DESIGN REVIEW BOARD
MEETING MINUTES
August 11, 2026
The Design Review Board of the City of Mesa met in the Study Session room at City Hall, 20 East Main
Street, on August 11, 2026, at 4:30 p.m.
BOARD PRESENT BOARD ABSENT STAFF PRESENT
Chairperson Dane Astle Evan Balmer
Vice Chairperson Ryan Circello
Denise Dunlop
Nicole Lynam
Megan Neal
Shelly Udall
David Winstanley
Chairperson Astle conducted a roll call.
1. Approval of minutes of previous meetings as written.
1-a. Minutes from the Design Review meetings held on July 14, 2026.
It was moved by Boardmember Winstanley, seconded by Boardmember Neal, that the July 14,
2026 minutes be approved.
Upon tabulation of votes, it showed:
AYES – Astle – Circello – Dunlop – Lynam – Neal – Udall – Winstanley
NAYS – None
ABSENT– None
Chairperson Astle declared the motion carried unanimously.
2. Election of the Design Review Officers:
Chair – Dane Astle
Boardmember Circello motioned to nominate Boardmember Astle as Chair and was seconded
by Boardmember Udall.
AYES – Astle – Circello – Dunlop – Lynam – Neal – Udall – Winstanley
NAYS – None
ABSENT– None

Design Review Board
August 11, 2026
Page 2
Vice Chair – Ryan Circello
Chairperson Astle motioned to nominate Boardmember Circello as Vice Chair and was
seconded by Boardmember Winstanley.
AYES – Astle – Circello – Dunlop – Lynam – Neal – Udall – Winstanley
NAYS – None
ABSENT– None
3. Discussion Items:
3-a. DRB24-00707. "Park North Multi-Family," 5± acres located approximately 270± feet east of the
northeast corner of South Power Road and East Guadalupe Road. Design Review to allow for
a 78-lot attached single residence development. (District 6) (See Attachment 1)
Planner ll Charlotte Bridges presented Case DRB24-00707, Park North, a request to allow 78
attached single-family residences on a vacant parcel located east of Power Road and north of
Guadalupe Road, with a Maricopa County Flood Control District channel along the frontage.
(See Page 1 through Page 4 of Attachment 1)
Ms. Bridges added the proposed development consists of 78 individually owned attached
residences. The project includes 21 side-by-side two-story building units totaling 48 dwelling
units, located primarily along the east, north, and west property boundaries. The remaining units
are arranged in front-to-back building configurations, with two-story structures connected at the
ground floor and located within the interior of the site. (See Page 5 through Page 7 of
Attachment 1)
Ms. Bridges noted that landscaping is proposed along Guadalupe Road, as well as along the
north and east sides of the property within the adjacent park. These improvements will be
provided through a development agreement with the City. The applicant will coordinate with the
Parks and Recreation Department regarding the placement and selection of tree species.
Additional landscaping is proposed throughout the development, including trees and shrubs
along the buildings and within the central amenity area. (See Page 8 through Page 9 of
Attachment 1)
Ms. Bridges reviewed the proposed building elevations, which generally consist of stucco,
siding, brick, concrete shingles, and aluminum garage doors. Three elevation variations are
proposed for both the side-by-side and front-to-back building types. (See Page 10 through Page
28 of Attachment 1)
Ms. Bridges stated the applicant is requesting Alternative Compliance for street-facing facades.
The zoning ordinance requires specified projections or recesses along street-facing facades.
The proposed side-by-side and front-to-back units provide second-story projections, with
recessed garage doors also incorporated into the front-to-back units. Alternative Compliance is
also requested related to material percentage requirements to allow the aluminum garage doors
to be considered as an exterior primary material. In addition, one rear elevation of the front-to-
back units does not meet the required exterior material standards because it is primarily stucco.
(See Page 29 through Page 30 of Attachment 1)
Ms. Bridges requested the Board's review and recommendation regarding the proposed building
elevations, landscape plan, and Alternative Compliance requests.

