July 26, 2023 
Z2023035 
Page 1 of 2 
 
 
 
 
Report to the Board of Supervisors 
Prepared by the Maricopa County Planning and Development Department 
 
Board Hearing Date: 
July 26, 2023 
 
Case #/Title:   
 
 
Z2023035 – Chandler Airpark Rezone 
 
Supervisor District: 
1 
 
Applicant/Owner:  
Adam Baugh, Withey Morris Baugh / Kevin Lee Peterson 
 
Request: 
Rezone from Rural-43 to IND-2 IUPD 
 
Site Location: 
Generally located south of the southwest corner of Ryan Rd. and 
McQueen Dr., in the Chandler area 
 
Site Size: 
Approximately 12 acres 
 
County Island Status: 
Yes, City of Chandler 
Additional 
Comments: 
The applicant is requesting a rezone to IND-2 IUPD. The applicant 
will seek annexation and considers the IND-2 IUPD zoning to be 
consistent with the parcel’s designation in the City of Chandler 
General Plan’s Future Land Use Map and Chandler Airpark Area 
Plan. There has been no recorded support or opposition. There are 
no outstanding concerns from reviewing agencies.  
 
Commission  
 
Recommendation: 
On 6/8/23, the Commission voted 7-0 to adopt a motion 
recommending the Board of Supervisors approve Z2023035, 
subject to conditions ‘a’ – ‘g’:  
 
a. 
Development of the site shall be in substantial conformance with the Narrative Report 
entitled “Rezone Narrative”, consisting of 11 pages, dated May 9, 2023 except as modified 
by the following conditions. 
 
b. 
IUPD overlay is applied to restrict the use of the site until the site is served by a public 
sewer system. Until such time, uses on the site are limited to those that can be 
accommodated by septic systems properly permitted by the Maricopa County 
Environmental Services Department. 
 
c. 
Administrative approval of a Plan of Development will be required prior to approval and 
issuance of construction permits to develop and establish use of the site. Prior to 
issuance of a building permit, written confirmation will be required from the emergency 
fire protection jurisdiction having authority that the facility has been designed in 
accordance with their regulations and requirements, and that emergency fire protection

July 26, 2023 
Z2023035 
Page 2 of 2 
service will be provided to the facility. Prior to issuance of the certificate of occupancy, 
local fire protection jurisdiction review and approval will be required. 
 
d. 
Prior to approval of the initial final plat or precise plan of development approval, the 
applicant shall provide the Maricopa County Planning and Development Department with 
an executed pre-annexation service agreement with the City of Chandler that identifies the 
detail for when the proposed project will be annexed and the provision of water and sewer 
service.  In lieu of pre-annexation service agreement the developer must provide a ‘will 
serve’ letter from the certificated water and sewer provider(s) or approval from MCESD. 
 
e. 
Noncompliance with any Maricopa County Regulation shall be grounds for initiating a 
revocation of this Zone Change as set forth in the Maricopa County Zoning Ordinance.  
 
f. 
The property owner/s and their successors waive claim for diminution in value if the 
County takes action to rescind approval due to noncompliance with conditions.  
 
g. 
The granting of this change in use of the property has been at the request of the applicant, 
with the consent of the landowner.  The granting of this approval allows the property to 
enjoy uses in excess of those permitted by the zoning existing on the date of application, 
subject to conditions.  In the event of the failure to comply with any condition, the property 
shall revert to the zoning that existed on the date of application.  It is, therefore, stipulated 
and agreed that either revocation due to the failure to comply with any conditions, does 
not reduce any rights that existed on the date of application to use, divide, sell or possess 
the property and that there would be no diminution in value of the property from the value 
it held on the date of application due to such revocation of the Zone Change. The Zone 
Change enhances the value of the property above its value as of the date the Zone Change 
is granted and reverting to the prior zoning results in the same value of the property as if 
the Zone Change had never been granted. 
 
 
Presented by: 
 
Joel Landis, Planner 
Reviewed by: 
 
Darren Gérard, AICP, Planning Manager   
 
Attachment: 
 
6/8/23 P&Z Packet (29 pages)  
 
 
Note: 
6/8/23 Draft P&Z Minutes are not available as of the writing of this report but can be provided 
upon request later when available.

