TSP includes a public survey for roadway users to express roadway safety concerns in Buckeye, including roads that are failing and need rehabilitation or reconstruction. Before commencement, public notices (written, digital, social) will be issued and will continue to be in effect throughout the length of the project. Buckeye provided and continues to provide educational outreach via its website, executive sessions with the City Council, and presentations to the community showing the roadway conditions and the need for repair. Since 2024, considerable time has been spent at various community outreach events discussing the need for substantial roadway maintenance activities throughout the City. Over the past 12 months, Buckeye has conducted 7 surveys, 6 online and in-person meetings, and 3 community events regarding transportation and safety. Additionally, the City of Buckeye was awarded a Safe Streets and Roads for All (SS4A) grant, which includes the planning for a citywide Transportation Safety Plan (TSP). The planning for this TSP includes a public survey for roadway users to express roadway safety concerns in Buckeye, including roads that are failing and need rehabilitation or reconstruction. Before commencement, public notices (written, digital, social) will be issued and will continue to be in effect throughout the length of the project. View Full Cost Estimate(/ARRP/Application/2591) Program Phase Location Description Work Description YearTo Program Funding Source FederalAmount LocalAmount Total Amount Local Share McDowell Road: From Tonopah Design Salome Highway east to Sun Valley Parkway McDowell Road: From Tonopah Right of Way Salome Highway east to Sun Valley Parkway Total Cost Local $ - §$ - $ - 0.00 % Local $ - §$ - $ - 0,00 % $ 729,780.10 $ 312,762.90 $ 30.00 % 1,042,543.00 Program Phase Location Description Work Description YearTo Program FundingSource FederalAmount LocalAmount Total Amount Local Share McDowell Road: From Tonopah Utilities Salome Highway Local $ - $ - $ - 0.00 % east to Sun Valley Parkway McDowell Road: Complete From Tonopah . . removal and $ Construction Salome Highway . 2026 STBGP. $ 729,780.10 $ 312,762.90 30.00 % reconstruction of 1,042,543.00 east to Sun Valley . asphalt paving Parkway Total Cost $ 729,780.10 $ 312,762.90 $ 30.00 % 1,042,543.00 © (/ARRP/GetCostEstimateAreaSummaries/2591?costEstimateld=2591) Signature Current Signature Signatory Name Applications must be signed before they can be Rob Roach considered. Signed Date Printed Signature Sheet Optionally download a printable page for your records. 4/29/2025 3:25:30 PM If you require a physical signature for your agency's internal records, a signature sheet can be downloaded here: Signature Sheet (https://callforprojects.azmag.gov/content/resources/Signature Attachment Page.pdf). MAG only requires the digital signature that is part of the online application process.