Report to the Planning and Zoning Commission
Prepared by the Maricopa County Planning and Development Department
Case: SU260001 – MMI Wittmann ILA
Hearing Date: September 24, 2026
Supervisor District: 4
Applicant: Sam Davis, Ledcor Group / Middle Mile Infrastructure, LLC
Owner: 37 Acres R & G Ranch Properties, LLC
Request: Special Use Permit (SUP) for a fiber-optic utility compound in the Rural-43
WHSC zoning district
Site Location: Generally located approx. 0.6 miles SE of 251st Ave. & US 60 (Grand Ave.),
in the Circle City / Morristown / Surprise area
Site Size: Approx. 2.1 acres of lease area on an approx. 37-acre parcel
Density: N/A
County Island: No
County Plan: White Tank / Grand Avenue Area Plan – Single Family / Rural
The property is within a Municipal Influence Area
Municipal Plan: City of Surprise – Neighborhood
Municipal Comments: None received to date
Support/Opposition: None known
Recommendation: Approve with conditions
SU260001
Page 1 of 10

Project Summary:
1. The applicant, Sam Davis of Ledcor Group, is requesting a Special Use Permit (SUP) for a
proposed fiber-optic utility compound on parcel 503-16-006A. The subject parcel comprises
approximately 37 acres and is located approximately one mile northwest of Circle City along the
southwest side of Grand Avenue (US 60). The SUP will be for a 90,000-square-foot lease area
toward the southwest corner of the subject parcel.
2. The lease area will measure 300’ x 300’ (90,000 sf), most of which will be undeveloped. A new
access easement will connect the lease area to Grand Ave., and a linear retention basin will be
placed along the south side of the lease area. Development beyond the easement and retention
basin will be limited to a fenced area measuring approximately 112’-6” x 128’ (14,400 sf). The
fence itself will be an 8’ chain-link fence topped with an additional 1’ of barbed wire and will
include a 16’ wide manual cantilever sliding access gate. In response to recommendations from
the Arizona State Land Department (ASLD), the developer will screen the fence with neutral or
desert color slats. Per the applicant’s narrative, a fence is preferred to a solid wall to maximize
unobstructed airflow for equipment cleanliness and operational stability. However, the narrative
assures that the facility will not generate noise or other emissions, effectively minimizing its
impact on nearby rural residences.
3. Within the fenced area, the developer will install a new utility compound and equipment shelter
that will serve as an infrastructure component supporting their existing fiber-optic network. The
equipment shelter will be a prefabricated modular unit measuring approximately 24’ x 36’ (864 sf)
and 13’ in height. In terms of construction materials, the shelter will be a precast concrete building
with an exposed coarse aggregate finish; it will be placed and anchored to a precast concrete
slab foundation. One equipment shelter will be installed during initial construction, although a
foundation pad will be provided for the installation of a second identical shelter in the future.
There will be no antennas, towers, or dishes with the facility. Outside lighting will be provided by
one downward-directed wall-mounted LED light fixture at each unit entry door (for three per unit).
Each light will have a dawn-to-dusk photocell control.
4. The facility will be unmanned and closed to the public. Access will be limited to authorized service
personnel who will visit the site infrequently for maintenance as needed. A single parking space
will be provided. Both the parking space and the 16’ wide access driveway within the easement
will be surfaced with stabilized decomposed granite.
5. The site is located within the Wickenburg Highway Scenic Corridor (WHSC) overlay zoning district
Class 2 intensity level as regulated in MCZO Section 704. Class 2 corresponds with the County
jurisdiction from 300’ to ¼-mile (1,320’) out from the Grand Ave. right-of-way. The Class 2
development regulations are minimal, only requiring structures to adhere to a maximum height
of 33’ and otherwise requiring development to observe the goals and policies established in the
WHSC plan to the extent practicable. The project will not conflict with these regulations.
SU260001
Page 2 of 10

Aerial photo of the subject site.
Aerial image of the surrounding region. Morristown visible to the NW and Circle City visible to the SE.
SU260001
Page 3 of 10

Eagle view of the site looking north into subject parcel (aerial image dated January 2024).
Overall Site Plan
SU260001
Page 4 of 10

Facility Site Plan with Inset
Existing On-Site and Adjacent Zoning / Land Use:
6. On-site: Rural-43 WHSC / Vacant
North: Rural-43 WHSC / Vacant
South: Rural-43 WHSC / Vacant
East: Rural-43 WHSC / Rural Residential
West: Rural-43 WHSC & C-2 WHSC / Western Trails Ranch
Zoning District Map
SU260001
Page 5 of 10

Utilities, Services and Infrastructure:
7. Water: N/A
Wastewater: N/A
School District: N/A (Morristown Elementary School District)
Fire: Circle City / Morristown Fire District
Police: Maricopa County Sheriff’s Office
Electric: Arizona Public Service
Because the proposed facility will be unmanned, there will be no demand for water or wastewater
connections. Prior to issuance of construction permits, written confirmation will be required from the fire
authority having jurisdiction that the facility has been designed in accordance with their regulations and
requirements, and that emergency fire protection service will be provided to the facility. Neither Arizona
Public Service nor Salt River Project have provided comments regarding this request.
The Circle City / Morristown Fire Department operates the fire station nearest to the subject site, located
at 380 Debs Circle, approximately 1.5 miles to the southeast. The nearest school, the Morristown
Elementary School, is located four miles to the northwest. The nearest MCSO office is located at 13063
West Bell Road in Surprise, approximately 20 miles southeast.
Right-of-Way:
8. The following table includes the right-of-way and classification information for existing and future
roads that impact the subject site, based upon the Maricopa County Department of
Transportation (MCDOT) Transportation System Plan 2040 and Road Information Tool, as well
as right-of-way records from the Arizona Department of Transportation (ADOT).
Street Name Half-width Existing R/W Half-width Proposed R/W Future Classification
Grand Ave. Approx. 100’ (varies) Approx. 100’ (varies) ADOT-maintained
(US 60) US Highway
Wild Rose N/A 100’ Parkway
Pkwy.
9. MCDOT’s Traffic Division has approved its review of this request due to the project’s small scale
and the minimal number of trips that will be generated by the proposed development. During the
initial review of the project, MCDOT’s Planning Division noted that the originally planned location
of the lease area (which was going to be toward the northwest corner of the parent parcel) was
within the preferred alignment for the future Wild Rose Parkway. As a future parkway alignment,
MCDOT requires preservation of at least 100’ from the future centerline. This required the
applicant to relocate the lease area. In an email dated April 1, 2026, the applicant proposed
relocating the lease area to the southwest corner of the parent parcel. Staff notes that the
proposed lease area now encroaches within 65’ of a section line, which corresponds with the
parent parcel’s south lot line. MCDOT acknowledged this section line in its initial review
comments from March 3, 2026. However, in its response to the applicant’s proposed relocation,
MCDOT confirmed that the site was now outside the future right-of-way and identified no further
concerns with the proposal. Furthermore, MCDOT’s Transportation System Plan does not identify
a future roadway alignment corresponding with the section line. Staff, therefore, interprets that
the proposed lease area no longer conflicts with existing or future MCDOT-maintained roads.
10. MCDOT has not yet established a construction timeline for Wild Rose Parkway. Currently, the only
right-of-way serving the parent parcel is US 60, an ADOT-maintained US highway. ADOT did not
SU260001
Page 6 of 10

respond directly to Planning staff except to acknowledge receipt of staff’s routing notice. The
applicant, however, has demonstrated proof of correspondence with ADOT. On April 2, 2026,
ADOT acknowledged receipt of the applicant’s Traffic Impact Assessment (TIA) pre-submittal
form. Like MCDOT, ADOT confirmed that the project will have minimal to no impact on their
facilities and will therefore not require a TIA or TIS. However, ADOT also advised that it does not
support new driveway access directly to US 60. Instead, ADOT recommends utilizing existing
driveways to access the proposed site. On April 3, 2026, ADOT further advised that if the project
affects its right-of-way in any manner (including access), then a permit will be required from
ADOT. The applicant’s current site plan does show the proposed access easement connecting
directly to US 60 via a new point of access. However, the applicant’s narrative states that they are
working with ADOT for an acceptable access arrangement.
Framework 2040 Maricopa County Comprehensive Plan
11. The subject site is located within Maricopa County’s White Tank / Grand Avenue Area Plan, which
designates it as being within the Single Family – Rural land use area. This land use designation
supports rural residential development at densities of up to one dwelling unit per acre. The site is
also located within the City of Surprise’s municipal planning area (MPA). Surprise’s general plan
designates the site as being within the City’s Neighborhood character area. Because the site is
located within an MPA, the Comprehensive Plan’s Municipal-Rural Framework considers it to be
within the County’s Area of Municipal Influence.
12. Generally, the Framework considers sites designated for rural uses by the applicable County area
plan as being within the Rural Service Area as opposed to the Urban Growth Area. However, a site
designated for rural land uses can be considered within the Urban Growth Area if 1) the applicable
municipal general plan designates the site with an urban land use, 2) the site meets the applicable
requirements of the Urban Solutions for Urban Development (USUD) strategy, and 3) the site has
an assurance of annexation from the applicable municipality. Surprise’s general plan applies the
Neighborhood character area broadly to urban, suburban, and rural neighborhoods. The plan does
include a Rural Residential Overlay sub-character area, but does not apply it to the subject site.
That said, neither the owner nor Surprise have expressed interest in annexation. The property is
not adjacent to Surprise jurisdiction nor along municipal utilities, suggesting that Surprise would
likely have little interest in annexing the site in the foreseeable future. With these facts known, it
can be concluded that, per the Framework’s guidelines, the site is within the Rural Service Area.
13. Per the USUD strategy, urban commercial uses generally require that adequate water and sewer
infrastructure will be available upon development, as well as adequate roadway infrastructure,
police protection, and fire protection. Being within the Rural Service Area, there is no existing
water or sewer infrastructure serving the site, and the nearest MCSO station is nearly 20 miles
away. At best, the site benefits from frontage along a major ADOT-maintained US highway and a
fire station located less than two miles away.
14. Although urban utilities and infrastructure are limited at the project site, they are not likely to
hinder the feasibility of the proposed land use, which essentially amounts to a rural utility use.
The unmanned fiber-optic facility will generate no water demand, no wastewater, and virtually no
traffic. Furthermore, it will be self-secured with a barbed-wire fence.
SU260001
Page 7 of 10

