02.Z2600020 PZ Staff Report Final
Extracted text (via pymupdf_layout)
52955 characters
Report to the Planning and Zoning Commission Prepared by the Maricopa County Planning and Development Department Case: Z260020 – Belmont 4 Hearing Date: September 24, 2026 Supervisor District: 4 Applicant: Lindsay Schube, Gammage & Burnham, PLC Owner: Belmont Infraco LLC Request: Zone Change from Rural-43 to IND-2 IUPD Site Location: Generally located North of Indian School Rd. on both sides of 355th Ave. in the Tonopah area. Site Size: Approximately 5,157 acres Density: N/A County Island: No County Plan: Tonopah Arlington Area Plan –Industrial Municipal Plan: N/A Municipal Comments: None received to date Support/Opposition: 2 letters of support Recommendation: Approve with conditions Z260020 Page 1 of 12 Project Summary: 1. The applicant on behalf of the owner is requesting a zone change from Rural-43 to IND-2 IUPD, subject to an Industrial Unit Plan of Development (IUPD). The proposal is for future industrial uses likely logistics, warehousing and employment uses along the freeway corridor and potentially those uses as well as manufacturing, data centers, energy production and battery storage elsewhere on site. The area is approximately 5,157 acres in size and is located north of Indian School Rd. at 355th Ave. in the Tonopah area. The site was a portion of the previously approved Belmont Development Master Plan (DMP). While the DMP previously changed the comprehensive plan with designated land uses, the zoning was never previously amended and has remained as Rural-43. 2. On May 23, 1991, the Board of Supervisors (BOS) approved the DMP per DMP 90-1. On December 12, 2006, the BOS approved DMP2006001, a major amendment to the DMP creating the current land use designations. On June 18, 2008 and April 11, 2012, the BOS approved modified conditions for the DMP per DMP2007009 and DMP2011006, respectively. On December 6, 2023, the BOS approved a comprehensive plan amendment (CPA) per CPA2023012 for 1,402 acres of the Belmont DMP that borders this site to the south designating that land for Mixed-Use to accommodate a future movie studio. Finally, on December 11, 2024, the BOS approved CPA240003 changing of the Tonopah Arlington Area Plan’s designation of the subject site from Belmont DMP to Industrial. 3. There is no plan of development (POD) incorporated into this zone change. There will be future PODs prior to construction permitting to establish the various land uses. 4. The proposed IUPD will deviate from the base IND-2 zoning district’s development standards to enable flexibility in future development. Maximum building height will be increased from 60’ to 80’ for industrial uses and up to 150’ for energy production. This is to accommodate modern designs for warehousing or other industrial uses while still maintaining a 60’ height limit for commercial or hospitality uses. Minimum parking requirements will be decreased for data center uses due to a relatively low number of employees compared to building volume thus less need for employee parking. 5. The applicant has worked with local residents to create a ‘no build buffer’ of at least 100’ adjacent to rural or residential zoned boundaries. The IUPD proposes a ¼-mile buffer from the future right- of-way of the planned I-11 freeway to be utilized for Employment Center activities which will require uses that provide employment opportunities as opposed to potential employee-extensive industrial uses such as data centers or solar power generation. 6. The following table (continues on next page) contrasts the base IND-2 development standards and use regulations against those of the proposed IUPD. BASE ZONING DISTRICT PROPOSED ZONING DISTRICT REGULATION REGULATIONS (IND-2) REGULATIONS (IND-2 IUPD) Commercial – 60’ Hospitality – 60’ Maximum Height 60’ Industrial – 80’ Energy Production – 150’ Minimum Front Setback 20’ 20’ 0’ adjacent to commercial and 0’ adjacent to commercial and Minimum Side Setback industrial zoning districts industrial zoning districts Z260020 Page 2 of 12 10’ adjacent to rural/residential 10‘ adjacent to rural/residential zoning districts zoning districts 0’ adjacent to commercial and 0’ adjacent to commercial and industrial zoning districts industrial zoning districts Minimum Rear Setback 25’ adjacent to rural/residential 25’ adjacent to rural/residential zoning districts zoning districts Minimum Lot Area 6,000 sq. ft. 6,000 sq. ft. Minimum Lot Width 60' 60' 75% ; Solar panels, battery storage containers, or ancillary electric Maximum Lot Coverage 60% generation structures shall not contribute to lot coverage calculations -1 loading and unloading space for each 10,000 square feet of -1 loading and unloading space industrial floor area. for each 10,000 square feet of -1 loading and unloading space for Minimum Loading and industrial floor area. each 250,000 square feet of data Unloading Regulations -1 loading and unloading space center floor area. for every 25,000 square feet of -1 loading and unloading space for commercial floor area. every 25,000 square feet of commercial floor area. 6’ solid masonry wall or privacy Minimum Site Enclosure 6’ masonry wall along the fence shall be required to screen and Screening perimeter of the property or to industrial outdoor uses only when Requirements screen industrial outdoor uses. adjacent to residential zoning or streets. Per Section 802 except for the Minimum Parking Per Section 802 following: Data Center: 1 space per 10,000 sf. Per Section 601; except that within one-quarter (1/4) mile of the future I-11 freeway corridor (measured from the edge of right-of-way), uses Permitted Uses Per Section 601 shall be limited to logistics, manufacturing, warehousing, distribution, and employment- generating uses and outdoor heavy industrial uses shall be prohibited. A minimum 100-foot-wide landscaped setback incorporating berms, native vegetation, and other screening elements designed to Required Residential None provide visual separation from the Buffer perimeter boundary of the IUPD zoning boundary adjacent to rural and residential zoning at time of development. Z260020 Page 3 of 12 Aerial photo of subject site Z260020 Page 4 of 12 Aerial of site and environs Existing Zoning Z260020 Page 5 of 12 IND-2 IUPD Zoning Exhibit Z260020 Page 6 of 12 Existing Zoning Exhibit image on the left and proposed zoning district image on the right. Existing On-Site and Adjacent Zoning / Land Use: 7. On-site: Rural-43 / Vacant – Undeveloped North: Rural-43 / Vacant – Undeveloped South: Rural-43 & IND-3 IUPD / Vacant – Undeveloped East: