Village Planning Committee Meeting Summary 
PHO-1-26--Z-92-23-8 
Date of VPC Meeting 
May 12, 2026 
Date of Planning 
Hearing Officer Hearing 
May 20, 2026 
Request 
Legislative review of the conceptual site plan, 
elevations, and landscape plan per Stipulation 1. 
Location 
Southeast corner of 19th Avenue and Baseline Road
VPC Recommendation 
Approval, with a modification 
VPC Vote 
14-0
VPC DISCUSSION & RECOMMENDED STIPULATIONS: 
Committee Members Manish Gupta, Darlene Jackson, Fatima Muhammad Roque, and 
Trent Marchuk joined during this item bringing quorum to 14 members present (10 
needed for quorum). 
One member of the public registered to speak and did not indicate support or 
opposition. 
STAFF PRESENTATION 
Samuel Rogers, staff, provided an introduction and overview of the proposal, 
identifying the size, location, zoning, adjacent land uses, and General Plan Land Use 
Map designation. Mr. Rogers discussed the PHO (Planning Hearing Officer) process, 
history of the site, and explained the request. 
APPLICANT PRESENTATION 
David Richert, representing the applicant, introduced himself, provided background on 
his history with the City of Phoenix, displayed the site plan, and described the proposed 
commercial project. Mr. Richert reviewed the building elevations, color palette, and 
material selections, and presented the landscape plan. Mr. Richert displayed the parcel 
map, described potential future users, discussed infrastructure needs, and summarized 
proposed signage and lighting for the site. 
QUESTIONS FROM THE COMMITTEE 
Committee Member George Brooks asked whether there is a car wash across the 
street and asked whether there is a need for another car wash on the subject site. Mr. 
ATTACHMENT B

South Mountain Village Planning Committee 
Meeting Summary 
PHO-1-26--Z-92-23-8 
Page 2 of 14 
 
Richert stated that the decision is driven by competition and discussed by-right zoning 
allowances. 
 
Committee Member Ralph Thompson II noted that the applicant had listed potential 
restaurants they had not yet heard from and asked about the project timeline. Mr. 
Richert stated that WinCo will construct much of the major site infrastructure, explained 
that additional users will follow, and estimated that full build-out could take 
approximately five years. 
 
Chair Arthur Greathouse III asked Mr. Richert to discuss the process of attracting 
tenants and the importance of having an anchor. Mr. Richert explained the calculations 
developers make when distributing infrastructure costs across future tenants and 
discussed maintenance and enforcement considerations. 
 
Committee Member Trent Marchuk thanked Mr. Richert for his advocacy for the area, 
shared that his wife is born and raised in South Phoenix, and explained that many locals 
embrace the name “South Phoenix”. Committee Member Trent Marchuk asked what 
happened with Fry’s, a previous potential tenant. Mr. Richert stated that Fry’s did not 
provide a reason, noted that Fry’s has another store in the general area, and stated that 
WinCo considers the site a strong opportunity. 
 
Committee Member Marchuk asked whether the corner is still targeted for a sit-down 
restaurant. Mr. Richert explained the rationale behind the proposed stipulation 
language, discussed a potential user, and stated that the location could be attractive for 
a local business. 
 
Vice Chair Emma Viera suggested that area could consider a district identity similar to 
Mesa’s Asian District and suggested a potential food-oriented district. 
 
Committee Member Marchuk asked whether residential uses previously planned as 
part of the larger rezoning area are still anticipated. Mr. Richert confirmed that 
residential development is still planned and described mitigation measures for 
compatibility between commercial and future residential uses. 
 
Committee Member Greg Brownell expressed concern about the large number of 
trees proposed, noted the potential water demand, and explained the risk of losing trees 
if not properly maintained. Committee Member Brownell asked whether the developer 
could form a partnership with SRP regarding water costs in the event the anchor tenant 
leaves. Mr. Richert discussed commercial associations and potential water-recycling 
efforts. Committee Member Brownell noted that the property is served by SRP irrigation 
and described how nurseries in South Mountain manage SRP irrigation rights. Mr. 
Richert stated that the SRP water rights would be turned over to the City of Phoenix and 
stated that he would work with City staff.

