Chapter 17
Wireless Telecommunications Towers and Antennas
Section 17.01 Purpose, Intent, and Applicability
A. The purpose of this chapter is to establish general guidelines for the siting of wireless communications
towers and antennas. The goals of this chapter are to:
1. Protect residential areas and land uses from potential adverse impacts of towers and antennas;
2. Employ the “General Authority” preserved to the Town under 47 U.S.C. § 332(c)(7)(A) to the greatest
extent the United States Congress intended while simultaneously complying with each of the substantive
and procedural requirements set forth within the subsection 47 U.S.C. § 332(c)(7)(B).
3. Employ the authority reserved under A.R.S. §§ 9-462.01, and 9-596.A to exercise the Town’s zoning
powers, land use, planning and permitting authority, exercise its police powers, and manage access to the
Town’s public rights of way.
4. Promote the location of towers in nonresidential areas;
5. Limit the total number of towers throughout the community;
6. Strongly encourage the joint use of new and existing tower sites as a primary option rather than
construction of additional single-use towers;
7. Require users of towers and antennas to locate them, to the extent possible, in areas where the adverse
impact on the community is minimal;
8. Require users of towers and antennas to configure them in a way that minimizes the adverse visual
impact of the towers and antennas through careful design, siting, landscape screening, and camouflaging
techniques;
9. Enhance the ability of the providers of telecommunications services to provide such services to the
community quickly, effectively, and efficiently;
10. Recognize that technology and laws regarding these facilities have changed, so the Town’s regulations
need to change accordingly;
11. Consider the public health and safety of communication towers; and
1

12. Avoid potential damage to adjacent properties from tower failure through engineering and careful
siting of tower structures.
13. Maintain the Town’s status as a designated International Dark Sky Community and an optimum
environment for stargazing.
14. Conserve and enhance the unique natural beauty, irreplaceable natural resources, historical, natural,
and man-made character and appearance of Fountain Park, McDowell Mountain Preserve, Pleasantville
Park, and views of Red Mountain and Four Peaks.
15. Protect Saguaro cacti as a unique natural resource promoting tourism, contributing to the aesthetic
well-being of the community, high property values, high quality of life, unique lifestyles, and providing
habitat protection for desert wildlife. Saguaro cacti grow slowly and cannot be replaced by a plant of like
character.
16. Protect the Sonoran Desert tortoise and its habitats as a unique natural resource and an important
component of Town of Fountain Hills natural environment that contributes to the aesthetic, environmental,
and personal well-being of the community. The Sonoran Desert tortoise is a state-protected species in
Arizona and a petitioned candidate for inclusion as a federally endangered species pursuant to the
Endangered Species Act of 1973, 16 U.S.C. §§ 1531–1544. Populations of the Sonoran Desert tortoise has
been documented in the Town of Fountain Hills.
17. Protect the quiet small-town suburban, scenic and visual character of the Town.
In furtherance of these goals, Town of Fountain Hills shall give due consideration to the Town of Fountain
Hills General Plan, the Town of Fountain Hills Zoning Ordinance, existing land uses, and environmentally
sensitive areas in approving sites for the location of towers and antennas.
B. It is the intent of this chapter:
1. That no wireless communication towers or antenna be sited, constructed, reconstructed, installed,
materially changed, expanded, or used unless in conformity with this chapter.
2. To achieve a balance between the need to provide wireless services with the health, safety, and general
welfare of the residents of Fountain Hills by balancing five (5) simultaneous objectives:
a. Enabling personal wireless service providers to provide adequate personal wireless services
throughout the Town so that Town residents can enjoy the benefits of same from any FCC-licensed
wireless carrier from which they choose to obtain such services;
b. Minimizing the number of cell towers and/or other personal wireless service facilities needed to
provide such coverage;
2

c. Preventing, to the greatest extent reasonably practical, any unnecessary adverse impacts upon the
Town’s communities, residential areas, and individual homes;
d. Complying with each of the substantive and procedural requirements set forth within the
subsection 47 U.S.C. § 332(c)(7)(B) for permit applications seeking approvals for the siting,
construction and operation of cell towers and/or other personal wireless service facilities; and
e. Complying with the Federal Communications Commission’s (FCC) legislative rules for
communications facilities including those for Radio Frequency human exposure limits in 47 C.F.R.
Part 1, Subpart I and those addressing State and Local government regulation of the Placement,
Construction, and Modification of Personal Wireless Service Facilities, in 47 C.F.R. Part 1, Subpart U.
This Section is not intended to, nor shall it be interpreted or applied to: (1) prohibit or effectively prohibit any
wireless telecommunications service provider's ability to provide reasonable and necessary wireless
communications services; (2) prohibit or effectively prohibit any entity's ability to provide reasonable and
necessary interstate or intrastate telecommunications service; (3) unreasonably discriminate among providers
of functionally equivalent services; (4) deny any request for authorization to place, construct or modify
wireless telecommunications service facilities solely on the basis of environmental effects of radio frequency
emissions so long as such wireless facilities comply in every instance and regard with all FCC's regulations
concerning such emissions; (5) prohibit any eligible facility that the Town may not deny under federal or state
law; or (6) otherwise authorize the Town to violate any applicable federal or state law.
C. Applicability.
1. New Towers and Antennas. All new towers or antennas in the Town of Fountain Hills shall be subject to
these regulations. The following exceptions apply:
a. Amateur Radio Station Operators/Receive Only Antennas. This chapter shall not govern any
tower, or the installation of any antenna, that is under the maximum building height of the zoning
district in which such structure is located and which is owned and operated by a federally licensed
amateur radio station operator or is used exclusively for receive only operations.
b. Pre-existing Towers or Antennas. Legally established pre-existing towers and pre-existing
antennas shall not be required to meet the requirements of this chapter, other than the requirements of
Sections 17.06(B)(1) and 17.06(C).
c. AM Array. For purposes of implementing this chapter, an AM array, consisting of one (1) or more
tower units and supporting ground system which functions as one (1) AM broadcasting antenna, shall
be considered one (1) tower. Measurements for setbacks and separation distances shall be measured
from the outer perimeter of the towers included in the AM array. Additional tower units may be added
within the perimeter of the AM array by right.
3