Rural-43 / Vacant – Undeveloped West: Rural-43 / Vacant – Undeveloped Utilities, Services and Infrastructure 8. Water: Hassayampa Utility Wastewater: Hassayampa Utility School District: Saddle Mountain Unified School District Fire: AZ Fire & Medical Authority / Rural Metro Police: Maricopa County Sherriff Electric: APS There are currently no municipal or private company services available to the subject site. The applicant has not obtained documentation (“will-serve” letters) from the proposed service providers for future development of water, wastewater, electricity, gas, and fire infrastructure. The applicant will be required to provide documentation with POD applications. Right-of-Way: 9. The following table (next page) includes existing and proposed half-width right-of-way and the future classification based upon the Maricopa County Department of Transportation (MCDOT) Major Streets and Routes Plan. Z260020 Page 7 of 12 Street Name Half-width Existing R/W Half-width Proposed R/W Future Classification Indian School Rd. 30’ 30’ Minor Arterial 355th Ave 28’ 28’ Principal Arterial (Wickenburg Rd.) Camelback Rd. 30’ 30’ Local 10. The majority of the roadways in the immediate area are unpaved. The development will be responsible for half street improvements surrounding the site though regional paving may be required to access the site from 1-10 to the south. Right of way and roadway dedication will take place at a future time when the parcel comes in for a Plan of Development. Adopted Plan: 11. Tonopah / Arlington Area Plan (adopted September 6, 2000) designates the site for Industrial uses. This designation indicates locations for major employment centers. Uses generally include; warehousing, storage, distribution and general manufacturing. The proposed IND-2 IUPD zoning is appropriate within the Industrial designation. 12. Maricopa County Framework 2040 Comprehensive plan (adopted May 20, 2026) The proposal is in concert with a preponderance of the comprehensive plan’s goals including land use goal #1 which promotes cohesive planning and infrastructure which leads to more organized growth patterns. The proposal also meets land use goal #3 which encourages high-quality development. The “Employment Center Development Area” as well as the “No Build Buffer” allow for development that limits uses in some areas and promotes growth in others to help create more attractive development patterns. 13. Among the goals and policies furthered by this proposal: Land Use Goal 1 – Achieve a coordinated pattern of development. Policy 1.13 – Maricopa County supports balanced land use patterns that include various residential, retail, non-retail employment, and public and civic land uses when appropriate urban services are available. Economic Growth Goal 1 – Foster a diverse and balanced economy to promote long-term economic stability and economic resiliency. Policy 1.1 – Maricopa County supports coordinated and balanced land use patterns that allow for both Basic and Non-Basic sector businesses. Economic Growth Goal 2 – Support the growth of opportunity in the local and regional economies. Goal Statement – Promoting initiatives that create economic opportunities for residents and businesses is crucial in elevating job creation, entrepreneurship and economic mobility. Economic Growth Goal 4 – Contribute to partnerships that advance an effective and integrated regional economy. Policy 4.2 – Maricopa County supports organizations and programs that attract a variety of Basic Sector and industry clusters that have long-term, stable growth prospects. Z260020 Page 8 of 12 Public Participation Summary: 10. The applicant complied with the requirements of the citizen review process with posting the site and notification by first class mail to interested parties and adjacent property owners within 300’ of the area being rezoned. According to the applicant’s citizen participation results report, they have not received any responses, opposition, or support for this request. As of the writing of this report, staff has received three letters of support from local interest groups. The letters speak of the applicant’s efforts to maintain wildlife corridors and habitat as well as supporting growth in the community. Outstanding Concerns from Reviewing Agencies: 10. N/A Staff Analysis: 11. Staff supports the IND-2 IUPD rezoning to match the Industrial land use designation in the county area plan. In this instance, staff considers well-integrated industrial campuses to present less compatibility issues with the surrounding rural sparsely developed region of the county than the previously entitled moderate-density master-planned community. The DMP has remained undeveloped for 25 years with low-density lot-splitting occurring in the surrounding region. The applicant believes the existing I-10 freeway and future I-11 freeway will present an appropriate location for an industrial employment center. Staff concurs and considers this consistent with the county comprehensive plan’s Coordinated Pattern of Development strategy. 12. Achieving a coordinated pattern of development is essential to supporting Maricopa County’s long term strategic goals. Coordinated development can help produce balanced and economically efficient land use patterns that include a well-integrated mix of residential, retail, office, industrial, employment centers, open space, and community amenities. This approach advances several key objectives, including the implementation of the County’s Strategic Priorities, enhancement of overall quality of life, expansion of the economic and tax base, maintenance of fiscal stability, and reduction of reliance on residential development as the primary source of growth. In addition, balanced land use contributes to public health by increasing access to recreational opportunities, shortening travel times, and allowing residents more personal time. Recommendation: 13. Staff recommends the Commission adopt a motion recommending that the Board of Supervisors approve Z260020 subject to the following conditions ‘a’ – ‘k’: a. Development of the site shall be in substantial conformance with the Zoning exhibit entitled “Belmont 4 Site“, consisting of 1 full-size sheet, dated August 21, 2026 , except as modified by the following conditions. b. Development of the site shall be in substantial conformance with the Narrative Report entitled “Belmont 4 Site Narrative”, consisting of 19 pages, dated August 21, 2026, except as modified by the following conditions. c. A public or private water system and public or private sewer system shall be required to be approved by Maricopa County prior to establishment of any non-residential use that requires potable water. Z260020 Page 9 of 12 d. The following IUPD standards shall apply: 1. Maximum Height: Commercial - 60 feet, Hospitality - 60 feet, Industrial - 80 feet, Energy Production - 150 feet. 2. Maximum lot coverage: 75% ; Solar panels, battery storage containers, or ancillary electric generation structures shall not contribute to lot coverage calculations. 