Staff Report

City of Mesa — City Council (2026-09-14)

View PDF Meeting page

Extracted text (via pymupdf) 55413 characters
City Council Staff Report 
 
Date 
August 31, 2026 
Case No.  
ZON25-00891 
Project Name 
Legacy Park 
Request 
 
Rezone 196.3± acres from Light Industrial (LI) to Planned Community 
(PC) District to allow for the development of a mixed-use planned 
community. 
Project Location 
Located at the northeast corner of South Ellsworth Road and East Williams 
Field Road 
Parcel No(s) 
313-25-953 
304-35-004E 
313-25-859U 
313-25-869W 
 
Project Area 
196.3± acres (Site) 
Council District 
District 6 
Existing Zoning 
Located in Maricopa County - Light 
Industrial (IND-2); upon annexation 
will be Light Industrial (LI)  
Proposed Zoning 
Planned Community (PC) District 
General Plan 
Designation 
Regional Center with an Evolve 
Growth Strategy 
Applicant 
Susan Demmitt/Dennis Newcombe, Gammage & Burnham 
Owner 
Pacific Proving LLC 
Staff Planner 
Nana Appiah, Development Services Director 
Mary Kopiaske-Brown, Planning Director 
Mallory Ress, Senior Planner

[2] 
Recommendation 
Staff finds that the Proposed Project is consistent with the Mesa 2050 General Plan, the purposes 
and intents of the Planned Community (PC) District from Mesa Zoning Ordinance (MZO) Section 
11-11-1, the land use and development regulations for the PC District from MZO Section 11-11-2, 
the evaluation criteria from MZO Section 11-11-3 for a PC District, and the proposed Community 
Plan meets the requirements of MZO Section 11-11-4. 
Staff recommends approval with conditions. 
Planning & Zoning Board Recommendation:  
On August 26, 2026, the Planning and Zoning Board voted (7-0) to recommend with conditions 
that City Council approve the proposed project.  
Project Overview 
Request: 
The applicant is requesting approval of a rezoning for 196.3± acres from Light Industrial (LI) to 
Planned Community (PC) District to allow for the development of a mixed-used planned 
community (Proposed Project) and approval of the associated Community Plan (Plan). 
Concurrent Applications: 
Annexation: A City Council hearing is scheduled for September 14, 2026, to review the request 
for annexation of the 196.3± acre project site (ANX25-00893). Upon annexation into the City, the 
project site would be zoned Light Industrial (LI). 
Plats: 
Preliminary Plat: The applicant will submit a preliminary plat for the proposed project site. 
Site Context 
General Plan:  
 
The Placetype for the subject site is Regional Center; the Growth Strategy for the subject 
site is Evolve. 
 
Planned Community (PC) District is a listed Zoning District under the Mesa 2050 General 
Plan for the Regional Center Placetype. 
 
Principal Land Uses in the Regional Center Placetype include Retail, Personal Services, 
Eating and Drinking Establishments, Entertainment and Recreation, Convenience 
Services, and Business Office. Supporting Land Uses include Public/Semi-Public, Multi-
Family Residential, Medical Facilities, and Light Industrial.

[3] 
 
The Proposed Project provides for an initial phase of mixed-use development that will 
create a core of uses such as Commercial Entertainment, Retail Sales, Restaurants, Multi-
Family Residential, and Parks and Recreation Facilities. Additional permitted uses include 
Hotels, Business and Professional Offices, Medical and Dental Offices, Personal Services, 
Research and Development, and other uses consistent with the General Plan. 
 
The Proposed Project is consistent with the Regional Center Placetype and furthers the 
implementation of, and is not contrary to, the Vision, Guiding Principles, Strategies, and 
applicable elements of the Mesa 2050 General Plan. 
 
Supporting General Plan Strategies: 
o LU1. Promote a balance of land uses to enhance the quality of life for current and 
future generations. 
o LU2. Create opportunities for placemaking in neighborhoods that reinforce their 
unique character and sense of place. 
o LU4. Create design and development standards that improve the City’s visual quality, 
urban form, and function to enhance the quality of life for current and future 
generations. 
o LU5. Encourage the development of vibrant activity centers in downtown and 
throughout the City. 
o H1. Create more opportunities for housing options. 
o H3. Create more opportunities for high-end and executive housing to meet the needs 
of Mesa’s expanding economy. 
o PO1. Provide a diverse range of neighborhoods, community, and regional parks 
within one-half mile of all residential areas. 
Sub-Area Plan: 
 
The project site is located in the Mesa Gateway Strategic Development Sub-Area within 
the Airport/Campus district. 
 
The Airport/Campus district is envisioned as a mixed-use district with high-intensity and 
pedestrian-oriented development comprised of employment uses and uses that support 
the needs of travelers and visitors to the surrounding community. High density residential 
uses may also be integrated. This area is the hub of visitor activity and creates the first and 
last impression visitors have of the community requiring the area to provide a very high-
quality image.  
 
The Proposed Project is planned as a high-quality, high-intensity, mixed-use destination 
that will integrate office, residential uses, hospitality, including a resort-level hotel, and 
retail, all within a pedestrian-oriented environment. 
 
The Proposed Project is consistent with the Airport/Campus district and furthers the 
implementation of, and is not contrary to, the vision and goals of the Mesa Gateway 
Strategic Development Plan.

[4] 
Zoning:  
 
The project site is the subject of a concurrent annexation request, which if approved, will 
provide the equivalent zoning district Light Industrial (LI). 
 