Design Review Board
August 11, 2026
Page 3
The Design Review Board made recommendations based on the Staff presentation.
Ms. Bridges provided the following summary of the Board’s recommendations:
• Work with the Maricopa Flood Control District to install trees, if allowed, on the property
between the project site and the Guadalupe Road right-of-way.
• Revise the landscape plan to provide a mix of trees species for the trees proposed to be
planted within Christopher J. Brady Park along the north and east side of the project site.
3-b. DRB25-00407. "Mountain America Credit Union," 1.5± acres located at the northeast corner
of East McKellips Road and North Recker Road. Design Review to allow for the development of
an approximately 7,962 square foot Financial Institution with drive-thru facilities. (District 5)
(See Attachment 2)
Planner ll Kwasi Abebrese presented Design Review Case DRB25-00407 for Mountain America
Credit Union, a request to allow an approximately 7,962-square-foot financial institution with
drive-through facilities on an approximately 1.5-acre vacant site at the northeast corner of
McKellips Road and Recker Road. Mr. Abebrese noted that the application was submitted and
reviewed under the previous code, and the previous design standards for the Limited
Commercial District apply to the proposal. (See Page 1 through Page 5 of Attachment 2)
Mr. Abebrese stated the development consists of an approximately 5,434 square-foot credit
union and a 2,397 square-foot facilities building, both located on the western portion of the site.
The credit union will include a drive-up ATM lane and dedicated teller lane with an
approximately 700-square-foot canopy. Site access will be provided from McKellips Road and
Recker Road. The project requires 26 parking spaces and will provide 32 spaces on the east
side of the credit union. (See Page 6 of Attachment 2)
Mr. Abebrese added the landscape plan includes foundation base landscaping, parking lot
landscaping, and landscape yards along Recker Road and McKellips Road. A 3.5 foot-high
masonry wall will screen the parking areas and drive-through facilities from McKellips Road.
Proposed plant materials include willow acacia, desert willow, red push pistache, Afghan pine,
red bird of paradise, dwarf bottlebrush, desert marigold, and chocolate daisy. (See Page 7 of
Attachment 2)
Mr. Abebrese outlined the proposed buildings will utilize four primary materials: stone veneer,
fiber cement lap siding, metal panel, and glazing. The credit union elevations incorporate these
materials throughout the building, with metal panels also used to screen rooftop mechanical
equipment. The facilities building will use similar materials and design elements. (See Page 8 of
Attachment 2)
Mr. Abebrese described the renderings that were provided showing the southeast, northwest,
and northeast perspectives of the credit union building, including the elevations visible from
McKellips Road, Recker Road, and the parking area. (See Page 9 through Page 14 of
Attachment 2)
Mr. Abebrese noted that there are no alternative compliance requests associated with the
proposal. Staff requested the Board's review and recommendation regarding the proposed
building elevations and landscape design. (See Page 15 of Attachment 2)
The Design Review Board made recommendations based on the Staff presentation.