d. Small Wireless Facilities. Wireless communication towers and antenna meeting the definition of
small wireless facilities as contained in A.R.S. 9-591 are subject to the requirements of Article 19-1,
Small Wireless Facilities, of the Town Code.
e. Mobile or Temporary Towers. Mobile wireless facilities, when placed on site for seven (7)
consecutive days or less, provided any necessary building permit or encroachment permit is obtained.
f. Utility Service Antennas in the Right-of-Way. Utility service antennas as defined in this chapter
placed in the public right-of-way are subject to the requirements of Article 16-3, Utility Service
Antenna, of the Town Code. (24-08, Amended, 09/04/2024, Deleted and replaced)
g. Over-the-Air-Reception Devices ("OTARD") antennas as defined by 47 C.F.R. § 1.4000(a).
2. Existing Towers and Antennas. Any existing towers which are modified, upgraded, or changed in any
manner shall be subject to the provisions of this ordinance as applicable. All existing towers and antennas
shall be subject to the maintenance and operations requirements in Sec. 17.06.
Section 17.02 Definitions
For the purposes of this article, and where not inconsistent with the context of a particular section, the defined
terms, phrases, words, abbreviations, and their derivations shall have the meanings provided in this section.
When not inconsistent with the context, words in the present tense include the future tense, words used in the
plural number include words in the singular number, and words in the singular number include the plural
number. The word “shall” is always mandatory and not merely directory. The definitions set forth herein shall
supersede any definitions set forth within the Town Code and Zoning Ordinance, and the definitions set forth
herein below shall control and apply to Chapter 17 of the Zoning Ordinance and all subparagraphs herein.
“Accessory facility or accessory structure” means a facility or structure serving or being used in conjunction
with a personal wireless services facility or complex and located on the same property or lot as the personal
wireless services facility or complex or an immediately adjacent lot, including, but not limited to utility or
transmission equipment storage sheds or cabinets.
“ACHP” means the Federal Advisory Council on Historic Preservation.
“ADA” means American Disabilities Act.
“ADEQ” means the Arizona Department of Environmental Quality.
“Adequate coverage” means, as determined by the Town Council, that a specific wireless carrier’s personal
wireless service coverage is such that the vast majority of its customers’ equipment can successfully connect to
the carrier’s radio access network and achieve a received signal strength of -110 dBm or better and deliver a -
90 dBm or better signal to the base station receiver (uplink) with a signal to noise ratio (SINR) of 3 dB or
4

higher the vast majority of the time, in the vast majority of the geographic locations within the Town, that the
Voice Drop Call Rate, e.g. the percentage ratio of dropped voice calls to total call attempts or successful call
setups remains at or below 3%. A “gap” can exist when there is a lack of coverage or when coverage exists but
quality is below the above metrics. The Town will assess whether a gap in a carrier’s personal wireless
services are significant, based upon such factors including, but not limited to, lack of significant physical size
of the gap, whether the gap is located upon a lightly traveled or lightly occupied area, whether only a small
number of customers are affected by the gap, and/or whether or not the carrier’s customers are affected for
only limited periods of time. A wireless carrier’s coverage shall not be deemed inadequate simply because the
frequency or frequencies at which its customers are using its services are not the most preferred frequency of
the wireless carrier.
For claimed capacity or quality shortfalls in an area that has coverage, the applicant must demonstrate through
independently-verifiable data and analysis, including network generated recordings based on user equipment
reports that users are consistently experiencing dropped voice calls (in contrast to dropped sessions involving
non-voice communications) at an unacceptable level during peak periods, or user devices are consistently
denied access to the network due to lack of overall capacity at peak periods.
If the applicant relies on signal strength data (whether network recorded or through drive tests) to demonstrate
a lack of coverage or inadequate quality/capacity the applicant must disclose all underlying data, its thresholds
for acceptable quality in such fashion that all claims and conclusions are independently verifiable.
The Town strongly encourages all applicants to use methods consistent with the FCC rules governing provider
reports and mapping data in 47 C.F.R. Part 1, Subpart V (§§ 1.7000 – 1.7010).
“Alternative tower structure” means man-made trees, clock towers, bell steeples, light poles and similar
alternative-design mounting structures that camouflage or conceal the presence of antennas or towers.
“Adjacent properties or properties adjacent” shall mean (i) those lots or parcels of land that abut another lot or
parcel of land or public right-of-way that is contiguous to a wireless facility site or proposed site and (ii) the
lots or parcels of land or public right-of-way that would be contiguous to lots or parcels or public rights-of-way
but for an intervening local or collector roadway.
“Aesthetic or aesthetics” refers to subjective or objective determinations related to whether and if so, how well
a facility will fit within the character of the area where the facility is proposed. This requires a broad range of
factors including but not limited to visual effects and impact on property values. The Town will consider
aesthetics for all applications and, where not prohibited by federal or state law, reserves the ability to impose
careful placement conditions or restrictions.
“Antenna” means an apparatus designed for the purpose of emitting radiofrequency (RF) radiation, to be
operated or operating from a fixed location pursuant to FCC authorization, for the provision of personal
wireless service and any commingled information services. This definition does not apply to antennas designed
for amateur radio use or satellite dishes for residential or household purposes.
5

“Antenna equipment” means equipment, switches, wiring, cabling, power sources, shelters or cabinets
associated with an Antenna, located at the same fixed location as the Antenna, and, when Co-located on a
PWSF Structure, is mounted or installed at the same time as such Antenna.
“Antenna facility” means Antenna and associated Antenna Equipment.
"Applicant" means any individual, corporation, limited liability company, general partnership, limited
partnership, estate, trust, joint-stock company, association of two or more persons having a joint common
interest, or any other entity submitting an application for a wireless communication facility permit, site plan
approval, building permit, and/or any other related approval, for the installation, operation and/or maintaining
of one or more wireless communication facilities.
"Application" shall mean all necessary and required documentation, information, and evidence that an
applicant must submit to receive a wireless communications facility permit, building permit, or other Town
approval for personal wireless service facilities from the Town.
“Backhaul network” means the lines that connect a provider’s towers/cell sites to one (1) or more cellular
telephone switching offices, and/or long distance providers, or the public switched telephone network.
“Balloon test” means the raising of a balloon (or placement of a “crank up” tower, crane or temporary
structure) equal to the height of a proposed personal wireless services facility tower for a period of 4 hours on
a pre-determined date and time prior to approval of a wireless facility permit application to assess the visual
impact of a proposed tower.
“Base station” means for purposes of eligible facilities requests the definition in the FCC’s regulations at 47
CFR § 1.6100 shall apply. A structure or equipment at a fixed location that enables FCC-licensed or authorized
wireless communications between user equipment and a communications network. The term does not
encompass a tower or any equipment associated with a tower.
“Board of Adjustment” means the Board of Adjustment of the Town of Fountain Hills, established pursuant to
Sec. 1.07 of the Zoning Ordinance with membership, powers, duties, and responsibilities as set forth in Article
2A-2 of the Town Code.
Carriers. See Wireless Carriers.
“Cell tower” means a free-standing, guy-wired, or otherwise supported pole, tower, or other structure designed
to support or employed to support equipment and/or antennas used to provide personal wireless services,
including, but not limited to, a pole, monopole, monopine, slim stick, lattice tower or other types of standing
structures.
“CEQ” means the Council on Environmental Quality, as established under NEPA.
"Collocate, colocate" or "collocation, colocation" can have different meanings depending on context.
6