3. Minimum Loading & Unloading: 1 loading and unloading space for each 10,000 square feet of industrial floor area. 4. 1 loading and unloading space for each 250,000 square feet of data center floor area. 1 loading and unloading space for every 25,000 square feet of commercial floor area. 5. Minimum Site enclosure & screening: A solid masonry wall or privacy fence not less than six feet in height shall be required to screen industrial outdoor uses only when adjacent to residential zoning or streets. 6. Minimum Parking: Per Section 802 except for the following: Data Center: 1 space per 10,000 sf. 7. Permitted uses: Per Section 601; except that: i. Until such time as the site is served by sewer, uses on the site shall only be those acceptable to the Maricopa County Environmental Services Department (MCESD) and Maricopa County Planning & Development Department that can have wastewater disposal accommodated via onsite septic systems.; and ii. In accordance with the “Employment Center Development Area” described in the narrative report referenced in condition ‘a’, that within one-quarter (1/4) mile of the final alignment of the I-11 freeway corridor (measured from the ultimate right-of-way), uses shall be limited to logistics, manufacturing, warehousing, distribution, and employment-generating uses; and iii. That outdoor heavy industrial uses shall be prohibited from within the same area described in condition ‘d.7.ii’. 8. No build buffer: A minimum 100-foot-wide landscaped setback incorporating berms, native vegetation, and other screening elements designed to provide visual separation from the perimeter boundary of the IUPD zoning boundary adjacent to existing residential uses at time of development as shown on the No Build Buffer Exhibit. e. The following engineering conditions shall apply: 1. Any new site improvements will require a Plan of Development (that will require an engineered Grading and Drainage Plan) and a Traffic Impact Study. 2. Without the submittal of a plan of development, no development approval will be inferred by the engineering review, including, but not limited to, drainage design, access, and roadway alignments. These items will be addressed as development plans progress and are submitted to the County for review. 3. Engineering review of planning and/or zoning cases is for conceptual design only. All development and engineering design shall be in conformance with Section 905 of the Maricopa County Zoning Ordinance; Drainage Policies and Standards; Floodplain Regulations for Maricopa County; MCDOT Roadway Design Manual; and current engineering policies, standards and best practices at the time of application for construction. 4. Based on the conceptual design nature of the information submitted, changes to the site layout may be necessitated by the final engineering design of the site’s drainage infrastructure. 5. Detailed Grading and Drainage (Site Infrastructure) Plans must be submitted with the application for Building Permits. Z260020 Page 10 of 12 f. The following MCDOT conditions shall apply: 1. The three items below require, at applicant’s expense, an American Land Title Association (“ALTA”) Owner’s Policy of Title Insurance showing title vested in Maricopa County, a political subdivision of the State of Arizona. i. 355th Avenue is classified as an urban principal arterial requiring fee dedication of a 65-foot half street from the section line per the Maricopa County Zoning Ordinance Section 804. ii. Camelback Road is classified as an urban parkway requiring preservation of a 100- foot half street from the section line per the Maricopa County Zoning Ordinance Section 805. iii. Cambell Avenue is classified as a rural major collector requiring fee dedication of a 40-foot half street from the mid-section line per the Maricopa County Zoning Ordinance Section 804. 2. It is the developer's responsibility to determine if the existing right of way is fee simple, if it is not then the developer will need to provide the right of way in said form. 3. Dedication shall be completed by time of permit approval or after 6 months after BOS Approval if no MCDOT or PND permit is required. 4. The above comments do not include identification of utilities or underground facilities within or adjacent to the required right-of-way that may have prior rights and/or require relocation. 5. Any additional dedication and offsite improvement requirements will be determined by MCDOT Traffic based on a submitted TIA/TIS and the above roadway classifications. If a TIA/TIS has been previously submitted, approval is valid for one year. If review for construction is not underway within this time period, MCDOT may request an updated traffic report to assess any changes in condition 6. A mid-section line alignment is located on the western perimeter of the proposed development requiring the setback line to start from a future half street Right-of-Way of 40-feet per the Maricopa County Zoning Ordinance Section 805. 7. Applicant to notify ADOT of proposed project through the Red-Letter Process, RedLetter@azdot.gov, due to the proximity to the future Hassayampa Freeway. g. Unless waived or modified by the County at time of subsequent development applications, the applicant or developer shall document implementation of the best practices and any recommendations by the Arizona Game and Fish Department (AGFD) related to habitat and wildlife resources. Should the Zoning Inspector and/or their designee decide that the owner or developer has not substantially undertaken these best practices in good faith, the owner or developer shall not receive final permits or certificate of occupancy until the best practices are implemented. h. Administrative approval of a plan of development will be required prior to approval and issuance of construction permits to develop and establish use of the site. i. Prior to issuance of a building permit, written confirmation will be required from the emergency fire protection jurisdiction having authority that the facility has been designed in accordance with their regulations and requirements, and that emergency fire protection service will