ORDINANCE NO. 26–12
AN ORDINANCE OF THE MAYOR AND COUNCIL OF THE TOWN OF
FOUNTAIN HILLS, MARICOPA COUNTY, ARIZONA, AMENDING THE
FOUNTAIN HILLS ZONING ORDINANCE BY REPEALING AND
REPLACING CHAPTER 17, WIRELESS TELECOMMUNICATION
TOWERS AND ANTENNAS WITH A NEW CHAPTER 17, WIRELESS
TELECOMMUNICATION TOWERS AND ANTENNA.
WHEREAS, the Mayor and Council of the Town of Fountain Hills (the “Town
Council”) adopted Ordinance No. 93-22 on November 18, 1993, which adopted the
Zoning Ordinance for the Town of Fountain Hills (the “Zoning Ordinance”); and
WHEREAS, the Town desires to enhance the ability of the providers of
telecommunications services to provide such services to the community quickly,
effectively, and efficiently while protecting residential areas and land uses from
potential adverse impacts of towers and antennas; and
WHEREAS, the Town Council desires to repeal the existing Chapter 17, Wireless
Communication Towers and Antennas and replace it with a new and updated
Chapter 17, Wireless Communication Towers and Antennas; and
WHEREAS, in accordance with the Zoning Ordinance and pursuant to ARIZ. REV.
STAT. § 9-462.04, public hearings regarding this ordinance were advertised in the
August 26, 2026, and September 1, 2026, editions of the Fountain Hills Times; and
WHEREAS, a public hearing was held by the Planning and Zoning Commission on
September 14, 2026, and by the Town Council on October 20, 2026; and
WHEREAS, in accordance with Article II, Sections 1 and 2, Constitution of Arizona,
and the laws of the State of Arizona, the Town Council has considered the individual
property rights and personal liberties of the residents of the Town and the probable
impact of the proposed ordinance on the cost to construct housing for sale or rent
before adopting this ordinance.
NOW, THEREFORE, BE IT ORDAINED BY THE MAYOR AND COUNCIL OF THE
TOWN OF FOUNTAIN HILLS, ARIZONA, as follows:
SECTION 1. The recitals above are hereby incorporated as if fully set forth
herein.
SECTION 2. Chapter 17 of the Fountain Hills Zoning Ordinance is hereby
repealed and replaced with the ordinance as provided in Exhibit A.

SECTION 3. If any provision of this Ordinance is for any reason held by any
court of competent jurisdiction to be unenforceable, such provision or portion
hereof shall be deemed separate, distinct and independent of all other provisions
and such holding shall not affect the validity of the remaining portions of this
Ordinance.
SECTION 4. EMERGENCY CLAUSE - WHEREAS, it is necessary for the
preservation of the peace, health, and safety of the Town of Fountain Hills, Arizona,
an emergency is declared to exist, and this ordinance shall become immediately
operative and in force from and after the date of adoption.
PASSED AND ADOPTED by the Mayor and Council of the Town of Fountain
Hills, Arizona, this 20th day of October, 2026.
TOWN OF FOUNTAIN HILLS, ARIZONA ATTEST:
____________________________________________ _______________________________________
Gerry M. Friedel, Mayor Bevelyn Bender, Town Clerk
REVIEWED BY: APPROVED AS TO FORM:
_____________________________________________ ________________________________________
Rachael Goodwin, Town Manager Town Attorney

ORDINANCE NO. 26-12
EXHIBIT A
Chapter 17
Wireless Telecommunications Towers and Antennas
Section 17.01 Purpose, Intent, and Applicability
A. The purpose of this chapter is to establish general guidelines for the siting of wireless
communications towers and antennas. The goals of this chapter are to:
1. Protect residential areas and land uses from potential adverse impacts of towers and antennas;
2. Employ the “General Authority” preserved to the Town under 47 U.S.C. § 332(c)(7)(A) to the
greatest extent the United States Congress intended while simultaneously complying with each of
the substantive and procedural requirements set forth within the subsection 47 U.S.C. §
332(c)(7)(B).
3. Employ the authority reserved under A.R.S. §§ 9-462.01, and 9-596.A to exercise the Town’s
zoning powers, land use, planning and permitting authority, exercise its police powers, and
manage access to the Town’s public rights of way.
4. Promote the location of towers in nonresidential areas;
5. Limit the total number of towers throughout the community;
6. Strongly encourage the joint use of new and existing tower sites as a primary option rather
than construction of additional single-use towers;
7. Require users of towers and antennas to locate them, to the extent possible, in areas where the
adverse impact on the community is minimal;
8. Require users of towers and antennas to configure them in a way that minimizes the adverse
visual impact of the towers and antennas through careful design, siting, landscape screening, and
camouflaging techniques;
9. Enhance the ability of the providers of telecommunications services to provide such services
to the community quickly, effectively, and efficiently;

10. Recognize that technology and laws regarding these facilities have changed, so the Town’s
regulations need to change accordingly;
11. Consider the public health and safety of communication towers; and
12. Avoid potential damage to adjacent properties from tower failure through engineering and
careful siting of tower structures.
13. Maintain the Town’s status as a designated International Dark Sky Community and an
optimum environment for stargazing,
14. Conserve and enhance the unique natural beauty, irreplaceable natural resources, historical,
natural, and man-made character and appearance of Fountain Park, McDowell Mountain Preserve,
Pleasantville Park, and views of Red Mountain and Four Peaks.
15. Protect Saguaro cacti as a unique natural resource promoting tourism, contributing to the
aesthetic well-being of the community, high property values, high quality of life, unique lifestyles,
and providing habitat protection for desert wildlife. Saguaro cacti grow slowly and cannot be
replaced by a plant of like character.
16. Protect the Sonoran Desert tortoise and its habitats as a unique natural resource and an
important component of Town of Fountain Hills natural environment that contributes to the
aesthetic, environmental, and personal well-being of the community. The Sonoran Desert tortoise
is a state-protected species in Arizona and a petitioned candidate for inclusion as a federally
endangered species pursuant to the Endangered Species Act of 1973, 16 U.S.C. §§ 1531–1544.
Populations of the Sonoran Desert tortoise has been documented in the Town of Fountain Hills.
17. Protect the quiet small-town suburban, scenic and visual character of the Town.
In furtherance of these goals, Town of Fountain Hills shall give due consideration to the Town of
Fountain Hills General Plan, the Town of Fountain Hills Zoning Ordinance, existing land uses, and
environmentally sensitive areas in approving sites for the location of towers and antennas.
B. It is the intent of this chapter:
1. That no wireless communication towers or antenna be sited, constructed, reconstructed,
installed, materially changed, expanded, or used unless in conformity with this chapter.
2. To achieve a balance between the need to provide wireless services with the health, safety,
and general welfare of the residents of Fountain Hills by balancing five (5) simultaneous
objectives:
a. Enabling personal wireless service providers to provide adequate personal wireless
services throughout the Town so that Town residents can enjoy the benefits of same from any
FCC-licensed wireless carrier from which they choose to obtain such services;

b. Minimizing the number of cell towers and/or other personal wireless service facilities
needed to provide such coverage;
c. Preventing, to the greatest extent reasonably practical, any unnecessary adverse impacts
upon the Town’s communities, residential areas, and individual homes;
d. Complying with each of the substantive and procedural requirements set forth within the
subsection 47 U.S.C. § 332(c)(7)(B) for permit applications seeking approvals for the siting,
construction and operation of cell towers and/or other personal wireless service facilities; and
e. Complying with the Federal Communications Commission’s (FCC) legislative rules for
communications facilities including those for Radio Frequency human exposure limits in 47
C.F.R. Part 1, Subpart I and those addressing State and Local government regulation of the
Placement, Construction, and Modification of Personal Wireless Service Facilities, in 47
C.F.R. Part 1, Subpart U.
This Section is not intended to, nor shall it be interpreted or applied to: (1) prohibit or effectively
prohibit any wireless telecommunications service provider's ability to provide reasonable and
necessary wireless communications services; (2) prohibit or effectively prohibit any entity's ability to
provide reasonable and necessary interstate or intrastate telecommunications service; (3) unreasonably
discriminate among providers of functionally equivalent services; (4) deny any request for
authorization to place, construct or modify wireless telecommunications service facilities solely on the
basis of environmental effects of radio frequency emissions so long as such wireless facilities comply
in every instance and regard with all FCC's regulations concerning such emissions; (5) prohibit any
eligible facility that the Town may not deny under federal or state law; or (6) otherwise authorize the
Town to violate any applicable federal or state law.
C. Applicability.
1. New Towers and Antennas. All new towers or antennas in the Town of Fountain Hills shall be
subject to these regulations. The following exceptions apply:
a. Amateur Radio Station Operators/Receive Only Antennas. This chapter shall not govern
any tower, or the installation of any antenna, that is under the maximum building height of the
zoning district in which such structure is located and which is owned and operated by a
federally licensed amateur radio station operator or is used exclusively for receive only
operations.
b. Pre-existing Towers or Antennas. Legally established pre-existing towers and pre-existing
antennas shall not be required to meet the requirements of this chapter, other than the
requirements of Sections 17.06(B)(1) and 17.06(C).
c. AM Array. For purposes of implementing this chapter, an AM array, consisting of one (1)
or more tower units and supporting ground system which functions as one (1) AM

broadcasting antenna, shall be considered one (1) tower. Measurements for setbacks and
separation distances shall be measured from the outer perimeter of the towers included in the
AM array. Additional tower units may be added within the perimeter of the AM array by
right.
d. Small Wireless Facilities. Wireless communication towers and antenna meeting the
definition of small wireless facilities as contained in A.R.S. 9-591 are subject to the
requirements of Article 19-1, Small Wireless Facilities, of the Town Code.
e. Mobile or Temporary Towers. Mobile wireless facilities, when placed on site for seven (7)
consecutive days or less, provided any necessary building permit or encroachment permit is
obtained.
f. Utility Service Antennas in the Right-of-Way. Utility service antennas as defined in this
chapter placed in the public right-of-way are subject to the requirements of Article 19-2,
Utility Service Antenna, of the Town Code.
g. Over-the-Air-Reception Devices ("OTARD") antennas as defined by 47 C.F.R. §
1.4000(a).
2. Existing Towers and Antennas. Any existing towers which are modified, upgraded, or changed
in any manner shall be subject to the provisions of this ordinance as applicable. All existing
towers and antennas shall be subject to the maintenance and operations requirements in Sec.
17.06.
Section 17.02 Definitions
For the purposes of this article, and where not inconsistent with the context of a particular section, the
defined terms, phrases, words, abbreviations, and their derivations shall have the meanings provided
in this section. When not inconsistent with the context, words in the present tense include the future
tense, words used in the plural number include words in the singular number, and words in the
singular number include the plural number. The word “shall” is always mandatory and not merely
directory. The definitions set forth herein shall supersede any definitions set forth within the Town
Code and Zoning Ordinance, and the definitions set forth herein below shall control and apply to
Chapter 17 of the Zoning Ordinance and all subparagraphs herein.
“Accessory facility or accessory structure” means a facility or structure serving or being used in
conjunction with a personal wireless services facility or complex and located on the same property or
lot as the personal wireless services facility or complex or an immediately adjacent lot, including, but
not limited to utility or transmission equipment storage sheds or cabinets.
“ACHP” means the Federal Advisory Council on Historic Preservation.

“ADA” means American Disabilities Act.
“ADEQ” means the Arizona Department of Environmental Quality.
“Adequate coverage” means, as determined by the Town Council, that a specific wireless carrier’s
personal wireless service coverage is such that the vast majority of its customers’ equipment can
successfully connect to the carrier’s radio access network and achieve a received signal strength of -
110 dBm or better and deliver a -90 dBm or better signal to the base station receiver (uplink) with a
signal to noise ratio (SINR) of 3 dB or higher the vast majority of the time, in the vast majority of the
geographic locations within the Town, that the Voice Drop Call Rate, e.g. the percentage ratio of
dropped voice calls to total call attempts or successful call setups remains at or below 3%. A “gap”
can exist when there is a lack of coverage or when coverage exists but quality is below the above
metrics. The Town will assess whether a gap in a carrier’s personal wireless services are significant,
based upon such factors including, but not limited to, lack of significant physical size of the gap,
whether the gap is located upon a lightly traveled or lightly occupied area, whether only a small
number of customers are affected by the gap, and/or whether or not the carrier’s customers are
affected for only limited periods of time. A wireless carrier’s coverage shall not be deemed inadequate
simply because the frequency or frequencies at which its customers are using its services are not the
most preferred frequency of the wireless carrier.
For claimed capacity or quality shortfalls in an area that has coverage, the applicant must demonstrate
through independently-verifiable data and analysis, including network generated recordings based on
user equipment reports that users are consistently experiencing dropped voice calls (in contrast to
dropped sessions involving non-voice communications) at an unacceptable level during peak periods,
or user devices are consistently denied access to the network due to lack of overall capacity at peak
periods.
If the applicant relies on signal strength data (whether network recorded or through drive tests) to
demonstrate a lack of coverage or inadequate quality/capacity the applicant must disclose all
underlying data, its thresholds for acceptable quality in such fashion that all claims and conclusions
are independently verifiable.
The Town strongly encourages all applicants to use methods consistent with the FCC rules governing
provider reports and mapping data in 47 C.F.R. Part 1, Subpart V (§§ 1.7000 – 1.7010).
“Adjacent properties or properties adjacent” shall mean (i) those lots or parcels of land that abut
another lot or parcel of land or public right-of-way that is contiguous to a wireless facility site or
proposed site and (ii) the lots or parcels of land or public right-of-way that would be contiguous to lots
or parcels or public rights-of-way but for an intervening local or collector roadway.
“Aesthetic or aesthetics” refers to subjective or objective determinations related to whether and if so,
how well a facility will fit within the character of the area where the facility is proposed. This requires
a broad range of factors including but not limited to visual effects and impact on property values. The

Town will consider aesthetics for all applications and, where not prohibited by federal or state law,
reserves the ability to impose careful placement conditions or restrictions.
“Alternative tower structure” means man-made trees, clock towers, bell steeples, light poles and
similar alternative-design mounting structures that camouflage or conceal the presence of antennas or
towers.
“Antenna” means an apparatus designed for the purpose of emitting radiofrequency (RF) radiation, to
be operated or operating from a fixed location pursuant to FCC authorization, for the provision of
personal wireless service and any commingled information services. This definition does not apply to
antennas designed for amateur radio use or satellite dishes for residential or household purposes.
“Antenna equipment” means equipment, switches, wiring, cabling, power sources, shelters or cabinets
associated with an Antenna, located at the same fixed location as the Antenna, and, when Co-located
on a PWSF Structure, is mounted or installed at the same time as such Antenna.
“Antenna facility” means Antenna and associated Antenna Equipment.
"Applicant" means any individual, corporation, limited liability company, general partnership, limited
partnership, estate, trust, joint-stock company, association of two or more persons having a joint
common interest, or any other entity submitting an application for a wireless communication facility
permit, site plan approval, building permit, and/or any other related approval, for the installation,
operation and/or maintaining of one or more wireless communication facilities.
"Application" shall mean all necessary and required documentation, information, and evidence that an
applicant must submit to receive a wireless communications facility permit, building permit, or other
Town approval for personal wireless service facilities from the Town.
“Backhaul network” means the lines that connect a provider’s towers/cell sites to one (1) or more
cellular telephone switching offices, and/or long distance providers, or the public switched telephone
network.
“Balloon test” means the raising of a balloon (or placement of a “crank up” tower, crane or temporary
structure) equal to the height of a proposed personal wireless services facility tower for a period of 4
hours on a pre-determined date and time prior to approval of a wireless facility permit application to
assess the visual impact of a proposed tower.
“Base station” means for purposes of eligible facilities requests the definition in the FCC’s regulations
at 47 CFR § 1.6100 shall apply. A structure or equipment at a fixed location that enables FCC-
licensed or authorized wireless communications between user equipment and a communications
network. The term does not encompass a tower or any equipment associated with a tower.