1. When and where A.R.S. §§ 9-951 — 9-600 apply, the definition in A.R.S. §§ 9-951.8 shall also apply.
That definition currently states:
"Collocate" or "collocation" means to install, mount, maintain, modify, operate or replace wireless
facilities on, within or adjacent to a wireless support structure or utility pole.
2. Where and when the FCC’s general rules for placement, construction and modification of personal
wireless facilities apply, the definition in 47 C.F.R. § 1.6002(g) shall also apply. That definition currently
states:
Collocation, consistent with § 1.1320(d) and the Nationwide Programmatic Agreement (NPA) for the
Collocation of Wireless Antennas, appendix B of this part, section I.B, means—
(1) Mounting or installing an antenna facility on a pre-existing structure; and/or
(2) Modifying a structure for the purpose of mounting or installing an antenna facility on that
structure.
(3) The definition of “collocation” in § 1.6100(b)(2) applies to the term as used in that section.
3. Where and when the FCC’s rules for wireless facility modifications apply, the definition in 47 C.F.R. §
1.6100(b)(2) shall also apply. That definition currently states:
(2) Collocation. The mounting or installation of transmission equipment on an eligible support structure
for the purpose of transmitting and/or receiving radio frequency signals for communications purposes.
“Complete application, completed application” means an application that contains all the necessary and
required information, records, evidence, reports, and/or data necessary to enable an informed decision to be
made with respect to an application. Where any information is provided pursuant to the terms of this Chapter
and the Development Services Director, Town Engineer or the Town’s expert or consultant, or the Council
determines, based upon information provided, that any additional, further, or clarifying information is needed
as to one or more aspects, then the application will be deemed incomplete until that further or clarifying
information is provided to the satisfaction of the Development Services Director, Town Engineer, Town
Council or the Town’s expert or consultant of the Council.
“Complex” means the entire site or facility, including all structures and equipment, located at the site.
“Council or Town Council” means the Town Council of the Town of Fountain Hills.
“DBM” (dBm) stands for decibel milliwatts, which is a concrete measurement of the wireless signal strength
of wireless networks. It expresses power relative to 1 milliwatt (mW) on a logarithmic scale. Emissions are
measured using positive whole or fractional numbers. Received signal strengths are typically recorded in
negative numbers because they are usually weaker than 1 milliwatt, and can range from approximately -30
dBm to -110 dBm. The closer the number is to 0, the stronger the cell signal. FCC, HHS and OSHA regulate
7

safe exposure thresholds but transmitter power (in dBm) is crucial to determining exposure, as it is the starting
point for calculating current exposure limits.
“Deployment” means the placement, construction, or substantial modification of a personal wireless service
facility.
“Development Services Director” (or “Director): T” means the person appointed by the Town Manager to be
the Development Services Director. If there is no such person designated by the Town Manager, the Town
Manager is the Development Services Director.
“Distributed antenna system, DAS” means a network of spatially separated antenna nodes connected to a
common source via a transport medium that provides personal wireless service within a geographic area.
“Effective prohibition” means a finding by the Town Council that if an application seeking approval for a
specific new Personal Wireless Service Facility at a specific location, and a specific height, were to be denied,
such denial would either: (a) prevent an identified Wireless Carrier from providing personal wireless services
within a specific geographic area, or areas, within the Town, or (b) would prevent a specific Wireless Carrier
from constructing a sufficient number of such facilities necessary to enable it to provide Personal Wireless
Services within the Town.
An effective prohibition shall not be found to exist if a Wireless Carrier has Adequate Coverage in a specified
geographic area, such that its end-use customers can use their cellular telephones to connect to landlines using
the Carrier’s Personal Wireless Services; however, the frequencies are not the “most preferred” frequencies of
the Carrier.
An effective prohibition shall also not be found to exist if an applicant fails to establish before the Town
Council that any existing geographic gap or capacity deficiency in the specific Wireless Carrier’s coverage
cannot be remedied through a less intrusive means than what is being proposed, including, but not limited to,
potential installations on alternative less intrusive sites, a shorter tower or facility, the incorporation of a more
stealthy design, etc.
A finding of Effective Prohibition, or lack thereof, shall be based upon an applicant’s submission of sufficient
probative, relevant, and sufficiently reliable evidence and the appropriate weight the Town Council deems
appropriate to afford.
“Eleventh hour submissions” means an applicant’s submission of new and/or additional materials in support of
an application less than five (5) business days before the expiration of an applicable shot clock or at an
otherwise unreasonably short period of time before the expiration of the shot clock, making it impracticable for
the Town Council to adequately review and consider such submissions due to their complexity, volume, or
other factors, before the expiration of the shot clock.
8