Z2023035 
Page 1 of 7 
 
 
Report to the Planning and Zoning Commission 
Prepared by the Maricopa County Planning and Development Department 
 
 
Case: 
Z2023035 – Chandler Airpark Rezone 
 
 
 
 
 
Hearing Date: 
June 8, 2023 
 
Supervisor District: 
1 
 
 
 
  
 
Applicant: 
Adam Baugh, Withey Morris Baugh  
 
Owner: 
Kevin Lee Peterson 
   
Request: 
Rezone from Rural-43 to IND-2 IUPD 
 
  
 
Site Location: 
Generally located south of the southwest corner of Ryan Rd. and McQueen 
Dr., in the Chandler area 
 
  
Site Size: 
Approximately 12acres 
 
Density: 
N/A 
 
County Island:  
Yes, City of Chandler 
 
 
County Plan: 
Rural Development Area (0-1 d.u./ac) 
 
Municipal Plan: 
City of Chandler – Employment / Chandler Airpark Area Plan – Innovation 
District 
 
Municipal Comments: 
None received to date  
 
Support/Opposition: 
None known 
 
Recommendation: 
Approve with conditions

Z2023035 
Page 2 of 7 
Project Summary: 
 
1. 
The applicant is requesting to rezone a Rural-43 zoned parcel to IND-2 to accommodate uses that 
are consistent with the parcel’s designation in the City of Chandler General Plan Future Land Use 
Map and Chandler Airpark Area Plan. The site is located just southwest of the Chandler Airpark 
and 700’ south of Pioneer Park. Prior owners received a Special Use Permit (SUP) Z91-61 to house 
a public riding and boarding stable. The City of Chandler did not object to this SUP as the applicant 
agreed to an avigation easement for the site. Originally approved in 1992, this SUP expired in 
2002. Subsequently, public boarding stables became an allowed use in the Rural-43 zoning 
district, negating the need for another SUP. There is an active building permit for the site, 
B202012715, to construct a 1,267’ CMU wall – however, the applicant has not submitted plans 
for this project since November of 2020. 
 
2. 
While several parcels along McQueen Rd. are still within Maricopa County jurisdiction, much of 
the surrounding area has been incorporated into the City of Chandler. The parcels south and 
southwest of the subject site are part of a larger industrial redevelopment taking place within 
Chandler. These projects include the approved Schrader Farms Business Park, and the pending 
Ryan Commerce Center, Hamilton Commerce Center, Arizona Commerce Center, and the Air 
Center Business Park across McQueen Rd. These sites are being or may be developed for major 
employment, knowledge-based, and light industrial type uses. The subject rezone would 
ultimately culminate in similar type development and, eventually, incorporation into the City of 
Chandler.  
 
 
2023 aerial photo of the site, oriented north

Z2023035 
Page 3 of 7 
Jurisdictional map of surrounding area (City of Chandler shown in teal)

Z2023035 
Page 4 of 7 
Zoning of properties within Maricopa County jurisdiction 
 
 
 
Development around the subject site (provided by applicant)

Z2023035 
Page 5 of 7 
 
Existing On-Site and Adjacent Zoning / Land Use: 
 
3. 
On-site: 
 
Rural-43 / Residential/Boarding Stable 
North: 
Rural-43 / Residential  
South: 
PAD (City of Chandler) / Vacant/Future Industrial 
East: 
Rural-43 SUP / Cole Event Center (Z2013027) 
West: 
AG-1 (City of Chandler) / Vacant/Future Industrial 
 
 
Utilities and Services: 
 
4. 
Water: 
 
Salt River Project 
Wastewater: 
Septic 
School District: 
Chandler Unified School District 
Fire: 
Chandler Fire Department 
Police:  
Maricopa County Sheriff’s Office 
 
Right-of-Way: 
 
5. 
The following table includes existing and proposed half-width right-of-way and the future 
classification based upon the Maricopa County Department of Transportation (MCDOT) Major 
Streets and Routes Plan.   
 
