Planning and Zoning Report 
Date 
August 26, 2026 
Case No.  
ZON26-00411 
Project Name 
ER2 
Request 
• 
Development Plan Review to allow for an industrial development 
• 
Special Use Permit to reduce the minimum number of required 
parking spaces 
Project Location 
Approximately 630± feet south of the southwest corner of Greenfield 
and McDowell Roads. 
Parcel No(s) 
141-26-006E  
 
Project Area 
8.7± acres 
Council District 
District 1 
Existing Zoning 
Light Industrial (LI) 
General Plan 
Designation 
Regional Employment Center 
Applicant 
Sean Lake, Pew & Lake, P.L.C. 
Owner 
AZ Greenfield Industrial LP 
Staff Planner 
Charlotte Bridges, Planner II 
 
Recommendation 
Staff finds that the Proposed Project is consistent with the Mesa 2050 General Plan and the 
Falcon Field Sub Area Plan, the review criteria for Development Plan Review outlined in MZO 
Section 11-69-6 of the Mesa Zoning Ordinance (MZO), as well as the review criteria for a Special 
Use Permit outlined in Section 11-7-5(E) of the MZO. 
Staff recommends approval with conditions.

[2] 
Project Overview 
Request: 
The applicant is requesting approval for a Development Plan Review and Special Use Permit 
(SUP) for a 155,597 square foot light industrial building and associated site improvements. 
Concurrent Applications: 
• 
Design Review: An Alternative Compliance request for the proposed elevations is 
scheduled to be reviewed by the Design Review Board on August 11, 2026 (Case No. 
ZON26-00411). 
Site Context 
General Plan:  
• 
The Placetype for the project site is Regional Employment Center with a Growth Strategy 
of Evolve. 
• 
Regional Employment Center areas are intended to accommodate large employers, such 
as hospitals and medical centers, airports, universities, corporate headquarters, high-tech 
companies and research parks.  These areas should have excellent access to major 
arterial roadway and freeways that can accommodate high traffic volumes and moderate 
truck traffic, exhibit high-quality design, cohesive architecture, ample landscape and 
amenities areas to support employees.  
• 
Light Industrial is a principal land use in the Regional Employment Center Placetype.   
• 
The Proposed Project is consistent with the Regional Employment Center Placetype and 
furthers the implementation of, and is not contrary to, the Vision, Guiding Principles, 
Strategies, and applicable elements of the Mesa 2050 General Plan. 
• 
Supporting General Plan Strategies: 
o LU1. Promote a balance of land uses to enhance the quality of life for current and future 
generations. 
o LU2. Create opportunities for placemaking in neighborhoods that reinforce their unique 
character and sense of place.   
o ED1.  Attract businesses and employers that create jobs with wages at or above the 
regional average. 
o ED2.  Invest is Mesa’s workforce development. 
o ED4. Protect and promote Mesa’s airports as global connections for tourism and 
business development. 
Sub-Area Plan:

[3] 
o The Proposed Project is located within the General Industrial land use area of the Falcon 
Field Sub-Area Plan.  The intent of the Falcon Field Sub-Area is to create a vibrant and 
progressive urban center that serves as an oasis of aviation related businesses, 
abundant high-quality employment, and regional entertainment.   
o The Proposed Project is consistent with the General Industrial land use area of the 
Falcon Field Sub-Area Plan and furthers the implementation of and is not contrary to its 
Vision and Land Use Strategies. 
Zoning:  
• 
The project site is zoned Light Industrial (LI) District and is in the Falcon Field Airport 
Airfield Overlay District, specifically, Airport Overflight Area Three (AOA3). 
• 
Office, limited manufacturing and warehouse uses are permitted in the LI District. 
Surrounding Zoning & Use Activity: 
The proposed use is compatible with surrounding land uses, which include other industrial uses 
and vacant land. 
Northwest 
 
LI 
Industrial Development 
North 
 
LI 
Vacant  
Northeast 
(Across Greenfield Road) 
LI-PAD 
Airport Industrial Development  
West 
 
LI 
Industrial Development 
Project Site 
 
LI 
Vacant 
East 
(Across Greenfield Road) 
LI-PAD 
Airport Industrial Development 
Southwest 
 
PEP-PAD 
Vacant 
South 
 
PEP-PAD 
Vacant 
Southeast 
(Across Greenfield Road) 
LI-PAD 
Airport Industrial Development 
Site History: 
• 
December 4, 1978: City Council annexed 1,633.11± acres, including the project site, into 
the City of Mesa (Ordinance No. 1193). 
• 
August 13, 1979: City Council rezoned 56.34± acres of recently annexed property, 
including the project site, from Maricopa County Rural 43 to Agricultural (AG) (Ordinance 
No. 1261, Case No Z79-074). 
• 
June 16, 1980: City Council rezoned 18.8± acres, including the project site, from AG to M-
1 (equivalent to Light Industrial [LI]) to accommodate an industrial park development 
(Ordinance No. 1390, Case No. Z80-047).