Design Review Board
August 11, 2026
Page 4
Mr. Abebrese provided the following summary of the Board’s recommendations:
• Increase the volume of the stone veneer or block sections on the building façades.
• Replace the Afghan Pine with a more desert adaptive tree type that is compatible with
the surrounding area.
• Evaluate the width and location of the light fixture above the door at the east elevation of
the building.
• Evaluate the height, width and materials of the proposed drive-up canopy to reduce the
feel of the weight of the top of the canopy.
3-c. DRB25-00903. "Terrible's Commercial Development," 1.3± acres located approximately 1,500
feet south of the southwest corner of South Crismon Road and East Southern Avenue. Design
Review to allow for an approximately 4,689 square foot Convenience Market with an
approximately 4,156 square foot Service Station. (District 5) (See Attachment 3)
Planner ll Chloe Durfee Daniel presented Design Review Request DRB25-00903 for Terrible’s,
proposing a 4,689-square-foot convenience store with a 4,156-square-foot accessory fuel
canopy. The site is located near Hampton Avenue and Crismon Road, south of Southern
Avenue and adjacent to the Lincoln residential project. (See Page 1 through Page 4 of
Attachment 3)
Ms. Durfee Daniel added the site is currently vacant and includes commercial uses to the north
and south. The proposal includes shared cross-access to the north and south, 15 parking
spaces are provided where 13 are required. The landscape plan incorporates existing trees
along with palo verde, mulga, date palms, and shrubs. The applicant reviewed the proposed
building elevations, colors, materials, stone accents, and site renderings, noting a significant
grade change across the site. (See Page 5 through Page 7 of Attachment 3)
Ms. Durfee Daniel also presented the fuel canopy elevations and requested Alternative
Compliance related to canopy articulation and materials, including wall and roof articulation and
the use of materials. Staff requested the Board’s review and recommendation regarding the
building elevations, fuel canopy, landscape design, and requested Alternative Compliance for
the fuel canopy. (See Page 8 through Page 15 of Attachment 3)
The Design Review Board made recommendations based on the Staff presentation.
Ms. Durfee Daniel provided the following summary of the Board’s recommendations:
• Appreciate the art panels.
• Canopy needs more variation including articulation in height and materials.
• Consider steps, reveal joints, or recesses for the canopy.
• For the Convenience store, there are too many materials.
• Remove the stone and replace it with the tile or provide block instead of the stone and
tile.
• With the tile, make sure it is popped out and a prominent material on the building.
3-d. DRB25-00910. "RV Service Building," 5.8± acres located at 2038 North Country Club Drive.
Design Review to allow for an approximately 7,975 square foot expansion of an existing
Automobile/Vehicle Sales Facility. (District 3) (See Attachment 4)

Design Review Board
August 11, 2026
Page 5
Mr. Abebrese presented Design Review Request DRB25-00910 for an approximately 7,975-
square-foot expansion of an existing automobile sales and service facility on an approximately
5.8-acre site located north of McKellips Road and west of Country Club Drive. The existing site
includes an office, warehouse and storage building, parking areas, and RV display areas. The
proposed addition would be located south of the existing building and would be accessed
through two existing drive aisles from North Country Club Drive. A total of 59 parking spaces are
required, with 61 spaces proposed. (See Page 1 through Page 7 of Attachment 4)
Mr. Abebrese noted that the project was submitted and reviewed under the previous
development code and is subject to the applicable General Commercial zoning design
standards. A separate Substantial Compliance Improvement Permit (SCIP) request is also
being processed for existing conditions that do not meet current development standards,
including landscape setbacks, perimeter landscaping, foundation landscaping, and parking lot
landscaping. That request was scheduled for consideration by the Board of Adjustment on
September 2. (See Page 8 of Attachment 4)
The landscape plan includes foundation landscaping and proposes trees and shrubs along
McKellips Road and Country Club Drive, as well as additional landscaping within the parking lot.
Existing utility and irrigation easements constrain tree placement in portions of the site adjacent
to County Club Drive. Additional landscaping is proposed as part of the SCIP improvements.
The proposed building includes three primary materials: stucco, metal wall panels, and smooth-
face concrete masonry units. Mr. Abebrese reviewed the north, south, east, and west
elevations, noting that portions of the east elevation would be visible from Country Club Drive
and portions of the west elevation would be visible from the adjacent industrial development.
(See Page 9 through Page 12 of Attachment 4)
Mr. Abebrese requested Alternative Compliance for several development standards, including
material composition, roof articulation, and wall articulation. The material request would allow
metal wall panels to exceed 50 percent of the north and south elevations, which are largely
internal to the site. The roof articulation request would allow deviations from requirements for
varied building heights and roof forms, while the wall articulation request applies to the internal
north elevation. Mr. Abebrese requested the Board’s review and recommendation regarding the
proposed building elevations, landscape design, and requested Alternative Compliance. (See
Page 13 through Page 14 of Attachment 4)
The Design Review Board made recommendations based on the Staff presentation.
Mr. Abebrese provided the following summary of the Board’s recommendations:
• Provide additional trees and shrubs outside of the existing 8 foot wide Public Utilities and
Facilities Easements (PUFE) at the south and east sides of the project site adjacent to
McKellips Road and Country Club Drive respectively, as well as within the existing
parking lot.
• Replace the proposed stucco in the building design with a different material such as
metal panel to match the north elevation of the building.
3-e. ZON26-00411. "ER2," 8.70± acres located approximately 630± feet south of the of the
southwest corner of North Greenfield Road and East McDowell Road. Alternative Compliance
request to allow for an approximately 155,597 square foot Industrial development. (District 1)
(See Attachment 5)

