Development Booklet

City of Chandler — Regular Meeting (2026-09-16)

View PDF Meeting page

Extracted text (via pymupdf) 14652 characters
i 
 
 
Preliminary Development Plan 
 
Amendment 
 
for 
 
 
Desert Palms 
 
 
 
 
 
 
NEC of Warner Road and Alma School Road 
 
by: 
 
Arizona Partners 
 
 
Case No: PLH25-0018 
 
Submitted:   June 9, 2025 
Resubmitted:  August 26, 2025 
Resubmitted:  April 21, 2026 
Resubmitted: July 21, 2026

ii
 
 
 
TABLE OF CONTENTS 
 
I. 
Introduction ......................................................................................................................... 1 
II. 
Site, Surrounding Area, and Existing Zoning ..................................................................... 1 
III. 
Proposed Preliminary Development Plan ........................................................................... 1 
A. 
Site Layout .......................................................................................................................... 1 
B. 
Architecture......................................................................................................................... 2 
C. 
Landscaping ........................................................................................................................ 2 
IV. 
Project Team ....................................................................................................................... 3 
V. 
Conclusion .......................................................................................................................... 3 
 
 
TABLE OF EXHIBITS 
 
 
Exhibit No.  
Description 
1 
Site Aerial 
2 
Aerial Plan 
3 
Enlarged Site Plans 
4 
Floor Plans 
5 
Perspective 
6 
Building Elevations 
7 
Landscape Plans 
8 
Signage Location

1
 
ARIZONA PARTNERS 
I. INTRODUCTION 
Arizona Partners (“AZP”) has recently acquired the center known as “Sun Village Fair” 
located at the northeast corner of Alma School Road and Warner Road (the “Center”). See Exhibit 
1, Site Aerial. AZP, as a locally based real estate company, is committed to revitalizing the 
downtrodden Center and making the best use of this Site. AZP specializes in redevelopment of 
tired and dysfunctional retail centers and currently owns a significant portfolio of real estate. AZP 
prides itself on working with a wide array of retailers and restaurant tenants—the vast majority of 
which are locally based.  
While the Walmart located on the east side of the Center has been successful, the west 
portion of the Center has struggled. Fry’s was previously operating in the large, approximately 
85,000 square foot building, but has since closed down. This area being vacant has caused this 
portion of the Center to be the target for vandalism and other undesirable activities. AZP’s 
proposed comprehensive renovation of a portion of the Center will benefit the area. AZP 
anticipates this renovation will include parking lot, landscaping, signage and building 
enhancements. 
AZP plans to renovate the former Fry’s store into three anchor tenant spaces (Major A, B, 
and C buildings). The revitalization also includes three shops buildings (Shops A, B, and C) and 
additional retail pads. See Exhibit 2, Aerial Plan. The prior zoning case and Preliminary 
Development Plan (“PDP”) was approved in 1991. Now, approximately 35 years later, it is 
necessary to reimagine the layout of this Center to make it a viable asset to the City once again.  
AZP seeks to amend the prior PDP to modify signage requirements, allow the revitalization 
of the shops buildings, and allow the additional retail pads. These changes are appropriate for the 
area, the Center, and the Site—which was designated for retail uses. The retail landscape has 
changed dramatically from 1991 to today. Particularly after Covid the retail landscape has changed 
and drive-thru uses are in peak demand. Here, the proposed drive-thrus and pads are necessary for 
the viability of the Center as a whole. Further, this Site, located near the intersection of two arterial 
roads, is appropriate for a drive-thru use. Overall, this proposed development will make good use 
of this underutilized Site that has failed to be developed despite its commercial zoning. 
II. SITE, SURROUNDING AREA, AND EXISTING ZONING 
The Site is designated on the City’s General Plan as “Neighborhoods”. The Neighborhoods 
designation allows a variety of residential and non-residential uses.  
The Site is zoned PAD and designated for retail uses. The vacant lot adjacent to Warner 
Road was designated as “Village Shops”—but has failed to develop since 1991. The proposed pad 
adjacent to Alma School previously shown as additional parking—however the Center already has 
sufficient parking. This request will allow for this challenging Site to be developed with a 
sustainable use and will complete the Center in a way that is complementary and beneficial to the 
Center and area. 
III. PROPOSED PRELIMINARY DEVELOPMENT PLAN 
A. 
Site Layout  
As described above, the overall Site is anticipated to be a mixture of anchor tenant 
buildings, inline shops buildings, and pads. This request pertains to the anchor tenant buildings 
and pads on the Site. AZP, as an experienced retail developer, has designed the site plan in line 
with market demand to ensure all spaces are utilized and the Center remains viable. See Exhibit