The applicant is requesting to rezone the site to Planned Community (PC) District. The 
rezoning request will adopt a Community Plan (Plan) which establishes the permitted and 
conditional uses, development standards, and certain project specific administrative 
processes for the subject site.  
Surrounding Zoning & Use Activity: 
The proposed mixed-use planned community is compatible with surrounding land uses, which 
include the Mesa Gateway Airport, Single-Family Residential, Commercial Recreation, and other 
commercial uses. 
Northwest 
(Across Ellsworth Rd. and 
State Route 24) 
AG 
Vacant 
North 
(Across State Route 24) 
PC 
Commercial Development  
Northeast 
(Across State Route 24) 
PC 
Single-Family Residential  
West 
(Across Ellsworth Rd.) 
LI-PAD-CUP 
Mesa Gateway Airport 
Project Site 
LI 
Vacant 
East 
(Across State Route 24) 
PC 
 Single-Family Residential 
Southwest 
(Across Ellsworth Rd. and 
Gateway Blvd.) 
LI-PAD 
Mesa Gateway Airport 
South 
(Across Williams Field Rd.) 
LI 
Commercial Recreation 
Southeast 
(Across Williams Field Rd.) 
LI 
Vacant (future commercial 
development) 
Project/Request Details 
Planned Community (PC) District Designation: 
The applicant is requesting to rezone the property (concurrent with an annexation request) from 
LI to PC for a mixed-use planned community development. Per MZO Section 11-11-1, the purpose 
of the PC District is to accommodate large-scale, unified and comprehensively planned 
developments through flexible standards that support innovative, high-quality residential and non-
residential uses consistent with the Mesa General Plan.  
The Proposed Project achieves the purpose and intent of MZO Section 11-11-1, by including 
regulations related to shade, mitigating urban heat, innovative building and landscape design, 
public amenities, and site-specific features.

[5] 
The Proposed Project will result in a cohesive mixed-use center with housing, employment, 
services, parks, open space and recreational uses accessible by walking, bicycling, and other 
transportation modes. 
Summary of the PC District 
The PC District is governed by the adopted Community Plan. The Community Plan is summarized 
by chapter below. 
Chapter 1 – Introduction 
Legacy Park is envisioned as a mixed-use destination that brings together residential, office, 
retail, dining, hospitality, open space, and civic gathering uses within a coordinated development 
framework and requirements of master technical reports.  The 196.3± acre project site is located 
at Ellsworth Road, Williams Field Road and SR-24 (Site). Design Principles for the Proposed 
Project include Design Principle 1 – Mixed-Use Community; Design Principle 2 – Walkable and 
Connected Community; and Design Principle 3 – Flexibility. 
Chapter 2 – The Legacy Park Plan 
To provide for flexibility and mixed-use outcomes, the Site will only have one Development Unit. 
The Plan simultaneously acts as the Community Plan and the Development Unit Plan – both are 
required for the PC District. There is one Land Use Group (Mixed-Use) that seeks to: create a 
dynamic, pedestrian oriented development; encourage flexible design that responds to market 
demands; and promote walkable design throughout the site. 
Chapter 3 – Permitted Uses and Land Use Budget 
Permitted uses include a broad range of residential, commercial, office, hospitality, civic, 
education and employment uses. An overall land use budget sets a maximum of 2,400 dwellings 
and 6.7 million square feet of non-residential floor area for the Proposed Project. Additionally, 
along SR-24, a Residential Limitation Area is established that caps residential uses at 40% of net 
developable land. 
The Proposed Project includes market-responsive phasing with flexible sequencing that 
maintains consistency with the overall vision and planning parameters. 
Chapter 4 – Development and Design Standards for Specific Uses 
The Plan establishes Development Standards for uses that are not defined or specifically 
regulated by the MZO. One such use that is not identified in the MZO is Signature Commercial, 
which is anticipated to be a key component of the Proposed Project. Signature Commercial 
applies to developments on sites of 12 acres or more with any individual user exceeding 80,000 
square feet. Signature Commercial will be required to provide a continuous, accessible pedestrian 
network with a minimum width of five feet, to connect buildings, parking, open spaces, and 
amenities.

[6] 
The pedestrian network must incorporate parking-lot pedestrian routes and a minimum of three 
pedestrian amenities (enhanced paving, shade, lighting, seating, public art, landscaping, or 
wayfinding). Shading is required for a minimum of 50% of on-site walkways using trees or shade 
structures. Enhanced arrival or monument features are required as is a unified architectural theme 
throughout buildings, landscaping, signage, lighting, pad developments, and site circulation. 
The Plan also establishes Development Standard for uses where the proposed standards differ 
from those established in the MZO. These include standards for Home Occupations, Live-Work 
Units, Outdoor Eating Areas, Temporary Uses, etc. 
Chapter 5 – Key Site Design Elements 
The Boulevard 
“The Boulevard” is a mixed-used pedestrian-oriented area that includes a main corridor and lateral 
extensions that extend pedestrian connections through the use of paseos, plazas, and open 
space connections. 
The Boulevard will consist of a minimum six-foot-wide clear pedestrian path and an adjacent 
pedestrian amenity zone. Amenities may include outdoor seating, public art, small gathering 
spaces, decorative paving, retail display zones, wayfinding elements, and other similar amenities.  
Architectural Standards: 
The Plan provides specific architectural standards for The Boulevard that are intended to provide 
consistency between multiple property owners and future development to maintain its overall 
vision. Buildings are required to be located close to designated pedestrian areas, with at least 
50% of ground floor facades abutting the frontage. Ground floor facades must incorporate 
variations in wall planes every 40 linear feet and a minimum of three distinct exterior materials or 
glazing to provide visual interest. Building design is also intended to contribute to pedestrian 
shade through such as awnings and recessed openings, as well as shade provided from the 
placement of buildings themselves.  
Pedestrian Area Landscape Standards: 
A tree canopy is proposed along The Boulevard to provide additional shade, and hardscape 
materials may be designed to reduce heat gain. Landscape areas may be located adjacent to 
roadways, within plazas, adjacent to building frontages, or within other pedestrian oriented areas 
to support shade, pedestrian comfort and streetscape character.  
Pedestrian and Architectural Lighting Standards:  
Pedestrian-scale lighting must be provided along sidewalks, storefronts, plazas, paseos, and 
other The Boulevard pedestrian areas. Development must use a minimum of two types of lighting 
such as street, pedestrian-scale, building-mounted, accent, landscape, or architectural lighting 
that illuminates entrances, storefronts, dining areas, intersections, and gathering spaces.  
Lighting design should be coordinated across adjoining properties to create a consistent 
streetscape.

