CITY OF BUCKEYE
Finance Department
530 E Monroe Ave. • Buckeye, Arizona 85326
Phone 623-349-6165 • www.buckeyeaz.gov
Maricopa Association of Governments - Arterial Rehabilitation and Reconstruction Grant Program – McDowell
Road – Application Summary Recap
Project Description:
The City of Buckeye’s Public Works Department seeks to reconstruct McDowell Road from Tonopah Salome
Highway to Sun Valley Parkway. The current roadway surface is “very poor”, with a Pavement Condition
Index number of 35. The roadway is currently experiencing several high-severity potholes, alligator pattern
cracking, block cracking with fatigue cracking in the wheel paths, rutting, raveling, and several longitudinal
cracking areas, causing safety concerns for all roadway users. The project includes the complete removal and
reconstruction of the asphalt paving and the addition of all appropriate signage and striping. All striping will
comply with the Manual on Uniform Traffic Control Devices standards. Americans with Disabilities Act
compliant features that may be available, needed, and/or required will be addressed and prioritized. This
stretch of road work is approximately 0.25 miles.
Project Cost
•
$ 1,042,543 ($729,780 Reimbursable based on budget)
Required Match
•
$ 312,763
Grant Amount
•
$ 729,780
Plans Once Grant Expires:
•
If awarded, the Award Agreement will be presented to Council for acceptance and approval. Any
additional McDowell Road reconstruction or maintenance needs will come from the General Fund
account unless additional grant funding opportunities become available, in which case the Grants team
will pursue.
Objectives and Expected Outcomes
Safety is the number one reason for this roadway reconstruction. The objective is to ensure that the
integrity of the roadway is improved to handle the anticipated increase in traffic, not only for residential
vehicles, but also commercial and industrial vehicles. This roadway reconstruction will improve roadway
safety through improved vehicle handling, increase road durability and longevity, and promote regional
roadway connectivity and integrity. Upon completion of this reconstruction project, the roadway will
move to a rating of “good” from its current rating of “very poor”.
Time Period for the Grant
•
FY 2026