South Mountain Village Planning Committee 
Meeting Summary 
PHO-1-26--Z-92-23-8 
Page 3 of 14 
 
Committee Member Kay Shepard described another shopping center that is a strong 
example of walkable design. Mr. Richert asked Committee Member Shepard to share 
photos and stated he would provide his contact information. 
 
Committee Member Manish Gupta noted that WinCo is an employee-incentivized 
company and offers prices lower than many competitors. 
 
Committee Member Brooks described a NASA infrastructure heat-mapping tool and 
encouraged the applicant to incorporate heat-mitigation strategies. Mr. Richert stated 
that he supports creative heat-mitigation methods, stated that building standards 
already require reflective materials, explained he could incorporate the latest 
techniques, and added that improvements along the Rio Salado could also support heat 
mitigation. Committee Member Brooks emphasized that retrofitting heat mitigation after 
construction is more costly and encouraged innovation early in the process. 
 
Committee Member Mark Beehler asked whether the developer is requesting to 
remove the Village Planning Committee (VPC) from the review process. Mr. Richert 
described the proposal. Chair Greathouse stated that stipulations could require the 
developer to return for review. Mr. Richert stated that the applicant is not trying to 
remove the VPC from the process and described the value of the Committee’s input. 
 
Committee Member Beehler asked what would happen if WinCo backs out and 
expressed concern that undesirable uses could replace the proposed tenants. 
 
Committee Member Marcia Busching asked whether the applicant had any objection 
to providing pedestrian access on Beautiful Lane. Mr. Richert stated that such access 
would likely be required when the residential development is proposed and that the 
team would note the request. Committee Member Busching recommended modifying 
Stipulation No. 1 to remove the word “approved,” change a reference “WinCo” to “Major 
A” site, and clarify that “lots” refers to the lots depicted on the site plan. Mr. Richert 
stated that the applicant team supports the proposed changes and noted that WinCo 
had requested their name be included in the stipulation. Committee Member Busching 
recommended adding a pedestrian access point at 17th Street and Beautiful Lane 
connecting east and south. 
 
Committee Member Marchuk asked about adding a stipulation preventing excessive 
pruning of trees. Mr. Richert discussed landscape maintenance practices and stated 
that delivery-timing information is not currently available in relation to pedestrian access. 
Mr. Richert suggested that a stipulation requiring a Comprehensive Sign Package could 
be added. 
 
Committee Member Marchuk asked about the corner user. Mr. Richert stated that the 
site plan is conceptual and potential users for the corner may change. Mr. Rogers 
described the landscape ordinance requirements and enforcement for maintenance,

South Mountain Village Planning Committee 
Meeting Summary 
PHO-1-26--Z-92-23-8 
Page 4 of 14 
 
explained that specific users for the corner cannot be stipulated, and confirmed that a 
stipulation requiring a Comprehensive Sign Package could be added. 
 
Committee Member Shepard described landscape maintenance best practices.  
 
Committee Member Beehler asked what benefits the South Mountain Village offers 
the developer to justify making the requested changes. Committee Member Busching 
stated that if she were the developer, she might not want to invest in designing a site 
that could later be changed. Chair Greathouse stated that the applicant is seeking 
feedback early and need some flexibility. 
 
Committee Member Marchuk asked whether recent state law related to administrative 
design review affects the discussion. Mr. Rogers explained that the state law is the 
reason the stipulation language must be modified. Chair Greathouse asked whether 
the Committee should stipulate future review and comment of the plans. Mr. Rogers 
confirmed that they could. 
 
Committee Member Brownell noted that other hearing bodies will review the case 
after the VPC, stated that the City Council office is the primary point of influence, stated 
that the Committee still has authority to make recommendations, and that the VPC is in 
a reasonable position to approve the request. 
 