“Eligible facilities request” means a request that meets the requirements in 47 CFR § 1.6100 for modification
of an existing Tower or Base Station that does not substantially change the physical dimensions of such Tower
or Base Station and involving:
(a) Co-location of new transmission equipment,
(b) Removal of transmission equipment, or
(c) Replacement of transmission equipment.
“Enure” means to operate or take effect. To serve to a person or party's use, benefit, or advantage.
“EPA” means the United States Environmental Protection Agency.
“Existing structure” means light poles, power poles, chimneys, billboards, and other similar structures, which
are placed, within the Town at the time of adoption of this chapter, except existing buildings.
“FAA” means the Federal Aviation Administration or its duly designated and authorized successor agency.
“Facility” means a set of wireless transmitting and/or receiving equipment, including any associated
electronics and electronics shelter or cabinet and generator.
“FCC” means the Federal Communications Commission.
“General population/uncontrolled exposure limits” means the applicable radiofrequency radiation exposure
limits set forth within 47 CFR §1.1310(e)(1), Table 1 Section (ii), made applicable pursuant to 47 CFR
§1.1310(e)(3), as further described and supplemented by the FCC Office of Engineering and Technology
Laboratory Division’s advisory Knowledge Database (KBD), available
at https://apps.fcc.gov/oetcf/kdb/index.cfm.
“HHS” means U.S. Department of Health and Human Services or its constituent agencies, including FDA
Food and Drug Administration, charged with review and compliance, meeting or exceeding requirements of
the RF-emitting consumer devices (e.g., electronic products such as cell phones) for health impacts.
“Height” means, when referring to a tower, personal wireless service facility, or personal wireless service
facility structure, the height shall mean the distance measured from the pre-existing grade level to the highest
point on the tower, facility, or structure, including, but not limited to, any accessory, fitting, fitment, extension,
addition, add-on, antenna, whip antenna, lightning rod or other types of lightning-protection devices attached
to the top of the structure.
“Historic Structure” means any structure that is either on the National Register of Historic Places or is eligible
for inclusion in the national register, irrespective of whether or not an application for inclusion onto the
national register has been filed or not filed.
9

“Illegally excessive RF radiation or illegally excessive radiation” means RF radiation emissions at levels that
exceed the legally permissible limits set forth within 47 CFR §1.1310(e)(1), Table 1 Sections (i) and (ii), as
made applicable pursuant to 47 CFR §1.1310(e)(3).
“In-kind call testing” means testing designed to measure the gap in Personal Wireless Service coverage
asserted by an applicant. In-Kind Call Testing for a claimed gap in Personal Wireless Services in buildings
means call testing performed in buildings to establish the existence or absence of such a gap, unless the
applicant provides an affidavit sworn under penalties of perjury demonstrating good faith but unsuccessful
attempts to secure access to buildings to conduct such testing. In-Kind Call Testing for a claimed gap in
Personal Wireless Services in vehicles or in the open air means call testing performed in vehicles or in the
open to establish the existence or absence of such a gap.
“In-kind replacement” means the replacement of a malfunctioning component(s) with a properly functioning
component of substantially the same weight, dimensions, and outward appearance.
“Least intrusive” means the location and design of a personal wireless service facility that would remedy a
significant gap in Personal Wireless Service coverage and (1) does the least disservice to the objectives stated
in § 270-219A(2), and (2) deviates as little as possible from (a) the preferential order of location in subsection
K (Priority of siting locations) and (b) applicable design standards in subsection L.
“Macrocell” means a cellular base station that typically sends and receives radio signals from large towers and
antennas. These include traditionally recognized cell towers, typically ranging from 50 to 199 feet in height.
“Maintenance or routine maintenance” means plumbing, electrical or mechanical work that may require a
building permit but that does not constitute a modification to the personal wireless service facility. It is work
necessary to assure that a wireless facility and/or telecommunications structure exists and operates reliably and
in a safe manner, presents no threat to persons or property, and remains compliant with the provisions of this
chapter and FCC requirements.
“Mobile or temporary tower” means a portable tower or other wireless communications facility capable of
being transported in or by a motor vehicle, or otherwise designed to be readily relocated, that is intended or
used to provide wireless communications services on a temporary or emergency basis and is not permanently
affixed to the site on which it is located. The term includes, but is not limited to, cells-on-wheels (COWs),
sites-on-wheels (SOWs), cells-on-light-trucks (COLTs), trailer-mounted monopoles, and similar portable
facilities.
“Monopole” means a wireless support structure that is not more than forty inches in diameter at the ground
level and that has all of the wireless facilities mounted on the pole or contained inside of the pole. Monopoles
are typically unguyed.
“Necessary, or necessity, or need” means what is technologically required for the equipment to function as
designed by the manufacturer and anything less will result in prohibiting the provision of service as intended
and described in the narrative of the application. “Necessary” or “need” does not mean what may be desired,
10

preferred, or the most cost-efficient approach and is not related to an applicant’s specific chosen design
standards or unspecified “coverage objectives.” Any situation involving a choice between or among
alternatives or options is not a need or a necessity.
“NEPA” means the National Environmental Policy Act, 42 U.S.C. §4321, et seq.
“NHPA” means the National Historic Preservation Act, 54 U.S.C. 300101 et seq, and 36 CFR Part 800, et seq.
“Node, DAS node” means a fixed antenna and related equipment installation that operates as part of a system
of spatially separated antennas, all of which are connected through a medium through which they work
collectively to provide personal wireless services, as opposed to other types of personal wireless facilities, such
as macrocells, which operate independently.
“Node” means a fixed antenna and antenna equipment installation that operates as part of a system of spatially
separated Antennas, all of which are connected through a medium through which they work collectively to
provide personal wireless services using hand-off capabilities. A 4G (LTE) node is referred to as an ENode B,
and a 5G node is referred to as a GNode B. Some sites incorporate both 4G and 5G. Some 5G capable sites
still rely on a 4G network core.
“Notice address” means an address, which is required to be provided by an applicant at the time it submits an
application, at which the Town, Town Council, and/or Development Services Director or Town Engineer
designee can mail notice, and the mailing of any notice to such address by first-class mail shall constitute
sufficient notice to any and all applicants, co-applicants, and/or their attorneys, to satisfy any notice
requirements under this Chapter, as well as any notice requirements of any other local, state and/or federal law.
“Notice of incompleteness, notice of incomplete application” means a written notice, sent by electronic mail ,
to an applicant seeking approval for the installation of a PWSF, wherein the sender advises the applicant that
its application is either incomplete, the wrong type of application, or is otherwise defective, and setting for the
reason or reasons why the application is incomplete and/or defective.
“Notice of effective prohibition conditions” means a written notice, which is required to be provided to the
Town at the time of the filing of any application by all applicants seeking any approval, of any type, for the
siting, installation, and/or construction of a PWSF, wherein the respective applicant asserts, claims or intends
to assert or claim, that a denial of their respective application, by any agent, employee, board or body of the
Town, would constitute an “effective prohibition ” within the meaning of the TCA, and concomitantly, that a
denial of their respective application or request would violate Section 47 U.S.C. §332(c)(7)(B)(i)(II) of the
TCA.
“Occupational/controlled exposure limits” means the applicable radiofrequency radiation exposure limits set
forth within 47 CFR §1.1310(e)(1), Table 1 Section (i), made applicable pursuant to 47 CFR §1.1310(e)(2).
11