[7] 
Signage Standards: 
Signage on The Boulevard storefronts may use varied sign types, colors, materials, typography, 
illumination, and mounting methods to create distinct tenant identities, provided each sign 
complements its building and is pedestrian-scaled. Signs must preserve clear and accessible 
pedestrian routes, required access, and sight visibility; illuminated signs must minimize glare and 
impact on nearby residences.  
Public art, murals, and specialty graphics may also be incorporated, subject to the applicable 
signage requirements. 
The Park 
Amenities: 
The initial phase of the development includes a 20+ acre park (The Park) that is the central 
organizing, recreational, and visual element of the Plan. The Park will include a minimum eight-
foot-wide primary pedestrian route that will connect major Park access points, gathering areas, 
and adjacent pedestrian connections. It includes a minimum of four shaded seating nodes with 
distinct amenities such as play areas, sports facilities, gardens, plazas, public art, trails, shade 
structures, or gathering spaces.  
Planting and Landscape Standards: 
The Park will feature a coordinated landscape design that supports pedestrian routes, gathering 
and seating areas, open-space features, shade, screening, event programming, open views, and 
long-term maintenance. Plantings may be clustered and may include trees, understory vegetation, 
turf or flexible lawns, raised planters, seat walls, container plantings, gardens, accent plantings, 
and landscaping associated with water features or overlooks. No fixed shrub-to-tree ratio applies, 
but landscaping must be coordinated with lighting, structures, utilities, access, and visibility 
without obstructing pedestrian or emergency routes. 
Lighting Standards: 
Lighting will support pedestrian safety, visibility, wayfinding, and evening use of the Park with 
pedestrian-oriented lighting along the primary route and illumination at access points, gathering 
areas, shade structures, and other activity areas to create an attractive and safe atmosphere.  
Lighting types include bollards, pedestrian-scale poles, integrated downlighting, accent or public-
art lighting, linear lighting, landscape lighting, or structure-mounted fixtures. Seating areas will be 
illuminated, and lighting coordinated with the Park design to minimize glare and light trespass. 
Resort Area 
The Resort Area is envisioned as a distinctive, guest-oriented destination that integrates 
hospitality, dining, events, recreation, and outdoor amenities within a coordinated, climate-
responsive setting. The Resort Area is intended to create a welcoming arrival experience, 
encourage connections between indoor and outdoor spaces, and complement The Park and 
surrounding development.

[8] 
Site Design Standards: 
The Resort Area will include a welcoming, memorable guest arrival experience through a clearly 
defined arrival sequence connecting internal streets, parking areas, pedestrian routes, building 
entrances, and service areas. Primary arrival areas will serve as focal points that reinforce the 
Resort Area’s identity and connect buildings with outdoor amenity and gathering spaces. Each 
primary arrival area will include a minimum of two unique features, such as a porte cochere, shade 
element, decorative paving, seating, landscaping, lighting, signage, public art, water feature, or 
outdoor gathering area, while maintaining safe pedestrian and accessible circulation. 
Buildings may be up to 94 feet in height, subject to airport height restrictions. Minimum setbacks 
are 10 feet, with at least 10 feet of separation from resort and other commercial buildings and 20 
feet from residential buildings. A minimum of five percent of the net resort development site must 
be provided as common open space. 
Architecture Standards: 
The Resort Area architecture creates a durable, guest-oriented, and climate-responsive character 
that allows for flexibility in style, branding, and building form. Primary frontages will include a 
minimum of two unique architectural features, and primary entrances require a minimum of two 
enhanced entry features. Buildings will incorporate shade, durable materials, indoor-outdoor 
connections, and solar-responsive treatments. Amenity structures, freestanding pads, and 
restaurants may have distinct designs but must remain coordinated with the overall resort through 
compatible materials, colors, forms, landscaping, lighting, and pedestrian connections. 
Chapter 6 – Site Development and Design Standards 
General Site Development and Design Standards provided in Chapter 6 apply to all development 
within the Site, unless a more specific standard is stated in Chapter 5, or Chapters 7 through 10. 
Development Standards 
Building Height: 
The Plan establishes three Height Zones allowing for a maximum building height of 150 feet 
(Height Zone 1), 94 feet (Height Zone 2), 86 feet (Height Zone 3). Height Zone 1 runs from the 
northwest corner of the Site to southeast corner of the Site along the SR-24 boundary. Height 
Zone 2 is central to the site. Height Zone 3 meets Height Zone 1 and runs north to south along 
the Site boundary with Ellsworth Road then turns east along the Site boundary with Williams Field 
Road and meets Height Zone 1 at the east side of the Site. Maximum heights are further organized 
by the following land uses and maximum heights: Multi-Family, 86 feet; Vertical Mixed-use, 90 
feet; Commercial, 150 feet; Office, 150 feet. Building height will be reviewed at the time of 
Development Plan review and is subject to airport height limitations. 
Parking: 
The initial phase of development includes a parking structure to support the proposed uses. On-
street parking is also planned for a portion of The Boulevard. The Park will also provide a minimum 
of 30 parking spaces. Further, Plan Section 6.G General Parking Development and Design 
Standards provides the required parking spaces by use, which are calculated on the gross floor