Public Participation Summary:
15. The applicant complied with the requirements of the citizen review process by posting the site
and sending notification by first class mail to interested parties and adjacent property owners
within 300’ of the site. Two signs were posted onsite in accordance with applicable regulations.
Staff received no public comment regarding the application. In addition to previously-discussed
correspondence from ASLD, ADOT, and MCDOT, the Arizona Game & Fish Department (AGFD)
provided a list of general recommendations for the developer. Luke Air Force Base responded to
County notice confirming that it has no concerns with this request.
Outstanding Concerns from Reviewing Agencies:
16. N/A
Staff Analysis:
17. Staff supports the applicant’s request for an SUP. For the reasons discussed in paragraphs 7 and
9 of this report, the proposed use does not require conventional urban services such as water or
wastewater infrastructure. In fact, since the facility will be unmanned, there is no need for a well
or septic system either. The proposed use arguably requires fewer services than a rural residence.
In many ways, the fiber-optic compound is similar to a wireless communication facility, albeit
without the tower, antennas, or emissions (staff also notes that WCFs are allowed by right in all
zoning districts except when the towers and/or antenna arrays exceed required dimensions). Put
another way, a fiber-optic compound is arguably a less intense use than some that are allowed
by right in the Rural-43 zoning district. As far as screening goes, staff believes the request for a
chain-link fence in lieu of a solid wall (which is generally required for WCFs to be permitted by
right) is reasonable due to the need for sufficient ventilation, the minimal noise that would be
generated by the use, and the minimally obtrusive aesthetic nature of the utility systems that
would be screened behind the fence. Finally, staff believes the proposed fiber-optic utility
compound provides a vital community benefit to Maricopa County by enhancing communications
infrastructure in a very remote area of the County.
18. Staff notes that the SUP area will be limited to the 300’ x 300’ lease area and will not include the
access easement that will, directly or indirectly, provide access to US 60. The routing of the
access easement as depicted on the site plan may not be final and will be subject to ultimate
approval from ADOT. The recommended conditions of approval include one condition requiring
that ADOT approval be obtained prior to issuance of building permits.
Recommendation:
19. Staff recommends the Commission adopt a motion recommending that the Board of Supervisors
approve SU260001 subject to the following conditions ‘a’ – ‘i’:
a. Development of the site shall be in substantial conformance with the Site Plan entitled
“Whittman ILA,” consisting of five full-size sheets, dated June 3, 2026, and stamped
received July 30, 2026, except as modified by the following conditions. Staff may
determine slight refinements to remain in substantial conformance with the approved site
plan. Minor and major amendments to the site plan will be determined in accordance with
Chapter 3 of the Maricopa County Zoning Ordinance.
SU260001
Page 8 of 10

b. Development of the site shall be in substantial conformance with the Narrative Report
entitled “MMI-Whittman AZ,” consisting of five pages, dated July 29, 2026, and stamped
received July 30, 2026, except as modified by the following conditions.
c. The following Planning Engineering conditions shall apply:
1. The parcel, 503-16-006A, contains areas of a FEMA designated special flood
hazard area. Proposed utility shelter does not appear to encroach into the
floodplain. Any encroachment or grading of the floodplain will require a flood use
permit and a building permit.
2. Site is in proximity and access is via US 60 and requires ADOT approval via the
redletter@azdot.gov process. ADOT approval must be obtained prior to building
permit issuance.
3. Engineering review of entitlement cases is conceptual in nature. All development
and engineering design shall be in conformance with Section 905 of the Maricopa
County Zoning Ordinance; Drainage Policies and Standards; Floodplain
Regulations for Maricopa County; MCDOT Roadway Design Manual; and current
engineering policies, standards and best practices at the time of application for
construction.
4. The County does not provide fire service, therefore, it is incumbent that the
applicant seek service and approval of plans from the jurisdictional fire service
provider.
d. This special use permit is valid for a period of 30 years and shall expire on October 21,
2056, or upon termination of the use for a period of 90 or more days, whichever occurs
first. All site improvements associated with the special use permit shall be removed within
90 days of such expiration or termination of use.
e. Prior to issuance of a building permit, written confirmation will be required from the
emergency fire protection jurisdiction having authority that the facility has been designed
in accordance with their regulations and requirements, and that emergency fire protection
service will be provided to the facility. Prior to issuance of the certificate of occupancy,
local fire protection jurisdiction review and approval will be required.
f. The owner shall submit construction permits to establish the land use and for site
improvements as shown on the site plan and receive final inspection status from the
Planning & Development Department Inspections Division establishing the use prior to
commencing operations. Violation of this condition may be grounds for revocation as set
forth in the Maricopa County Zoning Ordinance.
g. Noncompliance with any of the conditions assigned to the approval of this Special Use
Permit by the Maricopa County Board of Supervisors may be grounds for revocation in
accordance with the requirements and procedures as set forth in the Maricopa County
Zoning Ordinance.
h. The property owners and their successors waive claim for diminution in value if the County
takes action to rescind approval due to noncompliance with conditions.
SU260001
Page 9 of 10

i. The granting of this change in use of the property has been at the request of the applicant,
with the consent of the landowner. The granting of this approval allows the property to
enjoy uses in excess of those permitted by the zoning existing on the date of application,
subject to conditions. In the event of the failure to comply with any condition, and at the
time of expiration of the Special Use Permit, the property may be considered for revocation
to the zoning that existed on the date of application. It is, therefore, stipulated and agreed
that either revocation due to the failure to comply with any conditions, or the expiration of
the Special Use Permit, does not reduce any rights that existed on the date of application
to use, divide, sell or possess the property and that there would be no diminution in value
of the property from the value it held on the date of application due to such revocation or
expiration of the Special Use Permit. The Special Use Permit enhances the value of the
property above its value as of the date the Special Use Permit is granted and reverting to
the prior zoning results in the same value of the property as if the Special Use Permit had
never been granted.
Presented by: Nick Schlimm, Planner
Reviewed by: Rachel Applegate, Planning Supervisor
Attachments: Case Map (1 page)
Site Plan (5 pages)
Narrative Report (5 pages)
DPR comments (2 pages)
MCDOT-approved TIS waiver (1 page)
MCDOT Planning comments (1 page)
MCDOT Planning correspondence (5 pages)
ADOT correspondence (3 pages)
AGFD comments (2 pages)
ASLD correspondence (5 pages)
Luke Air Force Base comments (2 pages)
SU260001
Page 10 of 10

Application Name: MMI Whittman AZ ILA
Legal Description
6N-3W-29
Applicant Applicant Phone/Email
(859) 286-8160
Sam Davis
SU260001
Case Address Parcel Primary:503-16-006A
38122 N GRAND AVE MORRISTOWN, AZ 85342
MORRISTOWN, AZ 85342
Generated September 3, 2026 8:09 AM Gross Acres: 37 approx. Map scale 1:3,286
Supervisor District No. 4
SUP application for a utility compound for fiber optic ILA equipment shelters - Whittman AZ.
/
Maricopa County Planning & Development - Phoenix, AZ