2
3, Enlarged Site Plans and Exhibit 4, Floor Plans. The pads are located adjacent to Warner Road 
and Alma School Road, which is an ideal location for pads given that it is the intersection of two 
arterial roads. One additional pad (a future quick service restaurant with drive-thru) is located on 
Alma School Road, and three pads (two future quick service restaurants with drive-thrus) and one 
multitenant building with a casual restaurant and retail space are proposed to be located along 
Warner Road. The pads are well placed and each have several ingress/egress points that can be 
utilized by customers to ensure safe and efficient circulation. The proposed anchor and shops 
buildings are located on the north portion of the site, which has less visibility compared with the 
pad locations. As described below, the pads are designed to be attractive and enhance the street 
frontages. See Exhibit 5, Perspective. 
This proposed development is designed to be compatible and complementary to the 
existing development. The layout, landscaping, and architecture have been designed to integrate 
with the Center and be attractive to patrons and passers-by. 
B. 
Architecture 
The architecture has been designed to refresh the Center while being compatible with 
existing architecture in the Center. See Exhibit 6, Building Elevations. Architectural features 
such as varied massing, roof heights, and a variety of colors and materials will break up building 
massing. The buildings have also been designed to be pedestrian-friendly, with shading provided 
above entrances and pedestrian connections. Building materials include stucco as well as stone 
and metal elements. A variety of neutral colors have been utilized to be fitting for the desert 
background and are consistent and appropriate with the surrounding building context.  
C. 
Landscaping  
Landscaping has been designed to help create an attractive presence on Site, provide shade 
in appropriate locations, and help buffer the Site. See Exhibit 7, Landscape Plans. The 
landscaping theme creates a sustainable, colorful, and approachable plant palette that will create 
an attractive presence on the Site. The landscape plan features an ample hierarchy of plant material, 
and patterning to arrange a mixture of textures and colors to provide a year-round quality 
appearance. 
D. 
Signage 
Minor changes to signage standards are being requested. Enhanced signage will help ensure 
the viability of the Center and success of commercial uses.  
 
All tenant building signage in this Center shall comply with sign code. In addition, the 
Anchor tenants and Major tenants over 7,500 square feet and free-standing single-tenant pads may 
utilize up to 100% of their total allowed sign area to install a non-illuminated corporate-colored 
panel or similar solid material onto the building wall within their leased space, to be used as a 
background or backer for the tenant’s business name, copy, and graphics. The panel must fit within 
the building’s sign band, or the wall area designated for signs and all of the tenant’s wall sign copy 
must be located within its boundaries. See Exhibit 8, Signage Location. 
 
In addition to this PDP amendment, a separate PDP amendment and comprehensive sign 
plan has been filed that will govern portions of the overall Site, specifically the Anchor Tenant 
buildings and inline shops. Submittals have been coordinated to ensure consistency throughout the 
Desert Palms shopping center.

3
IV. PROJECT TEAM 
Developer: 
 
 
 
 
 
Arizona Partners 
 
8300 N Hayden Road, Suite A 200 
Scottsdale, AZ 85258 
 
Architect: 
 
 
 
 
 
RKAA Architects 
2233 E Thomas Road 
Phoenix, AZ 85016 
 
Civil Engineer: 
 
 
 
 
Olsson Engineering 
 
 
 
 
 
 
 
7878 N 16th St, #105 
 
 
 
 
 
 
 
Phoenix, AZ 85020 
 
Zoning: 
 
 
 
 
 
Burch & Cracchiolo, P.A. 
 
 
 
 
 
 
 
Attn:  Ed Bull/Madison Leake 
 
 
 
 
 
 
 
1850 North Central Avenue, Suite 1700 
 
 
 
 
 
 
 
Phoenix, AZ 85004 
V. CONCLUSION 
This request proposes a thoughtful plan that will revitalize a downtrodden center. This 
proposal will allow for additional commercial services and employment opportunities and be a 
significant improvement compared to what exists today. We request your approval. 
 