Vice Chair Viera expressed support for having cases return for review and comment. 
 
PUBLIC COMMENT 
 
JoAnne Jensen stated where she lives, explained that she was asked by the 
community to negotiate with the developer during earlier discussions, stated that the 
group had previously established a good balance, and expressed concern that 
community comments and ideas may not be carried forward. Ms. Jensen noted that 
there is significant community attention on this project, explained that the project will 
have major impacts on the area, expressed concerns regarding truck traffic, lighting 
levels, and the proposed 15-foot light-pole height. Ms. Jense stated that she serves on 
the Laveen VPC, emphasized the importance of the VPC role, and stated that it is 
unfortunate when the VPC is cut out of the process. Ms. Jensen stated that the 
presence of four gas stations and a car wash in the area does not make the site appear 
desirable and thanked the Committee for its time. 
 
APPLICANT RESPONSE 
 
Mr. Richert explained that lighting levels cannot be too low for safety reasons but that 
lighting can be shielded and stated that if trucks exit onto 19th Avenue truck-related 
issues should be minimized. 
 
FLOOR/PUBLIC DISCUSSION CLOSED: MOTION, DISCUSSION, AND VOTE

South Mountain Village Planning Committee 
Meeting Summary 
PHO-1-26--Z-92-23-8 
Page 5 of 14 
 
Chair Greathouse summarized the major goals of the project, noted that this is the 
largest site the Committee will see developed, and summarized the concerns raised by 
both the Committee and the public. 
Committee Member Marchuk stated that an 8-foot sound wall should be required and 
asked whether the Committee wanted to require future review and comment for 
subsequent development phases. Chair Greathouse stated that such a requirement 
should be included. 
 
Committee Member Darlene Jackson stated that the area needs something to soften 
the design and bring the development together, expressed hope that the trees can be 
retained, and explained that while there is community concern about the car wash use, 
landscaping can help soften the appearance. Committee Member Jackson stated that 
she likes the proposal and is glad to see WinCo locating in the area. 
 
Committee Member Marchuk stated that urgent care had been discussed as a 
potential use. Mr. Richert stated that urgent care would be an allowed use and asked 
that Committee Members send him potential user leads. Committee Member Marchuk 
stated that there is community interest in a medical use. 
 
MOTION 
Committee Member Marcia Busching made a motion to recommend approval of 
PHO-1-26--Z-92-23-8 with a modification. Committee Member Kay Shepard seconded 
the motion.  
 
Committee Member Mark Beehler requested a friendly amendment to the motion to 
require that truck traffic only access the commercial site from 19th Avenue and Baseline 
Road. Committee Member Busching and Committee Member Shepard accepted the 
friendly amendment.  
 
VOTE 
14-0, motion approval of PHO-1-26--Z-92-23-8 with a modification, passed with 
Committee Members Beehler, Brooks, Brownell, Busching, Coleman, F. Daniels, Gupta, 
Jackson, Marchuk, Muhammad Roque, Shepard, Thompson, Viera, and Greathouse in 
favor. 
 
Committee Member Fatima Muhammad Roque asked about EV charging. Mr. 
Rogers explained that a requirement regarding EV parking was included as a 
stipulation on the original rezoning case. Committee Member Brooks asked about 
modifying the stipulation regarding EV charging. Mr. Rogers explained that the 
stipulation regarding EV charging is not a part of the PHO request and cannot be 
modified.  
 