SUP COMPARISON TABLE EXTERIOR LIGHTING
BASE ZONING DISTRICT PROPOSED ZONING DISTRICT
REGULATION MAKE MODEL VOLTAGE LAMPS LOCATION REMARKS
REGULATIONS (RU-43) REGULATIONS (RU-43 SUP)
LED 80W 11'-3" ABOVE INTEGRAL PHOTOCELL, COVERED
TEXAS FLUORESCENTS DCC150SR-LED 120-277V
HEIGHT 30' 30' 4000K FINISHED GRADE WITH DOWNWARD ORIENTATION
FRONT YARD 40' 40'
SIDE YARD 20' 20'
STREET-SIDE YARD 20' 20'
REAR YARD 40' 40'
PROJECT ID: WHITTMAN ILA SHEET INDEX:
LOT AREA 1 ACRE 1 ACRE
LOT WIDTH 145' 145' ROUTE: LAS VEGAS, NV TO PHEONIX, AZ
CV-01 COVER SHEET
LOT AREA PER DWELLING UNIT 1 ACRE 1 ACRE
SITE ADDRESS: TBD, MORRISTOWN, AZ 85342
LOT COVERAGE 25% 25%
COORDINATES: 33.826079, -112.598459
PARKING SPACES REQUIRED N/A 1 SPACE P-01 EXHIBIT
PRE-SUBMITTAL NUMBER PA250153 P-02 SITE PLAN
PAVED PARKING REQUIRED COMPACTED AGGREGATE, AASHTO #57
P-03 GRADING PLAN
A SOLID WALL, NOT LESS THAN SIX
CHAIN-LINK FENCING AND 1' OF BARBED P-04 TYPICAL DETAILS
FEET IN HEIGHT, SHALL BE
WIRE PERMITTED. SLATS TO BE FITTED TO
REQUIRED ALONG AND ADJACENT
SCREENING THE CHAIN LINK TO PROVIDE
TO ANY SIDE OR REAR PROPERTY
ADDITIONAL SCREENING. SCREENING NO
LINE ABUTTING ANY RURAL OR
GREATER THAN 10' IN HEIGHT
RESIDENTIAL ZONE BOUNDARY
REGIONAL MAP: AERIAL MAP:
LEGAL DESCRIPTION
PROJECT INFORMATION
PRELIMINARY DESCRIPTION PENDING APPROVAL
SITE DATA SUP AREA/MMI EASEMENT: ALL THAT TRACT OR PARCEL OF LAND
LYING AND BEING IN THE SOUTHEAST QUARTER OF THE SOUTHWEST
PARENT PARCEL: 37.05 ACRES QUARTER OF SECTION 29, TOWNSHIP 6 NORTH, RANGE 3 WEST OF THE
SITE DEVELOPMENT: 0.55 ACRES GILA AND SALT RIVER BASE AND MERIDIAN, MARICOPA COUNTY,
SUP/EASEMENT AREA: 2.07 ACRES (90,000 SQFT) ARIZONA, AND BEING A PORTION OF THE LANDS OF 37 ACRES R & G
RANCH PROPERTIES, L.L.C., AS RECORDED IN INSTRUMENT NO.
20220689442, MARICOPA COUNTY RECORDS, AND BEING MORE
PROPOSED BUILDING DATA PARTICULARLY DESCRIBED AS FOLLOWS:
TWO OF EACH OF THE FOLLOWING: COMMENCING AT A 1/2-INCH REBAR WITH A 1-INCH YELLOW PLASTIC
DOUBLE MODULE ILA SHELTER CAP STAMPED "RLS 51969" FOUND AT THE NORTHWEST CORNER OF THE
AREA: 852 SQFT PARCEL DESCRIBED IN INSTRUMENT NO. 20220689442, MARICOPA
COUNTY RECORDS, HAVING AN ARIZONA GRID NORTH, NAD 83 (2011),
HEIGHT: 13'-0"
CENTRAL ZONE VALUE OF NORTHING: 1,029,981.97 FEET, EASTING:
LOT COVERAGE: 0.053% 493,063.10 FEET; THENCE RUNNING ALONG A TIE LINE, SOUTH 44°47'13"
500kW GENERATOR EAST, 28.33 FEET TO A POINT AND THE TRUE POINT OF BEGINNING;
AREA: 112.50 SQFT THENCE, SOUTH 89°41'32" EAST, 300.00 FEET TO A POINT; THENCE, SOUTH
00°07'07" WEST, 300.00 FEET TO A POINT; THENCE, NORTH 89°41'32" WEST,
HEIGHT: 13'-1.7" 300.00 FEET TO A POINT; THENCE, NORTH 00°07'07" EAST, 300.00 FEET TO
LOT COVERAGE 0.007% SAID TRUE POINT OF BEGINNING.
LOAD BANK (EQUIPMENT FOR GENERATOR) BEARINGS BASED ON ARIZONA GRID NORTH, NAD 83 (2011), CENTRAL
AREA: 15.80 SQFT ZONE.
HEIGHT: 9'-5.2"
SAID PARCEL CONTAINS 2.07 ACRES (90,000 SQUARE FEET), MORE OR
LOT COVERAGE: 0.001% SITE LESS.
ZONING LOCATION MMI ACCESS AND UTILITY EASEMENT: TOGETHER WITH A 40-FOOT
WIDE ACCESS AND UTILITY EASEMENT, MEASURING 20 FEET EACH SIDE
EXISTING: RU-43 OF CENTERLINE, LYING AND BEING IN THE SOUTHEAST QUARTER OF
PROPOSED: RU-43 WITH SUP THE SOUTHWEST QUARTER OF SECTION 29, TOWNSHIP 6 NORTH, RANGE
3 WEST OF THE GILA AND SALT RIVER BASE AND MERIDIAN, MARICOPA
COUNTY, ARIZONA, AND BEING A PORTION OF THE LANDS OF 37 ACRES
LAND USE
R & G RANCH PROPERTIES, L.L.C., AS RECORDED IN INSTRUMENT
EXISTING: VACANT 20220689442, MARICOPA COUNTY RECORDS, AND BEING MORE
PARTICULARLY DESCRIBED AS FOLLOWS:
PROPOSED: UTILITY SITE
LOCATION TO FIND THE POINT OF BEGINNING, COMMENCE AT A 1/2-INCH REBAR
PARKING WITH A 1-INCH YELLOW PLASTIC CAP STAMPED "RLS 51969" FOUND AT
THE NORTHWEST CORNER OF THE PARCEL DESCRIBED IN INSTRUMENT
COMPACTED DECOMPOSED GRANITE/AGGREGATE NO. 2022087169, MARICOPA COUNTY RECORDS, HAVING AN ARIZONA
PERMITTED GRID NORTH, NAD 83 (2011), CENTRAL ZONE VALUE OF NORTHING:
1,029,981.97 FEET, EASTING: 493,063.10 FEET, AND ELEVATION: 1,915.27
LANDSCAPING/SCREENING FEET; THENCE RUNNING ALONG A TIE LINE, SOUTH 44°47'13" EAST, 28.33
FEET TO A POINT ON THE MMI EASEMENT AREA; THENCE ALONG THE
SCREENING: CHAIN-LINK FENCE TO BE FITTED WITH SLATS NORTH LINE OF SAID MMI EASEMENT AREA, SOUTH 89°41'32" EAST,
WITH 1' BARBED WIRE 300.00 FEET TO A POINT; THENCE ALONG THE EAST LINE OF SAID MMI
EASEMENT SOUTH 00°07'07" WEST, 24.53 FEET TO A POINT AND THE TRUE
POINT OF BEGINNING; THENCE, LEAVING SAID EAST LINE NORTH
SCHOOL DISTRICT 89°45'04" EAST, 109.73 FEET TO A POINT OF CURVATURE TANGENT CURVE
TO THE RIGHT; THENCE ALONG A TANGENT CURVE TO THE RIGHT,
MORRISTOWN ELEMENTARY
HAVING A RADIUS OF 7.00 FEET, WITH A DELTA ANGLE OF 8°37'44", AND
AN ARC LENGTH OF 1.05 FEET TO A POINT OF TANGENT; THENCE, SOUTH
UTILITIES 81°37'12" EAST, 84.63 FEET TO A POINT OF CURVATURE TANGENT CURVE
TO THE LEFT; THENCE ALONG A TANGENT CURVE TO THE LEFT, HAVING
POWER: ARIZONA PUBLIC SERVICE CO. A RADIUS OF 23.00 FEET, WITH A DELTA ANGLE OF 8°21'50", AND AN ARC
WATER: N/A LENGTH OF 3.36 FEET TO A POINT OF TANGENT; THENCE, SOUTH 89°59'02"
WASTEWATER: N/A EAST, 105.89 FEET TO A POINT OF CURVATURE TANGENT CURVE TO THE
FIRE PROTECTION: CIRCLE CITY-MORRISTOWN FIRE DISTRICT LEFT; THENCE ALONG A TANGENT CURVE TO THE LEFT, HAVING A
RADIUS OF 23.00 FEET, WITH A DELTA ANGLE OF 10°20'18", AND AN ARC
POLICE PROTECTION: MARICOPA COUNTY SHERIFF
LENGTH OF 4.15 FEET TO A POINT OF TANGENT; THENCE, NORTH
NATURAL GAS: N/A
79°40'40" EAST, 68.65 FEET TO A POINT OF CURVATURE TANGENT CURVE
TELEPHONE: N/A TO THE LEFT; THENCE ALONG A TANGENT CURVE TO THE LEFT, HAVING
REFUSE PROVIDER: N/A A RADIUS OF 23.00 FEET, WITH A DELTA ANGLE OF 33°59'49", AND AN
ARC LENGTH OF 13.65 FEET TO A POINT OF TANGENT; THENCE, NORTH
CASE NUMBER: 45°40'51" EAST, 14.78 FEET, MORE OR LESS, TO THE ENDING AT A POINT
ON THE WESTERLY RIGHT-OF-WAY LINE OF US HIGHWAY 60 (W GRAND
SU260001 AVE).
REQUEST: BEARINGS BASED ON ARIZONA GRID NORTH, NAD 83 (2011), CENTRAL
ZONE.
SUP FOR MMI WHITTMAN AZ ILA
DEVELOPMENT OF A UTILITY COMPOUND FOR INSTALLATION
PARENT PARCEL:
OF FIBER OPTIC SEE SHEET P-01 FOR INFORMATION
EQUIPMENT SHELTERS AND ASSOCIATED EQUIPMENT
MMI LTS MANAGED TECHNICAL SERVICES, LLC. ECS SOUTHWEST LLP 14030 THUNDERBOLT PLACE, DH CHARLES ENGINEERING TALMAN CONSULTANTS, LLC DJ&A, P.C. DJ&A, P.C.
103 FOULK ROAD, SUITE 202 723 N OAKLAWN AVE SUITE 500 CHANTILLY VA 20151 802 DEMPSTER STREET 141 W. JACKSON BLVD, STE 1600A 2000 MAPLE STREET 2000 MAPLE STREET
WILMINGTON, DE 19803 ELMHURST, IL 60126 PHONE: (918)-922-7767 EVANSTON, IL 60202 CHICAGO, IL 60604 MISSOULA, MT 59808 MISSOULA, MT 59808
PHONE: (303) 886-1052 PHONE: 312-971-9182 PHONE: (872) 240-8033 PHONE: (773) 825-6261 PHONE: (406) 721-4320 PHONE: (406) 721-4320
PROPERTY OWNER PROGRAM DIRECTOR:
FRANK BAKER LEAD ENGINEERS: BRANCH MANAGER: LEAD ENGINEER: PROJECT MANAGER: PROJECT MANAGER:
WYAT GROOMS, PE ANDREW SCHWARZ, P.E., S.E. JAMES NORTON, P.E. BRIAN SOCIA, PLS EMILY GILLESPIE, PE
A&E PROJECT MANAGER:
TIM MILLER
DIGALERT
PREPARED FOR: PREPARED BY:
CALL TOLL FREE
REFERENCE DRAWINGS REVISIONS 48 HOURS BEFORE YOU DIG
UNDERGROUND SERVICE ALERT LTS Telecommunications
DRAWING No. DESCRIPTION REV DATE DESCRIPTION DES DFT CHK APP
(811) Services (USA) Inc.
14400 The Lakes Blvd.
Pflugerville, TX 78660
Middle Mile Infrastructure SHEET NUMBER REVISION
DWG 24 x 36

