Response Letter to Neighbor Opposition Letter
City of Mesa — Planning and Zoning Board - Public Hearing (2026-09-23)
Extracted text (via pymupdf_layout)
2804 characters
GAMMAGE & BURNHAM, PLC ATTORNEYS AT LAW 40 NORTH CENTRAL AVENUE 20TH FLOOR PHOENIX, ARIZONA 85004 TELEPHONE (602) 256-0566 FACSIMILE (602) 256-4475 ___________________ Dennis M. Newcombe Direct: (602) 256-4446 E-Mail Address: dnewcombe@gblaw.com September 15, 2026 Via U.S. Mail Dan McRoskey, President MCR Scottsdale, LLC 10531 4S Commons Drive Suite 166-662 San Diego, California 92127 Re: Terrible’s Convenience Store & Fueling Station; ZON25-00895. Dear Mr. McRoskey: The City of Mesa has forwarded a copy of your letter of September 4 to our client, Terrible Herbst, Inc. (“THI”). Thank you for sharing your comments regarding our proposed fueling facility at 1432 S. Crismon Road. We also want to acknowledge the environmental information you provided with your comments, including your property’s 2022 Phase I Environmental Site Assessment. While gas stations are a routinely allowed use in the City’s Limited Commercial District, as you might imagine, these days the underground storage tanks for such fueling facilities are closely regulated. THI takes environmental compliance and the safe operation of its fueling facilities seriously. As part of the development of this site, THI will take all measures required to ensure that the station is designed, permitted, constructed, operated, monitored, and maintained in compliance with all applicable federal, state, and local environmental laws, regulations, permitting requirements, and industry standards. This includes compliance with all applicable requirements governing underground storage tanks and associated fueling equipment, including required containment, leak- detection and monitoring systems, testing and inspection protocols, and appropriate response procedures. THI will work with the appropriate regulatory agencies and its qualified engineering and environmental professionals throughout the development and operation of the facility to ensure that all applicable requirements are satisfied and that any site-specific conditions are appropriately addressed. Dan McRoskey, President MCR Scottsdale, LLC September 15, 2026 Page 2 of 2 ___________________________ THI believes these regulatory, engineering, monitoring, and operational safeguards appropriately address the environmental considerations associated with the proposed fueling facility and will ensure that the station is operated responsibly and in a manner that protects the surrounding properties. We are looking forward to being a neighbor to the Dutch Bros on your property. Please feel free to contact us via letter, e-mail, or phone with any additional comments or questions regarding our proposal. Very truly yours, GAMMAGE AND BURNHAM, PLC Dennis M. Newcombe Dennis M. Newcombe Senior Land Use Planner cc: Chloe Durfee Daniel (chloe.durfeedaniel@mesa.az.gov)