Street Name 
Half-width Existing R/W 
Half-width Proposed R/W 
Future Classification 
McQueen Rd 
65’ 
65’ 
Major Street (City of Chandler) 
 
Adopted Plans: 
 
6. 
City of Chandler General Plan (adopted April 14, 2016): Employment - Major employers, 
knowledge-based industries, and industrial/business parks are allowed within Employment. A 
compatible mix of industrial support uses and residential densities as an integral component may 
be considered. Light industrial business parks may be considered in campus-like settings 
containing knowledge-based employers, corporate offices, manufacturing, and warehouse and 
distribution. A compatible mix of industrial support uses and residential densities may also be 
considered as an integral component of a planned mixed-use development. 
 
a. Chandler Airpark Area Plan (adopted October 14th, 2021): Innovation District - supports 
research & development, technical, creative, & other technology-forward businesses. Low to 
moderate intensity flexible, creative office, & business park developments are appropriate to 
this land use category. Residential uses of any type are prohibited in this district. 
 
Public Participation Summary: 
 
7. 
The applicant complied with the Maricopa County Public Participation Process with the required 
posting of the property and the notification to the adjacent property owners within 300’ of the 
subject site. Staff has not received any notice of opposition or support to the request. The 
applicant provided an email from a City of Chandler staff member with instructions on beginning 
the annexation process in relation to this project, but staff has not directly received 
communication from the City of Chandler.

Z2023035 
Page 6 of 7 
 
Outstanding Concerns from Reviewing Agencies: 
 
8. 
N/A 
 
Staff Analysis: 
 
9. 
Staff supports this rezone application as it matches the City of Chandler’s General Plan 
Employment designation and the Chandler Airpark Area Plan Innovation District designation. The 
surrounding area has been or is in the process of being developed for similar type land-uses 
allowed in the IND-2 zoning district. The applicant is intending on pursuing annexation into the 
City of Chandler once an end-user has been secured. 
 
10. 
Staff would note that there is no Plan of Development or zoning overlay included with this 
application. Staff does carry slight concern over the interim land uses of the site between an 
approval of this application and incorporation into the City of Chandler. The lack of public 
infrastructure currently available on-site does limit the applicant to interim land uses. However, 
IND-2 zoning does allow for the erecting of structures that may otherwise not be allowed within 
Chandler jurisdiction, such as billboards. Staff would not be supportive of this application if the 
sole purpose of the rezone would be to allow for such a land use. However, given the synergy 
between the proposed zoning and nearby land uses within the City of Chandler, staff still supports 
this application if annexation is pursued at maximum speed without major interim land uses that 
would require city services being processed by Maricopa County.  
 
Recommendation: 
 
11. 
Staff recommends the Commission adopt a motion recommending that the Board of Supervisors 
approve Z2023035 subject to the following conditions ‘a’ – ‘g’: 
 
a. 
Development of the site shall be in substantial conformance with the Narrative Report 
entitled “Rezone Narrative”, consisting of 11 pages, dated May 9, 2023 except as modified 
by the following conditions. 
 
b. 
IUPD overlay is applied to restrict the use of the site until the site is served by a public 
sewer system. Until such time, uses on the site are limited to those that can be 
accommodated by septic systems properly permitted by the Maricopa County 
Environmental Services Department. 
 
c. 
Administrative approval of a Plan of Development will be required prior to approval and 
issuance of construction permits to develop and establish use of the site. Prior to 
issuance of a building permit, written confirmation will be required from the emergency 
fire protection jurisdiction having authority that the facility has been designed in 
accordance with their regulations and requirements, and that emergency fire protection 
service will be provided to the facility. Prior to issuance of the certificate of occupancy, 
local fire protection jurisdiction review and approval will be required. 
 
d. 
Prior to approval of the initial final plat or precise plan of development approval, the 
applicant shall provide the Maricopa County Planning and Development Department with 
an executed pre-annexation service agreement with the City of Chandler that identifies the 
detail for when the proposed project will be annexed and the provision of water and sewer

Z2023035 
Page 7 of 7 
service.  In lieu of pre-annexation service agreement the developer must provide a ‘will 
serve’ letter from the certificated water and sewer provider(s) or approval from MCESD. 
 
e. 
Noncompliance with any Maricopa County Regulation shall be grounds for initiating a 
revocation of this Zone Change as set forth in the Maricopa County Zoning Ordinance.  
 
