1. MAP Development Fee Deferral: Cielo Verde Unit 4 Phase III

City of Yuma — Regular Meeting (2026-06-03)

View PDF Item 5. Meeting page

Extracted text (via tesseract_tsv) 386 characters
NY NY
E 35TH PL
4 NY Sf
o rs \ |
a
Ww
ile |
ae
a i
” ”
O
”
E 36TH ST
Ww
eS
a
5
Pe
x
”n
/ XQ
E 37TH ST
An | | | LT \ YY \ ZI
N@TE: THIS MAP IS PREPARED TO SHOW
GENERAL SITE LOCATION ONLY ANG REPRESENTS
AFFECTED AREA
NO SPECIFIC DIMENSIONS RELATED TO THE SITE.
LOCATION MAP
CITY OF YUMA
DATE: 4/29/2026
Prepared by: ANDREW MCGARVIE
ENGINEERING
SCALE: N.T.S
DEPARTMENT
Checked by: REVISED: