Extracted text (via tesseract_tsv)
4049 characters
Docusign Envelope ID: 86A29CC3-1498-8AB8-80CC-OF060FD6B527 > 6 HANDLER oe arizona ay City Clerk Document No. City Council Meeting Date: AMENDMENT TO CITY OF CHANDLER AGREEMENT IRON SALT FOR ODOR & CORROSION CONTROL CITY OF CHANDLER AGREEMENT NO. WW3-885-4614 THIS AMENDMENT NO. 3 (Amendment No. 3) is made and entered into by and between the City of Chandler, an Arizona municipal corporation (City), and US Peroxide LLC. dba USP Technologies, a Delaware corporation (Contractor), (City and Contractor may individually be referred to as Party and collectively referred to as Parties) and made _ 2026 (Effective Date). RECITALS WHEREAS, the Parties entered into an agreement for a turnkey non-hazardous iron salt product and dosing station as more fully described in the Agreement; and WHEREAS, the term of the Agreement was September 21, 2023 through September 20, 2024, with the option of up to four one-year extensions; and WHEREAS, the Parties wish to exercise the third option through this Amendment to extend the Agreement for six (months), AGREEMENT NOW THEREFORE, the Parties agree as follows: 1. The recitals are accurate and are incorporated and made a part of the Agreement by this reference. 2. Section Ill is amended to read as follows: The Agreement is extended for a six-month period September 21, 2026 through March 20, 2027. 3. Section IV is amended to read as follows: The City will pay the Contractor the per unit cost set forth in Revised Exhibit B of the original Agreement, which is incorporated into and made a part of this Amendment No. 3 by this reference. Total payments made to the Contractor during the term of this Amendment No. 3 will not exceed $ 350,000.00. Page 1 of 3 Docusign Envelope ID: 86A29CC3-1498-8AB8-80CC-OFO060FD6B527 4. All other terms and conditions of the Agreement remain unchanged and in full force and effect. If a conflict or ambiguity arises between this Amendment No. 3 and the Agreement, the terms and conditions in this Amendment No. 3 prevail and control. IN WITNESS WHEREOF, the Parties have entered into this Amendment on the Effective Date. FOR THE CITY FOR THE CONTRACTOR Nordow. Butler By: By: VP & General Manager, USP Technologies Its: Mayor Its: APPROVED AS TO FORM: By: City Attorney qo ATTEST: By: City Clerk Page 2 of 3 Docusign Envelope ID: 86A29CC3-1498-8AB8-80CC-OFO060FD6B527 REVISED EXHIBIT B TO AGREEMENT COMPENSATION AND FEES Fees can be laid out as cost per equipment, set-up, hauling, and chemical costs. It is preferred to have the cost be all included in the cost per gallon delivered. o Chemical Costs - Monthly usage estimate of 200 gpd or more (e) Equipment Costs - Monthly facility fee per system o Total Labor Costs - Mobilization fee per system Item Description UOM Amount Chemical Costs (SulFeLox product) | Per Gallon S 7.55 Month Facility Equipment Costs Fee/System S N/A Labor Costs Lump Sum S N/A Pricing is comprehensive in nature and includes supply of: Supply of chemicals necessary for support of the odor control program, specifically SulFeLox buffered iron solution USP-7,800-gallon double-walled tank Duplex pump skid specifically designed for SulFeLox product Fully integrated Advanced Dosing Control System for 24hr dose profiling All chemical suction and discharge piping, valves, etc. to the treatment process, including new fill line at Lone Butte Diversion Structure. ChemWatch ACS control system for remote monitoring and dosing control of the system Equipment mobilization, installation, start-up, and maintenance Initial on-site survey to determine peroxide/sulfide reaction rates and H25 removal efficiency Project management, applications & process optimization services Seasonal program optimization and equipment maintenance services Chemical safety training for site personnel Inventory and delivery management (ACS controller) All necessary sampling (liquid and vapor) labor and installation Weekly program reporting and documentation (USP Vista) SulFeLox program pricing at $7.55/gal delivered in full truckloads of 44k Ibs. Page 3 of 3