be provided to the facility. Prior to issuance of the certificate of occupancy, local fire protection jurisdiction review and approval will be required. j. The property owner/s and their successors waive claim for diminution in value if the County takes action to rescind approval due to noncompliance with conditions. Z260020 Page 11 of 12 k. The granting of this change in use of the property has been at the request of the applicant, with the consent of the landowner. The granting of this approval allows the property to enjoy uses in excess of those permitted by the zoning existing on the date of application, subject to conditions. In the event of the failure to comply with any condition, the property may be considered for revocation to the zoning that existed on the date of application. It is, therefore, stipulated and agreed that either revocation due to the failure to comply with any conditions, does not reduce any rights that existed on the date of application to use, divide, sell or possess the property and that there would be no diminution in value of the property from the value it held on the date of application due to such revocation of the Zone Change. The Zone Change enhances the value of the property above its value as of the date the Zone Change is granted and reverting to the prior zoning results in the same value of the property as if the Zone Change had never been granted. Presented by: Andrew Lorentzen, Planner Reviewed by: Rachel Applegate, Planning Supervisor Attachments: Case Map (1 page) Zoning Exhibit Plan, (1 page) Narrative Report/Ex. Summary (19 pages) Engineering comments (1 page) MCESD comments (1 page) MCDOT comments ( 2 pages) Support Letters (4 pages) Z260020 Page 12 of 12 Application Name: Belmont 4 Legal Description 2N-5W-6,2N-6W-15,2N-6W-11,2N-5W-19,2N-6W-13,2N-5W-7,2N-6W-12,2N-5W-18,2N-6W-1,2N-6W-24 Applicant Applicant Phone/Email (434) 249-7541 Lyle Begiebing Z260020 Case Address Parcel Primary:506-39-042 Generated September 3, 2026 8:51 AM Gross Acres: 5,148 approx. Map scale 1:52,372 Supervisor District No. 4 In alignment with its Comprehensive Plan designation of Industrial, this unique Property along the proposed I-11 and near the intersection of I-10 is envisioned to provide a dynamic mix of employment / Maricopa County Planning & Development - Phoenix, AZ ZONE CHANGE WITH OVERLAY BELMONT 4 SITE NARRATIVE Generally located North and West of Indian School Road and 347th Avenue Request: Rezone from RU-43 to IND-2 IUPD Case No. Z260020 Original Submittal: April 21, 2026 Resubmittal; July 10, 2026 Resubmittal: August 21, 2026 Gammage & Burnham PLC / Lindsay Schube & Michelle Santoro lschube@gblaw.com & msantoro@gblaw.com Page 1 of 13 TABLE OF CONTENTS EXECUTIVE SUMMARY ................................................................................................................................. 4 PURPOSE OF REQUEST ................................................................................................................................. 5 RELATIONSHIP TO SURROUNDING PROPERTIES ......................................................................................... 7 LOCATION AND ACCESSIBILITY .................................................................................................................... 8 CIRCULATION SYSTEM .................................................................................................................................. 8 DEVELOPMENT SCHEDULE (PHASING) ........................................................................................................ 9 COMMUNITY FACILITIES AND SERVICES ...................................................................................................... 9 PUBLIC UTILITIES AND SERVICES .................................................................................................................. 9 INDUSTRIAL UNIT PLAN OF DEVELOPMENT – DISTRICT REGULATIONS ................................................... 11 JUSTIFICATION FOR THE INDUSTRIAL UNIT PLAN OF DEVELOPMENT ..................................................... 12 CONCLUSION .............................................................................................................................................. 13 10172.4.3480921.1 Page 2 of 13 TABLE OF EXHIBITS EXHIBIT A – VICINITY MAP EXHIBIT B – EXISTING AND PROPOSED ZONING EXHIBIT C – NO-BUILD BUFFER AREA 10172.4.3480921.1 Page 3 of 13 EXECUTIVE SUMMARY The Belmont Development Master Plan (the “Belmont DMP”) was approved by the Maricopa County Board of Supervisors in 1991 with the intention of providing a diverse mix of uses including commercial, office, business, manufacturing and mixed residential use zones. In the time since its initial approval, the Belmont DMP has undergone several Major Amendments which updated the land use plan to reflect changed market conditions and more modern approaches to planning. The most current Belmont DMP was unanimously approved by the Maricopa County Board of Supervisors on June 18, 2008 (Case No. DMP2007009) and encompassed approximately 24,800 acres. See Exhibit A, Vicinity Map. Belmont was envisioned to be a sustainable community and was designed around a Town Center with surrounding smaller Villages of predominantly residential development. Although the Belmont DMP is primarily residential in nature, Mixed-Use Employment Center (MUEC) and Regional Retail Center (RRC) land use designations were located around the several existing and planned interchanges with the I-10 Freeway. Since the approval of the latest Belmont DMP land plan, markets have shifted, demanding more mixed uses and employment opportunities, especially near major freeway intersections. Additionally, in 2021, the preferred alignment for the future I-11 was published by the Arizona Department of Transportation (ADOT) and the Federal Highway Administration (FHWA). The preferred alignment is situated along the western edge of Belmont, as shown on the image to the right and is envisioned as a multi- use corridor that will connect Canada to Mexico, creating new opportunities for enhanced travel, mobility, trade, commerce, job and economic growth. The intersection of two major national highway systems is a catalyst to spur new economic development in the area. In the last 3 years multiple applications have been processed with the County to align Belmont with these new development patterns. In 2023, the applicant processed a Comprehensive Plan Amendment requesting to remove 1,147 acres from the Belmont DMP and amend the land use designation on a total of 1,401-acres to