Elevations and Rendering

City of Mesa — Design Review Board (2026-08-11)

View PDF Meeting page

Extracted text (via pymupdf) 912 characters
03.03.2026
CITY COMMENTS 4
07.06.2026         CITY COMMENTS
36" HIGH CMU SCREEN WALL AT AC
CONDENSERS IN FOREGROUND
(MATCH CMU COLOR)
FRONT ELEVATION:
STUCCO               1177 S.F. = 38%
DOORS                1675 S.F. = 55%  
CMU MASONRY    221 S.F. =   7%
                           TOTAL  3073 S.F.
+0"
+4"
-12"
+0"
PARAPET
+26-0"
PARAPET
+26-0"
PARAPET
+26-0"
PARAPET
+26-0"
+0"
+4"
+24"
+0"
+0"
+0"
+4"
+24"
+0"
+0"
+0"
+0"
+24"
+24"
+4"
+4"
+4"
+0"
+0"
+0"
+4"
+0"
+0"
+64"
+0"
+0"
AWNINGS ABOVE O.H.
DOORS; PROTRUDE 24"
REAR ELEVATION:
METAL PANEL      2022 S.F. = 66%
CMU MASONRY   1052 S.F. = 33%
                             TOTAL  3074 S.F.
SIDE ELEVATION (EACH):
STUCCO               238 S.F. = 19%
METAL PANEL      335 S.F. = 
% 
CMU MASONRY   679 S.F. = 
%
                           TOTAL  1252 S.F.
- ACCENT COLOR
- ACCENT COLOR

03.03.2026
CITY COMMENTS 4
07.06.2026         CITY COMMENTS

A-302