"Permit" means written permission required by an authority to install, mount, maintain, modify, operate or
replace a utility pole or monopole, to collocate a wireless facility on a utility pole or wireless support structure
or to collocate wireless facilities on a monopole.
“Permittee” means a holder of a Personal Wireless Service Facility Permit.
“Personal wireless service/personal wireless services” means commercial mobile services, unlicensed wireless
services, and common carrier wireless exchange access services, within the meaning of 47 U.S.C.
§332(c)(7)(c)(i), and as defined therein.
“Personal wireless service facility, personal wireless services facility or PWSF” means a facility or facilities
used for the provision of personal wireless services, within the meaning of 47 U.S.C. §332(c)(7)(c)(ii). It
means a specific location at which a structure that is designed or intended to be used to house or accommodate
antennas or other transmitting or receiving equipment is located. This includes, without limitation, towers of
all types and all kinds of support structures, including but not limited to buildings, church steeples, silos, water
towers, signs, utility poles, or any other structure that is used or is proposed to be used as a
telecommunications structure for the placement, installation and/or attachment of antennas or the functional
equivalent of such. It expressly includes all related facilities and equipment such as cabling, radios and other
electronic equipment, equipment shelters and enclosures, cabinets, and other structures enabling the complex
to provide personal wireless services.
“Pre-existing towers and pre-existing antennas” means any tower or antenna lawfully constructed or permitted
prior to the effective date of this Chapter, including any tower or antenna for which no permit or other zoning
approval was required at the time of construction, provided that the tower or antenna was otherwise lawfully
constructed for which a building permit has been properly issued prior to the effective date of the ordinance
codified in this chapter, including permitted towers or antennas that have not yet been constructed so long as
such approval is current and not expired.
"Private easement" means an easement or other real property right that is only for the benefit of the grantor and
grantee and the grantor's or grantee's successors and assigns.
“Probative evidence” means evidence which tends to prove facts, and the more a piece of evidence or
testimony proves a fact, the greater its probative value, as shall be determined by the Town Council or other
decision making authority, as the finder-of-fact in determining whether to grant or deny applications under this
provision of the Town Code.
“Repairs” means the replacement or repair of any components of a wireless facility or complex where the
replacement is substantially identical to the component or components being replaced, or for any matters that
involve the normal repair and maintenance of a wireless facility or complex without the addition, removal, or
change of any of the physical or visually discernible components or aspects of a wireless facility or complex
that will impose new visible intrusions of the facility or complex as originally permitted.
“RF” means radiofrequency.
12

“RF radiation” means radiofrequency radiation. That being electromagnetic radiation, which is a combination
of electric and magnetic fields that move through space as waves, and can include both Non-Ionizing radiation
and Ionizing radiation.
“School” means a public, charter, or private educational institution providing instruction for elementary and
secondary grades as defined in A.R.S. § 15-101 and includes the real property and facilities used for such
educational purpose.
“School property” means any parcel containing a public, charter, or private educational institution providing
instruction for elementary and secondary grades as defined in A.R.S. § 15-101 and includes associated
playgrounds, athletic fields, administrative buildings, parking areas, and other school-related facilities.
“Section 106 Review” means a review under Section 106 of the National Historic Preservation Act.
“Setback” means the distance between (a) any portion of a personal wireless facility and/or complex, including
but not limited to any and all accessory facilities and/or structures, and (b) the exterior line of any parcel of real
property or part thereof which is owned by, or leased by, an applicant seeking to construct or install a personal
wireless facility upon such real property or portion thereof. In the event that an applicant leases only a portion
of real property owned by a landlord, the setback shall be measured from the facility to the line of that portion
of the real property that is actually leased by the applicant, as opposed to the exterior lot line of the non-leased
portion of the property owned by the landlord.
“Shot clock, Arizona” means the statutory timeframes within which the Town must review a wireless
application for completeness of an application for wireless facilities in right-of-way pursuant to A.R.S. § 9-
594.C.2 and act on a wireless application before it is otherwise deemed approved pursuant to A.R.S. § 9-
594.C.2. For deemed approved purposes, the Arizona shot clock begins on the date when the Town determines
the application is properly completed. For applications involving wireless facilities not in right-of-way the
FCC shot clock will apply.
Shot clock, FCC: the presumptively reasonable time frame within which the Town must act on a wireless
application, as defined by the FCC, shown below subject to amendment from the FCC. The shot clock begins
when the applicant takes the first procedural step that the Town requires.
a. Aggregate of 60 days:
1) Standby emergency generators at previously permitted macro cell tower
sites.
2) Collocation of small wireless facilities at existing small wireless facility
sites.
3) Eligible Facilities Requests.
b. Aggregate of 90 days:
13

1) New small wireless facilities.
2) Collocation applications for additions to existing communications facilities not
defined as an eligible facilities request.
c. Aggregate of 150 days:
1) All other applications, such as development of a new communication tower or facility.
“SHPO” means the Arizona State Historic Preservation Office.
“Site developer or site developers” means individuals and/or entities engaged in the business of constructing
wireless facilities and wireless facility infrastructure and leasing space and/or capacity upon, or use of, their
facilities and/or infrastructure to wireless carriers. Unlike wireless carriers, site developers generally do not
provide personal wireless services to end-use consumers.
“Small cell” means a fixed cellular base station that sends and receives radio signals and is typically mounted
upon poles or support structures at substantially lower elevations than macrocell facilities.
"Small wireless facility" can have different meanings depending on context.
1. When and where A.R.S §§ 9-591 – 9-599 applies, the definition in A.R.S §§ 9-591.19 shall also apply.
That definition means a wireless facility that meets both of the following qualifications:
(a) All antennas are located inside an enclosure of not more than six cubic feet in volume or, in the
case of an antenna that has exposed elements, the antenna and all of the antenna's exposed elements
could fit within an imaginary enclosure of not more than six cubic feet in volume.
(b) All other wireless equipment associated with the facility is cumulatively not more than twenty-
eight cubic feet in volume, or fifty cubic feet in volume if the equipment was ground mounted before
August 9, 2017. The following types of associated ancillary equipment are not included in the
calculation of equipment volume pursuant to this subdivision:
()i An electric meter.
()ii Concealment elements.
()iii A telecommunications demarcation box.
()iv Grounding equipment.
()v A power transfer switch.
()vi A cutoff switch.
()vii Vertical cable runs for the connection of power and other services
2. Where and when the FCC’s general rules for placement, construction and modification of personal
wireless service facilities apply, the definition in 47 CFR §1.6002(l) shall apply. That definition states as
follows:
14