Design Review Board
August 11, 2026
Page 6
Ms. Bridges presented Zoning Case ZON26-00411 for an Alternative Compliance request
associated with a proposed approximately 155,597 square-foot industrial building on an
approximately 8.7 acre site south of McDowell Road and west of Greenfield Road. The site is
currently undeveloped. (See Page 1 through Page 5 of Attachment 5)
Ms. Bridges added the proposed single-story building would have a height of approximately 40
feet and include two access points from Greenfield Road and an additional access from Norcroft
Street. The applicant is also requesting a parking reduction through the Development Plan
Review process, reducing the required 280 spaces to 238 spaces.
Ms. Bridges noted the landscape plan includes perimeter landscaping along Greenfield Road
and the property boundaries, as well as required landscaping islands and trees within the
parking area. Parking canopies are proposed over portions of the parking area, which affect the
configuration of the required landscape islands. (See Page 6 through Page 7 of Attachment 5)
Ms. Bridges stated the building is proposed as concrete tilt-panel construction with two formliner
treatments, color variations, glass elements, awnings, breeze block, and landscape trellises.
The northeast corner includes a plaza and office area with a second-floor balcony. The
applicant also incorporated architectural fins, landscaping, and other design elements to provide
additional visual interest and articulation along the publicly visible elevations. (See Page 8
through Page 13 of Attachment 5)
Ms. Bridges advised that the project is being reviewed under the new zoning code. The
applicant is requesting Alternative Compliance with requirements related to façade articulation,
roof articulation, parapet detailing, façade material variety, and the percentage of primary
building materials on publicly visible elevations. Staff noted that the building primarily consists of
concrete tilt-panel construction, with formliners providing variation in texture and appearance.
(See Page 14 of Attachment 5)
Ms. Bridges requested the Board’s review and recommendation on the Alternative Compliance
request. The Board expressed positive feedback regarding the overall design, noting that the
proposal was well thought out, particularly given the scale of the building, and that the
alternative compliance requests were clearly addressed. (See Page 15 of Attachment 5)
The Design Review Board made recommendations based on the Staff presentation.
Ms. Bridges provided the following summary of the Board’s recommendations:
• Revise the landscape plan to provide a vine to climb the landscape trellises.
3-f. ZON26-00414. "Magna Steyr Canopies," 10.8± acres located at 7237 E Pecos Road.
Alternative Compliance Request to allow for the expansion of an Outdoor Storage facility.
(District 6) (See Attachment 6)
Senior Joshua Grandlienard presented Zoning Case ZON26-00414, for an Alternative
Compliance request associated with a manufacturing and product storage use. The site is
located at 7237 East Pecos Road, south of Pecos Road and west of Sossaman Road, and is
directly associated with the manufacturing facility to the west. (See Page 1 through Page 4 of
Attachment 6)
Mr. Grandlienard noted the operator manufactures automotive products at the adjacent facility,
after which completed products are transported to the subject site for storage. The site is