[9] 
area for a specific use. The Plan provides for flexibility in achieving parking requirements by 
allowing for the approval of a District Parking plan, Shared Parking plan, or parking reduction 
where the applicant demonstrates that adequate parking will be available to serve the proposed 
development.  
Multi-family developments are required to provide a minimum of one covered parking space per 
unit, which may include carports or garages.  
Bicycle and micromobility parking will generally be located adjacent to parking structures, civic 
spaces, trailheads, parks, open space areas, and other activity centers.   
Design Standards 
Architectural Standards: 
Primary building entrances shall include a minimum of two design features such as canopy, 
recessed entry, change in building massing and landscape improvements like planters or seat 
walls. For buildings three stories or more, the primary building entrance shall include a minimum 
of one multi-story or vertical design feature that emphasizes the entrance beyond the ground floor. 
A minimum of 20% ground-floor transparency is required for non-residential, multi-family and 
mixed-use buildings at primary building elevations that face a public or private street, primary 
pedestrian route, plaza, or common open space intended for public, customer or resident use.  
High-quality primary exterior materials are required such as fiber cement siding, stone, 
architectural metal, glazing and storefront systems, tile and brick. Color palettes shall reflect 
desert tones, natural materials, and regional architectural influences. Four-sided architecture is 
also required. 
Landscaping Standards: 
The Plan provides a suggested plant palette with tree species including The Plan provides a 
suggested plan palette with tree species, for a diversity of landscaping options.  
An average 12-foot-wide foundation base is required at building facades with a public entrance, 
and a minimum five-foot-wide foundation base is required along walls without a public entrance. 
Enhanced planting areas will be incorporated near building entrances, gathering areas, and 
pedestrian spaces to create visual interest and reinforce entry features.  
The Plan provides planting requirements for arterial, collector, and local roads with one tree and 
six shrubs per 25 linear feet of street frontage for arterial and collector roads, and one tree and 
four shrubs per 25 linear feet of street frontage for local roads (public or private). 
Pedestrian Circulation: 
The Plan establishes a coordinated system of paths, trails, paseos, and pedestrian connections. 
Within the internal core of the Site, the circulation network is designed primarily to support 
pedestrian movement between buildings, The Boulevard and lateral extensions, The Park, and 
other activity areas. 
The plan focuses on pedestrian comfort and open space quality requiring a minimum of 50% of 
paths, including sidewalks and detached pedestrian paths located within or adjacent to roadway

[10] 
corridors, which shall be shaded by tree canopy, shade structures, projecting canopies, covered 
walkways, building orientation, or similar techniques. 
An eight-foot-wide multi-use trail will be constructed along SR-24, which will connect to a six-foot-
wide detached sidewalk along Ellsworth and Williams Field roads.  
To enhance connectivity, safety, and convenience between the Site and destinations south of 
Williams Field Road, a grade-separated pedestrian crossing is planned as part of the long-term 
development of the Site. 
Lighting: 
Lighting throughout the Site shall function as a coordinated system composed of multiple layers 
to support safety, visibility, pedestrian comfort and placemaking. Lighting shall incorporate a 
variety of fixture types and lighting techniques appropriate to the architectural style, intensity, and 
character of each development. Lighting elements may include pedestrian-scaled fixtures, 
decorative street lighting, accent lighting, building mounted lighting or integrated landscape 
lighting. Lighting shall be designed and shielded to minimize glare, light trespass, and light 
pollution. 
Screening: 
Screening shall be designed as an integrated component of the Site and building design that 
organizes views, defines site edges, and supports transitions between differing land uses and 
development intensities. The Plan provides screening requirements for truck docks, loading, and 
services areas, trash and refuse collection areas, surface parking areas, parking structures, 
outdoor storage, and mechanical equipment. 
Requirements for screening where mixed-use or non-residential development is located adjacent 
to single-family residential development is provided to ensure that site design incorporates 
thoughtful transition strategies that respond to differences in scale, intensity, and activity.  
Chapters 7-10 - Design Standards and Guidelines (Multi-Family, Vertical Mixed-
Use, Commercial, Office) 
The standards in these chapters establish location specific development and design standards, 
which supplement the applicable standards in Chapter 6. Standards not addressed in these 
chapters remain subject to the otherwise applicable standards in the Plan. 
Multi-Family 
Development Standards: 
Multi-family developments require a minimum one-acre lot size. The maximum allowed height is 
86 feet, subject to airport height limits. Each dwelling unit is required to have one covered parking 
space.  
Design Standards: 
Building form shall be organized around pedestrian-oriented elements such as porches, balconies 
or courtyards and building orientation shall reinforce a compact, walkable neighborhood pattern. 
Architectural Standards:

[11] 
Garage doors are required to be integrated into the overall architecture of the building and shall 
not be the dominant feature of a primary building elevation. To achieve this a minimum of two 
design features such as recessed garage doors, architectural projections or recesses around the 
doors, canopies or trellises, or individual garage doors are required. Repetitive garage-dominant 
streetscapes along the public realm are prohibited.  
Buildings with ground-floor entry adjacent to public streets, private streets, common open space, 
or pedestrian paths shall incorporate a minimum of one design feature that engages with these 
areas such as a front porch, covered patio, entry courtyard or individual garden entry.  
Open Space Standards: 
A minimum of five percent of the net development area is required to be provided as common 
open space. The common open space shall be directly accessible from residential building, 
connected to internal pedestrian circulation network, integrated with the broader system of paths 
and trails and shall include a minimum of three amenities such as community clubhouse, dog 
park, community garden, bicycle repair station, or play structures. 
Private open space is required for a minimum of 75% of dwelling units with each private open 
space area required to be a minimum of 45 square feet. The private open space requirement may 
also be satisfied through enhanced common open space such as pool amenity area, rooftop 
decks, or other designated common open space areas that provide an equivalent or greater level 
of resident amenity and functionality. 
Vertical Mixed-Use 
Development Standards: 
The minimum lot area for Vertical Mixed-Use is established through the building area, parking 
requirements and setback requirements with a minimum required lot width of 50 feet and a 
maximum building height of 90 feet, subject to airport height limits. There is no minimum required 
mix of uses within individual buildings or developments. 
Design Standards: 
Buildings shall be oriented toward public streets, private streets, parks, or other publicly 
accessibly open spaces when such features are adjacent to the development. Ground floor 
frontages adjacent to the public realm are required to create an active and engaging relationship 
with the adjacent publicly accessible open spaces by providing a minimum of one design feature 
such as outdoor seating areas, entry courtyards, public art or landscape features. 
Architectural Standards: 
Buildings are required to incorporate a minimum of three exterior materials such as brick, 
architectural steel, fiber cement siding or stone. Additionally, primary building elevations are 
required to incorporate a minimum of three architectural features such as recessed or projecting 
wall planes, balconies or terraces, architectural lighting, public art integrated into the building 
architecture, and shade panels or similar architectural sunshades. 
Where a building has two or more principal uses, transitions between building uses shall be 
integrated into the overall architecture by incorporating a minimum of two features such as