f. 
The property owner/s and their successors waive claim for diminution in value if the 
County takes action to rescind approval due to noncompliance with conditions.  
 
g. 
The granting of this change in use of the property has been at the request of the applicant, 
with the consent of the landowner.  The granting of this approval allows the property to 
enjoy uses in excess of those permitted by the zoning existing on the date of application, 
subject to conditions.  In the event of the failure to comply with any condition, the property 
shall revert to the zoning that existed on the date of application.  It is, therefore, stipulated 
and agreed that either revocation due to the failure to comply with any conditions, does 
not reduce any rights that existed on the date of application to use, divide, sell or possess 
the property and that there would be no diminution in value of the property from the value 
it held on the date of application due to such revocation of the Zone Change. The Zone 
Change enhances the value of the property above its value as of the date the Zone Change 
is granted and reverting to the prior zoning results in the same value of the property as if 
the Zone Change had never been granted. 
 
 
 
Presented by: 
Joel Landis, Planner 
Reviewed by: 
Matthew Holm, AICP, Planning Supervisor 
 
Attachments: 
Case Map (1 page) 
 
Application (1 page) 
 
Narrative Report (11 pages) 
 
City of Chandler Email (3 pages) 
 
Site Plan (3 pages) 
 
Planning Engineering Comments (3 pages)

/
Maricopa County Planning & Development - Phoenix, AZ
1
Gross Acres: 12.02 approx.
Generated May 30, 2023 09:16 AM
Z2023035
Application Name:
Legal Description
SW of SWC of Ryan Rd. & McQueen Rd.  EDR
Applicant
Case Address
T02S R05E 010,
Adam Baugh for Withey Morris PLC
19820 S MCQUEEN Rd
Applicant Phone/Email
Parcel Primary:303-33-011B
602.346.4640
hayes@witheymorris.com
CHANDLER AZ 85286
Map scale 1:2,038
Supervisor District No.
THE APPLICANT IS REQUESTING TO REZONE THE SUBJECT PROPERTY FROM COUNTY RU-43 TO
IND-2 TO BE CONSISTENT WITH THE CITY OF CHANDLER GENERAL PLAN FUTURE LAND USE MAP
5.3585 in

Zone Change Application 
11/19/2021 
Planning & Development Department 
ALL FEES ARE DUE AT TIME OF APPLICATION AND ARE NON-REFUNDABLE. 
ZONE CHANGE APPLICATION 
REQUEST 
Project Name 
Description of Request: 
Existing Use of Property: 
Existing Zoning District: 
Requested Zone Change : 
Related Case Numbers: (List V# if site is subject to code violation) 
PROPERTY INFORMATION 
Address (if known): 
General Location (include nearest city/town): 
Size in Acres: 
Square Feet: 
Legal Description 
Section: 
Township:
Range:
Assessor’s Parcel Number(s): 
Subdivision Name (if applicable): 
OWNER’S AUTHORIZED AGENT INFORMATION
Name:
Contact:
Address:
City:
State:
Zip:
Phone #: 
Fax #: 
Email: 
PROPERTY OWNER INFORMATION 
Name:
Contact:
Address:
City:
State:
Zip:
Phone #: 
Fax #: 
Email: 
PROPERTY OWNER AND OWNER’S AGENT AUTHORIZATION  
I (property owner) 
 