 
 
 
 
 
 
 
Arizona Partners

EXHIBIT 1

EXHIBIT 2

EXHIBIT 3

EXHIBIT 4

EXHIBIT 5

EXHIBIT 6

0'-0"
FINISH FLOOR
12'-0"
B.O. CEILING
25'-8"
T.O. PARAPET
21'-8"
T.O. PARAPET
0'-0"
FINISH FLOOR
A-1
B-2
B-2
B-1
M-2
P-3
S-1
P-2
S-1
P-1
S-1
P-1
M-2
P-3
S-1
P-3
M-2
P-3
5
5
12'-0"
12'-0"
6
6
8
9
+0'-6"
0'-0"
+0'-6"
+5'-6'
0'-0"
FINISH FLOOR
12'-0"
B.O. CEILING
16'-0"
T.O. ROOF
21'-8"
T.O. PARAPET
25'-0"
T.O. PARAPET
HATCH INDICATES
SPANDREL GLASS
A-1
B-1
B-2
A-1
M-2
P-3
S-1
P-2
S-1
P-3
M-2
P-3
S-1
P-3
S-1
P-1
M-2
P-3
M-2
P-3
5
6
12'-0"
8
9
0'-0"
+1'-0"
+3'-0"
XXXX
0'-0"
FINISH FLOOR
12'-0"
B.O. CEILING
16'-8"
T.O. ROOF
7'-2"
B.O. CANOPY
21'-8"
T.O. PARAPET
25'-8"
T.O. PARAPET
0'-0"
FINISH FLOOR
B-2
D-1
D-1
D-1
M-2
P-3
M-2
P-3
S-1
P-1
S-1
P-2
B-1
S-1
P-3
M-2
P-3
1
3
4
5
7
8
9
9
9
0'-0"
+3'-0"
+5'-6"
+8'-6"
XXXX
0'-0"
FINISH FLOOR
12'-0"
B.O. CEILING
16'-0"
T.O. ROOF
21'-8"
T.O. PARAPET
25'-0"
T.O. PARAPET
9'-0"
B.O. CANOPY
HATCH INDICATES
SPANDREL GLASS
A-1
A-1
B-1
B-1
B-2
B-2
M-2
P-3
M-2
P-3
S-1
P-2
S-1
P-2
S-1
P-1
S-1
P-1
S-1
P-3
S-1
P-3
M-2
P-3
M-2
P-3
M-2
P-3
M-2
P-3
2
4
5
5
6
12'-0"
8
9
9
9
0'-0"
0'-0"
+1'-0"
+1'-0"
+3'-0"
+3'-0"
SOUTH ELEVATION
TOTAL: 
815 S.F.
STONE:
256 S.F. 31%
BRICK:
42 S.F.
5%
STUCCO:
387 S.F. 48%
METAL / DOOR
130 S.F. 16%
GLAZING
-
WEST ELEVATION
TOTAL: 
1,736 S.F.
STONE: 
364 S.F.
21%
BRICK:
135 S.F.
8%
STUCCO:
1,134 S.F. 65%
METAL / DOOR: 38 S.F.
2%
GLAZING:
65 S.F.
4%
NORTH ELEVATION
TOTAL:
814 S.F.
STONE:
180 S.F. 22%
BRICK:
48 S.F.
6%
STUCCO:
398 S.F. 49%
METAL / DOOR: 24 S.F.
3%
GLAZING: 
164 S.F. 20%
EAST ELEVATION
TOTAL: 
1,599 S.F.
STONE: 
333 S.F. 21%
BRICK:
130 S.F. 8%
STUCCO:
741 S.F. 46%
METAL / DOOR: 55 S.F.
3%
GLAZING:
340 S.F. 22%
2233 EAST THOMAS ROAD, PHOENIX, ARIZONA 85016
602-955-3900
RKAA.com
NOTICE OF ALTERNATE BILLING OR PAYMENT CYCLE:
THIS CONTRACT MAY ALLOW THE OWNER TO  REQUIRE
THE SUBMISSION OF BILLINGS OR ESTIMATES IN
BILLING CYCLES OTHER THAN THIRTY DAYS.  THIS
CONTRACT MAY ALLOW OWNER TO MAKE PAYMENT
O N S O M E A L T ERN A T IV E S C H ED UL E A F T ER
CERTIFICATION AND APPROVAL OF BILLING AND
ESTIMATES.  A WRITTEN DESCRIPTION OF SUCH OTHER
BILLING C YCLE APPLICABLE TO THE PROJECT IS
AVAILABLE FROM OWNER OR DESIGNATED AGENT.
PRELIMINARY
project #:
drawn by:
checked by:
design by:
COPYRIGHT 2025, ALL RIGHTS RESERVED.  THIS
DRAWING IS AN INSTRUMENT OF SERVICE.  IT IS THE
PROPERTY OF RKAA ARCHITECTS, INC. AND MAY NOT BE
REPRODUCED, OR REPRODUCTION HEREOF USED,
W I T HO UT W R IT T E N P E RM I S S I O N O F T H E
C O R P O R A T I O N .            I
A
R
C
H
I
T
E
C
S
T
,
I
N
C
