Elevations

City of Mesa — Design Review Board (2026-10-13)

View PDF Meeting page

Extracted text (via pymupdf_layout) 2820 characters
MATERIALS KEYNOTES
2 1
1 NORTH ELEVATION A11 BOX GUTTER, REFER TO DETAILS. PRE-FINISHED TO PERMIT
A-110 Keynote Area Percentage MATCH ROOF. SEE NOTE A21.
A19 1942.06 81% A12 LIGHTING PER ELECTRICAL.
A20 458.03 19% A19 CORRUGATED METAL PANEL: PBR PANEL
ROOF HIGH POINT EL. MANUFACTURER: BUNGER. COLOR: ASH GRAY
24' - 8" Total 2400.09 WXA0092L. MOUNTED VERTICAL ORIENTATION FOR
A20 CORRUGATED METAL PANEL: 6.8 PANEL
EAVE HEIGHT EL. EAST ELEVATION MANUFACTURER: BUNGER. COLOR: CHARCOAL
16' - 0" Keynote Area Percentage WXA0101L. MOUNTED HORIZONTAL ORIENTATION
A19 2918.89 67% A21 STANDING SEAM METAL PANEL ROOFING
A20 1431.13 33% MANUFACTURER: MBCI COLOR: POLAR WHITE ISSUE
WXW0049L
A19 Total 4350.2 A23 PREFINISHED METAL AWNING PER 1/A-501 AND 4/A-501.
TO MATCH A21.
WEST ELEVATION A24 PREFINISHED METAL DOWNSPOUT - TO MATCH A21. -
8" Keynote Area Percentage A25 HOLLOW METAL DOOR. COLOR: PAINTED TO MATCH
8" A19 2300.74 53% PEMB A22.
- 3' A20 2048.71 47% A26 INSULATED OVERHEAD SECTIONAL DOOR
FINISHED FLOOR EL. Total 4349.45 MANUFACTURER: BUNGER COLOR: TO MATCH A22.
8" 0' - 0" SUBMITTAL
A20 CONCRETE CURB A12
SOUTH ELEVATION
Keynote Area Percentage
A19 1944.87 81%
NORTH ELEVATION A20 457.95 19%
1 Total 2402.82
10' 5' 0' 10' 20' 90%
3/32" = 1'-0" GENERAL NOTES
A. THE SERVICE ENTRY SECTION CABINET WILL NOT BE VISIBLE FROM
THE STREET AND WILL BE BLOCKED BY INTERVENING BUILDINGS.
A B C D E F G H J K
2
A-110
A12 A11
ROOF HIGH POINT EL.
TYP 24' - 8"
2
A21 A-501 EAVE HEIGHT EL.
16' - 0"
A24 5' - 4" A23 A24 A24 A19 A24 A24 A23 A24 A24 A24 A24 A23 A24
8"
8"
-
3' FINISHED FLOOR EL.
DUPLEX PER 8" 0' - 0"
A25 ELECTRICAL A20 A25 A25
3' - 10" 10' - 10" 127' - 10" 10' - 10" 108' - 11" 10' - 10"
A20 A19 A20 A19 A20
EAST ELEVATION
2
10' 5' 0' 10' 20'
3/32" = 1'-0"
K J H G F E D C B A
2
A-110
A11
ROOF HIGH POINT EL.
24' - 8"
A21 EAVE HEIGHT EL.
16' - 0"
A23 A23 A23 A24
A24 A24 A24 A19 A24 A24 A24 A24 A24 A24
A25 A25
0"
-
5' FINISHED FLOOR EL.
0' - 0"
A25 A26 A26 A20
63' - 9 1/4" 60' - 8" 10' - 10" 127' - 9" 10' - 10" 3' - 7"
A20 A19 A20 A19 A20
WEST ELEVATION
3
10' 5' 0' 10' 20'
3/32" = 1'-0"
1 2
1
A-110 ROOF HIGH POINT EL.
24' - 8"
EAVE HEIGHT EL.
16' - 0"
A19
8"
8"
-
Expansion/50-575-BOEING-ZZ-M3-A-57511.rvt 3' FINISHED FLOOR EL.
8" 0' - 0"
A20
SOUTH ELEVATION
4
ACFC 10' 5' 0' 10' 20'
Mesa
3/32" = 1'-0"
Boeing
- ACCEPTABILITY DRAWN ASM DATE 07/21/26 SUBTITLE CURRENT REVISION SYMBOL DATE
SYM REVISION BY APPROVED DATE CHECKED OVERALL ELEVATIONS - COLOR 07/21/26 PM
SPECIFICATION THIS DESIGN IS AND/OR APPROVED KML 07/21/26 SHEET 4:47:54
Docs://C08117.001 ENGINEER
APPROVED BY DEPT. DATE BRPH 07/21/26 TITLE BOEING OPERATION SHEETS A-060a
CHECKED BUILDING 50-575 JOB NO. COMP NO. 8/3/2026
DESIGN BY: MESA, AZ C08117.001
Autodesk APPROVED BOEING MESA STORAGE WAREHOUSE Author:
DWG NO.
DATE: APPROVED 50-575-A-060a