VPC RECOMMENDED STIPULATIONS: 
 
OVERALL SITE

South Mountain Village Planning Committee 
Meeting Summary 
PHO-1-26--Z-92-23-8 
Page 6 of 14 
 
1. 
THAT THE APPROVED The conceptual site plan, DATED FEBRUARY 27, 
2026 FOR THE TOTAL COMMERCIAL C-2 SITE BE FOLLOWED AND BE 
APPLIED TO THE WINCO SITE MAJOR A SITE AND ALL FUTURE LOTS 
DEPICTED ON THE CONCEPTUAL SITE PLAN DATED FEBRUARY 27, 
2026. THE elevations, and landscape plan (SEE PALETTE OF COLORS AND 
BUILDING MATERIAL AS SHOWN ON ATTACHMENTS DATED FEBRUARY 
27, 2026) BE APPLIED TO THE WINCO SITE AND ALL for future 
development of the site DEPICTED ON THE CONCEPTUAL SITE PLAN 
DATE STAMPED FEBRUARY 27, 2026. shall be reviewed and approved by 
the Planning Hearing Officer through the public hearing process, including 
review by the South Mountain Village Planning Committee, for stipulation 
modification prior to preliminary site plan approval. This is a legislative review 
for conceptual purposes only. A COMPREHENSIVE SIGN PACKAGE SHALL 
BE REQUIRED FOR THE SITE THAT INCLUDES SIGNAGE THAT 
REQUIRES TRUCK TRAFFIC ENTER AND EXIT THE COMMERCIAL SITE 
FROM ONLY 19TH AVENUE AND BASELINE ROAD. THE APPLICANT 
SHALL RETURN TO THE SOUTH MOUNTAIN VILLAGE PLANNING 
COMMITTEE FOR REVIEW AND COMMENT OF THE FINAL SITE PLAN, 
ELEVATIONS, COLORS AND PALETTES, AND LANDSCAPE PLAN FOR 
ANY PARCEL NOT PREVIOUSLY PRESENTED PRIOR TO FINAL SITE 
PLAN APPROVAL. ANY IMPROVEMENTS SHALL USE MATERIALS AND 
DESIGNS FOR HEAT MITIGATIONS. Specific development standards and 
requirements will be determined by the Planning Hearing Officer and the OF 
THE Planning and Development Department. 
 
 
2. 
The sidewalk along Baseline Road shall be a minimum of 6 feet in width and 
detached with a minimum 10-foot-wide landscape strip located between the 
sidewalk and back of curb and planted to the following standards, as approved 
by the Planning and Development Department. 
 
 
 
 
a. 
Minimum 2-inch caliper, single-trunk, large canopy, drought-tolerant, 
shade trees planted 20 feet on center, or in equivalent groupings, that 
provide shade to a minimum 50. 
 
 
 
 
b. 
Drought tolerant vegetation to achieve a minimum of 75% live coverage. 
 
 
 
 
Where utility conflicts exist, the developer shall work with the Planning and 
Development Department on alternative design solutions consistent with a 
pedestrian environment for installing the required plants. 
 
 
3. 
The sidewalk along 19th Avenue shall be a minimum of 6 feet in width and 
detached with a minimum 10-foot-wide landscape strip located between the 
sidewalk and back of curb and planted to the following standards, as approved 
by the Planning and Development Department.

South Mountain Village Planning Committee 
Meeting Summary 
PHO-1-26--Z-92-23-8 
Page 7 of 14 
 
 
a. 
Minimum 2-inch caliper, single-trunk, large canopy, drought-tolerant, 
shade trees planted 20 feet on center, or in equivalent groupings, that 
provide shade to a minimum 50 percent. 
 
 
 
b. 
Drought tolerant vegetation to achieve a minimum of 75% live coverage. 
 
 
 
Where utility conflicts exist, the developer shall work with the Planning and 
Development Department on alternative design solutions consistent with a 
pedestrian environment for installing the required plants. 
 
 
4. 
The sidewalk along South Mountain Avenue shall be a minimum of 5 feet in 
width and detached with a minimum 5-foot-wide landscape strip located 
between the sidewalk and back of curb and planted with minimum 2-inch 
caliper, single-trunk, large canopy, drought-tolerant, shade trees planted 20 
feet on center, or in equivalent groupings, that provide shade to a minimum 
50%, as approved by the Planning and Development Department. 
 
