Presentation

City of El Mirage — Regular Meeting (2026-08-17)

View PDF Meeting page

Extracted text (via pymupdf) 4743 characters
City of El Mirage
CITY COUNCIL
Council Chambers
El Mirage City Hall
10000 N El Mirage Rd
El Mirage, Arizona 85335
August 17, 2026
Action Item: El Mirage Industrial Conditional Use Permit

Project Site Location
 
El Mirage Industrial 
9105 N El Mirage Road
El Mirage, AZ 85335
Lot Size:
9.42 ac.
2020 General Plan:
Commerce/Industry Park Planning Area 
Zoning:
Commerce Park
Overlays:
Luke AFB Land Use Compatibility
Flood Zone:
Not Applicable 
Land Use:
Vacant Undeveloped
Proposed Use:
Warehousing / Outdoor Storage
Action Required: 
Conditional Use Permit

Site Plan

Elevations

Landscaping

Stipulations
The Commission and Council shall, in addition to any other conditions, impose the following general conditions upon every 
conditional use permit granted. 
1. The applicant must sign a written acceptance of these conditions prior to the CUP being issued, per 
§154.157(E)(2)(f)(iv).
2. The right to a use and occupancy permit shall be contingent upon the fulfillment of all general and special conditions 
imposed by the conditional use permit procedure. 
3. All of the special conditions shall constitute restrictions running with the land and shall be binding upon the owner of 
the land, his or her successors or assigns.  
4. All conditions specifically stated under any conditional use listed in this chapter shall apply and be adhered to by the 
owner of the land, his or her successors, or assigns. 
5. The project shall be developed in substantial conformance with the submitted site plan, including the 105,760 square 
foot tilt-up warehouse, 5,000 square feet of office space, loading docks, truck circulation plan, parking layout, and the 
approximately 3.2-acre secured outdoor storage yard. Any significant modifications shall comply with CUP modification 
procedures in §154.157.
6. Uses within the building shall be limited to warehouse, industrial, and office operations as described in the narrative. 
No distribution center or high-intensity logistics use is permitted unless a revised CUP is approved. This condition is 
authorized as regulation of use under §154.157(E)(2)(e)(i).
7. Prior to occupancy, all prospective tenants shall contact the City of El Mirage Planning Department to verify that their 
proposed business operations are permitted within the approved Commerce Park zoning district and the conditions of 
this Conditional Use Permit. No tenant shall occupy or operate within the building or outdoor storage yard until written 
confirmation of use compliance has been obtained from the City.
8. All tenants shall comply with the requirements of ARS 28 8481, including all regulations related to Military Airport 
Land Use Compatibility within the Military Airport Territory. No tenant shall occupy or operate within the building or 
outdoor storage yard unless their proposed use fully complies with the restrictions and compatibility standards 
established under ARS 28 8481.
9. All tenants shall obtain City of El Mirage Tenant Improvement permits for any interior or exterior modifications prior 
to commencing any construction or occupancy. In addition, all tenants are required to maintain a valid City of El Mirage 
business license for the duration of their operations within the building and outdoor storage yard. No tenant may occupy 
the premises until these requirements are satisfied.
10. All site operations shall comply with §154.157(E)(2)(e)(ix), ensuring no excessive emissions beyond levels typical of 
modern warehouse uses. All loading, truck circulation, and outdoor storage activities must be operated in a manner that 
minimizes impacts to neighboring industrial properties.
11. Hours shall remain consistent with the narrative (7 a.m.–6 p.m.) unless modified by the City, per  §154.157(E)(2)(e)(x).

Staff Review:
The staff of the Technical Advisory Committee (TAC) has thoroughly reviewed the application 
and determined that it is appropriate to proceed with the public hearings.
Stipulation(s): 
The applicant shall consent to the Technical Advisory Committee's stipulations as set forth in 
the memorandum dated July 6, 2026.
Luke AFB Review:
Provided comments in a letter dated April 9, 2026, with the Pre-Application submittal. 
Will not have a negative impact: Identified potential mission risk if encompass with the project; 
see the attached Luke AFB letter. 
Public Comment: 
Three (3) inquiries were received, One (1) Comment at Public Hearing
Planning & Zoning 
Commission: 
The zoning application was recommended for approval as presented at the public hearing on 
July 14, 2026, with a vote of 4-1. 
City Council: 
August 17, 2026. Final Action 
If approved, applicant can submit the site plan for review and approval. 
Staff Review, Comments & Actions

Questions