“Board of Adjustment” means the Board of Adjustment of the Town of Fountain Hills, established
pursuant to Sec. 1.07 of the Zoning Ordinance with membership, powers, duties, and responsibilities
as set forth in Article 2A-2 of the Town Code.
Carriers. See Wireless Carriers.
“Cell tower” means a free-standing, guy-wired, or otherwise supported pole, tower, or other structure
designed to support or employed to support equipment and/or antennas used to provide personal
wireless services, including, but not limited to, a pole, monopole, monopine, slim stick, lattice tower
or other types of standing structures.
“CEQ” means the Council on Environmental Quality, as established under NEPA.
"Collocate, colocate" or "collocation, colocation" can have different meanings depending on context.
1. When and where A.R.S. §§ 9-951 — 9-600 apply, the definition in A.R.S. §§ 9-951.8 shall also
apply. That definition currently states:
"Collocate" or "collocation" means to install, mount, maintain, modify, operate or replace wireless
facilities on, within or adjacent to a wireless support structure or utility pole.
2. Where and when the FCC’s general rules for placement, construction and modification of
personal wireless facilities apply, the definition in 47 C.F.R. § 1.6002(g) shall also apply. That
definition currently states:
Collocation, consistent with § 1.1320(d) and the Nationwide Programmatic Agreement (NPA) for
the Collocation of Wireless Antennas, appendix B of this part, section I.B, means—
(1) Mounting or installing an antenna facility on a pre-existing structure; and/or
(2) Modifying a structure for the purpose of mounting or installing an antenna facility on that
structure.
(3) The definition of “collocation” in § 1.6100(b)(2) applies to the term as used in that section.
3. Where and when the FCC’s rules for wireless facility modifications apply, the definition in 47
C.F.R. § 1.6100(b)(2) shall also apply. That definition currently states:
(2) Collocation. The mounting or installation of transmission equipment on an eligible support
structure for the purpose of transmitting and/or receiving radio frequency signals for
communications purposes.
“Complete application, completed application” means an application that contains all the necessary
and required information, records, evidence, reports, and/or data necessary to enable an informed
decision to be made with respect to an application. Where any information is provided pursuant to the
terms of this Chapter and the Development Services Director, Town Engineer or the Town’s expert or

consultant, or the Council determines, based upon information provided, that any additional, further,
or clarifying information is needed as to one or more aspects, then the application will be deemed
incomplete until that further or clarifying information is provided to the satisfaction of the
Development Services Director, Town Engineer, Town Council or the Town’s expert or consultant of
the Council.
“Complex” means the entire site or facility, including all structures and equipment, located at the site.
“Council or Town Council” means the Town Council of the Town of Fountain Hills.
“DBM” (dBm) stands for decibel milliwatts, which is a concrete measurement of the wireless signal
strength of wireless networks. It expresses power relative to 1 milliwatt (mW) on a logarithmic scale.
Emissions are measured using positive whole or fractional numbers. Received signal strengths are
typically recorded in negative numbers because they are usually weaker than 1 milliwatt, and can
range from approximately -30 dBm to -110 dBm. The closer the number is to 0, the stronger the cell
signal. FCC, HHS and OSHA regulate safe exposure thresholds but transmitter power (in dBm) is
crucial to determining exposure, as it is the starting point for calculating current exposure limits.
“Deployment” means the placement, construction, or substantial modification of a personal wireless
service facility.
“Development Services Director” (or “Director): T” means the person appointed by the Town
Manager to be the Development Services Director. If there is no such person designated by the Town
Manager, the Town Manager is the Development Services Director.
“Distributed antenna system, DAS” means a network of spatially separated antenna nodes connected
to a common source via a transport medium that provides personal wireless service within a
geographic area.
“Effective prohibition” means a finding by the Town Council that if an application seeking approval
for a specific new Personal Wireless Service Facility at a specific location, and a specific height, were
to be denied, such denial would either: (a) prevent an identified Wireless Carrier from providing
personal wireless services within a specific geographic area, or areas, within the Town, or (b) would
prevent a specific Wireless Carrier from constructing a sufficient number of such facilities necessary
to enable it to provide Personal Wireless Services within the Town.
An effective prohibition shall not be found to exist if a Wireless Carrier has Adequate Coverage in a
specified geographic area , such that its end-use customers can use their cellular telephones to connect
to landlines using the Carrier’s Personal Wireless Services; however, the frequencies are not the “most
preferred” frequencies of the Carrier.
An effective prohibition shall also not be found to exist if an applicant fails to establish before the
Town Council that any existing geographic gap or capacity deficiency in the specific Wireless
Carrier’s coverage cannot be remedied through a less intrusive means than what is being proposed,

including, but not limited to, potential installations on alternative less intrusive sites, a shorter tower or
facility, the incorporation of a more stealthy design, etc.
A finding of Effective Prohibition, or lack thereof, shall be based upon an applicant’s submission of
sufficient probative, relevant, and sufficiently reliable evidence and the appropriate weight the Town
Council deems appropriate to afford.
“Eleventh hour submissions” means an applicant’s submission of new and/or additional materials in
support of an application less than five (5) business days before the expiration of an applicable shot
clock or at an otherwise unreasonably short period of time before the expiration of the shot clock,
making it impracticable for the Town Council to adequately review and consider such submissions
due to their complexity, volume, or other factors, before the expiration of the shot clock.
“Eligible facilities request” means a request that meets the requirements in 47 CFR § 1.6100 for
modification of an existing Tower or Base Station that does not substantially change the physical
dimensions of such Tower or Base Station and involving:
(a) Co-location of new transmission equipment,
(b) Removal of transmission equipment, or
(c) Replacement of transmission equipment.
“Enure” means to operate or take effect. To serve to a person or party's use, benefit, or advantage.
“EPA” means the United States Environmental Protection Agency.
“Existing structure” means light poles, power poles, chimneys, billboards, and other similar structures,
which are placed, within the Town at the time of adoption of this chapter, except existing buildings.
“FAA” means the Federal Aviation Administration or its duly designated and authorized successor
agency.
“Facility” means a set of wireless transmitting and/or receiving equipment, including any associated
electronics and electronics shelter or cabinet and generator.
“FCC” means the Federal Communications Commission.
“General population/uncontrolled exposure limits” means the applicable radiofrequency radiation
exposure limits set forth within 47 CFR §1.1310(e)(1), Table 1 Section (ii), made applicable pursuant
to 47 CFR §1.1310(e)(3), as further described and supplemented by the FCC Office of Engineering
and Technology Laboratory Division’s advisory Knowledge Database (KBD), available at
https://apps.fcc.gov/oetcf/kdb/index.cfm.
“HHS” means U.S. Department of Health and Human Services or its constituent agencies, including
FDA Food and Drug Administration, charged with review and compliance, meeting or exceeding

requirements of the RF-emitting consumer devices (e.g., electronic products such as cell phones) for
health impacts.
“Height” means, when referring to a tower, personal wireless service facility, or personal wireless
service facility structure, the height shall mean the distance measured from the pre-existing grade level
to the highest point on the tower, facility, or structure, including, but not limited to, any accessory,
fitting, fitment, extension, addition, add-on, antenna, whip antenna, lightning rod or other types of
lightning-protection devices attached to the top of the structure.
“Historic Structure” means any structure that is either on the National Register of Historic Places or is
eligible for inclusion in the national register, irrespective of whether or not an application for inclusion
onto the national register has been filed or not filed.
“Illegally excessive RF radiation or illegally excessive radiation” means RF radiation emissions at
levels that exceed the legally permissible limits set forth within 47 CFR §1.1310(e)(1), Table 1
Sections (i) and (ii), as made applicable pursuant to 47 CFR §1.1310(e)(3).
“In-kind call testing” means testing designed to measure the gap in Personal Wireless Service
coverage asserted by an applicant. In-Kind Call Testing for a claimed gap in Personal Wireless
Services in buildings means call testing performed in buildings to establish the existence or absence of
such a gap, unless the applicant provides an affidavit sworn under penalties of perjury demonstrating
good faith but unsuccessful attempts to secure access to buildings to conduct such testing. In-Kind
Call Testing for a claimed gap in Personal Wireless Services in vehicles or in the open air means call
testing performed in vehicles or in the open to establish the existence or absence of such a gap.
“In-kind replacement” means the replacement of a malfunctioning component(s) with a properly
functioning component of substantially the same weight, dimensions, and outward appearance.
“Least intrusive” means the location and design of a personal wireless service facility that would
remedy a significant gap in Personal Wireless Service coverage and (1) does the least disservice to the
objectives stated in § 270-219A(2), and (2) deviates as little as possible from (a) the preferential order
of location in subsection K (Priority of siting locations) and (b) applicable design standards in
subsection L.
“Macrocell” means a cellular base station that typically sends and receives radio signals from large
towers and antennas. These include traditionally recognized cell towers, typically ranging from 50 to
199 feet in height.
“Maintenance or routine maintenance” means plumbing, electrical or mechanical work that may
require a building permit but that does not constitute a modification to the personal wireless service
facility. It is work necessary to assure that a wireless facility and/or telecommunications structure
exists and operates reliably and in a safe manner, presents no threat to persons or property, and
remains compliant with the provisions of this chapter and FCC requirements.

“Mobile or temporary tower” means a portable tower or other wireless communications facility
capable of being transported in or by a motor vehicle, or otherwise designed to be readily relocated,
that is intended or used to provide wireless communications services on a temporary or emergency
basis and is not permanently affixed to the site on which it is located. The term includes, but is not
limited to, cells-on-wheels (COWs), sites-on-wheels (SOWs), cells-on-light-trucks (COLTs), trailer-
mounted monopoles, and similar portable facilities.
“Monopole” means a wireless support structure that is not more than forty inches in diameter at the
ground level and that has all of the wireless facilities mounted on the pole or contained inside of the
pole. Monopoles are typically unguyed.
“Necessary, or necessity, or need” means what is technologically required for the equipment to
function as designed by the manufacturer and anything less will result in prohibiting the provision of
service as intended and described in the narrative of the application. “Necessary” or “need” does not
mean what may be desired, preferred, or the most cost-efficient approach and is not related to an
applicant’s specific chosen design standards or unspecified “coverage objectives.” Any situation
involving a choice between or among alternatives or options is not a need or a necessity.
“NEPA” means the National Environmental Policy Act, 42 U.S.C. §4321, et seq.
“NHPA” means the National Historic Preservation Act, 54 U.S.C. 300101 et seq, and 36 CFR Part
800, et seq.
“Node, DAS node” means a fixed antenna and related equipment installation that operates as part of a
system of spatially separated antennas, all of which are connected through a medium through which
they work collectively to provide personal wireless services, as opposed to other types of personal
wireless facilities, such as macrocells, which operate independently.
“Node” means a fixed antenna and antenna equipment installation that operates as part of a system of
spatially separated Antennas, all of which are connected through a medium through which they work
collectively to provide personal wireless services using hand-off capabilities. A 4G (LTE) node is
referred to as an ENode B, and a 5G node is referred to as a GNode B. Some sites incorporate both 4G
and 5G. Some 5G capable sites still rely on a 4G network core.
“Notice address” means an address, which is required to be provided by an applicant at the time it
submits an application, at which the Town, Town Council, and/or Development Services Director or
Town Engineer designee can mail notice, and the mailing of any notice to such address by first-class
mail shall constitute sufficient notice to any and all applicants, co-applicants, and/or their attorneys, to
satisfy any notice requirements under this Chapter, as well as any notice requirements of any other
local, state and/or federal law.
“Notice of incompleteness, notice of incomplete application” means a written notice, sent by
electronic mail , to an applicant seeking approval for the installation of a PWSF, wherein the sender
advises the applicant that its application is either incomplete, the wrong type of application, or is

otherwise defective, and setting for the reason or reasons why the application is incomplete and/or
defective.
“Notice of effective prohibition conditions” means a written notice, which is required to be provided
to the Town at the time of the filing of any application by all applicants seeking any approval, of any
type, for the siting, installation, and/or construction of a PWSF, wherein the respective applicant
asserts, claims or intends to assert or claim, that a denial of their respective application, by any agent,
employee, board or body of the Town, would constitute an “effective prohibition ” within the meaning
of the TCA, and concomitantly, that a denial of their respective application or request would violate
Section 47 U.S.C. §332(c)(7)(B)(i)(II) of the TCA.
“Occupational/controlled exposure limits” means the applicable radiofrequency radiation exposure
limits set forth within 47 CFR §1.1310(e)(1), Table 1 Section (i), made applicable pursuant to 47 CFR
§1.1310(e)(2).
"Permit" means written permission required by an authority to install, mount, maintain, modify,
operate or replace a utility pole or monopole, to collocate a wireless facility on a utility pole or
wireless support structure or to collocate wireless facilities on a monopole.
“Permittee” means a holder of a Personal Wireless Service Facility Permit.
“Personal wireless service/personal wireless services” means commercial mobile services, unlicensed
wireless services, and common carrier wireless exchange access services, within the meaning of 47
U.S.C. §332(c)(7)(c)(i), and as defined therein.
“Personal wireless service facility, personal wireless services facility or PWSF” means a facility or
facilities used for the provision of personal wireless services, within the meaning of 47 U.S.C.
§332(c)(7)(c)(ii). It means a specific location at which a structure that is designed or intended to be
used to house or accommodate antennas or other transmitting or receiving equipment is located. This
includes, without limitation, towers of all types and all kinds of support structures, including but not
limited to buildings, church steeples, silos, water towers, signs, utility poles, or any other structure that
is used or is proposed to be used as a telecommunications structure for the placement, installation
and/or attachment of antennas or the functional equivalent of such. It expressly includes all related
facilities and equipment such as cabling, radios and other electronic equipment, equipment shelters
and enclosures, cabinets, and other structures enabling the complex to provide personal wireless
services.
“Pre-existing towers and pre-existing antennas” means any tower or antenna lawfully constructed or
permitted prior to the effective date of this Chapter, including any tower or antenna for which no
permit or other zoning approval was required at the time of construction, provided that the tower or
antenna was otherwise lawfully constructed.
"Private easement" means an easement or other real property right that is only for the benefit of the
grantor and grantee and the grantor's or grantee's successors and assigns.

“Probative evidence” means evidence which tends to prove facts, and the more a piece of evidence or
testimony proves a fact, the greater its probative value, as shall be determined by the Town Council or
other decision making authority, as the finder-of-fact in determining whether to grant or deny
applications under this provision of the Town Code.
“Repairs” means the replacement or repair of any components of a wireless facility or complex where
the replacement is substantially identical to the component or components being replaced, or for any
matters that involve the normal repair and maintenance of a wireless facility or complex without the
addition, removal, or change of any of the physical or visually discernible components or aspects of a
wireless facility or complex that will impose new visible intrusions of the facility or complex as
originally permitted.
“RF” means radiofrequency.
“RF radiation” means radiofrequency radiation. That being electromagnetic radiation, which is a
combination of electric and magnetic fields that move through space as waves, and can include both
Non-Ionizing radiation and Ionizing radiation.
“School” means a public, charter, or private educational institution providing instruction for
elementary and secondary grades as defined in A.R.S. § 15-101 and includes the real property and
facilities used for such educational purpose.
“School property” means any parcel containing a public, charter, or private educational institution
providing instruction for elementary and secondary grades as defined in A.R.S. § 15-101 and includes
associated playgrounds, athletic fields, administrative buildings, parking areas, and other school-
related facilities.
“Section 106 Review” means a review under Section 106 of the National Historic Preservation Act.
“Setback” means the distance between (a) any portion of a personal wireless facility and/or complex,
including but not limited to any and all accessory facilities and/or structures, and (b) the exterior line
of any parcel of real property or part thereof which is owned by, or leased by, an applicant seeking to
construct or install a personal wireless facility upon such real property or portion thereof. In the event
that an applicant leases only a portion of real property owned by a landlord, the setback shall be
measured from the facility to the line of that portion of the real property that is actually leased by the
applicant, as opposed to the exterior lot line of the non-leased portion of the property owned by the
landlord.
“Shot clock, Arizona” means the statutory timeframes within which the Town must review a wireless
application for completeness of an application for wireless facilities in right-of-way pursuant to A.R.S.
§ 9-594.C.2 and act on a wireless application before it is otherwise deemed approved pursuant to
A.R.S. § 9-594.C.2. For deemed approved purposes, the Arizona shot clock begins on the date when
the Town determines the application is properly completed. For applications involving wireless
facilities not in right-of-way the FCC shot clock will apply.