[12] 
changes in building material, architectural banding, changes in wall plane, or changes in window 
rhythm or glazing pattern. 
Buildings are required to incorporate climate responsive design using features such as roof 
overhangs, recessed windows or building entries, architectural sunshades, fins or shade panels, 
or balconies or terraces that provide building or pedestrian shading. 
Open Space Standards: 
A minimum of five percent of the net development is required as common open space, and a 
minimum of 75% of the total dwelling units provided shall have a minimum of 45 square feet of 
private open space. Common open space shall be based on the mix of use types provided in the 
building and shall incorporate a minimum of four amenities such as outdoor work lounge, rooftop 
pool, water feature, seating node, or electric bicycle charging station. Private open space 
requirements may be satisfied with shared residential open space, so long as the shared space 
provides an equivalent or greater level of resident amenity and functionality. 
Landscaping Standards: 
Flexibility in landscaping requirements is permitted for vertical mixed-use developments allowing 
for plant materials to be clustered or grouped to accommodate areas such as easements, utilities, 
outdoor dining, or public art, provided that the required quantity of plant material is redistributed 
elsewhere throughout the development.  
Commercial  
Development standards 
The minimum lot area for Commercial uses is established through the building area, parking 
requirements and setbacks with a maximum building height of 150 feet, subject to airport height 
limits. Front, side (internal and street), and rear setbacks are required to be a minimum of 10 feet. 
The required building separation is 10 feet to another commercial building and 20 feet to a 
residential building. 
Design Standards 
Freestanding pad developments, if incorporated into the commercial development, shall be 
integrated into the overall site design through coordinated building placement, parking layout, 
pedestrian circulation, landscape improvements, lighting, screening, and building architecture. 
Internal vehicle and pedestrian connections shall be provided between freestanding pad 
developments and surrounding commercial development, where practical.   
Architectural Standards: 
Primary building entrances shall incorporate a minimum of three features such as recessed or 
projecting wall planes, canopies or roof projections, architectural lighting, decorative screens or 
similar architectural sunshades. Primary building elevations shall incorporate a minimum of one 
of the following massing elements a minimum of every 80 feet: Horizontal or vertical building 
projection or recess; change in building height or parapet height; exterior material change; change 
in roof form; or architectural frame or projecting element. Primary building elevations shall also

[13] 
provide a minimum of three exterior materials such as tile or similar accent materials, stone, pre-
cast concrete, architectural steel, fiber cement siding or glazing and storefront systems. 
Buildings are required to incorporate climate responsive design features that respond to solar 
exposure and support occupant and pedestrian comfort. A minimum of one of the following shall 
be incorporated at the south and/or west elevations: roof overhangs; canopies or awnings; 
trellises or shade structures; recessed windows or recessed building entries; or architectural 
sunshades, fins or decorative screens. 
Landscaping Standards: 
Flexibility in landscaping requirements is permitted for Commercial developments allowing for 
plant materials to be clustered or grouped to accommodate areas such as easements, utilities, 
outdoor dining, or public art, provided that the required quantity of plant material is redistributed 
elsewhere throughout the development.  
Open Space Standards: 
A minimum of five percent of the net site area is required to be common open space that must be 
located to support employees and customers and be integrated into building entrances, primary 
pedestrian routes or outdoor activity areas. Pedestrian walkways that connect multiple building 
shall incorporate landscape improvements, shade, seating, lighting, decorative paving, or similar 
pedestrian-oriented site improvements. A minimum of three amenities shall be provided within the 
required common open space area(s) such as outdoor seating, public art, water feature, or 
pollinator garden. 
Lighting Standards: 
Pedestrian oriented lighting is required for primary pedestrian routes, building entrances, outdoor 
dining areas, outdoor seating areas, plazas, common open space and other publicly accessible 
outdoor spaces. Lighting serving loading areas, service areas, trash enclosures, and other 
operational functions shall be designed to support safety while minimizing glare and visual impact 
to adjacent publicly accessible open spaces.  
Office 
Development Standards 
The minimum lot area for Office uses is established through the building area, parking 
requirements and setbacks with a maximum building height of 150 feet, subject to airport height 
limits. Front and rear setbacks are permitted at zero feet and internal side or street side setbacks 
are required to be a minimum of 10 feet.  
Design Standards 
Architectural Standards: 
Primary building elevations shall incorporate a minimum of three architectural features such as 
recessed or emphasized building entry, canopy or arcade, change in exterior material or texture, 
or integrated public art. Building entrances may incorporate entry plaza, outdoor work lounge, 
employee gathering areas, landscape planters or seat wall. Additionally, office buildings shall be 
designed to support connections between interior workspaces and outdoor employee amenities,