Mixed-Use, to allow for the development of a movie studio along with retail, hospitality, and industrial near the intersection of 339th Avenue and Indian School Road, as shown on the image below in the red area. The amendment to the 10172.4.3480921.1 Page 4 of 13 Comprehensive Plan was approved by the Board of Supervisors on December 6, 2023 (CPA2023012). Concurrent with the Comprehensive Plan Amendment, the applicant also processed a rezone application for approximately 321 acres of the 1,401 acres from RU-43 to IND-2 IUPD (Z2023069) to allow for the first phase of development for the movie studio. The remaining 1,080 acres were later rezoned in 2025 from RU-43 to IND-2 IUPD per case Z250013. Additionally, in 2024 an amendment to the Comprehensive Plan was approved by the Board of Supervisors on December 11, 2024 (CPA24003) for 5,147 acres, as shown in purple in the image to the right. This request removed the acreage from the Belmont DMP and amended the land use designation to Industrial. PURPOSE OF REQUEST In light of these recent developments the applicant is now requesting to Rezone the 5,147 acres from RU-32 to IND-2 IUPD. The proposed area is outlined in purple in the image above, (the “Site” or “Property”). The Site is generally located north of the Interstate 10 along both sides of 355th Avenue and the future I-11. See Exhibit B, Existing & Proposed Zoning. In alignment with its Comprehensive Plan designation of Industrial, this unique Property along the proposed I-11 and near the intersection of I-10 is envisioned to provide a dynamic mix of employment uses that will spur commerce and economic growth. Employment uses such as warehousing, manufacturing, data centers, and energy production are all considered for this Property. In order to allow flexibility as the area develops the applicant is requesting IND-2 IUPD zoning for the entire 5,000 acres. With the IND-2 zoning, the applicant can proceed with a Plan of Development (POD) as each phase develops. Again, this Site is ideally located for this mix of proposed uses as it is both remote from any settled areas while being proximate to Interstate 10 and Interstate 11. Industrial zoning in a currently vacant area is often a smart and practical strategy before residential development begins. Establishing industrial and energy infrastructure first allows for the efficient placement of warehouses, data centers, power plants, and other essential facilities without the complications of existing neighborhoods, noise complaints, traffic conflicts, or safety concerns that typically arise when heavy industry is introduced near homes. Once the industrial base is in place, it creates jobs, builds supporting infrastructure like roads and utilities, and— most importantly—generates the reliable energy production (such as electricity from power 10172.4.3480921.1 Page 5 of 13 plants or renewable installations) that a growing future population will desperately need for homes, businesses, and daily life. By front-loading industrial development in empty land, communities can avoid costly retrofits later, minimize disruptions to residents, and ensure that when people eventually move in, the area already has the economic foundation and power capacity to support sustainable, thriving neighborhoods rather than struggling with shortages or incompatible land uses. Statement of Specific Application To facilitate development, the Applicant respectfully requests the following: 1. Rezone from RU-43 to General Industrial Industrial (IND-2) Industrial Plan of Development (IUPD). Description of Proposal Belmont 4 Site is envisioned as an industrial hub to serve western Maricopa County. Although a site plan for the Property has yet to be developed, it is envisioned to contain numerous uses. Key uses may include but are not limited to industrial uses such as warehousing, manufacturing, data centers, and energy production facilities. The proposal divides the Site into three (3) distinct development areas, as follows. No-Build Buffer Development Area Approximately 60 acres of the project area will be maintained as a permanent no-build buffer adjacent to existing residential uses. This area will consist primarily of a minimum 100-foot-wide landscaped setback incorporating berms, native vegetation, and other screening elements designed to provide visual separation between industrial development and surrounding residential uses. The buffer will serve as a transition zone that enhances compatibility, reduces potential impacts associated with industrial operations, preserves open space, and contributes to the overall aesthetic character of the project while protecting neighboring communities. See Exhibit C, No-Build Buffer Area. Logistics and Employment Center Development Area Approximately 960 acres located along and within one-quarter mile of the future I-11 freeway corridor (measured from future right-of-way line) are designated for logistics, manufacturing, warehousing, distribution, and employment-generating uses. This area is intended to capitalize on direct regional transportation access and visibility, making it well-suited for logistics parks, distribution centers, advanced manufacturing facilities, e- commerce operations, and related employment centers. Development within this area will be designed to efficiently accommodate freight movement, employee access, and support infrastructure while creating significant employment opportunities and 10172.4.3480921.1 Page 6 of 13 strengthening the regional economic base. Additionally, heavy industrial outdoor uses are prohibited within this development area. The Logistic and Employment Center Development Area is intended to encompass all lands located within one-quarter (1/4) mile of the ultimate freeway alignment to preserve opportunities for employment-generating land uses, including manufacturing, warehousing, logistics, and related industrial activities. Should the final freeway alignment shift within the boundaries of the Project Area, the Logistics and Employment Center Development Area shall correspondingly shift to maintain a consistent one- quarter (1/4) mile depth measured from the future freeway right-of-way, thereby preserving the intent of concentrating employment uses adjacent to the freeway corridor. If the ultimate freeway alignment is relocated outside of the Project Area, the one-quarter (1/4) mile Logistic and Employment Center Development Area requirement shall no longer apply. In such event, the Project Area shall not be subject to restrictions requiring employment-based uses adjacent to the freeway, and all