Shot clock, FCC: the presumptively reasonable time frame within which the Town must act on a
wireless application, as defined by the FCC, shown below subject to amendment from the FCC. The
shot clock begins when the applicant takes the first procedural step that the Town requires.
a. Aggregate of 60 days:
1) Standby emergency generators at previously permitted macro cell tower
sites.
2) Collocation of small wireless facilities at existing small wireless facility
sites.
3) Eligible Facilities Requests.
b. Aggregate of 90 days:
1) New small wireless facilities.
2) Collocation applications for additions to existing communications facilities not
defined as an eligible facilities request.
c. Aggregate of 150 days:
1) All other applications, such as development of a new communication tower or facility.
“SHPO” means the Arizona State Historic Preservation Office.
“Site developer or site developers” means individuals and/or entities engaged in the business of
constructing wireless facilities and wireless facility infrastructure and leasing space and/or capacity
upon, or use of, their facilities and/or infrastructure to wireless carriers. Unlike wireless carriers, site
developers generally do not provide personal wireless services to end-use consumers.
“Small cell” means a fixed cellular base station that sends and receives radio signals and is typically
mounted upon poles or support structures at substantially lower elevations than macrocell facilities.
"Small wireless facility" can have different meanings depending on context.
1. When and where A.R.S §§ 9-591 – 9-599 applies, the definition in A.R.S §§ 9-591.19 shall also
apply. That definition means a wireless facility that meets both of the following qualifications:
(a) All antennas are located inside an enclosure of not more than six cubic feet in volume or,
in the case of an antenna that has exposed elements, the antenna and all of the antenna's
exposed elements could fit within an imaginary enclosure of not more than six cubic feet in
volume.
(b) All other wireless equipment associated with the facility is cumulatively not more than
twenty-eight cubic feet in volume, or fifty cubic feet in volume if the equipment was ground
mounted before August 9, 2017. The following types of associated ancillary equipment are
not included in the calculation of equipment volume pursuant to this subdivision:
i. An electric meter.
ii. Concealment elements.
iii. A telecommunications demarcation box.
iv. Grounding equipment.
v. A power transfer switch.
vi. A cutoff switch.

vii. Vertical cable runs for the connection of power and other services
2. Where and when the FCC’s general rules for placement, construction and modification of
personal wireless service facilities apply, the definition in 47 CFR §1.6002(l) shall apply. That
definition states as follows:
(a) Small wireless facilities are facilities that meet each of the following conditions:
(i) The facilities—
Are mounted on structures 50 feet or less in height including their antennas as
defined in § 1.1320(d); or
Are mounted on structures no more than 10 percent taller than other adjacent
structures; or
Do not extend existing structures on which they are located to a height of more than
50 feet or by more than 10 percent, whichever is greater;
(ii) Each antenna associated with the deployment, excluding associated antenna
equipment (as defined in the definition of “antenna” in § 1.1320(d)), is no more than
three cubic feet in volume;
(iii) All other wireless equipment associated with the structure, including the wireless
equipment associated with the antenna and any pre-existing associated equipment on the
structure, is no more than 28 cubic feet in volume;
(iv) The facilities do not require antenna structure registration under part 17 of this
chapter;
(v) The facilities are not located on Tribal lands, as defined under 36 CFR 800.16(x); and
(vi) The facilities do not result in human exposure to radiofrequency radiation in excess
of the applicable safety standards specified in § 1.1307(b).
"Special taxing district" means a special district formed pursuant to title ARS 48, chapter 11, 12, 17,
18, 19, 20 or 22.
“Special Use Permit” means the official document or permit granted by the Town Council pursuant to
which an applicant is allowed to file for and obtain a building permit to construct and use a personal
wireless services facility, personal wireless service equipment, and/or any associated structures and/or
equipment which are used to house, or be a part of, any such facility or complex, or to be used to
provide personal wireless services.
“State” means the State of Arizona.
“Structure” means a pole, tower, base station, or other building, physical support of any form used for,
or to be used for, the provision of personal wireless service.
“Substantial evidence” means such relevant evidence as a reasonable mind might accept as adequate
to support a conclusion. It means less than a preponderance but more than a scintilla of evidence.

“TCA” means the Telecommunications Act of 1996, Pub. L. No. 104-104, 110 Stat. 56 (1996),
codified at various provisions of Title 47 U.S.C.
“Thermal runaway” means self-heating of an electrochemical system in an uncontrollable fashion.
“Tolling or tolled” means the pausing of the running of the time period permitted under the applicable
shot clock for the respective type of application for a personal wireless services facility. Where a shot
clock is tolled because an application has been deemed incomplete and timely notice of
incompleteness was mailed to the applicant, the submission of additional materials by the applicant to
complete the application will end the tolling, thus causing the shot clock period to resume running, as
opposed to causing the shot clock to begin running anew.
“Tower” means a mast, pole, monopole, slim stick, guyed tower, lattice tower, freestanding tower, or
other structure designed to support or employed to support antennas and other equipment, including
but not limited to dishes, transceivers and arrays used to provide personal wireless services and
wireless communications services. A ground- or building-mounted mast greater than ten feet tall and
six inches in diameter supporting one or more antennas, dishes, arrays, etc. shall be considered a
communications tower.
“Town” means the Town of Fountain Hills.
“Town code” means the Town Code of the Town of Fountain Hills.
“Undertaking” means any application seeking Town approval for the installation of a personal
wireless services facility licensed under the authority of the FCC shall constitute an undertaking
within the meaning of NEPA, in accord with 42 CFR §137.289 and 36 CFR §800.16.
“Utility” means Arizona (under ARS § 40-360.51 (5)): A public utility includes corporations or
persons engaged in furnishing water, gas, electricity, telephone service, or sewage disposal to the
public for compensation.
“Utility service antennas” means antenna placed on or near utility boxes, poles, switches, storage
tanks, etc., and used by a utility provider to facilitate the operation of the utility system.
“Wireless carriers or carrier” means companies that provide Personal Wireless Services to end-use
consumers.
“Wireless communication” means the transmission of voice or data without cable or wires.
“Wireless communication facility” means wireless communication facilities including, but not limited
to, facilities that transmit and/or receive electromagnetic signals for cellular radio telephone service,
personal communications services, enhanced specialized mobile services, paging systems, and related
technologies. Such facilities also include antennas, microwave dishes, parabolic antennas, and all
other types of equipment used in the transmission or reception of such signals; telecommunication
towers or similar structures supporting said equipment; associated equipment cabinets and/or

buildings; and all other accessory development used for the provision of personal wireless services.
These facilities do not include radio and television broadcast towers and government-operated public
safety networks.
“Zoning ordinance” means the Zoning Ordinance of the Town of Fountain Hills, as codified in
Chapter 1, Sec. 1.01 of the Zoning Ordinance.
Section 17.03 Requirements
A. General Requirements.
1. Principal or Accessory Use. Antennas and towers may be considered either principal or
accessory uses. A different existing use of an existing structure on the same lot shall not preclude
the installation of an antenna or tower on such lot.
2. Lot Size. For purposes of determining whether the installation of a tower or antenna complies
with district development regulations, including but not limited to setback requirements, lot
coverage requirements, and other such requirements, the dimensions of the entire lot shall control,
even though the antennas or towers may be located on leased parcels within such lot.
3. Aesthetics. Towers and antennas shall meet the following requirements:
a. Towers shall, subject to any applicable standards of the FAA, be painted a neutral color so
as to reduce visual obtrusiveness.
b. At a tower site, the design of the buildings and related structures shall, to the extent
possible, use materials, colors, textures, screening, and landscaping that will blend them into
the natural setting and surrounding buildings.
c. If an antenna is installed on a structure other than a tower, the antenna and supporting
electrical and mechanical equipment must be of a neutral color that is identical to, or closely
compatible with, the color of the supporting structure so as to make the antenna and related
equipment as visually unobtrusive as possible.
d. The choice of design for installing a new wireless communication facility or the
substantial modification of an existing wireless communication facility shall be chosen to
minimize the potential adverse impacts that the new or expanded facility may, or is likely to,
inflict upon nearby properties. Concealment elements should be used to camouflage the pole
and antennas.
e. Accessory Structures. Unless approved by the Town Council, all equipment associated
with a wireless communication tower is to be located below grade in a vault. If above grade

accessory structures are approved by the Town Council, they shall comply with the following
requirements.
i. Accessory structures shall maximize the use of building materials, colors, and textures
designed to blend with the natural surroundings. The use of specified concealment
elements for communications towers may be required by the Council to blend the
communications tower and/or its accessory structures further into the natural
surroundings using specified concealment elements.
ii. Accessory structures shall be designed to be architecturally similar, compatible with
each other, and shall be no more than 12 feet high. The buildings shall be used only for
housing equipment related to the particular site. Whenever possible, the buildings shall be
joined or clustered so as to appear as one (1) building.
iii. No portion of any telecommunications tower or accessory structure shall be used for
a sign or other advertising purpose, including but not limited to the company name,
phone numbers, banners, and streamers, except the following. A sign of no greater than 2
square feet indicating the name of the facility owner(s) and a twenty-four (24) hour
emergency telephone shall be posted adjacent to any entry gate. In addition, “no
trespassing” or other warning signs may be posted on the fence. All signs shall conform
to the sign requirements of the Town.
f. Visual Impacts. Towers must be placed to minimize visual impacts. Applicants shall place
towers on the side slope of the terrain so that, as much as possible, the top of the tower does
not protrude over the ridgeline, as seen from public ways.
g. Existing Vegetation. Existing vegetation shall be preserved to the maximum extent
possible. No cutting of trees shall take place on a site connected with an application made
under this chapter prior to the approval of the application.
h. Screening.
i. Tree plantings may be required to screen portions of the telecommunications tower
and accessory structures from nearby residential property as well as from public sites
known to include important views or vistas. The standard buffer shall consist of a
landscaped strip at least 4 feet wide outside the perimeter of the compound.
ii. Where a site adjoins a residential property or public property, including streets,
screening suitable in type, size and quantity shall be required by the Town Council.
iii. The applicant shall demonstrate to the approving board that adequate measures have
been taken to screen and abate noise emanating from on-site equipment, including but not
limited to heating and ventilating units, air conditioners, and emergency power

generators. Telecommunications towers shall comply with all applicable sections of this
chapter as it pertains to noise control and abatement.
i. Utility Services Antennas.
i. If placed on another utility structure such as a water tower, the antenna shall be
painted to blend with the building or equipment it is placed on.
ii. If a separate tower structure is used, the design shall comply with the provisions in
this section.
j. Data-Only and Information Service Facilities. To the maximum extent permitted by federal
and state law, any wireless facility used exclusively for the provision of an information
service, data collection, telemetry, machine-to-machine communication, sensing, monitoring,
or another service that does not constitute a personal wireless service under 47 U.S.C. §
332(c)(7)(C) or a telecommunications service protected by 47 U.S.C. § 253 shall be installed
underground or flush with grad, including its antenna, antenna equipment and accessory
equipment, where technically feasible. An applicant seeking above-ground installation shall
demonstrate through clear and convincing technical evidence that underground or flush-to-
grade installation would prevent the facility from performing its intended function and that
the proposed above-ground installation is the least visually intrusive technically feasible
alternative.
Nothing in this subsection shall require underground placement to the extent the applicant
demonstrates that such requirement is expressly prohibited or preempted by applicable federal
or Arizona law.
4. Lighting. Towers shall not be artificially lighted, unless required by the FAA or other
applicable authority. If lighting is required, the lighting alternatives and design chosen must cause
the least disturbance to the surrounding views and, to the degree possible while complying with
FAA requirements, meet the standards set in Zoning Ordinance Chapter 8, Outdoor Lighting
Control.
5. Measurement. For purposes of measurement, tower setbacks and separation distances shall be
calculated and applied to facilities located in the Town of Fountain Hills irrespective of municipal
and county jurisdictional boundaries.
6. Not Essential Services. Towers and antennas shall be regulated and permitted pursuant to this
chapter and shall not be regulated or permitted as essential services, public utilities, or private
utilities.
7. Franchises. Owners and/or operators of towers or antennas shall certify that all franchises
required by law for the construction and/or operation of a wireless communication system in the

Town of Fountain Hills have been obtained and shall file a copy of all required franchises with the
Community Development Director.
8. Signs. No signs other than those required by law shall be allowed on an antenna or tower.
9. Co-location and Multiple Antenna/Tower Plan. The Town of Fountain Hills encourages tower
and antenna users to submit a single application for approval of multiple towers and/or antenna
sites and to submit applications, which utilize co-location with an existing wireless
telecommunications provider. Applications for approval of multiple sites or for co-location with
an existing provider shall be given priority in the review process.
10. Security fencing. PWSF shall be enclosed by security fencing not less than 6 feet in height
and no more than 8 feet in height, shall be constructed of a block or masonry, and shall be
equipped with an appropriate anti-climbing device; provided, however, that the Town Council
may waive such requirements, as it deems appropriate.
11. Noise. Submission of applications for towers and associated equipment placed above grade,
including backup generators or power supplies, shall include noise and acoustical information,
prepared by a qualified firm or individual, for the base transceiver station(s), equipment buildings,
and associated equipment such as air conditioning units and backup generators. The Town may
require the applicant to incorporate appropriate noise baffling materials and/or strategies to avoid
any ambient noise from equipment reasonably likely to exceed the applicable noise regulations
contained in Section 11-1-7 of the Town Code.
12. Arizona Licensed Engineer. Any information of an engineering nature that the applicant
submits, whether civil, mechanical, or electrical, shall be certified by an Arizona licensed
professional engineer.
13. Verification by Town Engineer. Application approval issued under this chapter shall be
conditioned upon verification by the Town Engineer or designee that such tower structure is
structurally sound. Such verification shall be received by the applicant prior to submission.
14. Access and Parking. Areas sufficient for access to the tower and equipment location and for
temporary off-street parking of at least two vehicles shall be provided. The type and configuration
of the access and parking shall be subject to the standards set forth in Zoning Ordinance Chapter
7, Parking and Loading Requirements.
15. Minimum Height of Antennas. All antennas shall be located such that:
a. Any person walking adjacent to the transmitting surface of the antenna will be walking on a
grade that is a minimum of eight and one-half (8.5) feet below the transmitting surface; and,
b. No person at ground level will be exposed to an exposure level that is higher than allowed
by the FCC’s general population exposure rules.