Design Review Board
August 11, 2026
Page 7
proposed to include eight canopies totaling approximately 100,000 square feet, intended
primarily to protect the stored products from weather conditions such as hail and UV exposure.
A 10-foot wall currently screens the site and the adjacent manufacturing use from Pecos Road.
(See Page 5 through Page 6 of Attachment 6)
Mr. Grandlienard explained that staff’s primary concern is the appearance and durability of the
canopies, particularly those visible from Pecos Road. The proposed canopies consist primarily
of metal columns with gray fabric membrane coverings. Although the elevation drawings depict
a blue color, he clarified that the proposed fabric would be gray, consistent with the submitted
material board. (See Page 8 through Page 9 of Attachment 6)
The applicant is requesting Alternative Compliance with requirements related to durable, high-
quality building materials, façade material percentages, and roof materials. Mr. Grandlienard
noted that staff has concerns regarding the long-term durability and maintenance of the fabric
membrane given the local climate and its visibility from Pecos Road. Staff also noted that the
nature of the shade structures makes compliance with certain façade material requirements
difficult. (See Page 9 through Page 11 of Attachment 6)
Mr. Grandlienard stated that the applicant was willing to work with staff regarding possible
design modifications and had provided a list of alternative products for consideration. Mr.
Grandlienard requested the Board’s review and recommendation on the alternative compliance
request and invited the applicant to provide comments. (See Page 13 of Attachment 6)
The Design Review Board made recommendations based on the Staff presentation.
Mr. Grandlienard provided the following summary of the Board’s recommendations:
• Reduce the height of the canopies.
• Create a linear look from Pecos Road.
• Provide the Desert sand color for the canopies.
• Screen the site as much as possible.
• Shallow the gable of the roof of the canopies.
• Consider providing additional landscaping along Pecos to provide additional screening.
4. Staff update.
No staff update.
5. Adjourn.
Without objection, the Design Review Board adjourned at 6:34 p.m.
I hereby certify that the foregoing minutes are a true and correct copy of the minutes of the Design
Review Board meeting of the City of Mesa, Arizona, held on 11th day of August 2026. I further certify
that the meeting was duly called and held and that a quorum was present.
__________________________________________
DANE ASTLE, CHAIRPERSON
vf

City of Mesa
Design Review Board

DRB24-00707
Park North
Charlotte Bridges, Planner II

DEVELOPMENT SERVICES
Request
• Design Review
• To allow for 78 attached single
residences
3

DEVELOPMENT SERVICES
Location
• 5± acres
• Approximately 270± feet east
of the northeast corner of
South Power Road and East
Guadalupe Road
4

DEVELOPMENT SERVICES
Site Photo
Looking north towards the site
5

DEVELOPMENT SERVICES
Site Photo
Looking south from Christopher J. Brady Park
6

DEVELOPMENT SERVICES
Site Plan
• 78 attached single
residences
• 21 Side by Side building
types with two-stories
• 18 Front to Back building
types with two-stories
Gated emergency access Primary access from
through the commercial Guadalupe Road
development via new bridge
7

DEVELOPMENT SERVICES – PLANNING DIVISION
Landscape Plan
8

DEVELOPMENT SERVICES – PLANNING DIVISION
Landscape Plan
Common Space
Lot typical
9

DEVELOPMENT SERVICES – PLANNING DIVISION
Elevations – Side by Side “A”
10

DEVELOPMENT SERVICES – PLANNING DIVISION
Elevations – Side by Side “A”
11

DEVELOPMENT SERVICES – PLANNING DIVISION
Elevations – Side by Side “B”
12

DEVELOPMENT SERVICES – PLANNING DIVISION
Elevations – Side by Side “B”
13

DEVELOPMENT SERVICES – PLANNING DIVISION
Elevations – Side by Side “C”
14

DEVELOPMENT SERVICES – PLANNING DIVISION
Elevations – Side by Side “C”
15

DEVELOPMENT SERVICES – PLANNING DIVISION
Elevations – Front to Back “1 & 2 (A)”
16

DEVELOPMENT SERVICES – PLANNING DIVISION
Elevations – Front to Back “1 & 2 (A)”
17