 
 
Where utility conflicts exist, the developer shall work with the Planning and 
Development Department on alternative design solutions consistent with a 
pedestrian environment for installing the required plants. 
 
 
5. 
A minimum of 10% of the required shrubs, shall be a milkweed or other native 
nectar species, and shall be planted in groups of three or more, as approved by 
the Planning and Development Department. 
 
 
6. 
A 30-foot-wide multi-use trail easement (MUTE) shall be dedicated along the 
south side of Baseline Road and a minimum 10-foot-wide multi-use trail (MUT) 
shall be constructed within the easement in accordance with the MAG 
supplemental detail and as approved or modified by the Planning and 
Development Department. 
 
 
7. 
A 30-foot-wide multi-use trail easement (MUTE) shall be dedicated along the 
north side of South Mountain Avenue and a minimum 10-foot-wide multi-use 
trail (MUT) shall be constructed within the easement in accordance with the 
MAG supplemental detail and as approved or modified by the Planning and 
Development Department. 
 
 
8. 
A minimum of 5.25 acres shall be reserved for open space, as shown on the 
conceptual landscape plan date stamped November 13, 2023. 
 
 
9. 
Where pedestrian walkways cross a vehicular path, the pathway shall be 
constructed of decorative pavers, stamped or colored concrete, or other 
pavement treatments that visually contrasts parking and drive aisle surfaces, as 
approved by the Planning and Development Department.

South Mountain Village Planning Committee 
Meeting Summary 
PHO-1-26--Z-92-23-8 
Page 8 of 14 
 
10. 
All perimeter walls visible from street right-of-way shall include material and/or 
textural differences, such as stucco and/or split face block with a decorative 
element, such as tile or stamped designs, as approved by the Planning and 
Development Department.  
 
 
11. 
A minimum of two green infrastructure (GI) techniques for stormwater 
management shall be implemented per the Greater Phoenix Metro Green 
Infrastructure and Low-Impact Development Details for Alternative Stormwater 
Management, as approved or modified by the Planning and Development 
Department. 
 
 
12. 
Commercial landscaping and common areas shall be maintained by permanent 
and automatic/water efficient WaterSense labeled irrigation controllers or 
similar smart controller to minimize maintenance and irrigation water 
consumption for all on and offsite landscape irrigation. 
 
 
13. 
Natural turf shall only be utilized on individual single-family lots (behind the 
front yard); required retention areas (bottom of basin), and functional turf areas 
located on properties for uses such as parks and residential common areas, as 
approved by the Planning and Development Department. 
 
 
14. 
A minimum 50 feet of right-of-way shall be dedicated for the east side of 19th 
Avenue, adjacent to the development. 
 
 
15. 
A minimum 30 feet of right-of-way shall be dedicated for the north side of South 
Mountain Avenue, adjacent to the development. 
 
 
16. 
A minimum 50 feet of right-of-way shall be dedicated for the full width of all 
public local streets, internal to the development.  
 
 
17. 
A minimum 5-foot-wide sidewalk shall be constructed on both sides of all public 
local streets. 
 
 
18. 
Right-of-way shall be dedicated for the connection of the internal road network 
to Gary Way on the southeastern boundary of the site. 
 
 
19. 
Crosswalks shall be placed across internal roadways separating residential and 
commercial land at significant pedestrian crossings, as determined by the 
Street Transportation Department. 
 
 
20. 
Improvements to Baseline Road shall be consistent with the Arterial CM cross 
section including the construction of a raised median. 
 
 
21. 
A Traffic Impact Analysis (TIA) shall be submitted to the City for this 
development.  No preliminary approval of plans shall be granted until the study

South Mountain Village Planning Committee 
Meeting Summary 
PHO-1-26--Z-92-23-8 
Page 9 of 14 
 
is reviewed and approved by the Street Transportation Department. The TIA 
shall include signal warrant analysis for 19th Avenue and South Mountain 
Avenue. If the approved TIA determines that a signal is warranted at this 
intersection, the developer shall be required to fund 100% of the cost and 
construct the signal.  If the TIA does not warrant the signal, the developer shall 
be required contribute 25% of traffic signal cost in an escrow account to the 
Street Transportation Department.  
 