16. Fall Zone. Each new tower shall maintain a fall zone having a radius of not less than one
hundred twenty-five percent (125%) of the total height of the tower, measured from the base of
the tower. The fall zone of any tower, pole shall not overlap, in whole or in part, any portion of a
public sidewalk, street, alley, right-of-way, or occupied building.
B. Minimum Setbacks and Separations.
1. Setbacks From Property Lines. Except for utility service antennas, the following setback
requirements shall apply to all towers; provided, however, that the Town Council may reasonably
reduce the standard setback requirements if the goals of this chapter would be better served
thereby:
a. Towers must be set back a distance equal to at least one hundred fifty percent (150%) of
the height of the tower from any adjoining lot line. For guyed towers, the required setback
shall be measured from the outermost guy wire anchor point, and shall additionally account
for the manufacturer's or structural engineer's certified guy-wire failure/whip radius. In no
case shall a guy wire anchor, guy wire, or its calculated failure radius be located within 500
feet of an occupied structure, public right-of-way, or property line, whichever is more
restrictive.
b. Accessory buildings must satisfy the minimum zoning district setback requirements.
2. Separations From Adjacent Uses. Except for utility service antennas, the following separation
requirements shall apply to all towers and antennas.
a. Separation From Residential Uses, Schools, and Daycare Centers.
i. Tower separation shall be measured from the base of the tower to the lot line of the
residential uses.
ii. Separation requirements for towers shall be 500 feet from any residentially zoned or
used land including mixed-use.
The Town Council may reduce the standard separation requirements to 300’ if, through
information and data presented, the Council determines the goals of this chapter would
be better served thereby.
iii. Separation requirements for towers shall be 500 feet away from public or private K-
12 schools and licensed daycare facilities unless an applicant establishes that a lesser
setback is necessary to close a significant gap in the applicant's personal communication
service and the proposed tower is the least intrusive means to do so.
b. Separation Distances Between Towers. Separation distances between towers shall be
applicable for and measured between the proposed tower and pre-existing towers. The

separation distances shall be measured by drawing or following a straight line between the
base of the existing tower and the proposed base, pursuant to a site plan, of the proposed
tower. The separation distances (listed in linear feet) shall be as shown in Table 17.03 B.
Table 17.03 B. Separation Distances Between Towers
Monopole less than 65 ft. in
Monopole 65 ft. in Monopole less than 40
height but greater than 40 ft.
height or greater ft. in height
in height
Monopole 65 ft. in height or greater 2,500 feet 2,000 feet 1,500 feet
Monopole less than 65 ft. in height but 2,000 feet 2,000 feet 1,500 feet
greater than 40 ft. in height
Monopole less than 40 ft. in height 1,500 feet 1,500 feet 1,000 feet
C. Buildings or Other Equipment Storage.
1. Antennas Mounted on Structures or Rooftops. The equipment cabinet or structure used in
association with antennas shall comply with the following:
a. Unless approved otherwise by the Town Council for good cause shown, but located in an
underground vault.
b. If located above ground:
i. The cabinet or structure shall not contain more than 120 square feet of gross floor area
or be more than 8 feet in height and shall be located on the ground.
ii. Equipment storage buildings or cabinets shall comply with all applicable building
codes.
2. Antennas Mounted on Utility Poles, Light Poles, or Towers. The equipment cabinet or
structure used in association with antennas shall be located, unless otherwise approved by the
Town Council in an underground vault. If approved to be above ground, then in accordance with
the following:
a. In residential districts, the equipment cabinet or structure may be located:
i. In a required front yard or required street side yard, provided the cabinet structure is
no greater than 3.5 feet in height and 20 square feet of gross floor area and the
cabinet/structure is located a minimum of 3 feet from all lot lines. The cabinet/structure

shall be screened by sight obscuring landscaping which obscures at least ninety-five
percent (95%) of the structure at planting and throughout the duration of the cabinet or
structure’s existence with an ultimate height not to exceed forty-two (42) inches.
ii. In a required rear yard, provided the cabinet or structure is no greater than 5 feet in
height or 120 square feet in gross floor area. The cabinet/structure shall be screened by
sight obscuring landscaping which obscures at least ninety-five percent (95%) of the
structure at planting and throughout the duration of the cabinet or structure’s existence
with an ultimate height of 6 feet.
iii. The entry or access side of a cabinet or structure shall be gated by a solid, sight-
obscuring gate that is separate from the cabinet or structure.
b. In commercial or industrial districts the equipment cabinet or structure shall be no greater
than 14 feet in height or 300 square feet in gross floor area. The structure or cabinet shall be
screened by sight-obscuring landscaping with an ultimate height of 16 feet and a planted
height of at least 6 feet. The entry or access side of a cabinet or structure shall be gated by a
solid, sight-obscuring gate that is separate from the cabinet or structure. Such access way
shall not face residentially zoned property.
3. Modification of Building Size Requirements. In the case of wireless facilities considered by the
Town Council, the requirements of subsections (C)(1) and (C)(2) of this section may be modified
by the Town Council to address site specific conditions and requirements.
4. Battery Safety. Any battery energy storage or backup power system installed in connection
with a PSWF shall utilize lithium ion phosphate (LiFePO4 or LPE) batteries, which are less prone
to thermal runaway and fire hazard. All battery systems shall comply with applicable fire,
electrical, building, and product-safety codes and standards.
D. Co-location.
1. Any new telecommunications tower shall be designed to accommodate future shared use by
other communications providers. Design considerations shall include sufficient area for additional
ground equipment, structural design of the tower, and sufficient electrical power available for the
load of at least two (2) additional wireless service providers.
2. Good Faith. Applicants and permittees shall cooperate and exercise good faith in co-locating
wireless telecommunications facilities on the same support structures or site, if the Town so
requests. Good faith shall include sharing technical information to evaluate the feasibility of co-
location, and may include negotiations for erection of a replacement support structure to
accommodate co-location. A competitive conflict to co-location or financial burden caused by
sharing such information normally will not be considered as an excuse to comply with this
section.

3. Third Party Technical Review. In the event a dispute arises as to whether a permittee has
exercised good faith in accommodating other users, the Town may require the applicant to obtain
a third-party technical study at the applicant’s expense. The Town may review any information
submitted by the applicant and permittee(s) in determining whether good faith has been exercised.
4. Exceptions. No co-location may be required where the shared use would or does result in
significant interference in the broadcast or reception capabilities of the existing wireless
telecommunications facilities or failure of the existing wireless telecommunications facilities to
meet federal standards for emissions.
5. Violation; penalty. Failure to comply with co-location requirements when feasible may result
in denial of a permit request or revocation of an existing permit. (24-08, Amended, 09/04/2024, Deleted
and replaced)
Section 17.04 Application Types
A. Administrative. The following types of applications are processed administratively by staff:
1. Applications to change or modify an existing administratively approved wireless
communication facility that remains in compliance with all chapter requirements.
2. Applications to change or modify an existing wireless communication facility approved
through public review; provided, that the modification will not:
a. Increase the approved height of the supporting structure by more than ten percent (10%)
or 20 feet, whichever is greater;
b. Cause the original approved number of antennas to be exceeded by more than fifty
percent (50%);
c. Increase the original approved square footage of accessory buildings by more than 200
square feet;
d. Add new, additional, or larger microwave antenna dishes;
e. Expand the footprint of said support structure; or
f. Potentially cause significant adverse impacts on the existing support structure or the
surrounding area.
3. Applications for co-location of additional antenna for an additional service provider on an
existing administratively approved tower that remains in compliance with all chapter
requirements.

4. Applications for co-location of additional antenna for an additional service provider on an
existing tower approved through public review; provided, that the modification will not:
a. Increase the approved height of the supporting structure by more than ten percent (10%)
or 20 feet, whichever is greater;
b. Cause the original approved number of antennas to be exceeded by more than fifty
percent (50%);
c. Increase the original approved square footage of accessory buildings by more than 200
square feet;
d. Add new, additional, or larger microwave antenna dishes;
e. Expand the footprint of said support structure; or
f. Potentially cause significant adverse impacts on the existing support structure or the
surrounding area.
5. Applications for new utility service antenna that comply with the height and setback
requirements of the zoning district in which they are located.
6. Applications for mobile or temporary wireless facilities for more than seven (7) consecutive
days. An application shall identify the proposed location, purpose, date of installation, anticipated
duration of use, maximum height, equipment to be installed, and measures necessary to ensure
public and structural safety. The permit shall specify the period during which the mobile or
temporary tower or facility may remain at the site, after which the Tower or Facility and all
associated equipment shall be removed unless an extension is approved by the Town. Application
materials shall include:
a. Proof of event, emergency, or documented capacity need;
b. A site plan showing setback and fall zone compliance; and
c. Proof of general liability insurance per Section 17.06.G.1.
B. Public Review.
1. Any new tower or modification to existing towers or antennas that do not meet the
requirements in subsection (A) of this section for administrative review shall require review and
approval as provided in subsection 17.05 (C).
2. Any new tower not meeting the setback or separation requirements in Section 17.03 (B).

Section 17.05 Application Submittal, Review, and Processing
A. General. Unless waived in writing by Zoning Administrator, the following provisions shall
govern the review of all wireless communication facility applications:
1. Complete Application. Applications for wireless communication facilities shall be filed
electronically on the Town’s website by an owner of real property and shall contain the area
proposed for the wireless communication facility using the process established by the Director for
such applications. All such applications shall include the information required in this section.
Applications filed on behalf of the property owner by a third party shall include a statement from
the property owner authorizing the submittal of the application.
2. Applications shall include documentation of compliance with items listed in Section 17.03(A)
as applicable to the application submitted.
3. Inventory of Existing Sites. Each applicant for a new tower or co-location of new antenna on
an existing tower shall provide to the Development Services Director an inventory of its existing
towers, antennas, or sites approved for towers or antennas, that are either within the jurisdiction of
the Town of Fountain Hills or within one (1) mile of the border thereof, including specific
information about the location, height, and design of each tower. Each applicant shall also provide
a one (1) year build-out plan for all other wireless communications facilities within the Town. The
Development Services Director may share such information with other applicants applying for
administrative approvals or special use permits under this chapter or with other organizations
seeking to locate antennas within the jurisdiction of Town of Fountain Hills; provided, however,
that the Development Services Director is not, by sharing such information, in any way
representing or warranting that such sites are available or suitable.
4. Utility Service Antennas.
a. If the antenna complies with the height requirements of the underlying zoning district, the
plans for the antenna will be reviewed and approved with the overall site development plans
if the site is being developed concurrently. If the antenna is being added to an existing utility
site, the plans will be reviewed and processed consistent with the requirements of subsection
(C)(2) of this section.
b. If the antenna does not comply with the height requirements of the underlying zoning
district, the plans for the antenna will be reviewed and processed consistent with the
requirements of subsection (C)(3) of this section.
5. A list of the full names and contact information for all applicants, co- applicants, facility
owner(s), facility operator(s), site developer(s), and wireless carrier(s), property owner(s) and
other related third parties and their agent(s), if any, on whose behalf the application is being
submitted.

6. Proof of Authorization for Site Occupancy. Where an applicant is not the owner of the real
property upon which it seeks to install its equipment or facility, it shall submit proof of
authorization to occupy the site at issue.
If the applicant is leasing all or a portion of real property upon which it intends to install its
facility or equipment, then the applicant shall provide a written copy of its lease with the owner of
such property. The applicant may redact any financial terms contained within the lease, but it shall
not redact any portion of the lease which details the amount of area leased nor the specific portion
of the real property to which the applicant has obtained the right to occupy, access, or preclude
others from entering.
Where an applicant seeks to Co-Locate new equipment into an existing facility, it shall provide a
copy of its written co-location agreement with the owner of such pre-existing facility, from which
it may redact any financial terms.
7. Fire Safety: The applicant shall submit a Fire Safety Plan that includes a general description of
the personal wireless services facility for purposes of ensuring the Fire Department is fully
informed and prepared in case of a fire. The Fire Safety Plan shall include:
a. Location of all Fire Safety Plan documents.
b. Location of the facility’s alarm panel.
c. List of emergency contacts.
d. Specific responsibilities assigned to designated personnel.
e. Location of signal-processing equipment.
f. Location and listing of types of power equipment, including rectifiers, inverters,
distribution cabinets, bus bars, cables, and communications raceways.
g. Listing and location of batteries, including description of quantities and types of batteries,
specifying whether batteries are lithium-ion, nickel cadmium, sodium-nickel, valve-regulated
lead acid, and/or vented, and description of any associated exhaust ventilation system(s).
h. Description of actions to detect and prevent thermal runaway events.
i. Description of whether the facility will be located in a lightning-prone area. If the facility is
to be located in a lightning-prone area, description of how the facility shall comply with
NFPA 780 Standard for the Installation of Lightning Protection Systems;
j. Description of location and types of fuses used to ensure that if the wireless transmission
facility experiences overcurrent resulting from current exceeding the rating of equipment or
the ampacity of a conductor, the facility shall turn off temporarily.

k. Depowering procedures including identification of locations of electrical depowering
devices, which include:
i. Coded floor prints located in the Fire Safety Plan document;
ii. Facility signage to direct fire personnel to depowering locations;
iii. The method of turning off power to the following:
1) Alternating current power board. This is the primary source of electric power for a
telecommunications facility and is supplied by the local power company.
2) Standby power generator. This unit, usually a turbine or diesel generator, provides
standby ac power that is transferred manually or automatically whenever a loss of ac
power is experienced.
3) Direct current primary disconnect fuse or circuit breaker bay. This unit distributes
dc power to the secondary fuse or circuit breaker panels throughout the central office.
The secondary fuse or circuit breaker panels feed all the operating voltages to the
central office branch circuits.
4) Uninterruptible power supply (UPS)
5) HVAC systems serving the facility
6) Alternative energy devices, such as wind turbines, fuel cells, photovoltaic systems,
or other devices providing power to the facility.
l. Detailed electrical designs, signed and stamped by a licensed electrical engineer, demonstrating
compliance with the Building, Electric and Fire Code. The Code compliance demonstration shall
include all necessary underlying calculations and inputs, including but not limited to:
a. A short circuit and coordination study (“SCCS”) calculated pursuant to the IEEE 551-2006:
Recommended Practice for Calculating AC Short-Circuit Currents in Industrial and Commercial
Power Systems or the latest version of that standard. The study must demonstrate the protection
devices will ensure the equipment enclosure will not be breached. The SCCS must include
analysis of Voltage Transient Surges due to contact of conductors of different voltages;
b. A one-line diagram of the electrical system;
c. Voltage Drop & Load Flow Study;
d. Load Calculation;
e. Panel Directories;
8. Soil Erosion and Sedimentation Control: A soil erosion and sedimentation control plan,
prepared in accordance with the standards as established by the Town Engineering Division.

9. Engineer’s Report: For the construction of all new wireless facilities and to the extent not
already mandated herein, the applicant shall provide a report prepared and certified by a
professional engineer certifying the integrity and safety of all proposed new towers and/or
structures and indicating the location, type, and height of the proposed personal wireless services
facility, antenna capacity, on-site and abutting off-site land uses, means of access, setbacks from
property lines, all applicable American National Standards Institute (ANSI) technical and
structural codes. To the extent that an application proposes the co-location of new equipment onto
an existing tower or personal wireless services facility, the applicant shall provide an engineer's
report certifying that the proposed shared use will not diminish the structural integrity and safety
of the existing structure and explaining what modifications, if any, will be required in order to
certify above.
10. Visual Impact Analysis. The applicant shall provide a completed visual impact analysis that
shall include the following:
a. A “Zone of Visibility Map” to determine locations from where the new facility will be
seen.
b. A visual impact analysis which shall include photographic images taken from the
perspectives of the properties situated in closest proximity to the location being proposed for
the siting of the facility, as well as those properties which would reasonably be expected to
sustain the most significant adverse aesthetic impacts due to such factors as their close
proximity to the site, their elevation relative to the site, the existence or absence of a “clear
line of sight” between the tower location and their location.
The photographic images shall depict the height at which the proposed facility shall stand when
completed, including all portions and proposed attachments to the facility, including, but not
limited to, the main support structure, all antennas, transmitters, whip antennas, lightning rods, t-
bars, crossbars, and cantilever attachments which shall, in whole or in part, be affixed to it, any
and all surrounding equipment compound(s), fencing, cellular equipment cabinets, transformers,
transformer vaults and/or cabinets, sector distribution boxes, ice bridges, backup generators,
including but not limited to equipment boxes, switch boxes, backup generators, ice bridges, etc.,
to the extent that any of such compound and/ or equipment will be visible from properties other
than the property upon which the proposed tower and compound are to be installed.
The photographic images shall show the maximum silhouette, viewshed analysis, color and finish
palette, and proposed screening and landscaping. The analysis shall include the results of the
drone/balloon test, and other information as necessary to determine visual impact of the facility.
The analysis shall include a map depicting where the photos were taken. Where consistent with
the natural or built environment, the analysis shall include a native vegetation landscaping plan
with a visual simulation of how the chosen plants, at maturity, will screen the site.