DEVELOPMENT SERVICES – PLANNING DIVISION
Elevations – Front to Back “1 & 2 (A)”
18

DEVELOPMENT SERVICES – PLANNING DIVISION
Elevations – Front to Back “1 & 2 (A)”
19

DEVELOPMENT SERVICES – PLANNING DIVISION
Elevations – Front to Back “1 & 2 (B)”
20

DEVELOPMENT SERVICES – PLANNING DIVISION
Elevations – Front to Back “1 & 2 (B)”
21

DEVELOPMENT SERVICES – PLANNING DIVISION
Elevations – Front to Back “1 & 2 (B)”
22

DEVELOPMENT SERVICES – PLANNING DIVISION
Elevations – Front to Back “1 & 2 (B)”
23

DEVELOPMENT SERVICES – PLANNING DIVISION
Elevations – Front to Back “1 & 2 (C)”
24

DEVELOPMENT SERVICES – PLANNING DIVISION
Elevations – Front to Back “1 & 2 (C)”
25

DEVELOPMENT SERVICES – PLANNING DIVISION
Elevations – Front to Back “1 & 2 (C)”
26

DEVELOPMENT SERVICES – PLANNING DIVISION
Elevations – Front to Back “1 & 2 (C)”
27

DEVELOPMENT SERVICES – PLANNING DIVISION
Rendering
28

DEVELOPMENT SERVICES
Alternative Compliance
Façade Articulation - Street Facing Facades: Shall have at least 1
projection or recess of at least four 4 feet in depth, or 2 projections or
recesses of at least 2.5 feet in depth, for every 25 horizontal feet of
wall. If located on a building with two (2) or more stories, the
articulated elements must be greater than one (1) story in height
Materials - Primary exterior materials shall be brick, stone, integrally
tinted and textured masonry block, precast concrete, wood, natural
and synthetic stone, stucco and synthetic stucco, and glazing.
Materials - Buildings must contain at least two (2) kinds of primary
exterior materials with each of the materials covering at least 25% of
the exterior walls of the building.
29

DEVELOPMENT SERVICES
Findings
Staff is seeking your review and recommendation on the following:
Proposed building elevations and landscape design
Alternative Compliance
30

City of Mesa
Design Review Board

City of Mesa
Design Review Board

DRB25-00407
Mountain America Credit Union
Kwasi Abebrese, Planner II

DEVELOPMENT SERVICES
Request
• Design Review
• To allow for an approximately
7,962 square foot Financial
Institution with drive-thru
facilities
3

DEVELOPMENT SERVICES
Location
• 1.5± acre parcel
• Northeast corner of McKellips
Road and Recker Road
4

DEVELOPMENT SERVICES
Site Photos
Looking north towards the site from McKellips Road
5

DEVELOPMENT SERVICES
Site Plan
• Approx. 7,972 sq. ft. financial
institution
• Approx. 5,434 sq. ft. credit union
building
• Approx. 2,397 sq. ft. facilities
building
• Drive-up ATM lane and canopy at the
east side of the site
• Access from McKellips Road and
Recker Road
• 26 parking spaces required; 32 spaces
provided 6

DEVELOPMENT SERVICES
Landscape Plan
• Trees: Willow Acacia, Desert
Willow, Red Push Pistache
and Afghan Pine
• Shrubs: Red Bird of
Paradise, Dwarf Bottlebrush,
Desert Marigold and
Chocolate Daisy
7

DEVELOPMENT SERVICES
Materials & Colors
• Stone Veneer
• Fiber Cement Siding
• Metal Panel
• Glazing
8

DEVELOPMENT SERVICES
Elevations
9

DEVELOPMENT SERVICES
Elevations
10

DEVELOPMENT SERVICES
Elevations
11

DEVELOPMENT SERVICES
Rendering
Southeast Rendering 12

DEVELOPMENT SERVICES
Rendering
Northwest Rendering 13

DEVELOPMENT SERVICES
Rendering
Northeast Rendering
14

DEVELOPMENT SERVICES
Findings
Staff is seeking your review and recommendation on the following:
Proposed building elevations and landscape design
15