land within the Project Area may develop in accordance with the underlying industrial land use designations and applicable development standards established by the approved zoning. Industrial Innovation and Energy Development Area The remaining approximately 4,127 acres are designated for more intensive industrial uses that benefit from large land areas, operational flexibility, and separation from residential development. Potential uses include data centers, energy generation and storage facilities, advanced manufacturing operations, technology campuses, industrial processing facilities, and other high-value employment and infrastructure-intensive industries. This area is intended to support long-term economic growth by accommodating large-scale industrial investment, fostering innovation, and providing opportunities for industries that require substantial utility capacity, transportation access, and future expansion potential. RELATIONSHIP TO SURROUNDING PROPERTIES As detailed above, the Applicant has carefully and thoughtfully selected this Site because of its remote location near the I-10 and I-11 interchange. There are very few immediately adjacent neighbors apart from several large residential sites and a solar power generation station. Thus, development will have little to no adverse impact in terms of visibility, noise, or odor, however, as discussed above, to mitigate any potential impact, a 100-foot-wide landscape setback incorporating berms, native vegetation, and other screening elements is provided. This buffer will provide visual separation between industrial development and the surrounding residential uses, which are at a minimum and are identified in Exhibit C, No-Build Buffer Area. 10172.4.3480921.1 Page 7 of 13 In general, industrial development significantly benefits an area by driving economic growth, creating jobs, and improving infrastructure. It attracts businesses that provide employment opportunities, boosting local income and reducing unemployment rates, which in turn leads to improved living standards, increased technological innovation and greater access to goods and services. Improved infrastructure, such as roads and utilities, supports both businesses and residents, enhancing the overall quality of life. Ultimately, industrial development can transform a region into a thriving economic hub, diversifying the economy and attracting further investment in the area. The surrounding properties, uses and zoning are as follows: Location Use Current Zoning Onsite Vacant RU-43 North Vacant, Northern Avenue alignment RU-43 East Vacant RU-43 South Vacant RU-43 and IND-3 IUPD West Vacant RU-43 LOCATION AND ACCESSIBILITY The Site is located approximately 4.5 miles northeast of Tonopah and 1.6 miles north of the 355th Avenue/Hassayampa Road interchange with I-10. This interchange does not see significant use today. As each phase or parcel develops traffic and access will be evaluated along with the Plan of Development to ensure proper systems are in place. The topography of the Site is varied and comprised of gently sloped terraces, washes, and floodplains. At time of development, the proposed Site will adhere to Maricopa County’s drainage design guidelines and will largely preserve the historic flow patterns of any existing washes. This approach helps to ensure no adverse stormwater impacts to adjacent properties. CIRCULATION SYSTEM With no specific Plan of Development circulation has not been determined at this time and will be evaluated during the Plan of Development process. Currently access to the Site will be located along major arterials such as 355th Avenue/Wickenburg Road, 339th Avenue and Indian School Road. 10172.4.3480921.1 Page 8 of 13 DEVELOPMENT SCHEDULE (PHASING) The Applicant anticipates developing the Property over the next decade. Plan of Developments will be submitted when appropriate. COMMUNITY FACILITIES AND SERVICES Community Facilities and Services Table Facility Distance from Site Provider Burnt Well Rest Area Westbound +/- 16 miles Arizona Department of Transportation Tonopah Valley High School +/- 5 miles Saddle Mountain Unified School District Ruth Fisher Elementary School +/- 5 miles Saddle Mountain Unified School District Robbins Butte Game Preserve +/- 14 miles Arizona Game & Fish Department PUBLIC UTILITIES AND SERVICES Public Utilities and Services Table Utility Provider Water Hassayampa Utility Sewer Hassayampa Utility Gas N/A Communications TBD Refuse TBD Law Enforcement Maricopa County Sheriff Fire and Emergency Medical Services Discussions with AZ Fire & Medical Authority and Rural Metro. Determination will be made at time of POD. Electric APS Telephone TBD Hassayampa Utility/Global Water Resources is the intended water and wastewater provider for the project. The project site is located within the provider’s Certificate of Convenience and Necessity (CC&N) water service area. As part of the broader Belmont development, approximately 60 acres have already been deeded to the utility company for water and wastewater infrastructure. The development team will continue to coordinate closely with the provider to confirm capacity and ensure that utility planning aligns with future development needs. Water, sewer, and roadway infrastructure will be developed in a phased manner to align with the timing and location of industrial and manufacturing growth within the project area. Initial infrastructure improvements will be focused in areas targeted for near-term development, providing sufficient utility capacity and transportation access to support early 10172.4.3480921.1 Page 9 of 13 industrial users while minimizing upfront capital expenditures. Water and sewer mains, lift stations, storage facilities, roadway connections, and intersection improvements will be constructed as development occurs and demand warrants additional capacity. As industrial and manufacturing uses expand, utility systems and roadway networks will be extended and upgraded in subsequent phases to maintain adequate levels of service and accommodate increased traffic volumes, including employee, freight, and service vehicle movements. This phased approach ensures that infrastructure investments are efficiently matched to development activity, promotes safe and reliable access, and allows utility and transportation systems to expand in a coordinated, logical, and cost-effective manner as the undeveloped area transitions to full buildout. 