11. For proposed towers and facilities taller than 100 feet, the applicant shall perform a balloon
test and shall publish reasonably advanced public notice of the same to enable the Reviewing
Authority, property owners, and the community an opportunity to assess the actual adverse
aesthetic impact which the proposed facility is likely to inflict upon the nearby properties and
surrounding community. The balloon test shall be conducted for not less than eight consecutive
hours between 7:00 a.m. and 6:00 p.m. The primary test shall be conducted on a weekend. Said
date and time will be established by the Development Services Director in coordination with the
applicant, including an alternative date in case of inclement weather. If a balloon is used, the
diameter shall be equal to the largest antenna or dish proposed for the CRS tower or the width of
the tower, whichever is larger. The applicant will be responsible for publishing a public notice of
the balloon test in at least one local newspaper publication and notifying abutters owning property
within one thousand (1,000) feet radius, via U.S. Mail at least one week prior to the test.
12. If the application is for a facility that will not be attached to an existing utility pole and the
facility’s proposed height will be greater than 30 feet then structural elevations of the facility(ies)
shall include any trees and other structures within twenty (20’) feet, and their height.
13. Environmental Assessment Form. A completed environmental assessment form (EAF) and a
completed visual EAF addendum if required by ADEQ.
14. FCC Compliance Report.
An FCC compliance report, prepared by a licensed engineer, and certified under penalties of
perjury, that the content thereof is true and accurate, wherein the licensed engineer shall certify
that the proposed facility will be FCC compliant as of the time of its installation, meaning that the
facility will not expose members of the general public to radiation levels that exceed the
permissible radiation limits which the FCC has set.
If it is anticipated that more than one carrier and/or user is to install transmitters into the facility,
the FCC compliance report shall take into account anticipated exposure from all users on the
facility and shall indicate whether or not the combined exposure levels will or will not exceed the
permissible General Population Exposure Limits, or alternatively, the occupational Exposure
Limits, where applicable.
Such FCC Compliance Report shall provide the calculation or calculations with which the
engineer determined the levels of RF radiation and/or emissions to which the facility will expose
members of the general public.
On the cover page of the report, the report shall explicitly specify: (a) Whether the applicant and
their engineer are claiming that the applicable FCC limits based upon which they are claiming
FCC compliance are the General Population Exposure Limits or the Occupational Exposure
Limits. If the applicant and/or their engineer are asserting that the Occupational Exposure Limits
apply to the proposed installation, they shall detail a factual basis as to why they claim that the

higher set of limits is applicable, (b) The exact mi nimum distance factor, measured in feet,
which the applicant’s engineer used to calculate the level of radiation emissions to which the
proposed facility will expose members of the general public. The minimum distance factor is the
closest distance (i.e., the minimum distance) to which a member of the general public shall be
able to gain access to the transmitting antennas mounted upon, or which shall be a part of, the
proposed facility.
15. FCC License. A copy of any applicable Federal Communications Commission license
possessed by any carrier named as an applicant, co-applicant, or whose equipment is proposed for
installation as of the time the application is being filed with the Town.
16. Effective Prohibition Claims.
a. The Town is aware that applicants seeking approvals for the installation of new wireless
Facilities often assert that federal law, and more specifically the TCA, prohibits the local
government from denying their respective applications.
In doing so, they assert that their desired facility is “necessary” to remedy one or more
significant gaps in a carrier’s personal wireless service, and they proffer computer-generated
propagation maps to establish the existence of such purported gaps.
The Town is additionally aware that, in December 2018, driven by a concern that propagation
maps created and submitted to the FCC by wireless carriers were inaccurate, the FCC caused
its staff to perform actual drive tests, wherein the FCC staff performed 24,649 tests, driving
nearly ten thousand (10,000) miles through twelve (12) states, with an additional 5,916
stationary tests conducted at 42 locations situated in nine (9) states.
At the conclusion of such testing, the FCC Staff determined that the accuracy of the
propagation maps submitted to the FCC by the wireless carriers had ranged from as little as
16.2% accuracy to a maximum of 64.3% accuracy.
As a result, the FCC Staff recommended that the FCC no longer accept propagation maps
from wireless carriers without supporting drive test data to establish their accuracy. A copy of
the FCC Staff’s 66-page report is made a part of this Chapter as Appendix 1.
The Town considers it of critical import that applicants provide truthful, accurate, complete,
and sufficiently reliable data to enable the Town Council to render determinations upon
applications for new wireless facilities consistent with this Chapter’s requirements and the
TCA’s statutory requirements.
Consistent with same, if, at the time of filing an application under this Chapter, an applicant
intends to assert before the Town Council or the Town that: (a) an identified wireless carrier
suffers from a significant gap in its personal wireless services within the Town, (b) that the
applicant’s proposed installation is the least intrusive means of remedying such gap in

services, and/or (c) that under the circumstances pertaining to the application, a denial of the
application by the Town Council would constitute an “effective prohibition” under Section 47
U.S.C. §332 the TCA, then, at the time of filing such application, the applicant shall be
required to file a written statement which shall be entitled:
“Notice of Effective Prohibition Conditions”
If an applicant files a Notice of Effective Prohibition Conditions, then the applicant shall be
required to submit Probative Evidence to enable the Town Council to reasonably determine:
i. Whether or not the conditions alleged by the respective applicant exist,
ii. Whether there exists a significant gap or gaps in an identified wireless carrier’s
personal wireless services within the Town,
iii. The geographic locations of any such gaps, and
iv. The geographic boundaries of such gaps, to enable the Town Council to determine
whether granting the respective application would be consistent with the requirements of
this Chapter and the legislative intent behind same, and whether or not Federal law would
require the Town Council to grant the respective application, even if it would otherwise
violate the Town Code, including, but not limited to, this Chapter.
b. The additional materials which the applicant shall then be required to provide shall include
the following:
i. Drive Test Data and Maps. If, and to the extent that an applicant claims that a
specific wireless carrier suffers from a significant gap in its personal wireless services
within the Town, the applicant shall conduct or cause to be conducted a drive test within
the specific geographic areas within which the applicant is claiming such gap or gaps
exist, for each frequency at which the carrier provides personal wireless services. The
applicant shall provide the Town and the Town Council with the actual drive test data
recorded during such drive test, in a simple format which shall include, in table format:
1) The date and exact time of day for the test or tests,
2) The location, in longitude and latitude, of each point at which signal strength was
recorded and
3) Each signal strength recorded, measured in DBM, for each frequency. Such data
is to be provided in a separate table for each frequency at which the respective carrier
provides personal wireless services to any of its end-use customers.

4). The applicant shall also submit drive test maps depicting the actual signal
strengths recorded during the actual drive test for each frequency at which the carrier
provides personal wireless services to its end-use customers.
If an applicant claims that it needs a “minimum” signal strength (measured in DBM)
to remedy its gap or gaps in service, then for each frequency, the applicant shall
provide three (3) signal strength coverage maps reflecting actual signal strengths in
three (3) DBM bins, the first being at the alleged minimum signal strength, and two
(2) additional three (3) DBM bin maps depicting signal strengths immediately below
the alleged minimum signal strength claimed to be required.
By way of example, if the applicant claims that it needs a minimum signal strength of
– 95 DBM to remedy its alleged gap in service, then the applicant shall provide maps
depicting the geographic area where the gap is alleged to exist, showing the carrier’s
coverage at – 95 to -98 DBM, -99 to -101 DBM, and -102 to -104 DBM, for each
frequency at which the carrier provides personal wireless services to its end-use
customers.
ii. Denial of Service and/or Dropped Call Records. If and to the extent that an applicant
claims that a specific wireless carrier suffers from a capacity deficiency or a gap in
service that renders the carrier incapable of providing adequate coverage of its personal
wireless services within the Town, then the applicant shall provide dropped call records
and denial of service records evidencing the number and percentage of calls within which
the carrier’s customers were unable to initiate, maintain and conclude the use of the
carrier’s personal wireless services without actual loss of service, or interruption of
service.
iii. The equipment and methodology used.
iv. A list of any concurrent special events, festivals, road closures, or unusual network
conditions occurring in the test area during the test period.
17. Estimate for Cost of Removal of Facility. At or prior to the filing of an application for a
special use permit for the installation of a new personal wireless service facility, each respective
applicant shall provide a written estimate for the cost of the decommissioning and removal of the
facility, including all equipment that comprises any portion or part of the facility, compound
and/or complex, as well as any accessory facility or structure, including the cost of the full
restoration and reclamation of the site, to the extent practicable, to its condition before
development in accord with the decommissioning and reclamation plan required herein. The
Town Council’s Engineer shall review this estimate. A bond for the cost of removal as required in
Sec. 17.06 A. 2. shall be filed prior to commencement of construction.

18. Property Owner Consent & Liability Acknowledgement. A signed written consent from each
owner of the subject real property upon which the respective applicant is seeking installation of its
proposed personal wireless service facility, wherein the owner or owners both authorize the
applicant to file and pursue its application and acknowledge the potential landowner’s
responsibility, under Section 17.08 for engineering, legal and other consulting fees incurred by the
Town.
19. Applications Using Existing Towers.
a. Dimensioned, to-scale drawings showing the existing and proposed antenna on the tower
including the height of the tower and the antennas.
b. The number and type of existing and proposed antennas.
c. Engineering calculations documenting the structural changes and certifying the tower’s
ability to carry the new antennas.
d. Dimensioned, to-scale drawings illustrating modification of ground equipment, if any.
20. Applications Using New Towers
In addition to any information required for applications for special use permits pursuant to
Chapter 2, Section 2.02, applicants for a new wireless facility shall submit the following
information:
a. A site plan as required in Section 2.04 plus zoning, General Plan classification of the site
and all properties within the applicable separation distances set forth in Section 17.03(B)(1),
adjacent roadways, proposed means of access, elevation drawings of the proposed tower and
any other structures, photo simulations showing the tower in the proposed location from at
least four (4) directions, and other information deemed by the Development Services Director
to be necessary to assess compliance with this chapter.
b. The setback distance between the proposed tower and the nearest residential unit and
residentially zoned properties. Include an illustration of the fall zone for the tower.
c. The separation distance from other towers described in the inventory of existing sites
submitted pursuant to Section 17.03(B)(2) shall be shown on an updated site plan or map. The
applicant shall also identify the type of construction of the existing tower(s) and the
owner/operator of the existing tower(s), if known.
d. Method of fencing, and finished color and, if applicable, the method of camouflage and
illumination.
e. A description of compliance with Sections 17.03(A)(3), 17.03(A)(4), 17.03(A)(5),
17.03(A)(7), 17.03(A)(8), 17.03(A)(9), 17.03(A)(10), 17.03(A)(11), 17.03(B), subsection

(A)(3) of this section, Sections 17.06(A) and 17.06(B) and all applicable federal, state or local
laws.
f. A notarized statement by the applicant as to whether construction of the tower will
accommodate collocation of additional antennas for future users.
g. Identification of the entities providing the backhaul network for the tower(s) described in
the application and other cellular sites owned or operated by the applicant in the municipality.
h. Alternatives Analysis. An itemized list of alternative sites considered, with a
comprehensive explanation of reasons alternative sites are not technologically feasible.
Explanation shall include specific comparative analysis of how different sites would impact
aesthetic values, and other environmental values.
i. A description of the feasible alternative location(s) of future towers or antennas within the
Town of Fountain Hills based upon existing physical, engineering, technological or
geographical limitations in the event the proposed tower is erected.
j. A statement of compliance with Federal Communications Commission (FCC) radio
frequency (RF) exposure standards.
k. A biological resource survey addressing potential impacts to locally present protected
or sensitive species, including but not limited to the Sonoran Desert Tortoise (Gopherus
morafkai). The survey shall include the following:
i. A proposed facility description including location, height of tower as measured
from the ground, description of associated equipment, width and length of access
roads and driveways, and length and right-of-way width of power and
communication lines;
ii. Existing biological resources on-site including quantification of vegetation and
habitat types, color photo documentation of on-site and surrounding vegetation, a
description of water resources, potential habitat for federal and state-listed species,
and sensitive species habitats;
iii. The results of any focused surveys for federally listed species (if required); and
iv. Impacts to biological resources including quantification of the habitat to be
removed as a result of the proposed facility.
The director may waive this requirement based on a finding that existing information
verifies the lack of such biological resources on the site.

20. Filing Fee. Payment of a filing fee in an amount established by a schedule adopted by
resolution of the Council and filed in the offices of the Town Clerk. No part of the filing fee shall
be returnable.
B. Shot Clocks and Tolling. To comply with the requirements of Section 47 U.S.C. §332(c)(7)(B)(ii)
of the TCA, the following shot clock periods set forth hereinbelow shall be presumed to be reasonable
periods within which the Town shall render determinations upon applications for wireless
communication facilities.
The Town shall render determinations upon such applications within the periods set forth
hereinbelow, unless the applicable shot clock period listed below is tolled, extended by agreement or
the processing of the application is delayed due to circumstances beyond the Town’s control.
1. Application Shot Clocks.
a. Receipt of Initial Application. Upon receipt of an application, the Development Services
Director, or designee, shall review the application for completeness. If the Director
determines the application is: (i) incomplete, (ii) missing required application materials, (iii)
is the wrong type of application, or (iv) is otherwise defective, then, within ten (10) days for
administrative applications and thirty (30) days for public hearing applications of the Town’s
receipt of the application, the Director, or their designee, shall notify the applicant of the
finding and state what is needed to have a complete application.
The notice of incompleteness shall toll the shot clock, which shall not thereafter resume
running unless and until the applicant tenders an additional submission to the Director to
remedy the issues identified in the notice of incomplete application. The submission of any
responsive materials by the applicant shall automatically cause the shot clock period to
resume running.
If upon receipt of any additional materials from the applicant, the Director determines that the
application is still incomplete and/or defective, then the Director shall, once again notify the
applicant within ten (10) days for administrative applications and thirty (30) days for public
hearing applications of the applicant having filed its supplemental or corrected materials to
the Town and the shot clock shall once again be tolled, and the same procedure provided for
hereinabove shall be repeated.
If Applicant does not cure the stated deficiencies within 30 days, the application shall be
considered withdrawn or closed.
b. Application Review. The shot clock for administrative applications is ninety (90) days.
The shot clock for applications with new towers, monopoles, utility poles and other wireless
facilities that trigger public review applications is one hundred fifty (150) days.

2. Shot Clock Tolls, Extensions and Reasonable Delay Periods. Consistent with the letter and
intent of Section 47 U.S.C. §332(c)(7)(B)(ii) of the TCA, each of the shot clock periods set forth
within subsection (B) of this section shall generally be presumed to be sufficient periods within
which the Town shall render decisions upon applications.
Notwithstanding the same, the applicable shot clock periods may be tolled, extended by mutual
agreement between any applicant and/or its representative and the Town, and the Town shall not
be required to render its determination within the shot clock period presumed to be reasonable for
each type of application, where the processing of such application is reasonably delayed, as
described hereinbelow.
a. Tolling of the Applicable Shot Clock Due to Incompleteness and/or Applicant Error. As
provided for within subsection (B)(1) of this section, in the event that the Development
Services Director deems an application incomplete, the Director shall send a notice of
incompleteness to the applicant to notify the applicant that its application is incomplete and/or
contains material errors, and shall reasonably identify the missing information and/or
documents and/or the error(s) in the application.
If the Director sends a notice of incompleteness as described hereinabove, the applicable shot
clock shall automatically be tolled, meaning that the applicable shot clock period within
which the Town is required to render a final decision upon the application shall immediately
cease running, and shall not resume running, unless and until the Town receives a responsive
submission from the applicant.
If and when the applicant thereafter submits additional information in an effort to complete its
application, or cure any identified defect(s), then the shot clock shall automatically resume
running, but shall not be deemed to start running anew.
The applicable shot clock period shall, once again, be tolled if the Director thereafter provides
a second notice that the application is still incomplete or defective, despite any additional
submissions which have been received by the Town, from the applicant, up to that point.
b. Shot Clock Extension by Mutual Agreement. The Town shall be free to extend any
applicable shot clock period by mutual agreement with any respective applicant. This
discretion on the part of the Town shall include the Town’s authority to request, at any time,
and for any period of time the Town may deem reasonable or appropriate under the
circumstances, consent from a respective applicant to extend the applicable shot clock period
to enable the Town, the applicant, or any relevant third party, to complete any type of
undertaking or task related to the review, analysis, processing, and determination of the
particular application, which is then pending before the Town, to the extent that any such
undertaking, task, or review is consistent with, or reasonably related to, compliance with any
federal, state, or local law and/or the requirements of any provision of the Town Code,
including but not limited to this chapter.

