Project Narrative

City of Mesa — Design Review Board (2026-10-13)

View PDF Meeting page

Extracted text (via pymupdf_layout) 5786 characters
Boeing’s Warehouse Narrative
Introduction
Boeing is proposing a 35,000 sf warehouse building located at the northeast corner of N. Greenfield
Road and E. McDowell Road, Mesa, Arizona. The proposed warehouse will be located in the west
portion of the campus behind the existing and proposed Boeing fabrication center buildings.
General Information
The project site is a portion of APN 141-37-009M and comprises approximately 2.76 acres. The
proposed warehouse will encompass approximately 35,000 square feet. The proposed site is located
at the northeast corner of N. Greenfield Road and E. McDowell Road in Mesa, Arizona. More
specifically, the building will be situated within the western portion of the existing Boeing campus, just
west of the current flight line, behind the existing and proposed Boeing fabrication center buildings
within the 100-meter secure perimeter. The site is currently vacant land owned by Boeing. It is bordered
by the Boeing campus to the west, south, and east, and by vacant land to the north. The property is
designated Light Industrial (LI), where warehouse and storage are permitted use under the existing
zoning. The proposed warehouse building will be utilized by the existing and proposed fabrication
centers to store unused equipment. This proposed warehouse will not have any employees working in
the building. A Site Plan and Overall Site Plan exhibit have been included with this narrative to illustrate
the proposed layout.
Circulation and Parking
The proposed warehouse will be used solely for equipment storage supporting the existing and
proposed fabrication buildings. No additional employees will be working in the warehouse; therefore,
the existing and proposed parking for the fabrication buildings will adequately serve the site.
Vehicle circulation will be provided via a proposed 26-foot-wide asphalt drive aisle. Two access drive
aisles will connect the site to the existing north–south drive aisle to the west of the warehouse. Concrete
pavement and sidewalks will be provided at building entrances to facilitate pedestrian access. The
proposed drive aisle will accommodate full turning movements and provide adequate fire access
throughout the site.
Grading and Drainage
The proposed development is designed to fully contain the 100-year, 2-hour storm event. An on-site
retention basin and associated storage facilities will be sized to capture 100% of the required design
volume and will drain within 36 hours, in accordance with City of Mesa drainage criteria.
Utilities
The proposed warehouse will function solely as an equipment storage facility and will not require
additional staffing. As such, no domestic water or sanitary sewer services are anticipated. A 6-inch fire
service line will provide fire protection and will connect to an existing 12-inch fire line loop located west
of the proposed building. Additionally, a telecommunications line will be extended to serve the building.
kimley-horn.com 2046 Riverview Auto Drive, Suite 400, Mesa, AZ 85201 480 207 2666

Page 2
Architecture Alternative Compliance
See separate architectural narrative.
Alternative Landscape Plan
Due to the unique site characteristics of the proposed Warehouse as part of the Boeing Fabrication
Center within the Airfield Overlay District, an alternative landscape plan is requested by exceeding
minimum requirements of Mesa Zoning Ordinance Section 11-33-7. The proposed Warehouse will be
located within the 100-meter secure perimeter around the Boeing Fabrication Center buildings to
comply with the Governments Intelligence Community Directive (ICD) 705 relating to physical and
technical security standards for the site. Within this secure area, vegetation surrounding the existing
buildings and proposed Warehouse will be limited to limited quantities of ground covers and shrubs to
allow for inspectable space for security and safety of the building. Foundation base zones have been
provided but will be without vegetation due to the inspectable space requirements next to the buildings.
In addition, due to the proximity of the Boeing Flight area and safety concerns for Foreign Object
Damage (FOD) that can occur to the helicopters, the landscaping has been limited as well. The
alternative landscape plan meets six (6) of the design principles as set within Mesa Zoning Ordinance
Section 11-33-7(A). The landscape around the proposed Warehouse are native vegetation including
specimen cacti and native shrubs designed in vignettes creating a naturalistic design in layout of the
proposed plants mimicking patterns seen in the native Sonoran Desert. The overall Boeing Fabrication
Center features an excess plant variety and the proposed Warehouse matches the plant palette of the
landscape within the secure perimeter around the fabrication buildings. The basin behind the
warehouse is part of the larger drainage within the Boeing Fabrication Center and provides exceptional
storm water management by retaining all captured storm water above ground allowing it to be cleaned
by native vegetation before percolating into the ground. The site has compatibility with surrounding
uses both with the existing phase 1 of the Boeing Fabrication Center and the overall Boeing campus.
In studying the existing landscape of the existing phase 1, the plant palette selected for the proposed
center have proven plant viability and longevity while still complying with the Governments
Intelligence Community Directive (ICD) 705. The proposed landscape is requesting alternative
landscape plan for the secure area landscaping to comply with the Governments Intelligence
Community Directive (ICD) 705 relating to physical and technical security standards for the site.
kimley-horn.com 1855 West Baseline Road, Suite 200, Mesa, AZ 85202 480 207 2666