10172.4.3480921.1 Page 10 of 13 INDUSTRIAL UNIT PLAN OF DEVELOPMENT – DISTRICT REGULATIONS IND-2 IUPD DISTRICT REGULATIONS IND-2 DISTRICT REGULATIONS PROPOSED IND-2 IUPD DISTRICT REGULATIONS Permitted Uses Per Section 601 Per Section 601; except that within one-quarter (1/4) mile of the future I-11 freeway corridor (measured from the right-of-way), uses shall be limited to those defined in the Logistics and Employment Center Development Area. Maximum Building 60 feet Commercial - 60 feet Height Hospitality - 60 feet Industrial - 80 feet Energy Production - 150 feet Minimum Front Yard 20 feet 20 feet Minimum Side Yard -0 feet adjacent to commercial -0 feet adjacent to commercial and industrial and industrial zoning districts zoning districts -10 feet adjacent to -10 feet adjacent to rural/residential zoning rural/residential zoning districts districts Minimum Rear Yard -0 feet adjacent to commercial -0 feet adjacent to commercial and industrial and industrial zoning districts zoning districts -25 feet adjacent to -25 feet adjacent to rural/residential zoning rural/residential zoning districts districts Minimum Lot Area 6,000 square-feet 6,000 square-feet Minimum Lot Width 60-feet 60-feet Maximum Lot Coverage 60% 75% ; Solar panels, battery storage containers, or ancillary electric generation structures shall not contribute to lot coverage calculations Loading and Unloading -1 loading and unloading space for -1 loading and unloading space for each 10,000 Regulations each 10,000 square feet of square feet of industrial floor area. industrial floor area. -1 loading and unloading space for each -1 loading and unloading space for 250,000 square feet of data center floor area. every 25,000 square feet of -1 loading and unloading space for every commercial floor area. 25,000 square feet of commercial floor area. Site Enclosure and Minimum six foot masonry wall A solid masonry wall or privacy fence not less Screening Requirements along the perimeter of the than six feet in height shall be required to property or to screen industrial screen industrial outdoor uses only when outdoor uses. adjacent to residential zoning or streets. Parking Per Section 802 Per Section 802 except for the following: Data Center: 1 space per 10,000 sf. 10172.4.3480921.1 Page 11 of 13 JUSTIFICATION FOR THE INDUSTRIAL UNIT PLAN OF DEVELOPMENT The purpose of the Industrial Unit Plan of Development is to allow variations in the development standards providing flexibility due to the unique mix of uses and phasing of the Property. Given the size and nature of the proposed uses on the Property, minimal and modest modifications are being requested. These modifications are not being made to allow the applicant to “overuse” the Property or in a manner that is excessive of reasonable and substantial property rights. This application requests modifications to the following: Maximum Building Height. The maximum height allowed within the IND-2 zoning district is 60’. This proposal requests extended height allowance for a variety of uses. General commercial and retail will maintain the 60-foot maximum height. An increase to 60 feet is requested for hospitality, in alignment with a traditional limited-service hotel. Larger industrial uses require more flexibility therefore a maximum height of 80 feet is requested. Lastly, in the event that an energy production facility is proposed on the Site, a maximum height of 150 feet is requested in order to allow for towers and cooling elements. Additionally, building appurtenances with additional height up to 100’ listed in the Maricopa County Zoning Ordinance shall apply, so long as said structures are setback 1 additional foot for each additional foot in height beyond the maximum building height in height from the perimeter setback requirement. Lot Coverage. The maximum lot coverage within the IND-2 zoning district is 60%. This proposal requests 75% in order to allow flexibility as the Property develops. Additionally, our request is to allow solar panels, battery storage containers, or ancillary electric generation structure to not be part of lot coverage calculations for more flexibility for electric generation facilities. Loading and Unloading Regulations. Loading and unloading spaces shall be provided per County requirements except for Data Centers. The required ratio for Warehouse loading and unloading spaces is 1 space per 10,000 square feet. This proposal is requesting to increase the ratio to 1 space per 250,000 square feet for Data Centers. Data Centers are large footprint buildings, but they operate much differently than a typical warehouse building. The loading and unloading demand are substantially less than traditional warehouse use. Site Enclosure and Screening. Due to the very remote location and immense size of this Property, a solid screen wall is not necessary for all developments. There is no development of any kind on the adjacent, vacant desert land. There are no pedestrian paths or amenities in the area. A 6-foot masonry wall may be provided at smaller scale 10172.4.3480921.1 Page 12 of 13 commercial, retail and hospitality projects, but for industrial sites, a solid 6-foot masonry wall or privacy fence shall only be required to screen outdoor uses when adjacent to residential zoning or streets. Parking. Parking shall be provided per County requirements except for Data Centers. The required ratio for Warehouse parking is 1 space per 900 square feet. This proposal is requesting to increase the ratio to 1 space per 10,000 square feet for Data Centers. Again, Data Centers are large footprint buildings, but they operate much differently than a typical warehouse building. The parking demand is substantially less since much of the interior space within the building is occupied by infrastructure needed to store and process data, including servers, storage systems, etc. This unique use will not generate the same demand as traditional warehouse use. CONCLUSION Bemont 4 will be a game changer for the County and the State. This is a one-of-a-kind opportunity to create a commercial, industrial, employment and infrastructure hub that will serve western Maricopa County and the greater Phoenix valley. The modifications requested are minimal to meet the needs of such a unique use. 10172.4.3480921.1 Page 13 of 13 EXHIBIT A EXHIBIT B EXHIBIT C 6,000' AICP 11X17 R.GUBSER, 3,000' 3,000' 1,500' = 2026 1" 21, Scale: AUGUST 1115 0 RD SCHOOL INDIAN AVE 347TH AVE 351ST AVE 355TH AVE 359TH AVE AVE 367TH NORTHERN AVE 371ST HOME ALIGNMENT BETHANY RD AZ EXHIBIT COUNTY, NO-BUILD BUFFER MARICOPA Planning & Development Engineering Plan Review Date: May 19, 2026 Zachary Kobza, PE Planning & Development Memo To: Darren Gerard, AICP, Planning Manager, Department of Planning & 301 W. Jefferson St., Suite 170 Development Phoenix, Arizona 85003 Phone: (602) 723-5248 www.maricopa.gov/planning Attn: Andrew Lorentzen, Planner, Planning & Development Services email address: Zachary.Kobza@maricopa.gov cc: Bob Fedorka, PE, Engineering Manager, Planning and Development From: Zachary Kobza, PE, Senior Plans Examiner Engineer, Planning & Development Subject: Z260020 – Zone change to IND-3 IUPD with not Plan of Development APN(s): 506-39-042, etc. Engineering Review has reviewed the first plan and report routed for review on 04/30/2026, for the subject application and has no objections: The following stipulations will apply: 1. Any new site improvements will require a Plan of Development (that will require an engineered Grading and Drainage Plan) and a Traffic Impact Study. 