Board of Adjustment Report 
Date 
September 2, 2026 
Case No.  
BOA26-00484 
Project Name 
Fairfield CSP 
Request 
• Special Use Permit for a Comprehensive Sign Plan 
Project Location 
Located approximately 1,600± feet west of the northwest corner of 
Signal Butte Road and the US 60 Freeway 
Parcel No(s) 
220-82-028  
 
Project Area 
2.2± acres 
Council District 
District 5 
Existing Zoning 
Limited Commercial with a 
Planned Area Development 
Overlay (LC-PAD) 
General Plan 
Designation 
Regional Center 
Applicant 
Arizona Sign and Lighting, LLC. 
Owner 
World Travel Inns X, LLC 
Staff Planner 
Kwasi Abebrese, Planner II 
Recommendation 
Staff finds that the requested Comprehensive Sign Plan (CSP) meets the required findings 
outlined in Mesa Zoning Ordinance (MZO) Section 11-46-3 and the required findings for a Special 
Use Permit (SUP) in Section 11-70-5. 
Staff recommends approval with conditions.

[2] 
Project Overview 
Request: 
The applicant is requesting a Special Use Permit (SUP) for a Comprehensive Sign Plan (CSP) 
for a hotel development located in the Limited Commercial with a Planned Area Development 
Overlay (LC-PAD) District.  
The proposed CSP will allow a total of five (5) signs comprised of four (4) attached signs and 
one (1) monument sign as well as an increase in the maximum aggregate sign area permitted in 
the Limited Commercial (LC) District from 160 square feet to 345 square feet.  
Site Context 
General Plan:  
• 
The Placetype for the project site is Regional Center and the Growth Strategy is Evolve. 
• 
Entertainment and recreation uses, including hotels, are principal land uses in the 
Regional Center Placetype. 
Zoning:  
• 
The project site is zoned Limited Commercial with a Planned Area Development Overlay 
(LC-PAD). 
• 
Per Section 11-6-2 of the MZO, a hotel is a permitted use within the LC District. 
Surrounding Zoning & Use Activity: 
Northwest 
LC-PAD 
Vacant 
North 
RM-4-PAD 
Multiple Residences  
Northeast 
RM-5-PAD 
Multiple Residences 
West 
LC-PAD 
Vacant 
Project Site 
LC-PAD 
Vacant 
East 
LC-PAD 
Vacant 
Southwest 
US 60 Superstition Freeway 
 
South 
US 60 Superstition Freeway 
 
Southeast 
US 60 Superstition Freeway 
 
Site History: 
• 
September 2, 1987: The City Council annexed 747± acres, including the project site, into 
the City of Mesa (Case No. A87-008; Ordinance No. 2250) and subsequently zoned the 
site Suburban Ranch (SR) (equivalent to current Single Residence 43 [RS-43]) (Case No. 
Z87-067; Ordinance No. 2272). 
• 
August 1, 1988: The City Council approved a rezone of 117± acres, including the project 
site, from RS-43 to RS-43 and conceptual Office Commercial (OC), Limited Commercial 
(LC), Light Industrial (LI) as well as a Development Master Plan (DMP) to allow for a future 
mixed-use development (Case No. Z88-040).  
• 
April 16, 2007: The City Council approved a rezone of 114± acres, including the project 
site, from RS-43 DMP (conceptual OC, LC, and LI) to Multiple Residence 4 (RM-4),

[3] 
Limited Commercial with a Planned Area Development Overlay (LC-PAD) and LC-PAD 
with a Bonus Intensity Zone Overlay (LC-PAD-BIZ) and a Site Plan to allow for the 
development of a regional commercial shopping center with associated residential, office 
and hotel uses (Case No. Z07-022; Ordinance No. 4689). 
• 
June 12, 2007: The Board of Adjustment approved a Special Use Permit for a 
Comprehensive Sign Plan for a mixed-use development on approximately 114 acres, 
including the project site (Case No. BA07-030). 
• 
July 8, 2020: The City Council approved a rezone of 81± acres, including the project site, 
from LC-PAD and LC-PAD-BIZ to LC-PAD, RM-4-PAD, and Multiple Residence 5 with a 
Planned Area Development Overlay (RM-5-PAD) and a Site Plan to allow for a mixed-use 
development known as “Mountain Vista Marketplace” (Case No. ZON19-00872; 
Ordinance No. 5580).  
• 
December 11, 2024: The Planning and Zoning Board approved a Site Plan to allow for 
the development of a hotel on the project site (Case No. ZON24-00782).   
Project/Request Details 
Site Characteristics: 
The project site is located approximately 1,600 feet west of Signal Butte Road and 600 feet south 
of Hampton Avenue. Also, the site is located approximately 140 feet west of South 105th Place 
and is bordered by Arizona Department of Transportation (ADOT) right-of-way and the US 60 
Superstition Freeway to the south. The site is approximately 2.2± acres in size and is currently 
being developed with a four-story hotel building with a gross floor area of approximately 44,350 
square feet. 
Access to the site is provided from a shared access road, south of 105th Place, that serves as a 
secondary connection to the Mountain Vista planned development. An internal drive is also 
proposed to connect the site to the parcel to the west. 
 