(a) Small wireless facilities are facilities that meet each of the following conditions:
(i) The facilities—
.i Are mounted on structures 50 feet or less in height including their antennas as defined in §
1.1320(d); or
.ii Are mounted on structures no more than 10 percent taller than other adjacent structures; or
.iii Do not extend existing structures on which they are located to a height of more than
50 feet or by more than 10 percent, whichever is greater;
(ii) Each antenna associated with the deployment, excluding associated antenna equipment (as defined
in the definition of “antenna” in § 1.1320(d)), is no more than three cubic feet in volume;
(iii) All other wireless equipment associated with the structure, including the wireless equipment
associated with the antenna and any pre-existing associated equipment on the structure, is no more
than 28 cubic feet in volume;
(iv) The facilities do not require antenna structure registration under part 17 of this chapter;
(v) The facilities are not located on Tribal lands, as defined under 36 CFR 800.16(x); and
(vi) The facilities do not result in human exposure to radiofrequency radiation in excess of the
applicable safety standards specified in § 1.1307(b).
"Special taxing district" means a special district formed pursuant to title ARS 48, chapter 11, 12, 17, 18, 19, 20
or 22.
“Special Use Permit” means the official document or permit granted by the Town Council pursuant to which
an applicant is allowed to file for and obtain a building permit to construct and use a personal wireless services
facility, personal wireless service equipment, and/or any associated structures and/or equipment which are used
to house, or be a part of, any such facility or complex, or to be used to provide personal wireless services.
“State” means the State of Arizona.
“Structure” means a pole, tower, base station, or other building, physical support of any form used for, or to be
used for, the provision of personal wireless service.
“Substantial evidence” means such relevant evidence as a reasonable mind might accept as adequate to support
a conclusion. It means less than a preponderance but more than a scintilla of evidence.
“TCA” means the Telecommunications Act of 1996, Pub. L. No. 104-104, 110 Stat. 56 (1996), codified at
various provisions of Title 47 U.S.C.
“Thermal runaway” means self-heating of an electrochemical system in an uncontrollable fashion.
15

“Tolling or tolled” means the pausing of the running of the time period permitted under the applicable shot
clock for the respective type of application for a personal wireless services facility. Where a shot clock is tolled
because an application has been deemed incomplete and timely notice of incompleteness was mailed to the
applicant, the submission of additional materials by the applicant to complete the application will end the
tolling, thus causing the shot clock period to resume running, as opposed to causing the shot clock to begin
running anew.
“Tower” means a mast, pole, monopole, slim stick, guyed tower, lattice tower, freestanding tower, or other
structure designed to support or employed to support antennas and other equipment, including but not limited
to dishes, transceivers and arrays used to provide personal wireless services and wireless communications
services. A ground- or building-mounted mast greater than ten feet tall and six inches in diameter supporting
one or more antennas, dishes, arrays, etc. shall be considered a communications tower.
“Town” means the Town of Fountain Hills.
“Town code” means the Town Code of the Town of Fountain Hills.
“Undertaking” means any application seeking Town approval for the installation of a personal wireless
services facility licensed under the authority of the FCC shall constitute an undertaking within the meaning of
NEPA, in accord with 42 CFR §137.289 and 36 CFR §800.16.
“Utility” means Arizona (under ARS § 40-360.51 (5)): A public utility includes corporations or persons
engaged in furnishing water, gas, electricity, telephone service, or sewage disposal to the public for
compensation.
“Utility service antennas” means antenna placed on or near utility boxes, poles, switches, storage tanks, etc.,
and used by a utility provider to facilitate the operation of the utility system.
“Wireless carriers or carrier” means companies that provide Personal Wireless Services to end-use consumers.
“Wireless communication” means the transmission of voice or data without cable or wires.
“Wireless communication facility” means wireless communication facilities including, but not limited to,
facilities that transmit and/or receive electromagnetic signals for cellular radio telephone service, personal
communications services, enhanced specialized mobile services, paging systems, and related technologies.
Such facilities also include antennas, microwave dishes, parabolic antennas, and all other types of equipment
used in the transmission or reception of such signals; telecommunication towers or similar structures
supporting said equipment; associated equipment cabinets and/or buildings; and all other accessory
development used for the provision of personal wireless services. These facilities do not include radio and
television broadcast towers and government-operated public safety networks.
“Zoning ordinance” means the Zoning Ordinance of the Town of Fountain Hills, as codified in Chapter 1, Sec.
1.01 of the Zoning Ordinance.
16

Section 17.03 Requirements
A. General Requirements.
1. Principal or Accessory Use. Antennas and towers may be considered either principal or accessory
uses. A different existing use of an existing structure on the same lot shall not preclude the installation of
an antenna or tower on such lot.
2. Lot Size. For purposes of determining whether the installation of a tower or antenna complies with
district development regulations, including but not limited to setback requirements, lot coverage
requirements, and other such requirements, the dimensions of the entire lot shall control, even though the
antennas or towers may be located on leased parcels within such lot.
3. Aesthetics. Towers and antennas shall meet the following requirements:
a. Towers shall, subject to any applicable standards of the FAA, be painted a neutral color so as to
reduce visual obtrusiveness.
b. At a tower site, the design of the buildings and related structures shall, to the extent possible, use
materials, colors, textures, screening, and landscaping that will blend them into the natural setting and
surrounding buildings.
c. If an antenna is installed on a structure other than a tower, the antenna and supporting electrical
and mechanical equipment must be of a neutral color that is identical to, or closely compatible with,
the color of the supporting structure so as to make the antenna and related equipment as visually
unobtrusive as possible.
d. The choice of design for installing a new wireless communication facility or the substantial
modification of an existing wireless communication facility shall be chosen to minimize the potential
adverse impacts that the new or expanded facility may, or is likely to, inflict upon nearby properties.
Concealment elements should be used to camouflage the pole and antennas.
e. Accessory Structures. Unless approved by the Town Council, all equipment associated with a
wireless communication tower is to be located below grade in a vault. If above grade accessory
structures are approved by the Town Council, they shall comply with the following requirements.
i. Accessory structures shall maximize the use of building materials, colors, and textures
designed to blend with the natural surroundings. The use of specified concealment elements for
communications towers may be required by the Council to blend the communications tower
and/or its accessory structures further into the natural surroundings using specified concealment
elements.
17