PARENT PARCEL:
THE SOUTHEAST QUARTER OF THE SOUTHWEST QUARTER OF SECTION
29, TOWNSHIP 6 NORTH, RANGE 3 WEST OF THE GILA AND SALT RIVER
BASE AND MERIDIAN, MARICOPA COUNTY, ARIZONA;
EXHIBIT
EXCEPT ANY PORTION LYING WITHIN THE ATCHISON, TOPEKA AND ARIZONA STATE TRUST LANDS
SANTA FE RAILROAD RIGHT OF WAY AND THE PHOENIX-PRESCOTT N/A
HIGHWAY.
ALSO EXCEPT 1/3 OF ALL MINERAL RIGHTS, AS SET FORTH IN DEED
RECORDED IN DOCKET 1808, PAGE 50.
ALSO EXCEPT THE FOLLOWING PARCELS:
PARCEL A:
A TRACT OF LAND 208 FEET BY 208 FEET IN THE NORTHWEST CORNER OF
THE SOUTHEAST QUARTER OF THE SOUTHWEST QUARTER OF SECTION
29, TOWNSHIP 6 NORTH, RANGE 3 WEST OF THE GILA AND SALT RIVER
BASE AND MERIDIAN, AS DESCRIBED IN DEED TO ROY PARKER, HOWDY & THE BEAST WELDING AND
RECORDED IN BOOK 427 OF DEEDS, PAGE 327, RECORDS OF MARICOPA CUSTOM METAL FABRICATION LLC
COUNTY, ARIZONA. RU-43
PARCEL B: AGRICULTURE/MIXED JORGE JESUS VALVERDE, ET AL.
PARCEL # 503-16-003G RU-43
THAT PART OF THE SOUTHWEST QUARTER OF THE SOUTHEAST
VACANT
QUARTER AND
PARCEL # 503-16-005
THE SOUTHEAST QUARTER OF THE SOUTHWEST QUARTER OF SECTION
29, TOWNSHIP 6 NORTH, RANGE 3 WEST OF THE GILA AND SALT RIVER
BASE AND MERIDIAN, DESCRIBED AS FOLLOWS:
BEGINNING AT THE SOUTH QUARTER CORNER OF SAID SECTION 29;
THENCE NORTH 16 DEGREES 15 MINUTES EAST, 832.19 FEET TO A POINT
ON THE SOUTHWESTERLY RIGHT OF WAY LINE OF THE
PHOENIX-MORRISTOWN HIGHWAY, WHICH IS THE TRUE POINT OF
BEGINNING;
37 ACRES R&G RANCH
THENCE NORTH 52 DEGREES 04 MINUTES WEST ALONG SAID RIGHT OF PROPERTIES LLC
WAY LINE FOR 104.0 FEET TO A POINT;
RU-43 / C-2
CLARK FAMILY LIVING TRUST
THENCE SOUTH 37 DEGREES 56 MINUTES WEST, 416.0 FEET TO A POINT; RU-43 VACANT
PARCEL # 503-16-007G
VACANT
THENCE SOUTH 52 DEGREES 04 MINUTES EAST, 104.0 FEET TO A POINT;
PARCEL # 503-16-018
THENCE NORTH 37 DEGREES 56 MINUTES EAST, 416.0 FEET TO THE POINT
OF BEGINNING, AS DESCRIBED IN DEED TO PAUL W. CAIN AND
VIVIANNE B. CAIN, HIS WIFE, RECORDED IN DOCKET 156, PAGE 261,
RECORDS OF MARICOPA COUNTY, ARIZONA.;
RANCH
LLC
R&G
C-2
/ 503-16-007D
ACRES PROPERTIES
RU-43 STORAGE
COORDINATES:
37 #
PARCEL 33.826079, -112.598459
AL.
ET
CLARK FAMILY LIVING TRUST
RU-43
MOBILE HOME HODGSON,
C-2
PARCEL # 503-16-021 / 503-16-012
E
RU-43 COMMERCIAL
#
MARGARET
PARCEL
37 ACRES R&G RANCH PROPERTIES LLC
RU-43
VACANT
PARCEL # 503-16-006A
LEGEND
PATRICIA SAMPSON, ET AL.
RU-43
MOBILE HOME
PARCEL # 503-16-003K
R&G RANCH PROPERTY LLC
RU-43 / C-2
COMMERCIAL
PARCEL # 503-16-007H
DAREL KLASSEN, ET AL.
RU-43
VACANT
PARCEL # 503-16-003L
ARIZONA STATE TRUST LANDS
N/A
© 2026 Microsoft Corporation © 2026 Maxar ©CNES (2026) Distribution Airbus DS © 2026 TMAP MOBILITY Earthstar Geographics SIO
DIGALERT
PREPARED FOR: PREPARED BY:
CALL TOLL FREE
REFERENCE DRAWINGS REVISIONS 48 HOURS BEFORE YOU DIG
UNDERGROUND SERVICE ALERT LTS Telecommunications
DRAWING No. DESCRIPTION REV DATE DESCRIPTION DES DFT CHK APP
(811) Services (USA) Inc.
14400 The Lakes Blvd.
Pflugerville, TX 78660
Middle Mile Infrastructure SHEET NUMBER REVISION
DWG 24 x 36

SITE PLAN
COORDINATES:
33.826079, -112.598459
CONSTRUCTION NOTES
VAULTS CONDUIT DRIVE ACCESS FENCE
DIGALERT
PREPARED FOR: PREPARED BY:
CALL TOLL FREE
REFERENCE DRAWINGS REVISIONS 48 HOURS BEFORE YOU DIG
DRAWING No. DESCRIPTION REV DATE DESCRIPTION DES DFT CHK APP UNDERGROUND SERVICE ALERT LTS Telecommunications
(811) Services (USA) Inc.
14400 The Lakes Blvd.
Pflugerville, TX 78660
Middle Mile Infrastructure SHEET NUMBER REVISION
DWG 24 x 36

SITE
GRADING PLAN
1906
1915 1910
1905
1910
1905
1915
1904
1905
1910
1903 1914
1914 1909
1913 1906
1912 1905
1902 1911 1910 1908
1907 1910
1905
1913
1901 -2.2%
-4.1% 1912
1900
1911
-2.3%
1910
-1.3%
1909
1908
1907 1906
-1.4%
1899
1905
1898
1904
-4.2% 1903
1903
← ELEVATION GUIDE
-1.2%
1910
-0.7%
1897 1909 0000.00
0000'
1896 1896 1906
1908 1905
-4.2% -2.3%
-6.4%
1895
DIGALERT
CALL TOLL FREE PREPARED FOR: PREPARED BY:
REFERENCE DRAWINGS REVISIONS 48 HOURS BEFORE YOU DIG
DRAWING No. DESCRIPTION REV DATE DESCRIPTION DES DFT CHK APP UNDERGROUND (811) SERVICE ALERT LTS Services Telecommunications (USA) Inc.
14400 The Lakes Blvd.
Pflugerville, TX 78660
Middle Mile Infrastructure SHEET NUMBER REVISION
DWG 24 x 36

DETAIL 1 (SEV/CEV 36"x 60"x 48") TRENCH DETAIL SERVICE EQUIPMENT RACK
AGGREGATE BASE FOR DRIVE
CLEAN AGGREGATE SURFACE SECTION
* SEE SHEET E-01 UTILITY COORDINATION NOTES
DETAIL 2 (KEV 30"x 48"x 36")
1 CHAIN-LINK FENCE DETAIL
N.T.S.
DIGALERT
PREPARED FOR: PREPARED BY:
CALL TOLL FREE
REFERENCE DRAWINGS REVISIONS 48 HOURS BEFORE YOU DIG
DRAWING No. DESCRIPTION REV DATE DESCRIPTION DES DFT CHK APP UNDERGROUND SERVICE ALERT LTS Telecommunications
(811) Services (USA) Inc.
14400 The Lakes Blvd.
Pflugerville, TX 78660
Middle Mile Infrastructure SHEET NUMBER REVISION
DWG 24 x 36