In response to any request by the Town, the applicant, by its principal, agent, attorney, site
acquisition agent, or other authorized representative, can consent to any extension of any
applicable shot clock by affirmatively indicating its consent either in writing or by
affirmatively indicating its consent on the record at any public hearing or public meeting. The
Town shall be permitted to reasonably rely upon a representative of the applicant indicating
that they are authorized to grant such consent on behalf of the respective applicant, on whose
behalf they have been addressing the Town within the review process.
c. Reasonable Delay Extensions of Shot Clock Periods. The Town recognizes that there may
be situations wherein, due to circumstances beyond the control of the Town and/or the Town
Council, the review and issuance of a final decision upon an application for a wireless
communication facility cannot reasonably be completed within the application shot clock
periods delineated within subsection (B) of this section.
If, despite the exercise of due diligence by the Town, the determination regarding a specific
application cannot reasonably be completed within the applicable shot clock period, the Town
shall be permitted to continue and complete its review and issue its determination at a date
beyond the expiration of the applicable period, if the delay of such final decision is due to
circumstances including, but not limited to, those enumerated hereinbelow, each of which
shall serve as a reasonable basis for a reasonable delay of the applicable shot clock period.
i. In the event that the rendering of a final decision upon an application under this
chapter is delayed due to natural and/or unnatural events and/or forces which are not
within the control of the Town, such as the unavoidable delays experienced in
government processes due to the COVID 19 pandemic, and/or mandatory compliance
with any related federal or state government orders issued in relation thereto, such delays
shall constitute reasonable delays which shall be recognized as acceptable grounds for
extending the period for review and the rendering of final determinations beyond the
period allotted under the applicable shot clock.
ii. In the event that applicant tenders eleventh-hour submissions to the Town in the form
of (a) expert reports, (b) expert materials, and/or (c) materials which require a significant
period for review due either to their complexity or the sheer volume of materials which
an applicant has chosen to provide to the Town at such late point in the proceedings, the
Town shall be afforded a reasonable time to review such late-submitted materials.
If reasonably necessary, the Town shall be permitted to retain the services of an expert
consultant to review any late-submitted expert reports which were provided to the Town,
even if such review or services extend beyond the applicable shot clock period, so long as
the Town completes such review and retains and secures such expert services within a
reasonable period of time thereafter and otherwise acts with reasonable diligence in
completing its review and rendering its final decision.

C. Review and Processing of Applications.
1. Conformity to the following shall be considered in review of all applications:
a. The application is consistent with the objectives of this chapter.
b. The height of the proposed tower.
c. The adequacy of the proposed site, considering such factors as the sufficiency of the size
of the site to comply with the established criteria, the configuration of the site, and the extent
to which the site is formed by logical boundaries (e.g., topography, natural features, streets,
relationship of adjacent uses, etc.) that provide for the ability to comply with the provisions of
this chapter.
d. The extent to which the proposal responds to the impact of the proposed development on
adjacent land uses, especially in terms of visual impact.
e. The extent to which the proposed telecommunications facility uses concealment elements.
f. The extent to which the proposed facility is integrated with existing structures (i.e.,
buildings, signs, utility poles, etc.) with particular reference to design characteristics that have
the effect of reducing or eliminating visual obtrusiveness.
g. An applicant’s compliance with all Town requirements with respect to previous
applications.
h. Whether the proposed installation will inflict a significant adverse impact upon the
property values of properties that are located adjacent to, or in close proximity to, the
proposed site or properties that are otherwise situated in a manner that would cause the
proposed installation to inflict a significant adverse impact upon their value.
i. Whether the proposed installation will be incompatible with the use and/or character of
properties located adjacent to or in close proximity to the proposed site or other properties
situated in a manner that would cause the proposed installation to be incompatible with their
respective use.
j. Whether the proposed installation will be incompatible with and/or would have an adverse
aesthetic impact upon or detract from the use and enjoyment of, and/or character of,
recognized aesthetic assets of the Town, including, but not limited to, scenic areas and/or
scenic ridgelines, scenic areas, public parks, and/or any other traditionally or historically
recognized valuable scenic assets of the Town.
k. Whether the proposed installation shall have a sufficient fall zone and/or safe zone around
the facility to afford the general public safety against the potential dangers of structural
failure, icefall, debris fall, and fire.

l. Whether the applicant has mitigated the potential adverse impacts of the proposed facility to
the greatest extent reasonably feasible. To determine mitigation efforts on the part of the
applicant, the mere fact that a less intrusive site, location, or design would cause an applicant
to incur additional expense is not a reasonable justification for an application to have failed to
propose reasonable mitigation measures.
2. Review of Administrative Applications.
a. Administrative applications will be reviewed by staff using the Town’s standard building
permit review processes.
b. Applications for mobile or temporary wireless facilities which remain in place for more
than seven (7) consecutive days must submit a request for a temporary use permit as provided
in Section 2.03.
3. Review and Processing of Public Review Applications.
a. Applications which require public review and approval on private property will be
processed as special use permits and follow the requirements listed in Section 2.02 for special
use permits. Applications on Town owned property will not require a special use permit but
will follow the same requirements for notice for review by the Town Council.
b. Factual Determinations.
To decide applications under this Section, the Town Council shall render factual
determinations, which shall include two (2) specific types of factual determinations, as
applicable.
First, the Council shall render local zoning determinations according to Section i.
hereinbelow.
Then, if, and only if, an applicant asserts claims that a denial of its application would
effectively prohibit an identified Wireless Carrier from providing Personal Wireless Services
within the Town, or its proposed wireless facility or installation is necessary to remedy a
significant gap in personal wireless services for an explicitly identified Wireless Carrier, and
that its proposed installation is the least intrusive means of remedying a specifically identified
significant gap or gaps.
The Council shall then additionally render TCA determinations in accord with Section ii.
herein below.
The Council shall separately record each factual determination it makes in a written decision
and shall reference, or make note of, the evidence based upon which it rendered each of its
factual determinations.

Each factual determination made by the Council shall be based upon Substantial Evidence.
For purposes of this provision, “Substantial Evidence” shall mean such relevant evidence as a
reasonable mind might accept as adequate to support a conclusion. It means less than a
preponderance but more than a scintilla of evidence.
Evidence that the Council may consider shall include any evidence submitted in support of an
application and any evidence submitted by anyone opposing a respective application, whether
such evidence is in written or photographic form or whether it is in the form of testimony by
any expert, or any person who has personal knowledge of the subject of their testimony. The
Council may, of course, additionally consider as evidence any information or knowledge
which they, themselves, personally possess and any documents, records, or other evidence
which is a matter of public record, irrespective of whether such public record is a record of
the Town, or is a record of or is maintained by, another federal, state and/or other
governmental entity and/or agency which maintains records which are available for, or
subject to, public review.
The requirements for specific factual determinations set forth below are intended to enure to
the benefit of the Town, its residents, and property owners, and not applicants.
If, and to the extent that the Town Council fails to render one or more of such determinations,
that omission shall not constitute grounds upon which the respective applicant can seek to
annul, reverse or modify any decision of the Town Council.
i Local Zoning Determination
The Council shall make the following factual determinations as to whether the
application meets the requirements for granting a special use permit under this Chapter.
(a) Compliance with Section 2.02
Whether the proposed installation will meet each of the conditions and standards set
forth within Section 2.02 in the absence of which the Town Council is not authorized
to grant a special use permit.
(b) Potential Adverse Aesthetic Impacts
Whether the proposed installation will inflict a significant adverse aesthetic impact
upon properties located adjacent to, or in close proximity to, the proposed site or any
other properties situated in a manner that would sustain significant adverse aesthetic
impacts by the installation of the proposed facility.
(c) Potential Adverse Impacts Upon Real Estate Values
Whether the proposed installation will inflict a significant adverse impact upon the
property values of properties that are located adjacent to, or in close proximity to, the

proposed site or properties that are otherwise situated in a manner that would cause
the proposed installation to inflict a significant adverse impact upon their value.
(d) Potential Adverse Impact Upon the Character of the Surrounding
Community
Whether the proposed installation will be incompatible with the use and/or character
of properties located adjacent to or in close proximity to the proposed site or other
properties situated in a manner that would cause the proposed installation to be
incompatible with their respective use.
(e) Potential Adverse Impacts Upon Historic Properties or Historic Districts
Whether the proposed installation will be incompatible with and/or would have an
adverse impact upon, or detract from the use and enjoyment of, and/or character of a
historic property, historic site, and/or historic district, including, but not limited to,
historic structures, properties and/or districts which are listed on, or are eligible for
listing on, the National Register of Historic Places.
(f) Potential Adverse Impacts Upon Ridgelines or Other Aesthetic Resources of
the Town
Whether the proposed installation will be incompatible with and/or would have an
adverse aesthetic impact upon or detract from the use and enjoyment of, and/or
character of, recognized aesthetic assets of the Town, including, but not limited to,
scenic areas and/or scenic ridgelines, scenic areas, public parks, and/or any other
traditionally or historically recognized valuable scenic assets of the Town.
(g) Sufficient Fall Zones
Whether the proposed installation shall have a sufficient fall zone and/or safe zone
around the facility to afford the general public safety against the potential dangers of
structural failure, icefall, debris fall, and fire.
(h) Mitigation
Whether the applicant has mitigated the potential adverse impacts of the proposed
facility to the greatest extent reasonably feasible. To determine mitigation efforts on
the part of the applicant, the mere fact that a less intrusive site, location, or design
would cause an applicant to incur additional expense is not a reasonable justification
for an application to have failed to propose reasonable mitigation measures.
If, when applying the evidentiary standards set forth in Section 17.05 C. 3. b. i.
hereinabove, the Town Council determines that the proposed facility would not meet the
standards set forth within Section 2.02 or that the proposed facility would inflict one or

more of the adverse impacts described hereinabove to such a substantial extent that
granting the respective application would inflict upon the Town and/or its citizens and/or
property owners the types of adverse impacts which this provision was enacted to
prevent, the Town Council shall deny the respective application unless the Council
additionally finds that a denial of the application would constitute an Effective
Prohibition, as provided for in Sections 17.05 C. 3. b. ii. and iii immediately hereinbelow.
ii. TCA Determinations
In cases within which an applicant has filed a “Notice of Effective Prohibition
Conditions,” the Town Council shall determine if a denial of the respective application
would “Effectively Prohibit” a specifically identified Wireless Carrier from providing
Personal Wireless Services within any geographic area or areas in the Town.
More specifically, the Town Council shall determine whether a denial of the specific
application would either: (i) prevent an identified Wireless Carrier from providing
personal wireless services within a specific geographic area or areas within the Town or
(ii) would prevent a specific Wireless Carrier from constructing a sufficient number of
such facilities necessary to enable it to provide Personal Wireless Services within the
Town.
In determining whether a denial of any specific application would constitute an
“Effective Prohibition,” the Town Council shall determine: (1) whether an applicant has
established that an identified Wireless Carrier suffers from one or more significant gaps
in its Personal Wireless Services, and (2) whether its proposed installation is the least
intrusive means of remedying any such gap or gaps.
(a) Significant Gap in Personal Wireless Services of an Identified Carrier
The Town Council shall determine whether the applicant has established, based upon
probative evidence provided by the applicant and/or its representative, that a specific
Wireless Carrier suffers from a significant gap in its personal wireless services within
the Town.
In rendering such determination, the Council shall consider factors including, but not
necessarily limited to:
(1) Whether the identified Wireless Carrier, which is alleged to suffer from any
significant gap in their personal wireless services, already provides Adequate
Service in its Personal Wireless Services to its customers at any frequency being
used by the carrier to provide personal wireless services to its end-use customers,
(2) Whether any such alleged gap is relatively large or small in geographic size,

(3) Whether the number of the carrier’s customers affected by the gap is
relatively small or large,
(4) Whether or not the location of the gap is situated on a lightly traveled road,
or sparsely or densely occupied area, and/or
(5) Overall, whether the gap is relatively insignificant or otherwise relatively de
minimis.
An Effective Prohibition shall not be found to exist under subparagraph (iii)
hereinbelow if a Wireless Carrier has adequate coverage in any specified geographic
area, such that its end-use customers can use their cellular telephones to connect to
landlines using the Carrier’s Personal Wireless Services, but the frequency at which
the customers are using such services is not the frequency most desired by the
Carrier.
(b) Least Intrusive Means of Remedying Gap(s) in Service
The Town Council shall determine whether the applicant has established, based upon
probative evidence provided by the applicant and/or its representative, that the
installation of the proposed facility at the specific site proposed by the applicant and
the specific portion of the site proposed by the applicant, and at the specific height
proposed by the applicant, is the least intrusive means of remedying whatever
significant gap or gaps which the applicant has contemporaneously proven to exist as
determined by the Town Council based upon any evidence in support of, and/or in
opposition to, the subject application.
In rendering such determination, the Council shall consider factors including, but not
necessarily limited to:
(1) Whether the proposed site is the least intrusive location at which a facility to
remedy an identified significant gap may be located, and the applicant has
reasonably established a lack of potential alternative less intrusive sites and lack
of sites available for co-location,
(2) Whether the specific location on the proposed portion of the selected site is
the least intrusive portion of the site for the proposed installation
(3) Whether the height proposed for the facility is the minimum height actually
necessary to remedy an established significant gap in service,
(4) Whether or not a pre-existing structure can be used to camouflage the
facility and/or its antennas,

(5) Whether or not, as proposed, the installation mitigates adverse impacts to the
greatest extent reasonably feasible through the employ of Stealth design,
screening, use of color, noise mitigation measures, etc., and/or
(6) Overall whether or not there is a feasible alternative to remedy the gap
through alternative, less intrusive substitute installations.
An Effective Prohibition shall also not be found to exist in subparagraph (iii) hereinbelow
if an applicant fails to establish before the Town Council that any existing geographic gap
or capacity deficiency in the specific Wireless Carrier’s coverage cannot be remedied
through a less intrusive means than what is being proposed, including, but not limited to,
potential installations on alternative less intrusive sites, a shorter tower or facility, the
incorporation of a more stealthy design, etc.
iii. Finding of Effective Prohibition or Lack of Effective Prohibition
After considering the evidence presented before it, the Town Council shall determine
whether or not a denial of the respective application would constitute an effective
Prohibition.
If the Town Council affirmatively determines that the applicant has failed to establish
either: (i) that a denial of the application would prevent an identified Wireless Carrier
from providing personal wireless services within a specific geographic area or areas
within the Town or (ii) that a denial of the application would prevent a specific Wireless
Carrier from constructing a sufficient number of such facilities necessary to enable it to
provide Personal Wireless Services within the Town, then the Town Council shall find
that a denial of the application does not constitute an Effective Prohibition.
If the Town Council affirmatively determines that: (i) a denial of the application would
prevent an identified Wireless Carrier from providing personal wireless services within a
specific geographic area or areas within the Town, or (ii) that a denial of the application
would prevent a specific Wireless Carrier from constructing a sufficient number of such
facilities necessary to enable it to provide Personal Wireless Services within the Town,
then the Town Council shall find that a denial of the application would constitute an
Effective Prohibition, and the Town Council shall grant the subject application,
irrespective of whether or not the granting of same would otherwise be inconsistent with
any other provision of this Section §17.05 C. 3. b. Provided, the Town reserves the right
to deny an application even if doing so leads to an effective prohibition to the extent
allowed by the safe harbors contained in 47 U.S.C. §§ 253(b) and (c) and incorporated
into 332(c)(7)(B)(i), based on the evidence of record.
c. Availability of Suitable Existing Towers, Other Structures, or Alternative Technology. No
new tower shall be permitted unless the applicant demonstrates to the reasonable satisfaction

of the Town Council that no existing tower, structure or alternative technology that does not
require the use of towers or structures can accommodate the applicant’s proposed antenna. An
applicant shall submit information requested by the Town Council related to the availability
of suitable existing towers, other structures or alternative technology. Evidence submitted to
demonstrate that no existing tower, structure or alternative technology can accommodate the
applicant’s proposed antenna may consist of any of the following:
i. No existing towers or structures are located within the geographic area, which meet
applicant’s reasonable engineering and personal wireless service related quality
requirements. This evidence cannot be merely conclusory and must be supported by
propagation maps that include the underlying analysis models, engineering reports
speaking to the technical infeasibility, dropped call logs, and other data showing that a
new tower is the only means of accommodating the proposed antenna.
ii. Existing towers or structures are not of sufficient height to meet applicant’s
engineering requirements.
iii. Existing towers or structures do not have sufficient structural strength to support
applicant’s proposed antenna and related equipment.
iv. The applicant’s proposed antenna would cause electromagnetic interference with the
antenna on the existing towers or structures, or the antenna on the existing towers or
structures would cause interference with the applicant’s proposed antenna as certified by
an RF engineer.
v. The fees, costs, or contractual provisions required by the owner in order to share an
existing tower or structure or to adapt an existing tower or structure for sharing are
unreasonable. Costs exceeding new tower development are presumed to be unreasonable.
vi. The applicant demonstrates that there are other limiting factors that render existing
towers and structures unsuitable.
vii. The applicant demonstrates that an alternative technology that does not require the
use of towers or structures, such as a cable micro cell network using multiple low-
powered transmitters/receivers attached to a wire line system, is unsuitable. Costs of
alternative technology that exceed new tower or antenna development shall not be
presumed to render the technology unsuitable.
d. Following approval by the Town Council, the applicant may apply for a building permit
through the standard application process. Construction shall not commence prior to approval
of the building permit.
4. Environmental Impacts