ii. Accessory structures shall be designed to be architecturally similar, compatible with each
other, and shall be no more than 12 feet high. The buildings shall be used only for housing
equipment related to the particular site. Whenever possible, the buildings shall be joined or
clustered so as to appear as one (1) building.
iii. No portion of any telecommunications tower or accessory structure shall be used for a sign or
other advertising purpose, including but not limited to the company name, phone numbers,
banners, and streamers, except the following. A sign of no greater than 2 square feet indicating the
name of the facility owner(s) and a twenty-four (24) hour emergency telephone shall be posted
adjacent to any entry gate. In addition, “no trespassing” or other warning signs may be posted on
the fence. All signs shall conform to the sign requirements of the Town.
f. Towers must be placed to minimize visual impacts. Applicants shall place towers on the side slope
of the terrain so that, as much as possible, the top of the tower does not protrude over the ridgeline, as
seen from public ways.
g. Existing Vegetation. Existing vegetation shall be preserved to the maximum extent possible. No
cutting of trees shall take place on a site connected with an application made under this chapter prior
to the approval of the application.
h. Screening.
i. Tree plantings may be required to screen portions of the telecommunications tower and
accessory structures from nearby residential property as well as from public sites known to
include important views or vistas. The standard buffer shall consist of a landscaped strip at least 4
feet wide outside the perimeter of the compound.
ii. Where a site adjoins a residential property or public property, including streets, screening
suitable in type, size and quantity shall be required by the Town Council.
iii. The applicant shall demonstrate to the approving board that adequate measures have been
taken to screen and abate noise emanating from on-site equipment, including but not limited to
heating and ventilating units, air conditioners, and emergency power generators.
Telecommunications towers shall comply with all applicable sections of this chapter as it pertains
to noise control and abatement.
i. Utility Services Antennas.
i. If placed on another utility structure such as a water tower, the antenna shall be painted to
blend with the building or equipment it is placed on.
ii. If a separate tower structure is used, the design shall comply with the provisions in this
section.
18

j. Data-Only and Information Service Facilities. To the maximum extent permitted by federal and state
law, any wireless facility used exclusively for the provision of an information service, data collection,
telemetry, machine-to-machine communication, sensing, monitoring, or another service that does not
constitute a personal wireless service under 47 U.S.C. § 332(c)(7)(C) or a telecommunications service
protected by 47 U.S.C. § 253 shall be installed underground or flush with grad, including its antenna,
antenna equipment and accessory equipment, where technically feasible. An applicant seeking above-
ground installation shall demonstrate through clear and convincing technical evidence that
underground or flush-to-grade installation would prevent the facility from performing its intended
function and that the proposed above-ground installation is the least visually intrusive technically
feasible alternative.
Nothing in this subsection shall require underground placement to the extent the applicant
demonstrates that such requirement is expressly prohibited or preempted by applicable federal or
Arizona law.
4. Lighting. Towers shall not be artificially lighted, unless required by the FAA or other applicable
authority. If lighting is required, the lighting alternatives and design chosen must cause the least
disturbance to the surrounding views and, to the degree possible while complying with FAA requirements,
meet the standards set in Zoning Ordinance Chapter 8, Outdoor Lighting Control.
5. Measurement. For purposes of measurement, tower setbacks and separation distances shall be
calculated and applied to facilities located in the Town of Fountain Hills irrespective of municipal and
county jurisdictional boundaries.
6. Not Essential Services. Towers and antennas shall be regulated and permitted pursuant to this chapter
and shall not be regulated or permitted as essential services, public utilities, or private utilities.
7. Franchises. Owners and/or operators of towers or antennas shall certify that all franchises required by
law for the construction and/or operation of a wireless communication system in the Town of Fountain
Hills have been obtained and shall file a copy of all required franchises with the Community Development
Director.
8. Signs. No signs other than those required by law shall be allowed on an antenna or tower.
9. Co-location and Multiple Antenna/Tower Plan. The Town of Fountain Hills encourages tower and
antenna users to submit a single application for approval of multiple towers and/or antenna sites and to
submit applications, which utilize co-location with an existing wireless telecommunications provider.
Applications for approval of multiple sites or for co-location with an existing provider shall be given
priority in the review process.
10. Security fencing. PWSF shall be enclosed by security fencing not less than 6 feet in height and no
more than 8 feet in height, shall be constructed of a block or masonry, and shall be equipped with an
19

appropriate anti-climbing device; provided, however, that the Town Council may waive such
requirements, as it deems appropriate.
11. Noise. Submission of applications for towers and associated equipment placed above grade, including
backup generators or power supplies, shall include noise and acoustical information, prepared by a
qualified firm or individual, for the base transceiver station(s), equipment buildings, and associated
equipment such as air conditioning units and backup generators. The Town may require the applicant to
incorporate appropriate noise baffling materials and/or strategies to avoid any ambient noise from
equipment reasonably likely to exceed the applicable noise regulations contained in Section 11-1-7 of the
Town Code.
12. Arizona Licensed Engineer. Any information of an engineering nature that the applicant submits,
whether civil, mechanical, or electrical, shall be certified by an Arizona licensed professional engineer.
13. Verification by Town Engineer. Application approval issued under this chapter shall be conditioned
upon verification by the Town Engineer or designee that such tower structure is structurally sound. Such
verification shall be received by the applicant prior to submission.
14. Access and Parking. Areas sufficient for access to the tower and equipment location and for
temporary off-street parking of at least two vehicles shall be provided. The type and configuration of the
access and parking shall be subject to the standards set forth in Zoning Ordinance Chapter 7, Parking and
Loading Requirements.
15. Minimum Height of Antennas. All antennas shall be located such that:
a. Any person walking adjacent to the transmitting surface of the antenna will be walking on a grade
that is a minimum of eight and one-half (8.5) feet below the transmitting surface; and,
b. No person at ground level will be exposed to an exposure level that is higher than allowed by the
FCC’s general population exposure rules.
16. Fall Zone. Each new tower shall maintain a fall zone having a radius of not less than one hundred
twenty-five percent (125%) of the total height of the tower, measured from the base of the tower. The fall
zone of any tower, pole shall not overlap, in whole or in part, any portion of a public sidewalk, street,
alley, right-of-way, or occupied building.
B. Minimum Setbacks and Separations.
1. Setbacks From Property Lines. Except for utility service antennas, the following setback requirements
shall apply to all towers; provided, however, that the Town Council may reasonably reduce the standard
setback requirements if the goals of this chapter would be better served thereby:
a. Towers must be set back a distance equal to at least one hundred fifty percent (150%) of the height
of the tower from any adjoining lot line. For guyed towers, the required setback shall be measured
20