[4] 
• 
December 1, 2022: The City Council rezoned 17.7± acres, including the project site, to 
remove conditions of approval of Zoning Case No. Z80-047 and to add new conditions of 
approval and Site Plan Review to allow the development of three industrial buildings 
(Ordinance No. 5751, Case No. ZON22-00731).   
• 
December 12, 2022: The Planning Director’s designee approved a request for Design 
Review of the proposed building elevations and landscape plan for an industrial 
development that included the project site (Case No. DRB22-00730). 
• 
December 9, 2024:  The Planning Director’s designee administratively approved a request 
to extend the Site Plan approval granted by the City Council on December 1, 2022, (Case 
No. ZON22-00731) and the Design Review approval granted on December 12, 2022, 
(Case No. DRB22-00730) for one year per the allowance of Section 11-67-9(B) of the Mesa 
Zoning Ordinance (MZO).  Subsequently, the ZON22-0731 approved Site Plan expired on 
December 1, 2025, and the Design Review approval expired on December 12, 2025 (Case 
No. ADM24-00985).    
• 
March 9, 2026: The City Council adopted a new administrative review process under 
which an expired site plan may be eligible to proceed through Initial Development Plan 
Review. MZO Section 11-69-4. Compliance with the previously approved, now expired, 
Site Plan was included as a condition of approval of the 2022 rezoning (Ordinance No. 
5751, Case No. ZON22-00731). However, because the current proposed Development 
Plan does not change the use approved by the prior Site Plan, an Ordinance Condition 
Modification or rezoning is not required per Section 11-69-5 of the MZO. Accordingly, the 
proposed Development Plan does not require City Council approval and is within the 
Board’s review authority. 
Project/Request Details 
Site Plan: 
• 
Building Design: The proposed 40 feet in height building consists of a 132,544 square foot 
first floor area and a 23,043 square foot second floor area for a total industrial building area 
of 155,597 square feet.  The main entrance is located at the northeast corner of the building 
and is marked by an approximately 1,200± square foot entry plaza and 2,400± covered 
amenity patio.  
• 
Access: Two drives from Greenfield Road serve the site. The north drive will provide access 
to the parking field, while the southern drive provides access to the truck docks and loading 
area. A third point access is provided from Norcroft Street on the west side of the project 
site.  
• 
Parking: Per Table 11-32-3.A of the MZO, the total number of parking spaces required for 
the project site is 280 spaces.  The site plan shows a total of 238 space.  Consequently, 
the applicant is requesting a Special Use Permit to reduce the minimum number of required 
parking spaces from 280 spaces to 238 spaces based on the Parking Analysis provided 
with this application.  The Parking Analysis indicates that at least 25% of the employees

[5] 
that work in the manufacturing and warehouse areas of the building will also have an office. 
The MZO parking requirements do not factor in these overlapping uses of the Proposed 
Project. The Institute of Transportation Engineers (ITE) Parking Generation Manual 
provides models for estimating the number of required parking spaces based on an hourly 
demand for the different percentages of uses occurring on-site.  Based on the analysis 
provided, the peak parking demand for the Proposed Project is estimated to be at 2:00 
p.m. with 231 parking spaces occupied, which allows for an excess of seven parking 
spaces.   
• 
Landscaping: The landscape plan shows trees, shrubs and ground cover within the 
perimeter landscape areas along the east, south and west property lines.  Along the north 
property line, an extruded curb with shrubs is shown as a temporary buffer along the 
undeveloped edge of the project site.  Interior to the site, trees and shrubs are provided in 
the parking area islands and within the foundation base areas along the west, north and 
east sides of the building.    
Special Use Permit: 
This request includes a Special Use Permit (SUP) to reduce the minimum number of required 
parking spaces per Table 11-32-3.A of the MZO.  
• 
Required:  
o 1 parking space per 375 square feet of office area: 122 spaces 
o 1 parking space per 600 square feet of industrial area: 108 spaces 
o 1 parking space per 900 square feet of warehouse and storage area: 50 spaces 
o Total number of required parking spaces: 280 spaces 
• 
Proposed:  
o Total number of proposed parking spaces: 238 spaces 
Approval Criteria - Section 11-32-6(A): 
1. Special Conditions Reducing Parking Demand: The site plan indicates office, 
manufacturing and warehousing uses.  Approximately 25% of the employees that work in 
the manufacturing and warehouse areas of the Proposed Project will also have an office.  
Because of this overlap in operational uses, approximately 25% of the offices will not be 
consistently occupied, which results in a lower overall parking demand for the Proposed 
Project. 
2. Adequate Parking Supply: The provided parking analysis, based on ITE generation 
standards, indicates the proposed mix of operational uses requires 231 spaces during the 
2:00 p.m. peak hour of operation.  The Proposed Project provides 238 parking spaces, 
exceeding the anticipated demand by seven parking spaces. This surplus ensures 
sufficient parking availability to accommodate the Proposed Project.  
3. Impact on On-Street Parking: Since the project site supplies an adequate number of 
parking spaces, it is not anticipated that the Proposed Project will impact on-street parking