[14] 
where provided. For example, where a building directly abuts an outdoor work lounge or 
courtyard, the adjacent building frontage shall incorporate a minimum of one feature such as 
windows oriented toward the outdoor area, operable folding or sliding doors open to the outdoor 
area, or architectural frame or portal. 
Primary building elevations shall incorporate a minimum of one of the following massing elements 
a minimum of every 80 feet: Horizontal or vertical building projection or recess; change in building 
height or parapet height; exterior material change; change in roof form; or architectural frame or 
projecting element. Primary building elevations shall also provide a minimum of three exterior 
materials and glass may be counted as one exterior material.  
Buildings are required to incorporate climate responsive design features that respond to solar 
exposure and support employee and pedestrian comfort. A minimum of two of the following shall 
be incorporated at the south and/or west elevations: roof overhangs; canopies or awnings; 
trellises or shade structures; recessed windows or recessed building entries; or architectural 
sunshades, fins or decorative screens. 
Landscaping Standards: 
Flexibility in landscaping requirements is permitted for Office developments allowing for plant 
materials to be clustered or grouped to accommodate areas such as easements, utilities, outdoor 
dining, or public art, provided that the required quantity of plant material is redistributed elsewhere 
throughout the development. Pedestrian paths, primary building entrances, outdoor employee 
gathering areas, etc., shall incorporate shade using any of the following: shade trees, pergolas, 
trellises, building overhangs and similar shade elements.  
Open Space Standards: 
Common open space shall be designed to support employee wellness, collaboration, outdoor 
work, informal gathering, passive recreation, and campus identity. A minimum of four different 
amenities shall be provided such as outdoor fitness area, walking loop, pollinator garden, shade 
tree grove or electric bicycle charging station.  
Lighting Standards: 
Lighting shall be designed to reinforce campus character within the Office area to support 
employee safety, pedestrian circulation, wayfinding, and building identity. Pedestrian-oriented 
lighting is required along areas such as primary pedestrian pathways, primary building entrances, 
outdoor employee gathering areas, and other pedestrian or employee oriented outdoor spaces. 
Screening Standards: 
Screening shall be integrated into the overall architecture of the site and reinforce campus identity. 
Service areas, loading areas, trash and recycling enclosure and similar operational elements shall 
be designed to minimize visibility from public and private streets, primary building elevations, 
pedestrian pathways and other publicly accessible or employee-oriented outdoor spaces.  
Chapter 11 – Signage Development and Design Standards 
Signage standards for permanent attached and detached signage, and temporary signs, are 
provided in the Plan to ensure safety, readability, and aesthetic quality within the Site. A two-tier

[15] 
approach to permitting signage allows signs which meet permitted values listed in the Plan to 
proceed directly to permitting, while signage that is above the permitted value and below the 
maximum value requires administrative review and approval through a Sign Plan. Sign Plans shall 
provide a high-quality design and must respond to a minimum of one of the following: Unique 
physical conditions; Distinguishing characteristics or land use, architectural style, or other similar; 
or Special design features that complement the building or development.  
Electronic Message Centers may only be approved under a Sign Plan. Modifications to Sign Plans 
require an accompanying letter of approval from the Master Developer.  
There are two existing l billboards on the Site that are governed, and  treated as legal 
nonconforming by the Development Agreement. Other billboards in the vicinity remain under 
Maricopa County’s jurisdiction. 
Chapter 12 – Administration and Process Framework 
Chapter 12 establishes the Community Plan as Legacy Park’s primary zoning regulations. Where 
permitted by law, the Plan governs over conflicting Mesa Zoning Ordinance provisions; matters 
not addressed remain subject to the Zoning Ordinance. 
All development requires administrative Development Plan approval, which includes design 
review. Applications must first be reviewed by the Master Developer for consistency with the Land 
Use Budget and Plan, while the City retains final approval authority. 
Alternative Compliance may be approved when strict compliance is impractical or an alternative 
provides equivalent or superior results. This process supports flexibility and predictability while 
preserving departmental review, appeal rights, and referral to the Planning and Zoning Board for 
unresolved policy matters. 
Minor changes consistent with the Plan may be approved administratively. Major changes 
involving land use, density, intensity, acreage, or applicable amendment thresholds require City 
Council approval.  
Chapter 13 – Airport Overflight Processes 
Chapter 13 addresses Legacy Park’s proximity to Mesa Gateway Airport by requiring airport-
influence and noise disclosures for residential buyers and tenants, acknowledgment by 
purchasers, notice provisions in the CC&Rs, and a site-wide avigation easement benefiting the 
City and airport.  
All vertical structures must comply with FAA Part 77 and applicable FAA and Mesa Gateway 
Airport review.  Proposed heights may exceed mapped airport limits only when determined 
acceptable through the required review and clearance process.  
Development within Airport Overflight Areas must also comply with applicable MZO requirements 
for airport overflight, avigation easements, disclosures, airspace, and noise attenuation.

[16] 
Chapter 14 – Surrounding Community Facilities Assessment 
Legacy Park is located within the Queen Creek Unified School District service area. The Master 
Developer will coordinate with the District as development proceeds.  
The Plan also focuses on an interconnected recreation and open-space framework that includes 
The Park, multiple plazas, a 100-foot-wide SRP open-space buffer along SR-24, and a multi-use 
trail.  This will enhance connectivity within the site and to surrounding destinations, including the 
nearby Arizona Athletic Grounds. 
Fire and emergency response services will be provided by City of Mesa fire stations serving the 
area. The need for additional facilities or service enhancements will be evaluated as development 
progresses. Police services will be evaluated in coordination with the City as individual 
developments are proposed. 
At maximum buildout, Legacy Park is expected to generate additional demand for schools, fire 
and emergency medical services, police services, libraries, parks, and related community 
facilities. As development advances, an evaluation of facility capacity, access, funding, and timing 
will be conducted to ensure necessary services and improvements are coordinated with the pace 
and location of development. 
Chapter 15 – Infrastructure Element – Master Plans 
Chapter 15 establishes an interconnected network of public streets and private drives designed 
primarily for 25-mph travel. The Plan proposes four primary access points along Ellsworth Road 
and four primary access points along Williams Field Road, including The Boulevard, supported 
by collector streets, internal private drives, and two roundabouts. 
The Boulevard serves as the primary internal corridor, with a flexible alignment and traffic-calming 
features such as decorative paving and enhanced pedestrian crossings. Its construction, the SR-
24 buffer, and the Williams Field Road crossing will be coordinated as development progresses. 
Stormwater will be managed in various ways, including dry wells, and utilities may be located 
within internal rights-of-way. The chapter also allows specified engineering deviations related to 
roadway geometry, visibility, curbs, driveways, and sewer slopes, subject to City review and 
approval. 
As part of the Community Plan, the following Technical Studies have been completed and are 
incorporated into the Community Plan, but are included as separate documents: 
 