LTS Managed Technical Services LLC
14400 The Lakes Blvd., #100, Building C
Pflugerville, TX 78660
TITLE PAGE
Narrative Report
For
Special Use Permit Application
MMI-Whittman AZ / 37 ACRES R&G RANCH PROPERTIES LLC
ILA Fiber Optic Equipment Shelter in ~113x128 utility compound lot
ZN# SU260001
Location: ADDRESS TBD / ~0.45 mi south of the intersection of N 253rd Ave and HWY 60
Prepared On: 7/29/2026

GENERAL INFORMATION
Applicant: Middle Mile Infrastructure LLC
Developer: Sam J. Davis (agent for MMI)
LTS Managed Technical Services LLC
14400 The Lakes Blvd, Bldg C, Ste 100
Pflugerville, TX 78660
Site Address: TBD / General directions, From HWY 60, ~1.2 miles NW from Circle
City; then site is on SW side of road
Assessor’s Parcel No. 503-16-006A
Zoning: RU-43
Parcel Size: 37.05 acres, +/-
SUP / Easement Area Size: 90,000 sqft (300’ x 300’ easement)
Development Area: ~14,500 sqft
MMI Site: Whittman AZ
Property Owner: 37 ACRES R&G RANCH PROPERTIES LLC
Request: Approval of development of the proposed utility compound for
installation of fiber optic equipment shelters
PURPOSE OF REQUEST
On behalf of Middle Mile Infrastructure, LLC (MMI) – LTS Managed Technical Services LLC is requesting a
Special Use Permit (SUP) for a new utility compound for in-line amplifying (ILA) fiber optic utility
equipment shelter(s). The equipment shelter is ~864 square feet (sqft) and is unmanned / unoccupied.
The shelter is prefabricated off-site as a unit and is shipped and installed at the site and will contain the
equipment to support the fiber optic network.
DESCRIPTION OF PROPOSAL
MMI proposes to install a new utility compound and equipment shelter that acts as an infrastructure
component supporting their existing fiber-optic network. The equipment shelter is ~864 sqft,
prefabricated “double wide” modular unit. The initial installation will be for (1) “double wide” shelter
with a second one proposed for future installation. The shelter is approximately 24’x36’x12’-9”.

The equipment shelter is a precast concrete building with an exposed coarse aggregate finish, that is
placed and anchored to a precast concrete monolithic slab foundation at the required frost depth for
soil conditions. The prefabricated unit is shipped to the site in two modular halves, and is then installed
and sealed together on site. There are no antennas, towers, or dishes at the site or for this shelter.
The utility compound and equipment shelter is an unoccupied/unmanned facility that is not open to the
public and is fenced with an access gate that will be locked at all times. Access is only permitted by
trained and authorized service personnel on an infrequent basis (ex. Site maintenance, emergency
repairs, etc.). The utility compound will be surrounded by a 8’ chain-link security fence with 1’ (3-strand)
of barbed wire and screened with a neutral/desert color slats. The outside lighting on the site is (1)
downward directed wall mounted LED light fixture at each entry door (three total). Each light will have a
dawn to dusk photocell control. There will be no proposed signate at this location.
RELATIONSHIP TO SURROUNDING PROPERTIES
The site is in a sparsely populated, but not entirely remote part of Maricopa County on a vacant parcel.
The surrounding parcels are low-intensity with ample spacing between structures. There are a few
residential properties to the west, open space north and south, and small commercial uses to the east.
No emissions or noise generation will be created from the normal operations of this equipment shelter.
The fiber infrastructure requires placement of line amplifiers that helps improve the network by
providing additional signal stability, help carry information, and reduce latency. These routes are part of
the fiber optic backbones that help facilitate modern day communications.
LOCATION AND ACCESSIBILITY
The location of the utility compound has been chosen because of its proximity to the existing fiber optic
cable route and its minimal impact to the adjacent road. The compound will be accessed from an access
easement off of HWY 60. No direct access to US-60 proposed and
CIRCULATION SYSTEM (ON & OFF-SITE)
Visits to the site will be infrequent and primarily for scheduled maintenance visits (typically quarterly
through the year). This will not impact the existing traffic patterns of the area. The compound is not
open to public access. Applicant is working with ADOT for access approval to service road adjacent to
US-60

DEVELOPMENT SCHEDULE (PHASING)
The project is a small standard design and is built in one construction phase (4-6 weeks). The site is
grubbed / graded, site work prep and foundations are poured, the equipment shelter is installed and
final site work is completed. A second foundation pad will be poured for a future shelter installation.
COMMMUNITY FACILITIES AND SERVICES
The equipment shelter is located in a rural area with no schools or parks in close proximity. The shelter
itself is a private building that is not accessible to the public.
PUBLIC UTILITIES AND SERVICES
There will be no water or sewage utility required or provided. No waste or trash will be accumulated or
generated with this proposed development. This is an unoccupied / unmanned facility with no plumbing
or waste generation. The shelter will be services by the Circle City-Morristown Fire District and by the
District 4 Sheriff’s Office.
OTHER / ADDITIONAL INFORMATION
The utility compound is NOT in floodplain, however the proposed access drive does cross a Zone A
floodplain. We are proposing a reinforced dip crossing that will not impede on the floodplain and will
allow the water to carry over the crossing and not be impeded during an event.
DEVELOPMENT STANDARDS
REGULATION BASE ZONING DISTRICT PROPOSED ZONING DISTRICT
REGULATIONS (RU-43) REGULATIONS (SUP)
Height 30’ 30’
Front Yard 40’ 40’
Side Yard 20’ 20’
Street-side Yard 20’ 20’
Rear Yard 40’ 40’
Lot Area 1 acre 1 acre
Lot Width 145’ 145’
Lot Area Per Dwelling 1 acre 1 acre
Unit
Lot Coverage 25% 25%
Parking Spaces Required N/A 1 space
Paved Parking Stabilized DG Stabilized DG
Screening A solid wall, not less than six feet in Chain-link fencing and 1’ of barbed
height, shall be required along and wire permitted. Neutral colored slats
adjacent to any side or rear property will be fitted to the chain link to
line abutting any rural or residential provide additional screening. Screening
zone boundary. no greater than 10’ in height.

Justification of Standards
Parking Spaces – The utility compound and equipment shelter is unmanned / unoccupied and is visited
infrequently and generally only for maintenance and emergency repairs. No ADA spaces are proposed as
no public access is available to the site. An area within the compound will be reserved for maintenance
technicians to park.
Paved Parking – One parking space is being proposed for this site for a technician parking spot that is
infrequently used. Stabilized DG (AASHTO #57) on the site is appropriate.
Screening – Neutral / desert colored slats will be fitted to the proposed chain-link fence to provide
screening of the utility compound.
Total height of the chain-link fencing would be 8’ with 1’ of proposed barbed wire for 9’ in total height. A
total fence height of no greater than 10’ is being proposed.
1’ of barbed-wire is proposed in order to provide a layer of security to the site to prevent unintentional
damage of valuable equipment and prevent access and/or theft of sensitive information.
If there are any questions, please contact me at the information provided in my below signature block.
Sincerely,
Sam J. Davis
Sam J. Davis
Project Permitting – Site Infrastructure
LTS Managed Technical Services
14400 The Lakes Blvd. Suite 100 Bldg C, Pflugerville, TX 78660
w 859-286-8160 | sam.davis2@ledcor.com
www.ledcor.com
FORWARD. TOGETHER.

Planning & Development
Engineering Plan Review
Date: August 20, 2026
Anh Harambasic, PE
Planning & Development
301 W. Jefferson St., Suite 170 Memo To: Darren Gerard, AICP, Planning Manager, Department of Planning &
Phoenix, Arizona 85003 Development
Phone: (602) 506-3611
www.maricopa.gov/planning
Email address: Attn: Nicolas Schlimm, Planner, Planning & Development Services
anh.harambasic@maricopa.go
v From: Anh Harambasic, P.E. Engineering Plans Reviewer, Planning and
Development Services.
cc: Doug Jones, P.E., Engineering Supervisor, Planning & Development
Services
Subject: SU260001 ILA equipment shelters
Job Site Address: 38122 N Grand Ave Morrison, AZ 85342
APN(s): 503-16-006A
This applicant is requesting a special use permit for a utility compound for in-line
amplifying fiber optic utility equipment shelters. Unmanned/unoccupied 864 square
feet shelter.
PND Engineering Plan Review (DPR, FCD and PND Transportation) has reviewed the
1st submittal of the zone change request application routed for review on 7.30.2026
and has no objections to the special use request, approvals are subject to the following
conditions:
1. The parcel, 503-16-006A, contains areas of a FEMA designated special flood
hazard area. Proposed utility shelter does not appear to encroach into the
floodplain. Any encroachment or grading of the floodplain will require a flood
use permit and a building permit.
2. Site is in proximity and access is via US 60 and requires ADOT approval via
the redletter@azdot.gov process. ADOT approval must be obtained prior to
building permit issuance.
3. MCDOT TIS waiver was approved on 2.3.2026 and still valid.
4. Engineering review of entitlement cases is conceptual in nature. All
development and engineering design shall be in conformance with Section
905 of the Maricopa County Zoning Ordinance; Drainage Policies and
Standards; Floodplain Regulations for Maricopa County; MCDOT Roadway
Design Manual; and current engineering policies, standards and best
practices at the time of application for construction.
Page 1 of 2