City of Mesa
Design Review Board

City of Mesa
Design Review Board

DRB25-00903
Terrible’s
Chloe Durfee Daniel, Planner II

DEVELOPMENT SERVICES – PLANNING DIVISION
Request
• Design Review
• To allow for a 4,689± sq.ft.
Convenience Store with a
4,156± sq.ft Accessory Fuel
Canopy
3

DEVELOPMENT SERVICES – PLANNING DIVISION
Location
• 1.3± acres
• South of Southern Ave
• West Side of Crismon Road
4

DEVELOPMENT SERVICES – PLANNING DIVISION
Site Photos
Looking west towards the site from Crismon Road
5

DEVELOPMENT SERVICES – PLANNING DIVISION
Site Plan
• 4,689± sq.ft. C-store
• 4,156± sf.ft. accessory fuel canopy
• Shared cross access points
connecting out to Crismon Road
• 13 parking spaces required
• 15 parking spaces provided
6

DEVELOPMENT SERVICES – PLANNING DIVISION
Landscape Plan
7

DEVELOPMENT SERVICES – PLANNING DIVISION
Materials & Colors
8

DEVELOPMENT SERVICES – PLANNING DIVISION
Elevations
9

DEVELOPMENT SERVICES – PLANNING DIVISION
Elevations
10

DEVELOPMENT SERVICES – PLANNING DIVISION
Elevations
11

DEVELOPMENT SERVICES – PLANNING DIVISION
Renderings
12

DEVELOPMENT SERVICES – PLANNING DIVISION
Renderings
13

DEVELOPMENT SERVICES
Alternative Compliance
Wall Articulation - Publicly Visible Facades. Provide at least 2
changes in wall articulation every 50 feet.
Roof Articulation. Provide a minimum 2 feet vertical modulation for
flat roofs in excess of 100 feet.
Materials. Provide at least 3 different and distinct materials and no
more than 50% of a façade may be covered with 1 single material.
14

DEVELOPMENT SERVICES
Findings
Staff is seeking your review and recommendation on the following:
Proposed building elevations and landscape design
Alternative Compliance
15

City of Mesa
Design Review Board

City of Mesa
Design Review Board

DRB25-00910
RV Service Building
Kwasi Abebrese, Planner II

DEVELOPMENT SERVICES
Request
• Design Review
• To allow for an approximately
7,975 square foot expansion of
an existing Automobile Sales
and Service Facility
3

DEVELOPMENT SERVICES
Location
• 5.8± acre parcel
• 2038 North Country Club Drive
• North of McKellips Road
• West of Country Club Drive
4

DEVELOPMENT SERVICES
Site Photos
Looking west towards the site from Country Club Drive
5

DEVELOPMENT SERVICES
Site Photos
Looking north towards the site from McKellips Road
6

DEVELOPMENT SERVICES
Site Plan
• Approx. 7,975 square foot RV
service building
• Primary access from North
Country Club Drive
• 59 parking spaces required; 61
spaces provided
N 7

DEVELOPMENT SERVICES
Landscape Plan
• Trees: Smoothie Cascalote
• Shrubs: Gold mound, Red
Yucca, and Lynn’s Legacy
8

DEVELOPMENT SERVICES
Materials & Colors
• Smooth Face CMU
• Stucco
• Metal wall panel
9

DEVELOPMENT SERVICES
Elevations
10

DEVELOPMENT SERVICES
Elevations
11

DEVELOPMENT SERVICES
Rendering
Southeast Rendering
12

DEVELOPMENT SERVICES
Alternative Compliance
Materials. Facades shall incorporate at least 3 different materials
Materials. No more than 50% of the façade may be covered with
one single material
Roof Articulation. Vary building height including at least 2
changes in height or roof forms that are varied over different
portions of the building through changes in pitch, plane and
orientation
Wall articulation. Exterior building walls shall be subdivided and
proportioned to human scale, using projections, overhangs and
recesses
13

