Extracted text (via pymupdf_layout)
2820 characters
MATERIALS KEYNOTES 2 1 1 NORTH ELEVATION A11 BOX GUTTER, REFER TO DETAILS. PRE-FINISHED TO PERMIT A-110 Keynote Area Percentage MATCH ROOF. SEE NOTE A21. A19 1942.06 81% A12 LIGHTING PER ELECTRICAL. A20 458.03 19% A19 CORRUGATED METAL PANEL: PBR PANEL ROOF HIGH POINT EL. MANUFACTURER: BUNGER. COLOR: ASH GRAY 24' - 8" Total 2400.09 WXA0092L. MOUNTED VERTICAL ORIENTATION FOR A20 CORRUGATED METAL PANEL: 6.8 PANEL EAVE HEIGHT EL. EAST ELEVATION MANUFACTURER: BUNGER. COLOR: CHARCOAL 16' - 0" Keynote Area Percentage WXA0101L. MOUNTED HORIZONTAL ORIENTATION A19 2918.89 67% A21 STANDING SEAM METAL PANEL ROOFING A20 1431.13 33% MANUFACTURER: MBCI COLOR: POLAR WHITE ISSUE WXW0049L A19 Total 4350.2 A23 PREFINISHED METAL AWNING PER 1/A-501 AND 4/A-501. TO MATCH A21. WEST ELEVATION A24 PREFINISHED METAL DOWNSPOUT - TO MATCH A21. - 8" Keynote Area Percentage A25 HOLLOW METAL DOOR. COLOR: PAINTED TO MATCH 8" A19 2300.74 53% PEMB A22. - 3' A20 2048.71 47% A26 INSULATED OVERHEAD SECTIONAL DOOR FINISHED FLOOR EL. Total 4349.45 MANUFACTURER: BUNGER COLOR: TO MATCH A22. 8" 0' - 0" SUBMITTAL A20 CONCRETE CURB A12 SOUTH ELEVATION Keynote Area Percentage A19 1944.87 81% NORTH ELEVATION A20 457.95 19% 1 Total 2402.82 10' 5' 0' 10' 20' 90% 3/32" = 1'-0" GENERAL NOTES A. THE SERVICE ENTRY SECTION CABINET WILL NOT BE VISIBLE FROM THE STREET AND WILL BE BLOCKED BY INTERVENING BUILDINGS. A B C D E F G H J K 2 A-110 A12 A11 ROOF HIGH POINT EL. TYP 24' - 8" 2 A21 A-501 EAVE HEIGHT EL. 16' - 0" A24 5' - 4" A23 A24 A24 A19 A24 A24 A23 A24 A24 A24 A24 A23 A24 8" 8" - 3' FINISHED FLOOR EL. DUPLEX PER 8" 0' - 0" A25 ELECTRICAL A20 A25 A25 3' - 10" 10' - 10" 127' - 10" 10' - 10" 108' - 11" 10' - 10" A20 A19 A20 A19 A20 EAST ELEVATION 2 10' 5' 0' 10' 20' 3/32" = 1'-0" K J H G F E D C B A 2 A-110 A11 ROOF HIGH POINT EL. 24' - 8" A21 EAVE HEIGHT EL. 16' - 0" A23 A23 A23 A24 A24 A24 A24 A19 A24 A24 A24 A24 A24 A24 A25 A25 0" - 5' FINISHED FLOOR EL. 0' - 0" A25 A26 A26 A20 63' - 9 1/4" 60' - 8" 10' - 10" 127' - 9" 10' - 10" 3' - 7" A20 A19 A20 A19 A20 WEST ELEVATION 3 10' 5' 0' 10' 20' 3/32" = 1'-0" 1 2 1 A-110 ROOF HIGH POINT EL. 24' - 8" EAVE HEIGHT EL. 16' - 0" A19 8" 8" - Expansion/50-575-BOEING-ZZ-M3-A-57511.rvt 3' FINISHED FLOOR EL. 8" 0' - 0" A20 SOUTH ELEVATION 4 ACFC 10' 5' 0' 10' 20' Mesa 3/32" = 1'-0" Boeing - ACCEPTABILITY DRAWN ASM DATE 07/21/26 SUBTITLE CURRENT REVISION SYMBOL DATE SYM REVISION BY APPROVED DATE CHECKED OVERALL ELEVATIONS - COLOR 07/21/26 PM SPECIFICATION THIS DESIGN IS AND/OR APPROVED KML 07/21/26 SHEET 4:47:54 Docs://C08117.001 ENGINEER APPROVED BY DEPT. DATE BRPH 07/21/26 TITLE BOEING OPERATION SHEETS A-060a CHECKED BUILDING 50-575 JOB NO. COMP NO. 8/3/2026 DESIGN BY: MESA, AZ C08117.001 Autodesk APPROVED BOEING MESA STORAGE WAREHOUSE Author: DWG NO. DATE: APPROVED 50-575-A-060a