Page 2 of 2
5. The County does not provide fire service, therefore, it is incumbent that the
applicant seek service and approval of plans from the jurisdictional fire service
provider.
Please contact me if you have any questions or require any additional information.

back feet the
sent of square public of
be purpose the Site
Request will ~864 to (ex. generation
plans the is open basis
Waiver the for is shelter not is trip Comment
sam.davis2@ledcor.com or project that infrequent average
Study Applicable equipment
Traffic facility an on The Consultant
Not acknowledgment proposed The
roadway.
the personnel
your shelter(s). unoccupied/unmanned arterial
date cooperation. applicant, service
and your the equipment County
By sign per an authorized or
Sealed and for you As utility is Highway Code
Discipline Consultant Signature shelter and
Plans Date question Thank 503-16-006-A. optic trained State
sheet. Evaluate fiber equipment by the based additions and as to
every this to APN# (ILA) to points review (See network R/W permit applicant surrounding
answer with and permitted driveways hour. development Any Traffic for request hours. of other the
C=Consultant Parcel amplifying only peak sheet. or (TS) access TIS requirements. roadway peak approval any of
please along on compound is access PM existing or TS waiver property. and jurisdiction
plans located in-line Access or proposed review Statement a TIS MCDOT during details, responsibility
records, of B=Deleted for utility any AM the submit or TS study trips this constitute have 1 of
our set property The times. proposing the the comment Traffic to to for traffic 5 of not Plan the that Approved 1
for new compound all in for surrounding than usage Site Is Page
is a Comply the applicant, at trips impacts this a for modifications developer manual the less does of It agencies Is
sheet and for utility locked not is 5 than Comment of TIS for the be proposed site layout Waiver
This plans A=Will waiver new the per be site less study Summary criteria or the MCDOT applicant to on to on project development. other Study
Column. marked-up Code: study a for As will The be Review traffic MCDOT access require the impacts estimated concerns this geometric this all with
Compound that etc.). to to Project new will latest by for for Traffic
P.E./602.506.8677 Reply the Consultant traffic Application unoccupied. gate repairs, expected limited the meet any the no is traffic Waiver permits The
Utility back for / access is are in will including roadways, to Refer provided anticipates generation no requirements, applicable for
New Consultant Send seeking (SUP) an emergency described that has Study
Narwa, the is Permit unmanned with development comments parcel (TIS), MCDOT MCDOT. information MCDOT trip MCDOT Traffic requirements application
Sheet |SUP 503-16-006-A in process. is fenced use subject Study to by average of dedication their site.
Waiver SU260001 Laxmikanth comment the developer Use and is maintenance, proposed below land the the connecting approval the per attached), site Therefore, Approval or project
TIS APN The Special (sqft) and The on to Impact As the limits related submit the
Comment each complete No.
to to Page General General General
respond
Review and Summary: No. 1 2 3
Item
code
the Project Date 2/3/2026 2/3/2026 2/3/2026
Engineering use
No. Please General
No. No.
Name File Reviewer/Phone Review 1 1 1
Traffic Project Location MCDOT Consultant:
Int. LN LN LN

MCDOT Planning TAC Comments
Date: March 3, 2026
TAC Assigned Number: SU260001
APN: 503-16-006A
Description of Request: SUP in the Rural-43 WHSC zoning district for a fiber-optic utility
compound
Project Name: MMI Wittmann AZ ILA
Reviewer Contact Information
For any questions related to the comments herein please contact MCDOTPlanning@maricopa.gov
or 602-506-4619.
1st Submittal Comments
• All perimeter section line and mid-section line alignments of the proposed development
require the setback lines to start from a future half street Right-of-Way of 65- and 40-feet
(respectively) per the Maricopa County Zoning Ordinance Section 805.
• The Wild Rose Parkway preferred alignment traverses through this parcel requiring the
setback line to start from a future half street Right-of-Way of 100-feet from the center line
of the proposed alignment per the Maricopa County Zoning Ordinance Section 805.
• Applicant to notify the Project Manager, Bradlee Williams (BWilliams@azmag.gov) of
proposed project due to proximity to a the Maricopa Association of Governments (MAG)
Project US 60 Grand Avenue – Loop 303 to SR 74 Corridor Study.
• Applicant to notify ADOT of proposed project through the Red Letter Process,
RedLetter@azdot.gov, due to the proximity to the US 60.
Engineering Division P: 602.506.4889
2901 W. Durango Street F: 602.506.5969
Phoenix, Arizona 85009

Nicholas Schlimm (PND)
From: MCDOT Planning General
Sent: Wednesday, April 8, 2026 3:45 PM
To: Sam Davis
Cc: Laxmikanth Narwa (DOT); Jamie Hartig; Hasina Luna (DOT); Stephen Doubek (DOT);
Nicholas Schlimm (PND); Drew Sigado (DOT)
Subject: RE: SU260001 - Wild Rose Pkwy questions / MMI-Whittman AZ-37 Acres R&G-LV to
PHX
Good afternoon,
Thank you for your patience on MCDOT’s response. With these adjustments, you are outside of the
future ROW.
Thank you,
Devin Rouhani
Planner
Transportation
Engineering
2901 West Durango Street Phoenix, AZ 85009
O: 602-506-4619 C: 602-342-6768
E: devin.rouhani@maricopa.gov
[ Maricopa.Gov ]
Facebook | Instagram | X | YouTube | LinkedIn
From: Sam Davis <Sam.Davis2@ledcor.com>
Sent: Wednesday, April 1, 2026 9:06 AM
To: MCDOT Planning General <MCDOTPlanning@maricopa.gov>
Cc: Laxmikanth Narwa (DOT) <Laxmikanth.Narwa@maricopa.gov>; Jamie Hartig <Jamie.Hartig@ledcor.com>; Devin
Rouhani (DOT) <devin.rouhani@maricopa.gov>; Hasina Luna (DOT) <Hasina.Luna@maricopa.gov>; Stephen Doubek
(DOT) <Stephen.Doubek@maricopa.gov>; Nicholas Schlimm (PND) <Nicholas.Schlimm@maricopa.gov>; Drew Sigado
(DOT) <Drew.Sigado@maricopa.gov>; Sam Davis <Sam.Davis2@ledcor.com>
Subject: RE: SU260001 - Wild Rose Pkwy questions / MMI-Whittman AZ-37 Acres R&G-LV to PHX
Good ZjQcmQRYFpfptBannerStart mor ning – providing an updated concept to our conv ersation the ot her week: Can MCDOT please take a look at the attached site plan with the proposed relocation on the parcel and provide any comments/feedback or if the revised location would
This Message Is From an External Sender
This message came from outside your organization. Please use caution when corresponding outside the county.
ZjQcmQRYFpfptBanner End
Good morning – providing an updated concept to our conversation the other week:
Can MCDOT please take a look at the attached site plan with the proposed relocation on the parcel and
provide any comments/feedback or if the revised location would be in conflict with current plans?
 We worked with the property owner to move the proposed utility compound out of the Wild Rose
Pkwy feasibility alignment
1

 The location moved to the SW corner of the property (see attached site plan)
o The location is outside the setback from center line
o And just overall not inside any future ROW
 Driveway access would be similar location to initial submittal – it does cross thru a future ROW
Thank you,
Sam J. Davis
w 859-286-8160
From: MCDOT Planning General <MCDOTPlanning@maricopa.gov>
Sent: Thursday, March 19, 2026 1:33 PM
To: Sam Davis <Sam.Davis2@ledcor.com>
Cc: Laxmikanth Narwa (DOT) <Laxmikanth.Narwa@maricopa.gov>; Jamie Hartig <Jamie.Hartig@ledcor.com>; Devin
Rouhani (DOT) <devin.rouhani@maricopa.gov>; Hasina Luna (DOT) <Hasina.Luna@maricopa.gov>; Stephen Doubek
(DOT) <Stephen.Doubek@maricopa.gov>; Nicholas Schlimm (PND) <Nicholas.Schlimm@maricopa.gov>
Subject: RE: SU260001 - Wild Rose Pkwy questions / MMI-Whittman AZ-37 Acres R&G-LV to PHX
CAUTION: This email was sent from outside of Ledcor’s network. Please be careful while clicking links, opening attachments, or
replying to this email.
You are welcome, I sent over the meeting invite.
Thank you,
Drew Sigado
Planning Project Manager
Department of Transportation
Engineering Division
2901 West Durango Street Phoenix, Arizona 85009
O: 602-506-7223
E: Drew.Sigado@Maricopa.gov
[ Maricopa.Gov ]
Facebook | Instagram | Twitter | YouTube | LinkedIn
From: Sam Davis <Sam.Davis2@ledcor.com>
Sent: Thursday, March 19, 2026 11:16 AM
To: MCDOT Planning General <MCDOTPlanning@maricopa.gov>; Drew Sigado (DOT) <Drew.Sigado@maricopa.gov>
Cc: Laxmikanth Narwa (DOT) <Laxmikanth.Narwa@maricopa.gov>; Jamie Hartig <Jamie.Hartig@ledcor.com>; Devin
Rouhani (DOT) <devin.rouhani@maricopa.gov>; Hasina Luna (DOT) <Hasina.Luna@maricopa.gov>; Stephen Doubek
(DOT) <Stephen.Doubek@maricopa.gov>; Nicholas Schlimm (PND) <Nicholas.Schlimm@maricopa.gov>
Subject: RE: SU260001 - Wild Rose Pkwy questions / MMI-Whittman AZ-37 Acres R&G-LV to PHX
Thank you, Drew (@ Drew. Sigado@ Maricopa. gov – let’s say tomorrow Friday 3/20 @11am MST Please send over the Teams / meeting maker invite when you have a moment – thanks! Sam J. Davis w 859- 286- 8160 Fr om: MCDOT Planning General
Thank you, Drew (@Drew.Sigado@Maricopa.gov – let’s say tomorrow Friday 3/20 @11am MST
Please send over the Teams / meeting maker invite when you have a moment – thanks!
Sam J. Davis
w 859-286-8160
2