Comprehensive Sign Plan (CSP): 
The applicant is requesting a CSP to allow modifications from the Sign Ordinance to 
accommodate signage specific to the development. The proposed CSP will allow for a total of 
five (5) signs comprised of four (4) attached signs and one (1) monument sign on the project site.   
Per Section 11-43-3(D)(1) of the MZO, the maximum number of attached signs permitted in the 
LC District based on the front foot of the building occupancy is three (3). In addition, the maximum 
aggregate sign area for attached signage permitted is 160 square feet. The proposed hotel 
building has a linear frontage of approximately 180 feet. If approved, the proposed CSP will allow 
for an increase in the number of attached signs permitted in the LC District based on the front 
foot of the building occupancy from 3 to 4 as well as an increase in the maximum sign area for 
attached signage from 160 square feet to 345 square feet.  
There are no deviations requested for detached signs on the site. The proposed monument sign 
complies with all of the MZO sign standards. 
Table 1 compares the MZO standards and the proposed CSP modifications per Section 11-43-
3(D) of the MZO.

[4] 
Table 1: Standard Attached Signs 
 
Comprehensive Sign Plan MZO Section 11-46-3(D): 
Per Section 11-46-3(D) of the MZO, the Board of Adjustment must find at least one of the below  
criteria is met in order to approve a CSP.  As set forth below, based on staff’s review, staff finds 
that all of the criteria were satisfied.  
1.  Unique or Unusual Physical Conditions: The project site is located approximately 1,600 
feet west of Signal Butte Road and 600 feet south of Hampton Avenue. Also, the site is 
located approximately 140 feet west of South 105th Place and is bordered by Arizona 
Department of Transportation right-of-way and the US 60 Superstition Freeway to the 
south. The site is bordered to the north and northeast by multiple residence developments 
and a vacant parcel to the east and is primarily accessed from a shared access road 
located south of 105th  Place, which is a private street. There is limited visibility of the site 
from Hampton Avenue, which is the only public collector street access to the site. The 
proposed CSP will provide visibility of the proposed hotel on South 105th Place and the 
US 60 Superstition Freeway and ensure easy identification of the hotel building from the 
adjacent commercial developments, multiple residences and streets.  
2. Unique Characteristics of Land Use, Architectural Style, Site Location, Physical 
Scale, Historical Interest, or other Distinguishing Features: The approval of the 
proposed CSP would allow for signage that complements the architectural design of the 
proposed hotel development. The proposed CSP exhibits distinguishing features, colors 
and materials that are consistent with the approved building design on the site. 
3. Incorporation of Special Design Features: The proposed CSP includes attached signs, 
as well as a monument sign with designs and colors that are consistent with the 
architecture of the hotel building and will be well integrated with the rest of the site. The 
proposed attached signs comprised of aluminum and illuminated pan channel letters are 
designed to exhibit the brand architectural standards as well as match with the 
architectural design of the hotel development. Additionally, the proposed monument sign 
Sign 
Standards 
MZO Requirements 
Proposed CSP 
Staff 
Recommendation 
Maximum 
number of 
permitted signs 
per front foot of 
building 
occupancy (81 
– 199 feet) 
MZO Table 11-43-3-D-1: 
3 signs 
 
 
4 signs  
 
 
 
 
As proposed 
 
 
Maximum sign 
area per front 
foot of building 
occupancy (81 
– 199 feet) 
MZO Table 11-43-3-D-1: 
160 square feet 
 
345 square feet 
 
 
As proposed

[5] 
comprised of aluminum with a blue, satin finish is designed to match the architectural 
standards of the hotel and will be well integrated with the rest of the site. 
Special Use Permit: 
Per Section 11-46-3(A) of the MZO, a CSP must be approved in conjunction with an SUP.  Per 
Section 11-70-5(E) of the MZO, the Board of Adjustment must find all the below criteria are met 
for approval of a SUP.  Staff reviewed the application against the required criteria and, as set 
forth below, determined that each criterion has been met. 
 