 
22. 
All existing electrical utilities within the public right-of-way shall be 
undergrounded, adjacent to the development. The developer shall coordinate 
with the affected utility companies for their review and permitting. 
 
 
23. 
Existing SRP facilities along 19th Avenue are to be relocated outside of City 
right-of-way. Contact SRP to identify existing land rights and establish the 
appropriate process to relocate the facility. Relocations that require additional 
dedications or land transfer require completion prior to obtaining plat and/or 
civil plan review approval. 
 
 
24. 
Replace unused driveways with sidewalk, curb, and gutter. Also, replace any 
broken or out-of-grade curb, gutter, sidewalk, and curb ramps on all streets and 
upgrade all off-site improvements to be in compliance with current ADA 
guidelines. 
 
 
25. 
All streets within and adjacent to the development shall be constructed with 
paving, curb, gutter, sidewalk, curb ramps, streetlights, median islands, 
landscaping and other incidentals, as per plans approved by the Planning and 
Development Department. All improvements shall comply with all ADA 
accessibility standards. 
 
 
26. 
The property owner shall record documents that disclose the existence, and 
operational characteristics of Phoenix Sky Harbor Airport to future owners or 
tenants of the property.  The form and content of such documents shall be 
according to the templates and instructions provided which have been reviewed 
and approved by the City Attorney. 
 
 
27. 
In the event archaeological materials are encountered during construction, the 
developer shall immediately cease all ground-disturbing activities within a 33-
foot radius of the discovery, notify the City Archaeologist, and allow time for the 
Archaeology Office to properly assess the materials. 
 
 
28. 
Prior to final site plan approval, the landowner shall execute a Proposition 207 
waiver of claims form. The waiver shall be recorded with the Maricopa County 
Recorder's Office and delivered to the City to be included in the rezoning 
application file for record.

South Mountain Village Planning Committee 
Meeting Summary 
PHO-1-26--Z-92-23-8 
Page 10 of 14 
 
C-2, R-3, AND R-4 ZONED SITES (Commercial and Multifamily) 
 
 
29. 
All uncovered surface parking spaces shall be shaded to achieve a minimum 
25% shade with either structural shade, minimum 2-inch caliper size, single-
trunk, large canopy, drought-tolerant, shade trees, or a combination of the two, 
as approved by Planning and Development Department. 
 
 
30. 
A minimum of 2% of the required parking spaces shall include EV Installed 
infrastructure. A minimum of 5% of the required parking spaces shall include 
EV Capable spaces. 
 
 
31. 
Site lighting shall be provided at building entrances/exits, and in public 
assembly and parking areas, as approved by the Planning and Development 
Department. 
 
 
32. 
All public and private pedestrian pathways including sidewalks shall be shaded 
to a minimum 75%, as approved by the Planning and Development 
Department. 
 
 
33. 
Pressure regulating sprinkler heads and drip lines shall be utilized in any turf 
areas to reduce water waste. 
 
 
34. 
Only landscape materials listed in the Phoenix Active Management Area Low-
Water-Use/Drought-Tolerant Plant List shall be utilized, as approved or 
modified by the Planning and Development Department. 
 
 
C-2 ZONED SITES 
 
 
35. 
Drive-through windows adjacent to a perimeter street shall be screened by a 
minimum four-foot-tall mound, or other comparable screening, as approved by 
the Planning and Development Department. 
 
 
36. 
Bicycle parking spaces shall be provided per the requirements of Section 
1307.H of the Phoenix Zoning Ordinance through inverted U and/or artistic 
racks located near the office and installed per the requirements of Section 
1307.H of the Phoenix Zoning Ordinance. Artistic racks shall adhere to the City 
of Phoenix Preferred Designs in Appendix K of the Comprehensive Bicycle 
Master Plan. 
 