Master Concept Sewer Report  
 
Master Concept Water Report  
 
Master Concept Drainage Report  
 
Draft Traffic Impact Study

[17] 
Chapter 16 – Definitions 
Chapter 16 establishes project-specific definitions for housing types, open space, parking, signs, 
paseos, primary building elevations, and other terms used throughout the Plan.  Terms not defined 
follow the Mesa Zoning Ordinance.  
These definitions ensure clear, consistent, and predictable administration of the adopted zoning 
standards. 
Evaluation Criteria 
Evaluation Criteria Per MZO Section 11-11-3 
1. Conform to applicable policies, land use map designations, and land use definitions 
of the Mesa General Plan; 
The Proposed Project meets the applicable policies, land use map designations and land 
use definitions of the Mesa General Plan by providing permitted principal land uses such 
as Retail, Entertainment and Recreation, Eating and Drinking Establishments, Business 
Offices and supporting land uses such as Public/Semi-Public, Multi-Family Residential, and 
Medical Facilities, all in conformation with the Regional Center Placetype of the Mesa 
General Plan. 
2. Conform to the purposes and intents of the PC District as listed in Section 11-11-1; 
As described in the analysis provided above, the Plan meets the purposes and intents ofthe 
PC District by providing a core-mixed use initial phase of development that is centered 
around The Boulevard and The Park. This area provides extensive public amenities, open 
space, shade, and creative building and landscape design, creating a mixed-use center 
with housing, employment opportunities, services, parks, open space and recreational uses 
accessible primarily by walking. Pedestrian connectivity, is provided throughout the site on 
the many paths and trails, including the eight-foot-wide multi-use trail along SR-24 and 
detached sidewalks. With posted speed limits of 25 mph throughout the Site, bicyclists and 
e-bikes riders can safely utilize all provides streets. Additionally, building design 
emphasizes climate-responsive design by providing features such as recessed entries, 
canopies or awnings, trees at primary building entrances, architectural sunshades, and 
similar design features, which all mitigate urban heat. 
3. Provide the following when the PC District is located on a site designated as a Mixed 
Residential, Urban Residential, Neighborhood Center, Urban Center, Or Regional 
Center Placetype on the Mesa General Plan Placetype map:  
a. A mix of land uses in a wide variety of building forms which creates a 
complete community environment; and 
b. An appropriate mix of non-residential uses, including commercial, 
employment (such as office and industrial), and public/semi-public, in 
addition to multiple forms of residential uses; and

[18] 
c. One or more areas designated as villages or urban cores that will serve and 
complement surrounding residential development. 
The Plan provides a mix of land uses in a wide variety of building forms. These uses include 
but are not limited to hospitality uses, vertical mixed use, offices, restaurants, commercial 
uses, and residential uses. Residential uses, while primarily proposed for multi-family use 
may also include single family residential uses as part of the proposed resort area. The 
core-mixed use initial phase of development is centered around The Boulevard and The 
Park and provides public amenities and open space creating a mixed-use center with 
housing, employment opportunities, services, parks, open space and recreational uses all 
supporting surrounding residential development. 
4. Provide a combination of land uses that are arranged and designed in such a manner 
as to be well integrated with other land uses, the immediate surrounding area, the 
planned thoroughfare system, and other public facilities such as water and sewer 
systems, parks, schools, transit routes and utilities. 
The Proposed Project provides a combination of land uses that are arranged and designed 
to be integrated with other land uses and the immediate surrounding area. The project 
proposes a pedestrian crossing at The Boulevard that will connect across Williams Field 
Road to the future and existing commercial uses south of Williams Field. The initial phase 
of development will include all planned roadways and utilities required to connect to future 
uses on Site. 
5. Include adequate provisions and sites for schools, playgrounds, parks, trails, and 
other recreational facilities that are adequate to serve the anticipated population and 
interconnected with other public open spaces and recreational resources within the 
city. 
The Site falls within the Queen Creek School District. The master developer will coordinate 
with the school district as the development moves forward. The Park, which will be 
developed with the core initial phase of the Proposed Project is intended to serve the future 
residents of the Site and the existing community. It will provide open space, trails, and play 
areas. 
6. Adequately, reasonably, and conveniently integrate into existing and planned 
streets, transit systems, public services, utilities, and public facilities and will not 
result in a reduction in service levels to adjacent properties. 
The City of Mesa Transportation Department, Water Resources Department, Engineering 
Department and Development Services Department have reviewed the Community Plan. 
Currently, the Traffic Impact Study is in draft form. A final Traffic Impact Study will only be 
approved by the City Engineer and City Traffic Engineer and incorporated into the Plan 
following: review and approval of the Traffic Impact Study by ADOT; any required alterations 
or modifications made; and with specific installation timelines for certain improvements. 
The Departments have otherwise found that the Proposed Project adequately, reasonably 
and conveniently integrates into existing and planned streets, transit systems, public

