Extracted text (via pymupdf_layout)
1548 characters
KEYED NOTES A1 4" PAINT STRIPING FOR FUTURE EQUIPMENT & TOOLING PERMIT ZONES, AREAS TO BE COORDINATED WITH BOEING. A2 EQUIPMENT PAD PER STRUCTURAL. VERIFY SIZE WITH MECHANICAL EQUIPMENT. COORDINATE LOCATION IN FIELD WITH MECHANICAL CONTRACTOR. REFERENCE MECHANICAL DWGS FOR EQUIPMENT. FOR A5 6" DIA. STEEL BOLLARD. PAINTED SAFETY YELLOW. 1 1 2 REFERENCE DETAIL: 5/A-501. A-060 A6 FUTURE PALLET RACKING ZONE, AREAS TO BE 121' - 8" COORDINATED WITH BOEING. A9 REFERENCE DETAIL DJ-1/A-350 FOR OVERHEAD DOOR ISSUE 1' - 4" 1' - 4" JAMB BOLLARD. F.O. CURB F.O. CURB A10 METAL PANEL CANOPY BELOW. 1 4" CURB A-110 - - 1' F.O. K W1 E1 A5 SUBMITTAL 4" - A10 A2 33' W2 A9 J 90% A10 A1 0" - W3 A1 30' A9 A1 H A5 A1 0" A2 - 30' G A9 0" - 30' A5 A5 F W4 E2 A9 0" 4" 3 A1 - - STORAGE 30' 279' A-060 101A1 2 A-060 E A1 A5 0" - A2 30' D 0" - 30' C A1 0" - 2 30' A-110 A5 B A2 4" - 33' A6 4" CURB W5 - E3 1' F.O. A 4 A-060 1 2 K 12 G 11 NORTH D COMPOSITE FLOOR PLAN Expansion/50-575-BOEING-ZZ-M3-A-57511.rvt 1 10 10' 5' 0' 10' 20' A 3/64" = 1'-0" KEY PLAN ACFC Mesa Boeing - ACCEPTABILITY DRAWN ASM DATE 07/21/26 SUBTITLE CURRENT REVISION SYMBOL DATE SYM REVISION BY APPROVED DATE COMPOSITE FLOOR PLAN 07/21/26 PM THIS DESIGN AND/OR CHECKED Docs://C08117.001 SPECIFICATION IS APPROVED KML 07/21/26 SHEET 4:47:45 APPROVED BY DEPT. DATE ENGINEER BRPH 07/21/26 TITLE BOEING OPERATION SHEETS A-004 CHECKED BUILDING 50-575 JOB NO. COMP NO. 8/3/2026 DESIGN BY: MESA, AZ C08117.001 Autodesk APPROVED BOEING MESA STORAGE WAREHOUSE Author: DWG NO. DATE: APPROVED 50-575-A-004