1. Consistency with and advancement of the General Plan and other Plans/Policies: 
The proposed CSP is consistent with the goals and objectives of the General Plan. The 
proposed hotel development is consistent with the intent of the Regional Center Placetype 
and approval of the CSP will advance the goals and objectives of the General Plan by 
allowing a customized sign plan for a hotel development with a unique location and 
physical scale. 
2. Consistency of the Project’s characteristics with the Zoning District, General Plan 
and other Plans/Policies: The project site is located in a Limited Commercial with a 
Planned Area Development Overlay (LC-PAD) District. The purpose of the LC district is to 
provide areas for indoor retail, entertainment, and service-oriented businesses that serve 
the surrounding residential trade area within a one to ten-mile radius. Per Section 11-6-2 
of the MZO, a hotel is permitted in the LC zoning district. The proposed CSP is consistent 
with the location, design and operating characteristics and conforms to the goals and 
purposes of the LC zoning designation on the property. 
3. Project Impact: There will be no injurious or detrimental impact to surrounding properties 
with the proposed signage and the proposed signage will only encourage harmonic growth 
for the surrounding area. The proposed signs will not be overbearing in size, and will not 
flash, blink, animate or emit any noise. 
4. Adequate Public Services, Facilities, and Infrastructure: The City of Mesa utilities and 
public infrastructure are available to serve the proposed project. 
Findings: 
A. The project site is zoned LC-PAD. 
B. The proposed CSP will allow for an increase in the maximum number of attached signs 
permitted in the LC District based on the front foot of building occupancy from 3 to 4 as 
well as an increase in the maximum aggregate sign area for attached signage from 160 
square feet to 345 square feet. 
C. The proposed CSP meets all of the criteria for a Comprehensive Sign Plan outlined in 
Section 11-46-3(D) of the MZO. These include the following: 
1. The development site contains unique or unusual physical conditions that would 
limit or restrict normal sign visibility from East Hampton Avenue, which serves as 
the only public street access to the site. 
2. The proposed CSP exhibits unique architectural style and distinguishing features 
including colors and materials that are consistent with the approved building 
design on the site. 
3. The proposed signage incorporates special design features that reinforce or are 
integrated with the building architecture. The proposed signs comprised of 
aluminum and illuminated pan channel letters are designed to exhibit the brand

[6] 
architectural standards of the hotel development and will be well integrated with 
the rest of the site. 
D. Moreover, the proposed CSP meets the criteria for a Special Use Permit outlined in 
Section 11-70-5(E) of the MZO. These include the following: 
1. The proposal is consistent with and advances the goals and objectives of the 
Regional Center Placetype of the 2050 General Plan by allowing a customized 
sign plan for a hotel development with a unique location and physical scale.  
2. The proposed CSP is consistent with the location, design and operating 
characteristics and conforms to the goals and objectives of the LC zoning 
designation on the property.  
3. The proposed signs will not be injurious or detrimental to the surrounding area or 
to the general welfare of the City of Mesa. The proposed signs will not be 
overbearing in size, and will not flash, blink, animate or emit any noise. 
4. Adequate public services, public facilities and public infrastructure are available 
to serve the proposed project. 
Citizen Participation 
The applicant conducted a Citizen Participation process, notifying surrounding property owners.  
Required Notification: 
1. Property owners within 500 feet of the project site were notified of the public hearing.  
2. Neither the applicant nor staff has received any comments or concerns from surrounding 
property owners on the proposed project.  
Conditions of Approval 
Staff recommends approval of the Special Use Permit for a Comprehensive Sign Plan based on 
the findings above and subject to the following conditions: 
1. Compliance with the final sign plan as submitted. 
2. Compliance with the Mesa Zoning Ordinance, including all applicable City development 
codes and regulations. 
3. Compliance with all requirements of the Development Services Department regarding the 
issuance of building permits.  
4. Any sign components that become deteriorated, damaged, or weakened shall be 
promptly repaired or replaced. 
5. All signage to be reviewed and approved through a separate sign permit application.  
Section 11-70-5 of the MZO allows for a revocation process if any condition, stipulation, or term 
of the approval of the SUP has been violated.  In addition to the conditions of approval above, 
approval of the SUP is conditioned on the information provided by the applicant at the public 
hearing and in the application (including any accompanying narrative and other supplemental 
materials) not being false or materially misleading at the time of approval. 
Exhibits 
Exhibit 1 – Vicinity Map

[7] 
Exhibit 2 – Project Narrative 
Exhibit 3 – Site Plan 
Exhibit 4 – Comprehensive Sign Plan 
Exhibit 5 – Power Point Presentation