If, and to the extent that, the Town Council determines a proposed installation bears the potential
for a significant adverse impact upon the environment within the meaning of ADEQ and/or the
NEPA, then the Council shall be expected to comply with the requirements of ADEQ in
determining both:
a. The extent of adverse impacts upon the environment and/or historic properties; and,
b. What mitigation measures the applicant should be required to undertake to minimize the
adverse environmental impacts and/or impacts upon historic sites, structure and/or districts.
If a respective applicant fails to obtain a review from the ADEQ and/or NEPA and opinion letters
from the ADEQ and the FCC pertaining to its proposed installation prior to a first public hearing
before the Town Council for the respective application, then the Town Council may make direct
requests to the ADEQ and the FCC for their review of the application. The Town Council may
request the FCC’s review and input in completing the statutorily-required environmental impact
analysis pursuant to ADEQ and NEPA.
In addition, the Town Council shall comply with the statutory requirements of ADEQ to complete
an ADEQ review, make determinations of significance, and, where appropriate, require the
applicant to complete a draft environmental impact statement and, if additionally appropriate, to
thereafter complete a final environmental impact statement and analysis.
So long as the Town Council acts with reasonable diligence in completing its ADEQ and NEPA
review, if compliance with the statutory requirements for environmental review requires a period
of effort that extends beyond the expiration of the applicable shot clock period, the delays beyond
such period shall be deemed reasonable.
5. Historic Site Impacts
The Town Council shall consider the potential adverse impacts of any proposed facility upon any
historic site, district, or structure consistent with the Town’s historic preservation law
requirements and comprehensive plan and ADEQ.
If, and to the extent that, the Town Council determines that a proposed installation bears the
potential for a significant adverse impact on a historic site or a historic district within the meaning
of ADEQ and/or the NHPA (especially if the historic site at issue is listed upon the National
Register of historic places), then the Council shall comply with the requirements of both ADEQ
and Town law in determining both:
a. The extent of adverse impacts upon the historic properties, and
b. What mitigation measure might the applicant be required to undertake to minimize the
adverse environmental impacts and/or adverse impacts upon historic sites, structures and/or
district.

Should a respective applicant fail to obtain a SHPO and/or a Section 106 review under NHPA,
and opinion letters from SHPO and the FCC pertaining to its proposed installation prior to a first
public hearing before the Town Council for the respective application, then the Town Council
shall make direct requests to SHPO and the FCC for their review of the application. They shall
request SHPO and the FCC’s review and input in completing the statutorily-required
environmental/historic impact analysis pursuant to ADEQ and NHPA.
This request shall include, but not be limited to, a request to the FCC for a Section 106 review, as
defined in this Chapter, as the Town recognizes each application for a special use permit for the
installation of a personal wireless services facility shall constitute “an undertaking” for purposes
of compliance with the National Historic Preservation Act.
In addition, the Town Council shall comply with the statutory requirements of ADEQ to complete
a SEQ ADEQ RA review, make determinations of significance, and, where appropriate, require
the applicant to complete a draft environmental impact statement, and if additionally appropriate,
to thereafter complete a final environmental impact statement and analysis.
So long as the Town Council acts with reasonable diligence in completing its ADEQ and NHPA
review, if compliance with the statutory requirements for historic preservation review requires a
period of effort that extends beyond the expiration of the applicable shot clock period, the delays
beyond such period shall be deemed reasonable.
6. Tribal Site Impacts
The Town Council shall consider the potential adverse impacts of any proposed facility upon any
tribal lands associated with the Fort McDowell Yavapai Nation and the Salt River Prima-
Maricopa Indian Community near or within the general area of Fountain Hills, Arizona. If, and to
the extent that, the Town Council determines that a proposed installation bears the potential for a
significant adverse impact on such tribal lands, then the Council shall issue notice to tribal
representatives and request tribal review of the application.
7. Force Majeure
In the event that the rendering of a final decision upon an application under this Chapter is
delayed due to natural and/or unnatural events and/or forces which are not within the control of
the Town or the Town Council, such as the unavoidable delays experienced in government
processes due to the COVID 19 pandemic, and/or mandatory compliance with any related federal
or state government orders issued in relation thereto, such delays shall constitute reasonable
delays which shall be recognized as acceptable grounds for extending the period for review and
the rendering of final determinations beyond the period allotted under the applicable shot clock.
8. In granting a permit, the Town may impose conditions to the extent such conditions are
necessary to minimize any adverse effect of the proposed tower on adjoining properties.

Section 17.06 Maintenance and Operation
A. Removal of Abandoned Antennas and Towers; Bond Required.
1. Any antenna or tower that is not operated for a continuous period of ninety (90) days shall be
deemed abandoned. Within ninety (90) days of receipt of notice from the Town of Fountain Hills
notifying the owner of such abandonment, the owner of such antenna or tower shall completely
remove the same and all related equipment and improvements and shall restore all affected areas
to a condition compliant with all applicable laws, which includes without limitation the Code.
Failure to remove an abandoned antenna or tower within said ninety (90) day period shall be
grounds to remove the tower or antenna at the owner’s expense. The Town shall have the right
(but not the obligation) to perform such removal and restoration with or without notice. If there
are two (2) or more users of a single tower, then this provision shall not become effective until all
users cease using the tower for the prescribed period.
2. Upon receiving a special use permit approval from the Town Council and a building permit,
prior to the commencement of installation and/or construction of such facility or any part thereof,
the applicant shall file with the Town a bond for a length of no less than three (3) years in an
amount of the estimate of a certified engineer of one-hundred twenty-five percent (125%) of the
cost of removal of the facility and all associated structures, fencing, power supply, and other
appurtenances connected with the facility. The bond must be provided within thirty (30) days of
the approval date and before any installation or construction begins.
Replacement bonds must be provided ninety (90) days prior to the expiration of any previous
bond.
At any time the Town has good cause to question the sufficiency of the bond at the end of any
three-year (3) period, the owner and/or operator of the facility, upon request by the Town, shall
provide an updated estimate and bond in the appropriate amount.
Failure to keep the bonds in effect is cause for the removal of the facility at the owner's expense.
Each facility will require a separate bond, regardless of the number of owners or location.
B. State or Federal Requirements.
1. Compliance with state and federal requirements. All towers must meet or exceed current
standards and regulations of the FAA, the FCC, and any other agency of the state or federal
government with the authority to regulate towers and antennas. If such standards and regulations
are changed, then the owners of the towers and antennas governed by this chapter shall bring such
towers and antennas into compliance with such revised standards and regulations within six (6)
months of the effective date of such standards and regulations, unless a different compliance
schedule is mandated by the controlling state or federal agency. Failure to bring towers and

antennas into compliance with such revised standards and regulations shall constitute grounds for
the removal of the tower or antenna at the owner’s expense.
2. Prohibition against illegally excessive emissions and RF testing.
As disclosed on the FCC’s public internet website, personal wireless services facilities erected at
any height under 200 feet are not required to be registered with the FCC.
Of even greater potential concern to the Town is the fact that the FCC does not enforce the RF
radiation limits codified within the CFR by either: (a) testing the actual radiation emissions of
wireless Facilities either at the time of their installation or at any time thereafter, or (b) requiring
their owners to test them. See relevant excerpts from the FCC’s public internet website annexed
as Appendix 2.
This means that when wireless Facilities are constructed and operated within the Town, the FCC
will have no idea where they are located and no means of determining, much less ensuring, that
they are not exposing residents within the Town and/or the general public to Illegally Excessive
levels of RF Radiation.
The Town deems it to be of critical importance to the health, safety, and welfare of the Town, its
residents, and the public at large that personal wireless service facilities do not expose members
of the general public to levels of RF radiation that exceed the limits which have been deemed safe
by the FCC, and/or are imposed under CFR. The FCC has recognized that 47 U.S.C. §
332(c)(7)(B)(iv) permits state and local governments, when making decisions on the placement,
construction, and modification of personal wireless service facilities, to consider whether such
facilities comply with the Commission's regulations concerning RF emissions. In re Human
Exposure to Radiofrequency Electromagnetic Fields et al., 34 FCC Rcd 11687, 11739, ¶114
(2019).
In accord with the same, the Town enacts the following RF Radiation testing requirements and
provisions set forth herein below.
No wireless telecommunications facility shall at any time be permitted to emit illegally excessive
RF Radiation as defined in Section 17.02 or to produce power densities that exceed the legally
permissible limits for electric and magnetic field strength and power density for transmitters, as
codified within 47 CFR §1.1310(e)(1), Table 1 Sections (i) and (ii), as made applicable pursuant
to 47 CFR §1.1310(e)(3) unless the operator implements and retains responsibility for ongoing
effectiveness of the mitigation actions contained in 47 C.F.R. §1.1307(b)(4).
To ensure continuing compliance with such limits by all owners and/or operators of wireless
communication facilities within the Town, all owners, and operators of wireless communication
facilities shall submit reports as required by this section.

As set forth hereinbelow, the Town may additionally require, at the owner and/or operator’s
expense, independent verification of the results of any analysis set forth within any reports
submitted to the Town by the owner and/or operator.
If an operator of a personal wireless service facility fails to supply the required reports or fails to
correct a violation of the legally permissible limits described hereinabove, following notification
that their respective facility is believed to be exceeding such limits, any special use permit or
other zoning approval granted by the Town Council or any other body or representative of the
Town is subject to modification or revocation by the Town Council following a public hearing.
a. Certification of Compliance with Applicable RF Radiation Limits. Within forty-five (45)
days of initial operation or a substantial modification of a wireless communication facility,
the owner and/or operator of each telecommunications antenna shall submit to the
Development Services Director a written certification by a licensed professional engineer,
sworn to under penalties of perjury, that the facility’s radio frequency emissions comply with
the limits codified within 47 CFR §1.1310(e)(1), Table 1 Sections (i) and (ii), as made
applicable pursuant to 47 CFR §1.1310(e)(3).
The engineer shall also measure the emissions of the approved wireless facility, including the
cumulative impact from other nearby wireless facilities, and determine if such emissions are
within the limits described hereinabove.
A report of these measurements and the engineer’s findings with respect to compliance with
the FCC’s maximum permissible exposure (MPE) limits shall be submitted to the
Development Services Director.
If the report shows that the facility does not comply with applicable limits, then the owner
and/or operator shall cease operation of the facility until the facility is brought into
compliance with such limits. Proof of compliance shall be a certification provided by the
engineer who prepared the original report. The Town may require, at the applicant’s expense,
independent verification of the results of the analysis.
b. Random RF Radiofrequency Testing. At the operator’s expense, the Town may retain an
engineer to conduct random unannounced RF radiation testing of such wireless facilities to
ensure the facility’s compliance with the limits codified within 47 CFR §1.1310(e)(1) et seq.
The Town may cause such random testing to be conducted as often as the Town may deem
appropriate. However, the Town may not require the owner and/or operator to pay for more
than one (1) test per facility per calendar year unless such testing reveals that one (1) or more
of the owner and/or operator’s facilities are exceeding the limits codified within 47 CFR
§1.1310(e)(1) et seq., in which case the Town shall be permitted to demand that the wireless
facility be brought into compliance with such limits, and to conduct additional tests to

determine if, and when, the owner and/or operator thereafter brings the respective wireless
facility and/or facilities into compliance.
If the Town at any time finds that there is good cause to believe that a personal wireless
service facility and/or one or more of its antennas are emitting RF radiation at levels in excess
of the legal limits permitted under 47 CFR §1.1310(e)(1) et seq., then the Town shall provide
written notice to the owner and/or operator identifying the noncompliance and the corrective
action required. Except where the violation presents an immediate threat to public safety, the
owner or operator shall be afforded a reasonable period, not to exceed thirty (30) days, to cure
the violation or demonstrate compliance. If the violation has not been cured within the
prescribed period, a hearing shall be scheduled before the Town Council at which the owner
and/or operator of such facility shall be required to show cause why any and all permits
and/or approvals issued by the Town for such facility and/or facilities should not be revoked,
and a fine should not be assessed against such owner and/or operator.
Such hearing shall be duly noticed to both the public and the owner and/or operator of the
respective facility or facilities at issue. The owner and/or operator shall be afforded not less
than two (2) weeks' written notice by first-class mail to its Notice Address.
At such hearing, the burden shall be on the Town to show that, by a preponderance of the
evidence, the Facilities emissions exceeded the permissible limits under 47 CFR
§1.1310(e)(1) et seq.
In the event that the Town establishes same, the owner and/or operator shall then be required
to establish, by clear and convincing evidence, that a malfunction of equipment caused their
failure to comply with the applicable limits through no fault on the part of the owner/operator.
If the owner and/or operator fails to establish same, the Town Council shall have the power to
and shall revoke any special use permit, variance, building permit, and/or any other form of
zoning-related approval(s) which the Town Council, Board of Adjustment, Town Engineer
and/or any other representative of the Town may have then issued to the owner and/or
operator, for the respective facility.
In addition, the Town may issue a civil citation of not less than $1,000, nor more than $5,000
for such violation of subparagraph 1. hereinabove, or, in the case of a second offense within
less than five (5) years, a minimum fine of $5,000, nor more than $25,000.
In the event that an owner or operator of one or more personal wireless service facilities is
found to violate subparagraph 1. hereinabove three or more times within any five (5) year
period, then in addition to revoking any zoning approvals for the facilities which were
violating the limits codified in 47 CFR §1.1310(e)(1) et seq., the Town Council shall render a
determination within which it shall deem the owner/operator prohibited from filing any

applications for any new wireless personal services facilities within the Town for a period of
five (5) years.
c. Annual Testing. The owner or operator of all PWSF shall provide for and conduct an
inspection of radio frequency radiation at least once annually by a licensed radio frequency
engineer. Three copies of a report shall be provided to the Development Services Department,
verifying that the radio frequency radiation is in compliance with FCC Guidelines.
3. Actions for Noncompliance. If the Town at any time finds that there is good cause to believe
that a wireless communication facility and/or one (1) or more of its antennas are emitting RF
radiation at levels in excess of the legal limits permitted under 47 CFR §1.1310(e)(1) et seq., the
Town shall provide written notice to the owner and/or operator identifying the noncompliance and
the corrective action required. Except where the violation presents an immediate threat to public
safety, the owner or operator shall be afforded a reasonable period, not to exceed thirty (30) days,
to cure the violation or demonstrate compliance. If the violation has not been cured within the
prescribed period, then a hearing shall be scheduled before the Town’s Zoning Administrator at
which the owner and/or operator of such facility shall be required to show cause why any and all
permits and/or approvals issued by the Town for such facility and/or facilities should not be
revoked, and a fine should not be assessed against such owner and/or operator.
The owner and/or operator shall be afforded not less than two (2) weeks’ written notice of the
hearing.
At such hearing, the burden shall be on the Town to show that, by a preponderance of the
evidence, the facilities emissions exceeded the permissible limits under 47 CFR §1.1310(e)(1) et
seq.
In the event that the Town establishes same, the owner and/or operator shall then be required to
establish, by clear and convincing evidence, that a malfunction of equipment caused their failure
to comply with the applicable limits through no fault on the part of the owner/operator.
If the owner and/or operator fails to establish same, the Town shall have the power to revoke any
permit, building permit, and/or any other form of approval(s) which the Town Council or any
other representative of the Town may have then issued to the owner and/or operator, for the
respective facility. The Zoning Administrator may revoke an administrative approval. The
decision of the Zoning Administrator may be appealed to the Town Manager. If the tower or
antenna was approved by the Town Council, revocation will be considered by the Town Council
in the same manner as the original approval.
In addition, the Town may issue a civil citation for noncompliance as provided in Section 1-8-3 of
the Town Code.
In the event that an owner or operator of one (1) or more wireless communication facility is found
to violate subsection (B)(1) of this section three (3) or more times within any five (5) year period,