From: MCDOT Planning General <MCDOTPlanning@maricopa.gov>
Sent: Wednesday, March 18, 2026 3:21 PM
To: Sam Davis <Sam.Davis2@ledcor.com>; Nicholas Schlimm (PND) <Nicholas.Schlimm@maricopa.gov>
Cc: Laxmikanth Narwa (DOT) <Laxmikanth.Narwa@maricopa.gov>; Jamie Hartig <Jamie.Hartig@ledcor.com>; Devin
Rouhani (DOT) <devin.rouhani@maricopa.gov>; Hasina Luna (DOT) <Hasina.Luna@maricopa.gov>; Stephen Doubek
(DOT) <Stephen.Doubek@maricopa.gov>
Subject: RE: SU260001 - Wild Rose Pkwy questions / MMI-Whittman AZ-37 Acres R&G-LV to PHX
CAUTION: This email was sent from outside of Ledcor’s network. Please be careful while clicking links, opening attachments, or
replying to this email.
Good afternoon,
Thank you for reaching out to discuss this. Yes, we can set up a meeting to address your questions, see
availability below for this week.
 Thursday, 3/19
o 10:30 – 12
 Friday, 3/20
o 9 – 12
o 1 – 3
Lax and Hasina, this is related to the Planning comments provided, you will be added as optional to the
meeting. If you are unable to attend and if any questions arise for TSMO we can follow up.
Thank you,
Drew Sigado
Planning Project Manager
Department of Transportation
Engineering Division
2901 West Durango Street Phoenix, Arizona 85009
O: 602-506-7223
E: Drew.Sigado@Maricopa.gov
[ Maricopa.Gov ]
Facebook | Instagram | Twitter | YouTube | LinkedIn
From: Sam Davis <Sam.Davis2@ledcor.com>
Sent: Wednesday, March 18, 2026 1:03 PM
To: Nicholas Schlimm (PND) <Nicholas.Schlimm@maricopa.gov>; Hasina Luna (DOT) <Hasina.Luna@maricopa.gov>
Cc: Laxmikanth Narwa (DOT) <Laxmikanth.Narwa@maricopa.gov>; Sam Davis <Sam.Davis2@ledcor.com>; Jamie Hartig
<Jamie.Hartig@ledcor.com>; MCDOT Planning General <MCDOTPlanning@maricopa.gov>; Drew Sigado (DOT)
<Drew.Sigado@maricopa.gov>
Subject: SU260001 - Wild Rose Pkwy questions / MMI-Whittman AZ-37 Acres R&G-LV to PHX
Good after noon – following up with MCDOT on TAC comment received for #S U260001. Our questions and exhibit are below – if a m eeting/phone call can help review this item specifically, we w ould appreciate getting something set up here
Good afternoon – following up with MCDOT on TAC comment received for #SU260001. Our questions
and exhibit are below – if a meeting/phone call can help review this item specifically, we would
appreciate getting something set up here before the end of the week.
3

Application# SU260001
Parcel# 503-16-006A
1. Wild Rose Pkwy – preferred alignment feasibility study
 While our proposed equipment shelters are setback from the alignment – a significant
portion of our proposed easement is falling within this “reserved” ROW.
 Is this preferred alignment limit our ability for any future expansion of the site?
 We had designed our access along the property line to ADOT RoW – but this access is
allowed, only buildings/structures are required to be setback?
 Is there a waiver or any relief that can be requested ?
 We contacted the property owners and they were unaware of this proposed alignment
running through their property
4

2. If access or the site has to move –
 Does MCDOT have any recommendations on access options to a locked parcel?
Thank you,
Sam J. Davis
Project Permiƫng – Site Infrastructure
LTS Managed Technical Services
14400 The Lakes Blvd. Suite 100 Bldg C, Pflugerville, TX 78660
w 859-286-8160
www.ledcor.com
FORWARD. TOGETHER.
5



ADOT Traffic Guidelines and Processes
August 2021
IDO and TSMO
240 Traffic Impact Analysis & Statement
Exhibit 240-A. Traffic Impact Analysis Pre-Submittal Form
Project Name: MMI Whittman AZ ILA - Michael Rhodes LLC
Developer/Owner: LTS Managed Technical Services, LLC
Phone Number: 859-286-8160
Email: Sam.Davis2@ledcor.com
Project Location
State Route (with nearest MP or Street): US-60 / 123.4 SB
Local Jurisdiction: Maricopa County AZ
Stage of Development (choose one)
☐ X Planning/Zoning ☐ Development Plan
Brief Description of Project (land use, intensity, timeframe/phasing)
This access driveway request is for access to a proposed utility compound for fiber optic network equipment shelters
and supporting equipment. The compound/equipment shelters are unmanned/unoccupied. Traffic is not generated by
the proposed development - scheduled maintenance occurs every 2-3 months and is accomplished by (1) technician in
a standard sized vehicle. No heavy trucks or similar are entering / existing the compound.
Proposed Access (number, location, restrictions)
(1) utility access driveway along US-60 ~at MP 123.4 SB on the south side of US-60
Preliminary Assumptions (provide as attachment)
● Trip Generation ● Pass-By Or Internal Capture
● Study Horizon Years ● Future Roadway Network
● Trip Distribution ● Study Area Intersections
Traffic Study Required (choose one) ☐ Yes ☐ X No
Traffic Study Type (choose one if yes, none if no)
☐ Transportation Planning Study
☐ Traffic Impact Analysis
☐ Traffic Impact Statement
Traffic Study Preparer
Firm Name:
Contact:
Phone:
Email:
Pre-Submittal Forms are not required for each project but are a useful tool to reduce the number of submittals/reviews
and aid development timeframes. When submitted, Regional Traffic Engineering staff will review and confirm the form
in a timely manner. Changes to the above information should be provided in writing. A hard copy of an approved Pre-
Submittal Form shall be included in the Study appendix.
Approval by: By Nicholas.Schlimm Date: at 3:32 pm, Sep 07, 2026
We do not support new driveway to access US60 directly. We recommend utilizing the
existing driveways to access the proposed site. Please see the redlines below. The parcels
in the south side of the site along US60 and the subject development should consider
shared access when they develop in the future. The existing driveways locations should be
240-14
reviewed and re-evaluated at that time.

Nicholas Schlimm (PND)
From: cboucher@azgfd.gov on behalf of Project Evaluation Program - Game and Fish
<pep@azgfd.gov>
Sent: Friday, March 6, 2026 1:07 PM
To: Nicholas Schlimm (PND)
Subject: Re: SU260001 - Technical Advisory Committee (TAC) Notification
This Message Is From an External Sender
This message came from outside your organization. Please use caution when corresponding outside the county.
Mr. Schlimm,
The Department appreciates the opportunity to provide an evaluation of impacts to wildlife or wildlife habitats
associated with this project. Based on the information provided, the Department offers the following general
recommendations:
 Please minimize the potential introduction or spread of exotic invasive species, including aquatic and
terrestrial plants, animals, insects and pathogens. Precautions should be taken to wash and/or
decontaminate all equipment utilized in the project activities before entering and leaving the site.
Please review the Arizona Department of Agriculture’s website for a list of prohibited and
restricted noxious weeds and the Arizona Native Plant Society for recommendations on control
methods. To view a list of documented invasive species or to report invasive species in or near your
project area visit iMapInvasives - a national cloud-based application for tracking and managing
invasive species.
 Please ensure the project complies with Arizona Native Plant Law regulations. A Native Plant Inventory
may need to be conducted to identify, record, and coordinate plant salvage efforts for species that are
Protected under the Arizona Native Plant Law. In addition, the applicable land management agencies
should be consulted regarding guidelines for revegetation efforts.
 If vegetation removal/trimming is required, the Department recommends that a qualified biologist
survey for nesting birds within the project area if work will be conducted during the breeding season.
The trees and/or vegetation within the project area may provide nesting opportunities for avian species
that are regulated under the Migratory Bird Treaty Act (MBTA) and protected under state law.
Breeding season for birds in the project vicinity is generally January through late June. If it is
anticipated the project will not be in compliance with MBTA, the Department also recommends
contacting the U.S. Fish and Wildlife Service (USFWS) for technical assistance and options to
comply with the MBTA.
 If trenching or digging of holes will occur, trenching/digging and backfilling crews should be close
together to minimize the amount of open trenches/holes at any given time. Avoid leaving
trenches/holes open overnight. Where trenches/holes cannot be back-filled immediately, escape ramps
should be constructed, which can be short lateral trenches or wooden planks sloping to the surface.
The slope should be less than 45 degrees (1:1). Trenches/holes that have been left open should be
inspected and animals removed prior to backfilling.
This email serves as our official response.
If you have any questions regarding this email, please feel free to contact me.
Thanks,
1