 
37. 
Bicycle parking spaces shall be shaded by a structure, landscaping, or a 
combination of the two to provide a minimum of 75% shade, as approved by 
the Planning and Development Department.

South Mountain Village Planning Committee 
Meeting Summary 
PHO-1-26--Z-92-23-8 
Page 11 of 14 
 
38. 
A minimum of 5% of the provided bicycle parking spaces shall include standard 
electrical receptacles for electric bicycle charging capabilities, as approved by 
the Planning and Development Department. 
 
 
39. 
Prior to final site plan approval, documentation shall be provided that 
demonstrates a commitment to participate in the Water Efficiency Checkup 
program for a minimum of 15 years, or as approved by the Planning and 
Development Department. 
 
 
R-3 AND R-4 ZONED SITES (Multifamily) 
 
 
40. 
Bicycle infrastructure shall be provided as described below, located in open 
space areas, near entrances of buildings, or in a secure location inside the 
building and installed per the requirements of Section 1307.H of the Phoenix 
Zoning Ordinance. Bicycle parking spaces shall be provided through inverted U 
and/or artistic racks. Artistic racks shall adhere to the City of Phoenix Preferred 
Designs in Appendix K of the Comprehensive Bicycle Master Plan, as 
approved by the Planning and Development Department 
 
 
 
a. 
The developer shall provide secure bicycle parking per Section 1307 of 
the Zoning Ordinance. 
 
 
 
 
b. 
Guest bicycle parking shall be provided at a minimum rate of 0.05 
spaces per dwelling unit, up to a maximum of 50 spaces required.  
 
 
 
 
c. 
A bicycle repair station (“fix it station”) shall be provided and maintained 
on site within an amenity area or near a primary site entrance. The 
bicycle repair station (“fix it station”) shall be provided in an area of high 
visibility and separated from vehicular maneuvering areas, where 
applicable. The repair station shall include, but not be limited to: 
 
 
 
 
 
i. 
Standard repair tools affixed to the station; 
 
 
 
 
 
 
ii. 
A tire gauge and pump affixed to the base of the station or the 
ground; 
 
 
 
 
 
 
iii. 
A bicycle repair stand which allows pedals and wheels to spin 
freely while making adjustments to the bike. 
 
 
41. 
A minimum of 10% of the provided bicycle parking spaces shall include 
standard electrical receptacles for electric bicycle charging capabilities, as 
approved by the Planning and Development Department. 
 
 
R-3 ZONED SITES

South Mountain Village Planning Committee 
Meeting Summary 
PHO-1-26--Z-92-23-8 
Page 12 of 14 
 
42. 
Perimeter fencing adjacent to 19th Avenue shall be a minimum of 50% open 
view fencing, as approved by the Planning and Development Department. 
 
 
43. 
Buildings adjacent to 19th Avenue shall have units oriented towards 19th 
Avenue and shall include individual porches or patios.  
 
 
44. 
The maximum building height shall be limited to two stories or 30 feet. 
 
 
R-4 ZONED SITES 
 
45. 
The maximum building height shall be limited to two stories or 30 feet. 
 
 
46. 
The development within the R-4 area shall be limited to a maximum of 360 
units.  
 
 
R1-10 ZONED SITES 
 
 
47. 
Building elevations shall be developed to the following standards, as approved 
by the Planning and Development Department: 
 
 
 
a. 
Building elevations shall contain multiple colors, exterior accent materials 
and textural changes that exhibit quality and durability such as brick, 
stone, colored textured concrete or stucco, or other materials to provide 
a decorative and aesthetic treatment. 
 
 
 
b. 
A minimum of 50% of the elevations for each floor plan shall provide a 
covered front porch in the front yard with a minimum of 60 square feet in 
area at a depth of at least 6 feet. No porch shall terminate within the 
plane of a door or window. 
 
 
 
c. 
Pitched roofs shall be provided on all building elevations. 
 