then in addition to revoking any zoning approvals for the facilities which were violating the limits
codified in 47 CFR §1.1310(e)(1) et seq., the Town Council shall render a determination within
which it shall deem the owner/operator prohibited from filing any applications for any new
wireless personal services facilities within the Town for a period of five (5) years.
C. Building Codes; Safety Standards. To ensure the structural integrity of towers, the owner of a
tower shall ensure that it is maintained in compliance with standards contained in applicable state or
local building codes and the applicable standards for towers that are published by the Electronic
Industries Association, as amended from time to time. If, upon inspection, the Town of Fountain Hills
concludes that a tower fails to comply with such codes and standards and constitutes a danger to
persons or property, then upon notice being provided to the owner of the tower, the owner shall have
thirty (30) days to bring such tower into compliance with such standards. Failure to bring such tower
into compliance within said thirty (30) days shall constitute grounds for the removal of the tower or
antenna at the owner’s expense.
D. Noise. Wireless facilities and all related equipment must comply with all noise regulations and
shall not exceed such regulations, either individually or collectively. Backup generators shall only be
operated during power outages and/or for testing and maintenance purposes between the hours of 9:00
a.m. and 4:00 p.m.
E. Maintenance. Prior to scheduling a final inspection for construction of a tower and associated
equipment, the applicant shall file with the Town a bond in the amount of the estimate of a certified
engineer of one-hundred twenty-five percent (X 125% ) of the maintenance, equipment, and
landscaping to cover the ongoing maintenance of the tower, equipment, and landscaping. The bond
amount shall be reviewed and revised every three years thereafter. Should the owner of the tower,
equipment, and/or landscaping fail to maintain said facilities consistent with the Town’s approval and
ordinance requirements, and after notice for correction by the Town, the Town may call and utilize the
bonds to perform the needed maintenance activities.
F. Maintenance Contact Information. Each permittee of a wireless telecommunications facility shall
provide the director with the name, address and 24-hour local or toll-free contact phone number of the
permittee, the owner, the operator and the agent responsible for the maintenance of the facility
("contact information"). The contact information for the agent responsible for the maintenance of the
facility must include at least one natural person. Contact information shall be updated within seven (7)
days of any change.
G. Indemnity and liability for damages.
1. The wireless telecommunications facility provider shall defend, indemnify, and hold harmless
the Town or any of its boards, commissions, agents, officers, and employees from any claim,
action or proceeding against the Town, its boards, commission, agents, officers, or employees to
attack, set aside, void, or annul, the approval of the project when such claim or action is brought
within the time period provided for in applicable state and/or local statues. The Town shall

promptly notify the provider(s) of any such claim, action or proceeding if the Town bears its own
attorney's fees and costs, and the Town defends the action in good faith.
2. Wireless telecommunications facility operators shall be strictly liable for interference caused by
their facilities with Town communications systems. The operator shall be responsible for costs for
determining the source of the interference, all costs associated with eliminating the interference
(including but not limited to filtering, installing cavities, installing directional antennas, powering
down systems, and engineering analysis), and all costs arising from third party claims against the
Town attributable to the interference.
H. Certificate of Insurance required. The applicant shall maintain adequate and sufficient liability
insurance during the construction period and thereafter, the carrier shall maintain liability insurance,
issued by an insured authorized to do business in the State of Arizona meeting the criteria of this
section throughout the life of any PWSF erected within the Town of Fountain Hills, at least as broad as
follows:
1. Commercial General Liability Insurance. The permittee shall procure and maintain at its
expense or cause its contractor or subcontractor to procure and maintain throughout the term
of this permit, commercial General Liability ("CGL") insurance on an "occurrence" basis,
with limits not less than $2,000,000 per occurrence per wireless carrier or $4,000,000 per
wireless carrier in the aggregate. If a general aggregate limit applies, either the general
aggregate limit shall apply separately to this project location or the general aggregate limit
shall be twice the required occurrence limit. CGL insurance must include coverage for the
following: Bodily Injury and Property Damage; Personal Injury/Advertising Injury;
Premises/Operations Liability; Products/Completed Operations Liability; Aggregate Limits
that Apply per Project; Explosion, Collapse and Underground ("UCX") exclusion deleted;
Contractual Liability with respect to the permit; Broad Form Property Damage; and
Independent Consultants Coverage. The policy shall contain no endorsements or provisions
limiting coverage for (i) contractual liability; (ii) cross liability exclusion for claims or suits
by one insured against another; (iii) products/completed operations liability; (iv) bodily injury
or damage from RF exposure at levels exceeding the FCC limits; or (v) contain any other
exclusion contrary to the conditions in this permit.
2. Environmental Pollution Liability Insurance. The permittee shall procure and maintain at
its expense or cause its contractor or subcontractor to procure and maintain throughout the
term of this permit, Contractors Pollution Liability Insurance including contractual liability
coverage to cover liability and legal expenses arising out of cleanup, removal, storage, or
handling of hazardous or toxic chemicals, materials, substances, or any other pollutants by the
permittee or any subcontractor resulting from pollution conditions associated with the
personal wireless services facility in an amount not less than $1,000,000 each occurrence
combined single limit for bodily injury and property damage.

3. Umbrella Policy. If an umbrella or excess liability insurance policy is used to satisfy the
minimum requirements for insurance coverage listed above, the umbrella or excess liability
policies shall provide coverage at least as broad as specified for the underlying coverages and
covering those insured in the underlying policies. Coverage shall be "pay on behalf," with
defense costs payable in addition to policy limits. Permittee shall provide a "follow form"
endorsement or schedule of underlying coverage satisfactory to the Town indicating that such
coverage is subject to the same terms and conditions as the underlying liability policy.
4. Endorsements. The relevant policy(ies) shall name the Town, its elected/appointed
officials, commission members, officers, representatives, agents, volunteers and employees as
additional insureds. The permittee shall use its best efforts to provide thirty (30) days' prior
notice to the Town of the cancellation or material modification of any applicable insurance
policy.
5. Verification of Coverage. Permittee shall furnish the Development Services Department
with original certificates and amendatory endorsements or copies of the applicable policy
language providing the insurance coverage required herein. All certificates and endorsements
are to be received and approved by the Development Services Department before any work
commences. However, failure to obtain required documents prior to the work beginning shall
not waive the Licensee's obligation to provide them. Permittee shall furnish updated
certificates and endorsements to the Town annually. The Town reserves the right to require
updated certificates and endorsements or complete, certified copies of all required insurance
policies, including the endorsements required herein, at any time.
6. Permittee Has Full Liability: The permittee shall assume full liability for damage or injury
caused to any property or person by the personal wireless services facility.
7. Permittee shall provide an executed agreement, pursuant to which Permittee and any
related third parties agree to defend, hold harmless and fully indemnify the Town, its officers,
employees, agents, attorneys, and volunteers, from (i) any claim, action or proceeding
brought against the Town or its officers, employees, agents, or attorneys to attack, set aside,
void, or annul any such approval of the Town or (ii) a successful legal action brought against
the Town for loss of property value or other harm caused by the placement or operation of a
small cell installation. Such indemnification shall include damages, judgments, settlements,
penalties, fines, defensive costs or expenses, including, but not limited to, interest, attorneys’
fees and expert witness fees, or liability of any kind related to or arising from such claim,
action, or proceeding whether incurred by the Permittee, the Town and/or the parties initiating
or bringing such proceeding. The agreement shall also include a provision obligating the
Permittee to indemnify the Town for all of the Town’s costs, fees and damages which the
Town incurs in enforcing the indemnification provisions of this Section.
All insurance required under this Chapter shall be issued by an insurer holding a current A.M. Best
rating of A- or better, that is not an affiliate, subsidiary, or captive insurance entity of the applicant,

permittee, or any parent or related company thereof. Self-insurance and insurance issued by a special-
purpose or single-project entity created by the applicant shall not satisfy this requirement. The Town
reserves the right to request and independently verify the insurer's rating and independence prior to
permit issuance and at each renewal.
I. ADA Accommodations. The Town seeks to comply with the Americans With Disabilities Act, and
shall comply with same in the event that any person who is disabled within the meaning of the Act
seeks a reasonable accommodation, to the extent they are entitled to same under the Act.
J. Decommissioning and Reclamation Plan shall include the following information:
1. A plan for disposal of all solid waste, special waste and hazardous waste in accordance
with local, state, and federal waste disposal regulations detailing the types and quantities of
waste materials and methods of disposal;
2. A description of how and on what schedule stabilization and re-vegetation of the site as
deemed necessary to minimize erosion will be accomplished. Permittee should include, to the
extent possible, restoration of native vegetation, and pollinator-friendly seed mixtures shall be
used to the maximum extent possible in re-vegetation of ground cover;
3. An estimate of costs for the decommissioning of the personal wireless services facility with
a detailed description of how the estimated costs were derived, including the date which was
the basis for the estimate;
4. A decommissioning plan signed by the party responsible for decommissioning and the
landowner (if different) whose minimum requirements meet the standards of this Ordinance.
Such plan must be filed in the Town Office prior to the first operation of the personal wireless
services facility;
5. An estimate of the total cost of decommissioning value of the equipment and itemization of
the estimated major expenses, including the projected costs of measures taken to minimize or
prevent adverse effects on the environment during the implementation of the
decommissioning plan.
Section 17.07 Nonconforming Uses
A. Not Expansion of Nonconforming Use. Towers that are constructed, and antennas that are
installed, in accordance with the provisions of this chapter shall not be deemed to constitute the
expansion of a nonconforming use or structure.
B. Pre-existing Towers. Pre-existing towers shall be allowed to continue their usage as they presently
exist. Routine maintenance (including replacement with a new tower of like construction and height)

shall be permitted on such pre-existing towers. New construction other than routine maintenance on a
pre-existing tower shall comply with the requirements of this chapter.
C. Rebuilding Damaged or Destroyed Nonconforming Towers or Antennas. Notwithstanding other
provisions of this chapter, bona fide nonconforming towers or antennas that are damaged or destroyed
may be rebuilt without having to first obtain a special use permit and without having to meet the
separation requirements specified in Section 17.03. The type, height, and location of the tower on site
shall be of the same type and intensity as the original facility approval; provided, however, that any
destroyed lattice or guyed tower shall be replaced with a monopole structure only. Building permits to
rebuild the facility shall comply with the then applicable building codes and shall be obtained within
ninety (90) days from the date the facility is damaged or destroyed. If no permit is obtained or if said
permit expires, the tower or antenna shall be deemed abandoned as specified in Section 17.06(A).
Section 17.08 Retention of Consultants
A. Use of Consultants. Where deemed reasonably necessary by the Town Council and/or the Town,
the Town Council and/or the Town may retain the services of professional consultants to assist the
Town in carrying out its duties in review and approval of personal wireless service facilities. Where
the Town Council uses the services of private engineers, attorneys, or other consultants for purposes
of engineering, scientific, land use planning, environmental, legal, or similar professional reviews of
the adequacy or substantive aspects of applications or of issues raised during the course of review of
applications for special use permit approvals of personal wireless service facilities, the applicant and
landowner, if different, shall be jointly and severally responsible for payment of all the reasonable and
necessary costs incurred by the Town for such services. That responsibility shall not exceed the actual
cost to the Town of such engineering, legal, or other consulting services.
B. Advance Deposits for Consultant Costs. The Town and/or Town Council may require advance
periodic monetary deposits held by the Town on account of the applicant or landowner to secure the
reimbursement of the Town's consultant expenses. The amount of the deposit required shall be
established through the Council adoption of the fee schedule resolution based on the schedule of fees
charged by the Town’s approved consultant. After the review and approval of itemized invoices by
the Development Services Director, or designee, as to the reasonableness and necessity of the
consultant charges, the Town may make payments from the deposited monies for engineering, legal,
or consultant services. Upon receiving a request by the applicant or landowner, the Town shall supply
copies of such invoices to the applicant and/or landowner reasonably in advance of review and
approval, appropriately redacted where necessary to shield legally privileged communications
between Town officers or employees and the Town's consultant. When it appears that the remaining
deposit held for the applicant or landowner by the Town may be insufficient to pay current or
anticipated invoices, the Town shall cause the applicant or landowner to deposit additional monies to
meet such expenses or anticipated expenses in accordance with the fee schedule. Consultants shall
undertake no review on any matter scheduled before the Town until the initial deposit has been made

or requested replenishment of the deposit has been made. No reviewing agency shall be obligated to
proceed unless the applicant complies with deposit requirements.
C. Reasonable Limit Upon Consultant Expenses. A consultant expense or part thereof is reasonable in
amount if it bears a reasonable relationship to the customary fee charged by engineers, attorneys, or
planners within the region for services performed on behalf of applicants or reviewing boards in
connection with comparable applications for land use or development.
The Town may also take into account any special conditions for consideration as it may deem
relevant, including but not limited to the quality and timeliness of submissions on behalf of the
applicant and the cooperation of the applicant and agents during the review process.
A consultant expense or part thereof is necessarily incurred if it was charged by the engineer, attorney
or planner, or other consultants for a service that was rendered to assist the Town in: (a) making
factual determinations consistent with the goals of protecting or promoting of the health, safety or
welfare of the Town or its residents; (b) assessing potential adverse environmental impacts such as
those identified within an ADEQ process; (c) accessing potential adverse impacts to historic
properties, structures and/or districts, and/or (d) assessing and determining factual issues relevant to
Effective Prohibition claims, as addressed herein, enabling the Council to best comply with the letter
and intent of the provision of the TCA which is relevant thereto.
D. Audits Upon the Request of an Applicant. Upon request of the applicant or landowner, the Town
Council shall review all invoices and determine whether such engineering, legal, and consulting
expenses are reasonable in amount and necessarily incurred by the Town in connection with the
review and consideration of an application for personal wireless service facility. In the event of such a
request, the applicant or landowner shall be entitled to be heard by the Town Council on reasonable
advance notice.
E. Liability for Consultant Expenses. For a land-use application to be complete, the applicant shall
provide the written consent of all owners of the subject real property, both authorizing the applicant to
file and pursue land development proposals and acknowledging potential landowner responsibility,
under this section, for engineering, legal, and other consulting fees incurred by the Town. If different
from the applicant, the owner(s) of the subject real property shall be jointly and severally responsible
for reimbursing the Town for funds expended to compensate services rendered to the Town under this
section by private engineers, attorneys, or other consultants. The applicant and the owner shall remain
responsible for reimbursing the Town for its consulting expenses, notwithstanding that the deposit
account may be insufficient to cover such expenses. No building permit or other permit shall be issued
until reimbursement of costs and expenses determined by the Town to be due. In the event of failure to
reimburse the Town for such fees, the following shall apply:
The Town may seek recovery of unreimbursed engineering, legal, and consulting fees by court action
in an appropriate jurisdiction, and the defendant(s) shall be responsible for the reasonable and
necessary attorney's fees expended by the Town in prosecuting such action.

Alternatively, and at the sole discretion of the Town, a default in reimbursement of such engineering,
legal, and consulting fees expended by the Town shall be remedied by charging such sums against the
real property that is the subject of the application by adding that charge to and making it a part of the
next annual real property tax assessment roll of the Town. Such charges shall be levied and collected
simultaneously and in the same manner as Town-assessed taxes and applied in reimbursing the fund
from which the costs were defrayed for the engineering, legal, and consulting fees. Prior to charging
such assessments, the owners of the real property shall be provided written notice to their last known
address of record by certified mail, return receipt requested, of an opportunity to be heard and object
before the Town Council to the proposed real property assessment, at a date to be designated in the
notice, which shall be no less than 30 days after its mailing.