authorize (owner’s agent) 
to file this application on all matters relating to this request with Maricopa County. By signing this form as the 
property owner I hereby agree to abide by any and all conditions that may be assigned by the Maricopa County 
Board of Supervisors, Maricopa County Planning and Zoning Commission, or Maricopa County Planning and 
Development Department staff as applicable, as part of any approval of this request, including conditions, 
development agreements, and/or any other requirement that may encumber or otherwise affect the use of my 
property. 
PROPOSITION 207 WAIVER 
The property owner acknowledges that the approval being sought by this application may cause a reduction in 
the existing rights to use, divide, sell or possess the private property that is the subject of this application.  The 
property owner further acknowledges that it is the property owner who has requested the action sought by the 
filing of this application.  Therefore, with full knowledge of all rights granted to the property owner pursuant to 
A.R.S.§12-1132 through 1138, the property owner does hereby waive any and all claims for diminution in value of 
the property with regard to any action taken by Maricopa County as result of the filing of this application. 
Property Owner Signature: 
Date:
VERIFICATION OF APPLICATION INFORMATION 
I certify that the statements in this application and support material are true. Any approvals or permits granted by Maricopa 
County in reliance upon the truthfulness of these statements may be revoked or rescinded.  
Owner or Authorized Agent Signature:
Date:
CASE INACTIVITY  
Cases which are not active within six (6) months will be considered inactive and closed by staff. A letter 
addressing the inactivity will be sent to the owner’s authorized agent or property owner with notification of the 
case to be closed within thirty (30) days. To pursue entitlement after the closing of the case, a new application 
and associated fees will need to be filed. 
Withey Morris, PLC
hayes@witheymorris.com
3/7/23
SW of SWC of Ryan Road and McQueen Rd
Rezone from RU-43 to IND-2 IUPD for consistency with Chandler's General Plan
Equestrian center with public riding and board stables
RU-43
IND-2 IUPD
19820 S McQueen Rd 
SW of SWC of Ryan Road and McQueen Rd (Chandler
12.02
523,724
10
25
SE
303-33-011B
Alex Hayes
2525 E Arizona Biltmore Circle, Suite A-212
Withey Morris, PLC
Phoenix
AZ
85286
(602) 236-0600
19280 S McQueen Rd 
Kevin Lee Peterson
Chandler
DocuSign Envelope ID: 5AE69B1B-5CB9-4653-A708-8619341B1B69
3/8/2023
Kevin Peterson

Page | 1 
SW of SWC of Ryan Road and 
McQueen Road 
Rezone Narrative 
Case Number: Z2023035
First Submittal: March 17, 2023 
Second Submittal: April 27, 2023
Third Submittal: May 9, 2023

Page | 2 
 
Development Team 
 
 
 
Applicant 
 
 
Withey Morris Baugh, PLC 
2525 E. Arizona Biltmore Circle Ste. A-212  
Phoenix, AZ 85016 
Contact: Adam Baugh  
Email: adam@wmbattorneys.com  
Phone: (602) 230-0600 
 
 
Developer 
 
 
 
Hawkke, LLC 
1094 S Gilbert Rd #203 
Gilbert, Arizona 85296 
Contact: Dan Porter 
Email: dan@hawkke.com 
Phone: (480) 485-0295

Page | 3 
 
Request 
 
The applicant is requesting to rezone the subject property from County RU-43 to Ind-2 to be consistent 
with the City of Chandler General Plan Future Land Use Map and accommodate uses consistent with the 
Ind-2 district.    
Location 
 
The property is located southwest of the southwest corner of E Ryan Road and S McQueen Road (APN: 
303-33-011B), as shown on the attached aerial map (Tab 1). It is approximately 12.02 acres and is currently 
operated as an equestrian center with public riding and board stables. The property is located in the 
unincorporated area of Maricopa County but is covered under the City of Chandler General Plan and 
Planning Area. 
Current General Plan and Zoning 
 
The Property is currently zoned County RU-43 (Tab 2). The City of Chandler General Plan Future Land Use 
Plan Map designates the property as “Employment,” which is intended to strengthen the City of 
Chandler’s economic base by expanding growth areas and identifying a variety of employment areas for 
future growth (Tab 3). Major employers, knowledge-based industries, and industrial/business parks are 
allowed within this land use category. Industrial is the proper zoning district that aligns with the 
Employment Land Use category. 
 
Adjacent Land Uses 
 
North: Residential subdivision/Church (RU-43) 
East: Equestrian Center (RU-43) 
South: Planned industrial (Current zoning: Chandler PAD) 
West: Planned Industrial (Current zoning: Chandler AG-1) 
Project Overview 
 
The proposed rezone is requested to align with the City of Chandler General Plan Future Land Use Map 
and to better reflect the development pattern in this area. The Property is located within a county island 
that is adjacent to an area that is developing with industrial uses around it. As shown on the exhibit below, 
the property has industrial zoning to the south (Schrader Farms Business Park – PLH20-0030), and pending 
applications on file with the City of Chandler to rezone land to industrial to the west and east (see map 
below).  The Arizona, Hamilton, and Ryan Commerce Centers are proposed pursuant to Case No. PLH22-
0028. The Air Center Business Park is the subject of Case No. PLH22-0051.