2. Without the submittal of a plan of development, no development approval will be inferred by the engineering review, including, but not limited to, drainage design, access, and roadway alignments. These items will be addressed as development plans progress and are submitted to the County for review. 3. Engineering review of planning and/or zoning cases is for conceptual design only. All development and engineering design shall be in conformance with Section 905 of the Maricopa County Zoning Ordinance; Drainage Policies and Standards; Floodplain Regulations for Maricopa County; MCDOT Roadway Design Manual; and current engineering policies, standards and best practices at the time of application for construction. 4. Based on the conceptual design nature of the information submitted, changes to the site layout may be necessitated by the final engineering design of the site’s drainage infrastructure. 5. Detailed Grading and Drainage (Site Infrastructure) Plans must be submitted with the application for Building Permits Please contact me with any questions. Water and Waste Management Division Subdivision Infrastructure & Planning Program Project Name: Belmont 4 Primary Contact Name: Larry Yount 301 W. Jefferson St. Phoenix, AZ 85003 Planning Application Type: Zone Change APN(s): 506-39-042 S u b d i vi s io n @ m a ri co p a .go v Reviewer: Syed Alam, P.E. Planner Name: Andrew Lorentzen e s d .m a r i c o pa .g o v Email: syed.alam@maricopa.gov Planning Case #: Z260020 Phone: 602-879-4969 Date: May 20, 2026 The Maricopa County Environmental Services Department (MCESD) has completed review for the Belmont 4 planning case(s). Please note the following MCESD requirements for site development: Subdivision Infrastructure and Planning – An Approval to Construct application is required and must be submitted to MCESD’s Subdivision & Infrastructure Program for water, reclaimed water and/or wastewater system infrastructure. A Water Service Agreement signed by the Utility is required and must be submitted to MCESD’s Subdivision & Infrastructure Program if the site/development will be provided with water and/or reclaimed water by a Utility. A Capacity Assurance Form issued by the Utility is required to MCESD’s Subdivision & Infrastructure Program if the site/development wastewater service is being provided by a Utility. For subdivision related questions, please contact the Subdivision and Infrastructure Program at (602) 506-1058 or email subdivision@maricopa.gov. Additional Notes – *It should be noted that this document does not approve the referenced project. Comments are provided for the benefit of the applicant for MCESD permit requirements and as an advisory to Maricopa County Planning and Development Department. Other Maricopa County agencies may have additional requirements. Final review and approval will be made through Planning and Development Department procedures. Applicant may need to submit separate applications to the Maricopa County Environmental Services Department for approval of proposed facilities regulated by the Department. Review of any such application will be based on current regulations at the time of application. Page | 1 MCDOT Planning TAC Comments Date: 6/2/2026 TAC Assigned Number: Z260020 APN: 506-39-042 Description of Request: Rezone to IND-3 IUPD for industrial and solar Project Name: Belmont 4 Reviewer Contact Information For any questions related to the comments herein please contact MCDOTPlanning@maricopa.gov or 602-506-4619. 1st Submittal Comments • The three items below require, at applicant’s expense, an American Land Title Association (“ALTA”) Owner’s Policy of Title Insurance showing title vested in Maricopa County, a political subdivision of the State of Arizona. o 355th Avenue is classified as an urban principal arterial requiring fee dedication of a 65-foot half street from the section line per the Maricopa County Zoning Ordinance Section 804. o Camelback Road is classified as an urban parkway requiring preservation of a 100- foot half street from the section line per the Maricopa County Zoning Ordinance Section 805. o Cambell Avenue is classified as a rural major collector requiring fee dedication of a 40-foot half street from the mid-section line per the Maricopa County Zoning Ordinance Section 804. • It is the developer's responsibility to determine if the existing right of way is fee simple, if it is not then the developer will need to provide the right of way in said form. • Dedication shall be completed by time of permit approval or after 6 months after BOS Approval if no MCDOT or PND permit is required. • The above comments do not include identification of utilities or underground facilities within or adjacent to the required right-of-way that may have prior rights and/or require relocation. • Any additional dedication and offsite improvement requirements will be determined by MCDOT Traffic based on a submitted TIA/TIS and the above roadway classifications. o If a TIA/TIS has been previously submitted, approval is valid for one year. If review for construction is not underway within this time period, MCDOT may request an updated traffic report to assess any changes in condition. • A mid-section line alignment is located on the western perimeter of the proposed Engineering Division P: 602.506.4889 2901 W. Durango Street F: 602.506.5969 Phoenix, Arizona 85009 Z260020 6/2/2026 Page 2 development requiring the setback line to start from a future half street Right-of-Way of 40- feet per the Maricopa County Zoning Ordinance Section 805. • Applicant to notify ADOT of proposed project through the Red Letter Process, RedLetter@azdot.gov, due to the proximity to the future Hassayampa Freeway. Engineering Division P: 602.506.4889 2901 W. Durango Street F: 602.506.5969 Phoenix, Arizona 85009