JCH wastewater plant pumps and motors
Extracted text (via pymupdf)
5792 characters
Water Utilities Grant Stayberg Western Regional Territory Manager 4109 NE 107th St., Vancouver WA, 98686 Tel +1.503.706.0601 June 19, 2026 Re: Flygt, a Xylem Water Solutions company Kevin Voigt City of El Mirage, Utilities Maintenance To Mr. Voigt, Xylem Water Solutions, Flygt brand (Flygt) is the manufacturer of Flygt pumps and parts for your water and wastewater processes. All equipment, components and parts associated with your Flygt equipment should originate from Flygt’s Factories. Flygt, A Xylem brand solely uses James, Cooke and Hobson as its only authorized representation/direct distributor in New Mexico, Arizona and parts of Nevada (Clark County) and Texas territories. All inquiries regarding Flygt equipment and parts as well as service should be routed through James, Cooke and Hobson. Below is their contact information. This letter is in effect through an indefinite period as per their contract. If there are any changes to James, Cooke and Hobson’s contract; Flygt a Xylem brand will provide written notice. James, Cooke & Hobson Inc 3501 E Broadway Rd Phoenix, AZ 85040 Phone (602) 243-0585 If there are any questions concerning the above statement please feel free to contact me Sincerely, Grant Stayberg Grant Stayberg Western Regional Territory Manager - Water Utilities Activity # PROJECT ACTIVITY TITLE DEPT GL ACCOUNT CARRYFORWARD 62009 Court Security Remodel Court 121-5-2251-656 497,000 $ 62602 Emergency Operations Center Wall Conversion Fire 111-5-2511-656 50,000 $ 62604 Emergency Vehicle Traffic Control Signal Fire Station Fire 111-5-2513-658 255,000 $ 62612 Sundial IV Park Renovation Parks and Recreation 111-5-4562-658 450,000 $ 62515 Park Improvements Parks and Recreation 111-5-4562-658 4,500,000 $ 62613 Vehicle Replacement Program-Parks Parks and Recreation 111-5-4562-650 75,000 $ 62009 Court Security Remodel Public Works 111-5-1583-656 240,000 $ 62601 Cactus Rd. Half Street Improvements Public Works 131-5-3581-658 185,000 $ 62309 121st Ave Roadway Improvements Construction Public Works 131-5-3581-657 370,000 $ 62115 Neighborhood Traffic Calming Program (NTCP) Public Works 131-5-3581-657 1,000,000 $ 62079 Wastewater Process System Improvements Public Works 541-5-7585-655 200,000 $ 62619 WRF Facility Remodel Public Works 541-5-7585-656 119,000 $ 62623 Vehicle Replacement Program - Water Water 511-5-7115-650 75,000 $ 62065 Water Production Facility Rehabilitation Program Water 511-5-7115-656 800,000 $ 62621 Alto Well site Discharge Pipe Replacement Water 511-5-7115-673 100,000 $ 62522 Residential and Commercial Meter Replacement Project Water 511-5-7115-673 7,675,000 $ Carry-Forward FY2027 51 62079 Wastewater Process System Improvements Public Works 541-5-7585-655 $ 200,000 Project Number: 62079 Department: Wastewater Total Budgeted Capital Costs: $1,000,000.00 Type: Water and Sewer Total Budgeted Funding Sources: $1,000,000.00 Request Groups: CIP Teams: Public Works Timeline: 07/01/2025 to 06/30/2031 Request description: Capital Costs FY2027 FY2028 FY2029 FY2030 FY2031 Total Budgeted Planning $0.00 Design $0.00 Engineering $0.00 Land/Right-of-way $0.00 Construction/Maintenance $0.00 Equipment/Vehicle/Furnishings $200,000.00 $200,000.00 $200,000.00 $200,000.00 $200,000.00 $1,000,000.00 Other $0.00 Total $200,000.00 $200,000.00 $200,000.00 $200,000.00 $200,000.00 $1,000,000.00 Funding Source FY2027 FY2028 FY2029 FY2030 FY2031 Total Budgeted 149 - Special Projects $0.00 511 - Water $0.00 513 - Ranchettes $0.00 541 - Sewer $200,000.00 $200,000.00 $200,000.00 $200,000.00 $200,000.00 $1,000,000.00 148 - CDBG $0.00 111 - General $0.00 Total $200,000.00 $200,000.00 $200,000.00 $200,000.00 $200,000.00 $1,000,000.00 Account Codes (Capital Costs): 541-5-7581-657 $1,000,000.00 $1,000,000.00 Type of Project Strategic Priority Bond Eligible Grant Funding Project Status Division No No Modified Utilities Wastewater Process System Improvements This project is a multi-year program to upgrade and/or replace critical wastewater process equipment which includes the following: pumps, motors, blowers, centrifuge, belt press, filters, decanters, aerators, disinfection systems, VFD's, and PLC's. Process equipment is essential to operating the wastewater reclamation facility. The program has been in place since FY18. The program is flexible and allows staff to plan for rebuilds and replacements of specific pumps and motors and other process equipment necessary for the wastewater plant to function. Typically, staff will plan to replace between 3 to 4 system pumps. Components of specialty equipment items such as the centrifuge or belt press replacements are eligible for this project. Generally, a pump/motor/component's useful life is between 15 to 30 years. Staff will program for rebuilding of the asset for two cycles followed by replacement at the end of the useful life of the asset. This allows for the most efficient use of resources. Assets are evaluated by systematic checks from staff on a routine basis and standards from the American Water Works Association (AWWA).This program benefits the community by ensuring that the City's wastewater system remains operational. Keeping the WRF properly running with planned maintenance and replacement of critical assets will prolong the useful life of the plant while keeping the health, safety, and welfare of the community as a top priority.The 2021 National Community Survey found that 74% of El Mirage residents rate wastewater services favorably, and 91% of residents feel it is important to focus on utility infrastructure in the next two years. Modified: Added FY2031 amount. Additional Information Improvement Superior Infrastructure 72