Page | 4 
 
 
 
 
The proposed rezone will position the Property for future development consistent with the City of 
Chandler’s General Plan and the Airpark Area Plan’s Innovation District. When an end user materializes 
that require city services, the Property will annex into the City of Chandler and pursue site plan (PDP 
application) with the City of Chandler. The Applicant has discussed this site with City of Chandler Planning 
and Development Department and understands the types of uses that are anticipated within the 
Innovation District of the City’s Airpark Area Plan. In the interim, the Property may be utilized for uses 
that are permitted within the Ind-2 district and do not require additional utilities.  
 
Access and Circulation 
 
Currently, the Property is accessed via a dirt road extending east from McQueen Road to the southern 
perimeter of the Property. However, the property immediately south of the subject site is approved to be 
developed as the Schrader Farms Business Park, which would include the installation of a new collector 
road (Canary Way), which will extend east from McQueen Road along the Southern perimeter of the 
subject site. Additionally, Hamilton Road will be installed in the first phase of development of the new 
Ryan Commerce Center west of the Property. In short time, there will be two improved access roads able 
to serve this project.

Page | 5 
 
Utilities 
 
PUBLIC UTILITIES 
SERVICE PROVIDERS 
Fire Protection 
Chandler Fire Department 
Police Protection 
Maricopa County Sheriff 
Water 
Salt River Project 
Wastewater 
Septic System 
Gas 
Southwest Gas 
Electric 
Salt River Project 
Telephone 
Cox Communications 
Refuse 
Private Contractor 
 
Conclusion 
 
The proposed rezone is consistent with the City of Chandler’s General Plan and the development pattern 
in this area. The Ind-2 zoning district will accommodate industrial uses that are compatible with existing 
and proposed development in the area and will help achieve the goal of expanding employment 
opportunities around the Chandler Airpark.

TAB 1

SW of SWC Ryan Rd and Mcqueen Rd, Maricopa County (19820 S McQueen Rd)
N
Aerial Map

TAB 2

SW of SWC Ryan Rd and Mcqueen Rd, Maricopa County (19820 S McQueen Rd)
N
Zoning Map

TAB 3

SW of SWC Ryan Rd and Mcqueen Rd, Maricopa County (19820 S McQueen Rd)
N
Chandler General Plan Map
Mcqueen Rd
Queen Creek Rd

From:
Lauren Schumann
To:
Adam Baugh
Subject:
RE: 19820 S McQueen Rd)
Date:
Tuesday, April 18, 2023 4:48:19 PM
Attachments:
image001.png
image002.png
image003.png
image004.png
Good Afternoon Adam,
The annexation process?! Here I thought I was being phished and then I see the firm’s
name was changed.
Congratulations on becoming a partner!
In the past couple of years, we run the annexation and rezoning case concurrently so if the
rezoning will not be approved the annexation can be withdrawn.  Please see my flowchart
below (this is my training exhibit so please don’t distribute). Generally after first review of
the zoning case, we try to get the annexation scheduled for the first of three City Council
meetings (Public Hearing- step 6 below). The complete process is outlined in our
Annexation application. If a property was to annex and develop under the initial City Zoning,
they can be processed in approximately 2-3 months. An annexation and rezoning typically
6 months.
Your first step will be Pre-Tech. Let me know if you have additional questions or concerns.

Lauren Schumann
Principal Planner, City of Chandler’s Planning Division
215 E. Buffalo St.
Chandler, AZ 85225
(480) 782-3156
From: Adam Baugh <adam@wmbattorneys.com> 
Sent: Tuesday, April 18, 2023 11:41 AM
To: Lauren Schumann <Lauren.Schumann@chandleraz.gov>
Subject: 19820 S McQueen Rd)
Hi Lauren,
I am looking at this site which has a General Plan designation of Employment and the Area Plan calls
for innovation.  We will develop per those plans.  Upon filing the annexation, how long does it take
from filing to council approval of the annexation?  What are the annexation steps please?
G. Adam Baugh, Esq.
Withey Morris Baugh, PLC
2525 E. Arizona Biltmore Circle, Ste A-212
Phoenix, AZ  85016
602-230-0600 Main
602-346-4603 Direct

Check out our podcast: Dirt to Development
 
     
 
Please be advised that this e-mail and any files transmitted with it are confidential attorney-client communication or
may otherwise be privileged or confidential and are intended solely for the individual or entity to whom they are
addressed. If you are not the intended recipient, please do not read, copy or retransmit this communication, but
destroy it immediately. Any unauthorized dissemination, distribution or copying of this communication is strictly
prohibited.
 