[6] 
in the industrial development to the west.  Additionally, there is no on-street parking on 
Greenfield Road.   
Approval Criteria - Section 11-70-5(E): 
1. Consistent with the General Plan and other Plan/Policies: The Proposed Project 
complies with the 2050 General Plan and the Falcon Field Sub Area Plan by providing for 
skilled employees that will contribute to high-quality employment in the area. 
2. Zoning District Intent: The Proposed Project aligns with the zoning district’s intent and 
will help support and contribute to industrial employers within the Regional Employment 
Center Placetype. 
3. Project Impact: The Proposed Project will not be injurious or detrimental to surrounding 
properties or the welfare of the City since the Proposed Project is providing a sufficient 
quantity of parking spaces to accommodate its mix of operational uses. 
4. Adequate Public Facilities: The applicant will be required to install necessary offsite 
improvements and/or upgrades to support the Proposed Project. 
Citizen Participation 
The applicant conducted a Citizen Participation process, notifying surrounding property owners, 
HOAs, and registered neighbors.  
Neighborhood Meeting: 
A virtual neighborhood meeting was held on July 23, 2026.  There were no residents or 
neighboring property owners in attendance.   
Required Notification: 
• 
Property owners within 1,000 feet, HOAs within ½ mile, and registered neighborhoods 
within one mile of the subject site were notified of the public hearing.  
• 
Staff did not receive any communication about the Proposed Project. 
Conditions of Approval 
Staff recommends approval of the Development Plan and Special Use Permit subject to the 
following conditions: 
1. Compliance with the final site plan and landscape plan as submitted. 
2. Compliance with all applicable City development codes and regulations. 
3. Relocation of the existing flood irrigation structure requires approval from the Water 
Resources Department or applicable governmental subdivision responsible for the 
ownership or maintenance of the flood irrigation facility prior to the issuance of any building 
permit.

[7] 
4. Dedicate the right-of-way and easements required under the Mesa City Code at the time 
of application for a building permit, at the time of recordation of the subdivision plat, or at 
the time of the City's request for dedication whichever comes first. 
5. Compliance with all requirements of Chapter 19 of the Zoning Ordinance including: 
a. Owner must execute the City’s standard Avigation Easement and Release for 
Falcon Field Airport prior to or concurrently with the recordation of the final 
subdivision map or the issuance of a building permit, whichever occurs first. 
b. Due to the proximity to Falcon Field Airport, any proposed permanent, or temporary 
structure, as required by the FAA, is subject to an FAA filing, for review in 
conformance with CFR Title 14 Part 77 (Form 7460) to determine any effect to 
navigable airspace and air navigation facilities. A completed form with a response 
by the FAA must accompany any building permit application for structure(s) on the 
property.  
c. Provide written notice to future property owners that the project is within one mile 
of Falcon Field Airport. 
d. Prior to issuance of any building permit, provide documentation by a registered 
professional engineer or registered professional architect demonstrating 
compliance with the noise level reductions required in Section 11-19-5 of the Mesa 
Zoning Ordinance. 
e. All final subdivision plats must include a disclosure notice in accordance with 
Section 11-19-5(C) of the Zoning Ordinance which must state in part: “This 
property, due to its proximity to the Falcon Field Airport, will experience aircraft 
overflights, which are expected to generate noise levels that may be of concern to 
some individuals.” 
 
Exhibits 
Exhibit 1 – Vicinity Map 
Exhibit 2 – Project Narrative 
Exhibit 3 – Site Plan 
Exhibit 4 – Landscape Plan 
Exhibit 5 – Grading and Drainage Report 
Exhibit 6 – Elevations 
Exhibit 7 – Citizen Participation Plan 
Exhibit 8 – Citizen Participation Report  
Exhibit 9 – Parking Analysis 
Exhibit 10 – Power Point Presentation