[19] 
services, utilities and public facilities and will not result in a reduction in service levels to 
adjacent properties. 
7. Promote development that is appropriate to and well-integrated with its 
environmental setting, including existing vegetation, soils, geology, topography, and 
drainage patterns. 
The City of Mesa Development Services Department has reviewed the Proposed Project 
and determined that the development is appropriate to and well-integrated with the existing 
environmental setting, including existing vegetation, soils, geology, topography, and 
drainage patterns. 
8. Preserve, where possible, any significant historical, cultural, and archaeological 
features of the site. 
Per Chapter 1 of the Plan, the master developer will ensure compliance with MZO Sections 
11-11-4 and 11-11-3(C) and all applicable federal and state statutes governing cultural 
resources and any applicable conditions of approval.  The Master Developer will also 
consult with the City Archaeologist, the State Historic Preservation Office, Tribal Historic 
Preservation Offices, and other qualified professionals. 
9. Provide superior design and environmental sustainability in comparison with 
development reviewed under other base zoning district regulations. 
The Proposed Project provides superior design pursuant to MZO Section 11-31-32 by 
providing cohesive, high-quality and context-sensitive architecture, landscaping and 
signage; requiring architectural design and other standards that are above what is required 
in the MZO; encouraging climate-responsive building design; and provides safe, 
comfortable public spaces with integrated open space and pedestrian amenities. 
10. Provide a level of detail that adequately describes the relative quality and design 
themes of the built environment of the project, both at completion and during the 
phased implementation of the Community Plan. 
The Plan provides architectural standards, landscape standards, open space standards, 
pedestrian circulation standards, lighting standards, sign standards and parking standards 
which apply to all development within the entire Proposed Project. 
11. Be compatible with, and not detrimental to, adjacent properties or the surrounding 
neighborhood(s). 
The Proposed Project is compatible with, and not detrimental to, adjacent properties or the 
surrounding neighborhood. The Site is bound on all sides by public right-of-way, including 
SR-24, and Ellsworth and Williams Field roads. A pedestrian connection will be provided at 
Williams Field to connect with the existing and future commercial retail, restaurant and 
recreation uses to the south of the Site. The Proposed Project provides much needed 
commercial services, such as entertainment, restaurants and retail along with office, 
hospitality and residential uses. These additional services will support the immediate 
vicinity, including the Mesa Gateway Airport.

[20] 
Impact Analyses 
School Impact: 
The Queen Creek Unified School District (District) was notified of the Proposed Project and 
determined that the District currently has capacity to serve future residents of the development 
with three elementary schools and one comprehensive 7-12 secondary campus.   
Citizen Participation: 
The applicant conducted a Citizen Participation process, notifying surrounding property owners, 
HOAs, and registered neighbors.  
Neighborhood Meeting: 
A neighborhood meeting was held on August 12, 2026, with four attendees.  Attendees were  in 
support of the Proposed Project and no concerns were raised.  
Required Notification: 
 
Property owners within 1,000 feet, HOAs within ½ mile, and registered neighborhoods 
within one mile of the subject site were notified of the public hearing.  
 
Staff has not received any public input on the Proposed Project.  
Conditions of Approval 
Staff recommends approval of the rezoning request and the Community Plan, subject to the 
following conditions: 
1. 
Compliance with the Community Plan and any future amendments thereto, including 
to the:  
a. 
Master Concept Sewer Report; 
b. 
Master Concept Drainage Report; 
c. 
Master Concept Water Report; and 
d. 
Final Traffic Impact Study. 
2. 
Compliance with all City development codes and regulations except as identified within 
the Community Plan. 
3. 
Dedication of the right-of-way and easements required under the Mesa City Code at 
the time of application for a building permit, at the time of recordation of the subdivision 
plat, and at the time of the City’s request for dedication. 
4. 
On-site traffic mitigation measures identified in the final Traffic Impact Study, all off-site 
improvements, and street frontage landscaping shall be installed in the first phase of 
construction.

[21] 
5. 
Traffic Impact Study. The applicant recognizes that the Traffic Impact Study submitted 
with the Plan is not the final, approved Traffic Impact Study. Prior to the issuance of 
any permit, the final Traffic Impact Study must be approved at the sole discretion of 
the City Engineer and City Traffic Engineer.  
a. 
As an exception to this requirement, after conferring with the Building Official, 
Planning Director, City Engineer, and City Traffic Engineer, the Development 
Services Department Director may authorize certain work to proceed at the 
applicant’s sole risk before such approval if the Director determines that the 
final Traffic Impact Study is unlikely to differ from the current draft in a manner 
that would require the work to be modified, relocated, or reperformed. 
b. 
If the applicant proceeds with work at its sole risk and the final Traffic Impact 
Study requires revisions to previously approved documents or the 
modification, relocation, or reperformance of work that does not comply with 
the final Traffic Impact Study, the applicant shall complete such revisions or 
work at its sole cost and expense. The applicant shall also be responsible for 
any associated resubmittals, reviews, and fees. 
c. 
If a final Traffic Impact Study requires any amendment to the Community Plan 
or modifications any City standards, including those approved in the 
Community Plan, such amendments and modifications are not subject to this 
administrative approval, and instead will be governed by the applicable 
amendment or modification process set forth in the Community Plan or MZO. 
6. 
Install any mitigation required by ADOT at the intersection of Ellsworth Road and SR-
24, Williams Field Road and SR-24, or both, except that the City Manager may 
determine, in their sole discretion, that installation of one or more specific mitigation 
measures is not required. 
7. 
Execution and compliance with all requirements of Development Agreement DA26-
02402, including the Legacy Project Maintenance Agreement, and any future 
amendments thereto. 
Exhibits 
Exhibit 1 - Presentation   
Exhibit 2 - Ordinance  
Exhibit 3 - Ordinance Map   
Exhibit 4 - Vicinity Map   
Exhibit 5 - Community Plan   
Exhibit 6 - Minutes   
Exhibit 7 - Submittal Documents