 
 
48. 
The maximum building height shall be limited to one story or 24 feet. 
 
 
49. 
Lots along the south perimeter shall be a minimum of 160 feet in depth.  
 
 
50. 
Lots shall be a minimum of 75 feet in width. 
 
 
51.  
Prior to preliminary plat approval, documentation shall be provided that 
demonstrates participation in the Environmental Protection Agency’s 
WaterSense certification program, or an equivalent program, as approved by 
the Planning and Development and Water Services Departments.  
 
 
52.  
A WaterSense inspection report from a third-party verifier shall be submitted 
that demonstrates successful participation in the Environmental Protection

South Mountain Village Planning Committee 
Meeting Summary 
PHO-1-26--Z-92-23-8 
Page 13 of 14 
 
Agency’s WaterSense certification program, or an equivalent program, prior to 
certificate of occupancy, as approved by the Planning and Development 
Department.   
 
 
53. 
Participation in the City of Phoenix Homeowner’s Association Water Efficiency 
Program shall be incorporated into to Covenants, Conditions, and Restrictions 
for the subdivision, prior to final site plan approval. 
 
 
54. 
Swimming pools on individual single-family lots shall be limited to 600 square 
feet in size. 
 
 
55. 
Only landscape materials listed in the Phoenix Active Management Area Low-
Water-Use/Drought-Tolerant Plant List shall be utilized in the common areas 
and within the front yards of individual residential lots, as approved or modified 
by the Planning and Development Department. 
 
 
R1-10, R-3, AND R-4 ZONED SITES (SINGLE-FAMILY AND MULTIFAMILY) 
 
 
56. 
All landscape setbacks shall be planted with minimum 2-inch caliper, large 
canopy, drought-tolerant trees, 20 feet on center, or in equivalent groupings, 
with five 5-gallon shrubs per tree, as approved by the Planning and 
Development Department. Where utility conflicts exist, the developer shall work 
with the Planning and Development Department on alternative design solutions 
consistent with a pedestrian environment for installing the required plants. 
 
 
STAFF COMMENTS REGARDING VPC RECOMMENDATION: 
 
The VPC modification to Stipulation No. 1 included several elements that include text 
changes to improve clarity, a requirement for a Comprehensive Sign Package, that the 
applicant return to the VPC for review and comment of the final site plan, elevations, 
colors and palettes, and landscape plan, and that any improvements utilize use 
materials and designs for heat mitigations. Staff recommends that the portions of the 
modification regarding a Comprehensive Sign Package, review and comment of the 
final site plan, elevations, colors and palettes, and landscape plan, and the requirement 
to utilize materials and designs for heat mitigation be separated out of Stipulation No. 1 
and be included as individual stipulations. See below for staff recommended language:  
 
1. 
That the conceptual site plan, dated February 27, 2026 for the total commercial 
C-2 site be followed and be applied to the Major A Site and all future lots 
depicted on the conceptual site plan dated February 27, 2026. The elevations, 
and landscape plan (see palett of colors and building material as shown on 
attachments dated February 27, 2026) be applied to the WinCo site and all 
future development of the site depicted on the conceptual site plan date 
stamped February 27, 2026. Specific development standards and requirements

South Mountain Village Planning Committee 
Meeting Summary 
PHO-1-26--Z-92-23-8 
Page 14 of 14 
 
will be determined by the Planning Hearing Officer of the Planning and 
Development Department. 
 
2. 
A Comprehensive Sign Package shall be required for the site that includes 
signage that requires truck traffic enter and exit the commercial site from only 
19th Avenue and Baseline Road, as approved by the Planning and 
Development Department. 
 
 
3. 
The applicant shall return to the South Mountain Village Planning Committee 
for review and comment of the final site plan, elevations, colors and palettes, 
and landscape plan prior to final site plan approval for any parcel not previously 
presented.  
 
 
4. 
Any improvements shall use materials and designs for heat mitigations.