Extracted text (via pymupdf_layout)
5037 characters
City Council Report Date: September 28, 2026 To: City Council Through: Marc Heirshberg, Assistant City Manager From: Erik Guderian, Transportation Director Sabine King, Assistant Transportation Director Subject: Power Road from State Route 202 (Santan Freeway) to the East Maricopa Floodway CIP Project No. CP0104 Intergovernmental Agreement with Maricopa County Department of Transportation and Town of Gilbert Council District 6 Purpose and Recommendation The purpose of this report is to request Council approval of a resolution authorizing the City of Mesa (City) to enter into an Intergovernmental Agreement (IGA) with Maricopa County (County), through the Maricopa County Department of Transportation (MCDOT), and the Town of Gilbert (Town) for improvements to Power Road from State Route 202 (Santan Freeway) to the East Maricopa Floodway (EMF). Refer to Exhibit “A” for the project location. Staff recommends Council approve the resolution and authorize the City Manager to execute the IGA on behalf of the City. The IGA defines each party’s cost responsibilities for design, permitting, right-of-way acquisition, utility relocation, construction, construction management, cost sharing, and transfer of the roadway from the County to the City. Background Power Road between the Santan Freeway and the EMF (Project) is currently a predominantly four-lane roadway constructed to rural arterial standards. Power Road is an unincorporated County Road bounded by the City to the east and the Town to the west. Significant growth is occurring in this area of the City and Town. The corridor serves southeast Mesa and provides regional connectivity to adjacent communities. Continued growth in the area has increased the need to upgrade the roadway to urban arterial standards. Discussion Public agencies are authorized under A.R.S. § 11-951 et seq. to enter into IGAs to jointly provide services and cooperatively deliver transportation projects and related infrastructure. The Project will widen Power Road to six lanes including raised landscaped medians, ADA-compliant sidewalks and ramps, bike lanes, signing and striping, upgrade traffic signals, streetlights, improved drainage facilities, and acquire the necessary right-of- way and easements for the improvements. The improvements will be designed and constructed in accordance with City standards. Under the IGA, the City will serve as the lead agency for design, permitting, right-of- way acquisition, utility relocation, construction, and construction management. The County will assist with acquisition of right-of-way within the unincorporated area, and the County and Town will provide required permits and participate in the project development process. The Project is located within the segment of Power Road extending from the south right-of-way line of Williams Field Road to Baseline Road, which a 2003 IGA between the City and Town identified as Mesa’s area of future responsibility. Under the current IGA, the City will initiate annexation of the roadway following completion of the right-of-way acquisition process and will assume responsibility for its operation and maintenance upon Project completion. The City, the Town and the County have developed a preliminary design for the improvements. The current Project cost estimate, based on the 60% design, is $61,315,900. The estimated cost shares are $22,386,364 for the City (36.51%), $21,190,441 for the Town (34.56%), and $17,739,095 for the County (28.93%). Costs for enhancements above County standards will be shared by the City and Town, while improvements requested specifically by one jurisdiction will be paid by that jurisdiction. The City will invoice the County and Town for 50% of their estimated shares at the start of construction and reconcile the remaining shares after Project completion. Under the current funding schedule, the County’s initial construction payment will not be available before July 1, 2031, unless the County makes funds available earlier. Construction is therefore currently anticipated in Fiscal Year 2032. Design work will continue when this IGA is in place, and the necessary funding has been programmed and appropriated by each agency. Alternatives The City Council could choose not to enter into the IGA. This is not recommended because the City would not have binding commitments from the County and Town to share Project costs and responsibilities, which would likely delay the planned improvements to this important regional corridor. Fiscal Impact The IGA assigns an estimated $22,386,364 in Project costs to the City. A separate Project Agreement with the Maricopa Association of Governments provides up to $1,607,196.57 in Arterial Life Cycle Program reimbursement for eligible design costs. Funding for the balance of the City’s estimated share has not been identified at this 2 time. Future expenditures are contingent upon Council budget approval and appropriation. Coordinated With This Agreement has been coordinated with the Engineering Department. 3 4