 
 
CAUTION: This Email is from an EXTERNAL source. Ensure you trust this sender before clicking on
any links or attachments.
 
NOTICE: This E-mail (including attachments) is covered by the Electronic Communications
Privacy Act, 18 U.S.C. ss 2510-2521, is confidential and is legally privileged. If you are not
the intended recipient, you are hereby notified that any retention, dissemination, distribution,
or copying of this communication is strictly prohibited. Please delete if received in error and
notify sender. Thank you kindly.

SW of SWC Ryan Rd and McQueen Rd, Maricopa County (19820 S McQueen Rd)
N
Current Zoning Map

SW of SWC Ryan Rd and McQueen Rd, Maricopa County (19820 S McQueen Rd)
N
Proposed Zoning Map

Legal Description 
 
THAT PART OF THE NORTHEAST QUARTER OF THE SOUTHEAST QUARTER OF SECTION 10, TOWNSHIP 
2 SOUTH, RANGE 5 EAST OF THE GILA AND SALT RIVER BASE AND MERIDIAN, MARICOPA COUNTY 
ARIZONA, DESCRIBED AS FOLLOWS: 
 
COMMENCING AT THE SOUTHEAST CORNER OF THE NORTHEAST QUARTER OF THE SOUTHEAST 
QUARTER OF SECTION 10; 
 
THENCE SOUTH 89 DEGREES 21MINUTES 56 SECONDS WEST, ALONG THE SOUTHERLY LINE OF THE 
SAID NORTHEAST QUARTER OF THE SOUTHEAST QUARTER OF SECTION 10, A DISTANCE OF 489.44 
FEET TO THE TRUE POINT OF BEGINNING; 
 
THENCE CONTINUING SOUTH 89 DEGREES 21MINUTES 56 SECONDS WEST ALONG THE SAID 
SOUTHERLY LINE OF THE NORTHEAST QUARTER OF THE SOUTHEAST QUARTER OF SECTION 10, A 
DISTANCE OF 830.05 FEET TO THE SOUTHWEST CORNER OF THE NORTHEAST QUARTER OF THE 
SOUTHEAST QUARTER OF SECTION 10; 
 
THENCE NORTH 00 DEGREES 03 MINUTES 10 SECONDS EAST ALONG THE WESTERLY LINE OF THE 
SAID NORTHEAST QUARTER OF THE SOUTHEAST QUARTER OF SECTION 10, A DISTANCE OF 631.00 
FEET; 
 
THENCE NORTH 89 DEGREES 21 MINUTES 56 SECONDS EAST BEING PARALLEL WITH SAID SOUTHERLY 
LINE OF THE NORTHEAST QUARTER OF THE SOUTHEAST QUARTER OF SECTION 10, A DISTANCE OF 
830.05 FEET; 
 
THENCE SOUTH 00 DEGREES 03 MINUTES 10 SECONDS WEST BEING PARALLEL WITH THE SAID 
WESTERLY LINE OF THE NORTHEAST QUARTER OF THE SOUTHEAST QUARTER OF SECTION 10, A 
DISTANCE OF 631.00 FEET TO THE TRUE POINT OF BEGINNING.