To picture help from protect the your Internet. priv acy, Microsoft Office prevented automatic download of this To help protect your privacy, Microsoft Office prevented automatic download of this picture from the Internet. Cheri Bouchér
Project Evaluation Program Specialist
ARIZONA GAME AND FISH DEPARTMENT
5000 W. Carefree Highway
Phoenix, AZ 85086
OFFICE: 623-236-7615
CELL: 619-997-2051
cboucher@azgfd.gov
azgfd.gov
On Fri, Feb 6, 2026 at 1:55 PM Nicholas Schlimm (PND) <Nicholas.Schlimm@maricopa.gov> wrote:
Good afternoon,
The attached document includes the TAC memo for Case SU260001. Please review the attached memo
for instructions to download application materials.
If you have any questions or concerns, please feel free to contact me.
Thank you,
Nick Schlimm
PLANNING & DEVELOPMENT
301 W. Jefferson St. #170 Phoenix, AZ 85003
Planner
O: 602-506-0031
MARICOPA.GOV
Facebook | Instagram | Twitter | YouTube
2

Nicholas Schlimm (PND)
From: Rhonda Buss <rbuss@azland.gov>
Sent: Monday, February 23, 2026 12:44 PM
To: Nicholas Schlimm (PND)
Cc: Karen Dada
Subject: ASLD Comments - SU260001 Fiber Equipment SUP
This Message Is From an External Sender
This message came from outside your organization. Please use caution when corresponding outside the county.
Dear Nicholas Schlimm,
Thank you for the public notice regarding File No. SU-260001, fiber equipment SUP. ASLD is opposed to
the proposed screening development standard modification and requests that the existing codified
screening standard for a solid wall not less than 6-feet remain in effect where adjacent to State Trust
Land. Development interest in the area has been received.
Please feel free to contact me if there are any questions or comments.
Thank you,
To protect privacy, Micro Office prevente help so y f Rhonda Buss, AICP
auto downloa this from Internet. pictu mati the Planner III
1110 W. Washington St
Phoenix, AZ 85007
602-542-3126
land.az.gov | Facebook | Twitter/X
1

Nicholas Schlimm (PND)
From: Karen Dada <kdada@azland.gov>
Sent: Monday, March 9, 2026 9:07 AM
To: Sam Davis; Nicholas Schlimm (PND); Karen Dada
Cc: rbuss@azland.gov; Jamie Hartig
Subject: Re: SU260001 - ASLD Comments, fiber equipment / MMI-Whittman AZ-37 acres R&G-
LV to PHX
This Message Is From an External Sender
This message came from outside your organization. Please use caution when corresponding outside the county.
Good morning Sam,
Rhonda has been out for a family emergency.
For your question on legal access to your site, to get the most accurate information, please submit a
request through our Public Portal. If you can, please include both the APN and the TRS for the land
that is subject of the request. While a ROW may exist, depending on the terms of the instrument and
who it was issued to, it may not provide the access you would need. That is outside of the Planning
Section's area of expertise, so this route will ensure that you have the access that you need to
facilitate your development.
ASLD would accept the slatted fence.
To protect privacy, Micro Office prevente help so y f Karen Dada, AICP
auto downloa this from Internet. pictu mati the Assistant Director
Real Estate Division
1110 W. Washington St
Phoenix, AZ 85007
602-542-3118
land.az.gov | Facebook | Twitter/X
On Fri, Mar 6, 2026 at 10:25 AM Sam Davis <Sam.Davis2@ledcor.com> wrote:
Hi Rhonda – following up with you on this correspondence from the other day.
When you can – please let us know what comments you have regarding our suggested screening
options.
1

Feel free to give me a call (859-286-8160) if it would be easier for us to have a conversation about your
comments and what options we can provide.
Thank you!
Sam J. Davis
w 859-286-8160
From: Sam Davis <Sam.Davis2@ledcor.com>
Sent: Wednesday, March 4, 2026 9:22 AM
To: rbuss@azland.gov
Cc: kdada@azland.gov; Sam Davis <Sam.Davis2@ledcor.com>; Jamie Hartig <Jamie.Hartig@ledcor.com>
Subject: SU260001 - ASLD Comments, fiber equipment / MMI-Whittman AZ-37 acres R&G-LV to PHX
Importance: High
Hi Rhonda (@rbuss@azland.gov) – Nick Schlimm with Maricopa County PND provided us the ASLD
comment regarding our proposed screening modification for our project.
He suggested we contact you directly to provide further details or alternatives.
 The proposed enclosure / security fencing at the site is and 8’ tall chain-link fence with 1’ of
security wire on top
 Typically, our client prefers this option to allow as much unobstructed airflow as possible
 The shelters are unmanned / unoccupied – so having some unobstructed visibility to the
site can help deter unauthorized site access, vandalism, or damage to valuable/sensitive
equipment
 In lieu of a fully solid / opaque wall – would ASLD be OK with screening-slats in the chain-link
fencing on the north side of the compound?
 These slats can be neutral in color
 Our client can still get the benefit of mostly unobstructed airflow and security of the site –
and the screening would be 8’ high, providing relief to the ASDL view.
 Additional question for ASLD – for the property and abutting Grand Ave – could you confirm if there
is a ROW boundary/edge on that NE side of the property?
2

 From survey / GIS parcels – it was unclear where the ROW ended and State Trust Land
began
 My sketch here – the red dashes are an assumed ROW
I look forward to hearing from you – please let me know your thoughts on this and if you have any other
questions.
Thank you,
Sam J. Davis
Project Permitting – Site Infrastructure
LTS Managed Technical Services
14400 The Lakes Blvd. Suite 100 Bldg C, Pflugerville, TX 78660
w 859-286-8160
www.ledcor.com
3

FORWARD. TOGETHER.
4

Nicholas Schlimm (PND)
From: GERARDI, CHRISTINE L CIV USAF AETC 56 FW/CVE <christine.gerardi@us.af.mil>
Sent: Wednesday, March 4, 2026 1:08 PM
To: Nicholas Schlimm (PND)
Cc: 56 FW/CIT Community Initiative
Subject: RE: SU260001 - Technical Advisory Committee (TAC) Notification
This Message Is From an External Sender
This message came from outside your organization. Please use caution when corresponding outside the county.
Greetings,
Thank you for allowing Luke AFB to make comments on the MMI Infrastructure, requesting a special use permit for
a new utility and equipment shelter. The location is approximately 5 miles outside the Luke Auxiliary Field #1 2004
JLUS 65 Ldn “high noise or accident potential zone” as defined by A.R.S. § 28-8461 and within the “territory in the
vicinity of a military airport” also defined by A.R.S. § 28-8461.
This request will not have a negative impact on Luke AFB Flight Operations. Because the site is located within the
“territory in the vicinity of a military airport” it may be subjected to approximately 170 over flights per day. We
recommend a strong notification program to inform future applicants/occupants about Luke AFB operations; to
include review of the sound attenuation requirements found in A.R.S. §28-8482.
If applicable, it should be noted that certain investments and real estate transactions within the military
installation footprint of Luke AFB may be subject to review by the Committee on Foreign Investment in the United
States (CFIUS) to determine the effect of such transactions on the national security of the United States. The
CFIUS regulations, Foreign Investment Risk Review Modernization Act of 2018 (FIRRMA) provisions, and related
resources can be found on the Department of the Treasury’s website: http://www.treasury.gov/cfius.
Christy Gerardi
Encroachment Specialist
Community Initiatives Team
Luke AFB, Arizona
OƯice: (623) 856-7811
Cell: (801) 529-5254
From: Nicholas Schlimm (PND) <Nicholas.Schlimm@maricopa.gov>
Sent: Friday, February 6, 2026 1:56 PM
To: AQD Business Assistance <AQBusinessAssistance@maricopa.gov>; Maricopa County Parks
<MaricopaCountyParks@maricopa.gov>; Paul Chagolla (MCSO) <P_Chagolla@MCSO.maricopa.gov>; Brian Stutsman
(MCSO) <BrianStutsman@MCSO.Maricopa.gov>; redletter@azdot.gov; rlamoureux@azgfd.gov; Project Evaluation
Program - Game and Fish <pep@azgfd.gov>; steven.kadatz@aps.com; pe@azland.gov; BG@YourRealEstateResource.biz;
grgaz24@netzero.net; planning@surpriseaz.gov; beamc@aol.com; diastu46@gmail.com; Linda de Berge
<ldeberge@gmail.com>; ridgeway.d@gmail.com; 56 FW/CIT Community Initiative
<56FW.CIT.CommunityInitiative@us.af.mil>; kcotner@azmag.gov; pburnett@azmag.gov; cindysellsrbon@gmail.com;
publisher@wickenburgsun.com; Sam.Davis2@ledcor.com; Jamie.Hartig@ledcor.com
Subject: [Non-DoD Source] SU260001 - Technical Advisory Committee (TAC) Notification
1

Good afternoon,
The attached document includes the TAC memo for Case SU260001. Please review the attached memo for instructions
to download application materials.
If you have any questions or concerns, please feel free to contact me.
Thank you,
Nick Schlimm
PLANNING & DEVELOPMENT
301 W. Jefferson St. #170 Phoenix, AZ 85003
Planner
O: 602-506-0031
MARICOPA.GOV
Facebook | Instagram | Twitter | YouTube