RWK
RH
25028.00
02-09-2026
DESERT PALMS
SHOP AND QSR
NEC OF WARNER AND ALMA SCHOOL
CHANDLER, AZ 85224
PRELIMINARY DEVELOPMENT PLAN
NAME
ADDRESS
ADDRESS
CONTACT: Name
PHONE: 
SCALE:
3
SOUTH ELEVATION - QSR 2
3/16" = 1'-0"
SCALE:
4
WEST ELEVATION - QSR 2
3/16" = 1'-0"
A4.3
MM
QSR 2 ELEVATION
SCALE:
1
NORTH ELEVATION - QSR 2
3/16" = 1'-0"
SCALE:
2
EAST ELEVATION - QSR 2
3/16" = 1'-0"
A.
ALL ROOF MOUNTED MECHANICAL EQUIPMENT SHALL
BE FULLY SCREENED BY PARAPET WALLS EQUAL TO, OR
GREATER THAN, THE HIGHEST POINT ON THE
MECHANICAL EQUIPMENT.
B.
SOLID MASONRY WALLS AND GATES EQUAL TO, OR
GREATER THAN, THE HIGHEST POINT ON THE
MECHANICAL EQUIPMENT SHALL SCREEN ALL GROUND
MOUNTED MECHANICAL EQUIPMENT.
C.
ANY ROOF ACCESS LADDERS SHALL BE LOCATED INSIDE
THE BUILDING. ROOF DRAINAGE SHALL UTILIZE INTERIOR
ROOF DRAINS OR BE ARCHITECTURALLY INTEGRATED
FOR THE BUILDING DESIGN. ARCHITECTURALLY
INTEGRATED ROOF DRAINS SHALL REQUIRE ADDITIONAL
ARTICULATION BEYOND PAINT ACCENTS. SECTION
35-1902 (8)(e)(15), ZONING CODE.
D.
SCREENING SHALL BE ARCHITECTURALLY INTEGRATED
FOR THE SERVICE ENTRANCE SECTION (SES) AND ALL ALL
UTILITIES. ALL GROUND MOUNTED EQUIPMENT SHALL
BE SCREENED FROM PUBLIC VIEW BY A CONCRETE OR
MASONRY WALL WITH SOLID GATES, EQUAL TO OR
GRATER IN HEIGHT THAN THE MECHANICAL
EQUIPMENT. SECTION 35-1902 (8)(e)13. ZONING CODE.
E.
SIGNS REQUIRE A SEPARATE SUBMITTAL AND PERMIT.
3-5/8 x 2-1/4 x 7-5/8 BRICK VENEER TO MATCH
EXISTING CENTER
COLOR: #9 BLEND VERTICAL
MANUF: BELDEN
ANODIZED ALUMINUM STOREFRONT SYSTEM
WITH SOLARBAN R100 (2) CLEAR + CLEAR
GLASS LOW E EXTERIOR GLAZING
MANUF:
KAWNEER
COLOR:
BLACK
CLIFFSTONE
COLOR:
MESQUITE
MANUF:
EL DORADO STONE
GENERAL NOTES
EXTERIOR FINISH SCHEDULE
MAN DOOR
COLOR:
#DE6357 "BLACK TIE"
MANUF:
DUNN EDWARDS
PBR PANEL METAL ROOFING (VERTICAL)
COLOR:
CHARCOAL GRAY
MANUF:
WESTERN STATES METAL ROOFING
STEEL FRAME/BRAKE METAL
PAINT
COLOR:
#DEW385 "LIGHTHOUSE"
MANUF:
DUNN EDWARDS
PAINT
COLOR:
#DE6355 "TARNISHED SILVER"
MANUF:
DUNN EDWARDS
PAINT
COLOR:
#DE6357 "BLACK TIE"
MANUF:
DUNN EDWARDS
SMOOTH STUCCO
METAL TRELLIS
METAL FENCE
KEYNOTE
1.
KNOX BOX - INSTALL PER FIRE DEPARTMENT
2.
F.D.C. LOCATION AND SIGNAGE
3.
FIRE RISER LOCATION WITH SIGNAGE
4.
12" HIGH CONTRASTING ADDRESS SIGNAGE, G.C. TO
CONFIRM WITH CITY OF CHANDLER COMPLIANCE
5.
DASHED LINE INDICATES MECHANICAL UNIT
6.
WALL PACK LIGHT FIXTURE, 12'-0" A.F.F.
7.
SERVICE ENTRY SECTION LOCATION
8.
DASHED LINE INDICATES ROOF BEYOND
9.
UNDER CANOPY LIGHT FIXTURE
B-2
B-1
A-1
D-1
M-1
M-2
P-1
P-2
P-3
S-1
M-3
M-4
MATERIAL PERCENTAGE

NORTH
SOUTH

EXHIBIT 7

EXHIBIT 8