Doug Jones, P.E., CFM
Planning & Development
301 W. Jefferson St., Suite 170
Phoenix, Arizona 85003
Phone: (602) 372-0790
www.maricopa.gov/planning
Email address:
Doug.Jones@maricopa.gov
 
Planning & Development
Engineering Plan Review
Date:  
March 31, 2023
Memo To:
Darren Gerard, AICP, Planning Manager, Department of Planning & 
Development
Attn:
Joel Landis, Planner, Planning & Development Services
cc:
Michael Norris P.E., Engineering Manager, Planning and Development
Bob Fedorka, PE, Engineering Supervisor, Planning & Development
From:
Doug Jones, PE, CFM, Plans Examiner Engineer, Planning & 
Development
Subject:  
Z2023035 – SW of SWC of Ryan Rd. & McQueen Rd. Zone Change 
w/out POD RU-43 -> IND-2
APN(s):
303-33-011B   
Engineering Review has reviewed the first plan and report routed for review on 
03/27/2023, for the subject application and has No Objections pending the 
establishment of suitable access and subject to the following conditions:
1.
Any new site improvements will require a Plan of Development and Traffic 
Impact Study. 
2.
McQueen Road is within the jurisdiction of the City of Chandler. The applicant 
will be responsible for coordinating with the City to review any traffic impact, 
right-of-way dedication, permitting or roadway improvement requirements 
needed to provide suitable access to the site, including the east/west access 
to McQueen Road that is also within the City limits.
3.
Without the submittal of a plan of development, no development approval will 
be inferred by the engineering review, including, but not limited to drainage 
design, access and roadway alignments. These items will be addressed as 
development plans progress and are submitted to the County for further review 
and/or entitlement.
4.
Engineering review of planning and/or zoning cases is for conceptual design 
only. All development and engineering design shall be in conformance with 
Section 1205 of the Maricopa County Zoning Ordinance; Drainage Policies and 
Standards; Floodplain Regulations for Maricopa County; MCDOT Roadway 
Design Manual; and current engineering policies, standards and best practices 
at the time of application for construction.
All plans and reports should be developed and formatted to document that the 
project is designed to meet all County regulations, ordinances and design 
standards.

Page 2 of 3
It is incumbent upon the engineer to demonstrate compliance with all 
regulatory requirements and County design standards.
Please contact me with any questions.
DRAINAGE PLAN REVIEW REFERENCES:  
The Drainage Regulations are listed in Section 1205 of the MCZO:
https://www.maricopa.gov/documentcenter/view/272 
Maricopa County Drainage Policies and Standards Manual:
https://www.maricopa.gov/DocumentCenter/Home/View/2369 
For Additional Information See:
https://www.maricopa.gov/1635/Drainage-Review
FLOOD CONTROL DISTRICT OF MARICOPA COUNTY REFERENCES:  
Floodplain Regulations for Maricopa County:
https://www.maricopa.gov/DocumentCenter/View/630 
For Additional Information See:
https://www.maricopa.gov/3847/Flood-Control-District 
PND TRANSPORTATION REFERENCES:
Residential Driveway Guidelines
https://www.maricopa.gov/documentcenter/view/362 
Roadway Design Manual
http://www.mcdot.maricopa.gov/DocumentCenter/View/24883
Maricopa County Resolution for ROW Permits
https://www.maricopa.gov/documentcenter/view/364 
For Additional Information See:
https://www.maricopa.gov/156/MCDOT 
PND STORMWATER QUALITY (SWPPP) REFERENCES:
Storm Water Quality Management and Discharge Control Regulation
https://www.maricopa.gov/DocumentCenter/View/6577
Air Pollution Control Regulations Rule 310
https://www.maricopa.gov/DocumentCenter/View/5354 
For Additional Information See:
https://www.maricopa.gov/3980/Water-Sewage-Stormwater-Waste

Page 3 of 3
Abbreviations Key:
Drainage:
DD = 
Department Directive (See: http://www.maricopa.gov/1911/Department-
Directives)
MCZO =
Maricopa County Zoning Ordinance
DPSM = 
Maricopa County Drainage Policies and Standards
SSA = 
State Standard Attachment
DDMV1= Maricopa County Drainage Design Manual – Hydrology
DDMV2 = Maricopa County Drainage Design Manual – Hydraulics
Flood Control:
FRMC =
Floodplain Regulations for Maricopa County
PND Transportation:
RDM = 
MCDOT Roadway Design Manual
RDG = 
MCDOT Residential Design Guidelines
MSRP = 
MCDOT Major Streets and Routes Plan
PND Storm Water:
SWMDCR=
Maricopa County Storm Water Quality Management and Discharge 
Control Regulation
DDMV3= Maricopa County Drainage Design Manual – Erosion Control
APCR=
Maricopa County Air Pollution Control Regulations – Rule 310