DEVELOPMENT SERVICES
Findings
Staff is seeking your review and recommendation on the following:
Proposed building elevations and landscape design
Alternative Compliance
14

City of Mesa
Design Review Board

City of Mesa
Design Review Board

ZON26-00411
ER2
Charlotte Bridges, Planner II

DEVELOPMENT SERVICES
Request
• Alternative Compliance
• To allow for an approximately
155,597 square foot industrial
development
3

DEVELOPMENT SERVICES
Location
• 8.7± acres
• Approximately 630± feet
south of the southwest
corner of North Greenfield
Road and East McDowell
Road
4

DEVELOPMENT SERVICES
Site Photo
Looking west from Greenfield Road towards the site
5

DEVELOPMENT SERVICES
Site Plan
• 155,597± sq. ft.
• Single-story 40 ft. in
height
• Two access points onto
Greenfield Road
• One access point onto
Norcroft Street
6

DEVELOPMENT SERVICES – PLANNING DIVISION
Landscape Plan
7

DEVELOPMENT SERVICES
Materials & Colors
8

DEVELOPMENT SERVICES – PLANNING DIVISION
Elevations
East Elevation
North Elevation
9

DEVELOPMENT SERVICES – PLANNING DIVISION
Elevations
West Elevation
South Elevation
10

DEVELOPMENT SERVICES – PLANNING DIVISION
Renderings
11

DEVELOPMENT SERVICES – PLANNING DIVISION
Renderings
12

DEVELOPMENT SERVICES – PLANNING DIVISION
Renderings
13

DEVELOPMENT SERVICES
Alternative Compliance
Façade Articulation: Publicly Visible Facades: Shall have at least one,
4-feet or two, 2.5 feet change in plan every 50 horizontal feet of wall.
Roof Articulation: Flat roofs in excess of 100 feet in length, shall
provide vertical modulation that is at least two feet.
Parapet detailing: All parapets must have details such as cornices,
moldings, trim, or variations in brick coursing.
14

DEVELOPMENT SERVICES
Alternative Compliance
Materials – Publicly Visible Facades:
Shall incorporate at least two (2) different primary building materials.
Materials. Each primary building material shall cover at least 25% of a
publicly-visible façade.
15

DEVELOPMENT SERVICES
Findings
Staff is seeking your review and recommendation on the following:
Alternative Compliance
16

City of Mesa
Design Review Board

City of Mesa
Design Review Board

ZON26-00414
Magna Steyr
Josh Grandlienard, Senior Planner

DEVELOPMENT SERVICES
Request
• Alternative Compliance
• To allow for eight covered canopies
on site
3

DEVELOPMENT SERVICES
Location
• 10.8± acres
• 7237 East Pecos Road
• South of Pecos Road and west of
Sossaman Road
4

DEVELOPMENT SERVICES
Site Photo
Looking south from Pecos Road towards the site
5

DEVELOPMENT SERVICES
Site Plan
• Existing outdoor storage of vehicles
• Eight Canopies proposed to for
weather protection
• Total area of 217,932 square feet
6

DEVELOPMENT SERVICES
Materials & Colors
• Metal Columns
• Fabric Canopy
7

DEVELOPMENT SERVICES
Elevations
8

DEVELOPMENT SERVICES
Alternative Compliance
Materials. Primary materials shall cover no less than 75% of each
building façade.
Materials. Each primary building material shall cover at least 25% of a
publicly-visible façade.
Materials. Buildings shall be constructed of Durable, high-quality
materials appropriate for the Arizona Climate
Roof Materials. All visible pitched roofs shall consist of metal seam,
clay tile, concrete tile, or a similar grade of roofing materials
9

DEVELOPMENT SERVICES
Findings
Staff is seeking your review and recommendation on the following:
Alternative Compliance
10

City of Mesa
Design Review Board