from the outermost guy wire anchor point, and shall additionally account for the manufacturer's or
structural engineer's certified guy-wire failure/whip radius. In no case shall a guy wire anchor, guy
wire, or its calculated failure radius be located within 500 feet of an occupied structure, public right-
of-way, or property line, whichever is more restrictive.
b. Accessory buildings must satisfy the minimum zoning district setback requirements.
2. Separations From Adjacent Uses. Except for utility service antennas, the following separation
requirements shall apply to all towers and antennas.
a. Separation From Residential Uses, Schools, and Daycare Centers.
i. Tower separation shall be measured from the base of the tower to the lot line of the residential
uses.
ii. Separation requirements for towers shall be 500 feet from any residentially zoned or used land
including mixed-use.
iii. Separation requirements for towers shall be 500 feet away from public or private K-12
schools and licensed daycare facilities unless an applicant establishes that a lesser setback is
necessary to close a significant gap in the applicant's personal communication service and the
proposed tower is the least intrusive means to do so.
The Town Council may reduce the standard separation requirements to 300’ if, through
information and data presented, the Council determines the goals of this chapter would be better
served thereby.
b. Separation Distances Between Towers. Separation distances between towers shall be applicable
for and measured between the proposed tower and pre-existing towers. The separation distances shall
be measured by drawing or following a straight line between the base of the existing tower and the
proposed base, pursuant to a site plan, of the proposed tower. The separation distances (listed in linear
feet) shall be as shown in Table 2.
Table 17.03 B. Separation Distances Between Towers
Monopole less than 65 ft. in
Monopole 65 ft. in Monopole less than 40
height but greater than 40 ft.
height or greater ft. in height
in height
Monopole 65 ft. in height or greater 2,500 feet 2,000 feet 1,000 feet
21

Monopole less than 65 ft. in
Monopole 65 ft. in Monopole less than 40
height but greater than 40 ft.
height or greater ft. in height
in height
Monopole less than 65 ft. in height but 2,000 feet 2,000 feet 1,500 feet
greater than 40 ft. in height
Monopole less than 40 ft. in height 1,000 feet 1,500 feet 1,000 feet
C. Buildings or Other Equipment Storage.
1. Antennas Mounted on Structures or Rooftops. The equipment cabinet or structure used in association
with antennas shall comply with the following:
a. Unless approved otherwise by the Town Council for good cause shown, but located in an
underground vault.
b. If located above ground:
i. The cabinet or structure shall not contain more than 120 square feet of gross floor area or be
more than 8 feet in height and shall be located on the ground.
ii. Equipment storage buildings or cabinets shall comply with all applicable building codes.
2. Antennas Mounted on Utility Poles, Light Poles, or Towers. The equipment cabinet or structure used in
association with antennas shall be located, unless otherwise approved by the Town Council in an
underground vault. If approved to be above ground, then in accordance with the following:
a. In residential districts, the equipment cabinet or structure may be located:
i. In a required front yard or required street side yard, provided the cabinet structure is no greater
than 3.5 feet in height and 20 square feet of gross floor area and the cabinet/structure is located a
minimum of 3 feet from all lot lines. The cabinet/structure shall be screened by sight obscuring
landscaping which obscures at least ninety-five percent (95%) of the structure at planting and
throughout the duration of the cabinet or structure’s existence with an ultimate height not to
exceed forty-two (42) inches.
ii. In a required rear yard, provided the cabinet or structure is no greater than 5 feet in height or
120 square feet in gross floor area. The cabinet/structure shall be screened by sight obscuring
landscaping which obscures at least ninety-five percent (95%) of the structure at planting and
throughout the duration of the cabinet or structure’s existence with an ultimate height of 6 feet.
22

iii. The entry or access side of a cabinet or structure shall be gated by a solid, sight-obscuring
gate that is separate from the cabinet or structure.
b. In commercial or industrial districts the equipment cabinet or structure shall be no greater than 14
feet in height or 300 square feet in gross floor area. The structure or cabinet shall be screened by sight-
obscuring landscaping with an ultimate height of 16 feet and a planted height of at least 6 feet. The
entry or access side of a cabinet or structure shall be gated by a solid, sight-obscuring gate that is
separate from the cabinet or structure. Such access way shall not face residentially zoned property.
3. Modification of Building Size Requirements. In the case of wireless facilities considered by the Town
Council, the requirements of subsections (C)(1) and (C)(2) of this section may be modified by the Town
Council to address site specific conditions and requirements.
4. Battery Safety. Any battery energy storage or backup power system installed in connection with a PSWF
shall utilize lithium ion phosphate (LiFePO4 or LPE) batteries, which are less prone to thermal runaway
and fire hazard. All battery systems shall comply with applicable fire, electrical, building, and product-
safety codes and standards.
D. Co-location.
1. Any new telecommunications tower shall be designed to accommodate future shared use by other
communications providers. Design considerations shall include sufficient area for additional ground
equipment, structural design of the tower, and sufficient electrical power available for the load of at least
two (2) additional wireless service providers.
2. Good Faith. Applicants and permittees shall cooperate and exercise good faith in co-locating wireless
telecommunications facilities on the same support structures or site, if the Town so requests. Good faith
shall include sharing technical information to evaluate the feasibility of co-location, and may include
negotiations for erection of a replacement support structure to accommodate co-location. A competitive
conflict to co-location or financial burden caused by sharing such information normally will not be
considered as an excuse to comply with this section.
3. Third Party Technical Review. In the event a dispute arises as to whether a permittee has exercised
good faith in accommodating other users, the Town may require the applicant to obtain a third-party
technical study at the applicant’s expense. The Town may review any information submitted by the
applicant and permittee(s) in determining whether good faith has been exercised.
4. Exceptions. No co-location may be required where the shared use would or does result in significant
interference in the broadcast or reception capabilities of the existing wireless telecommunications facilities
or failure of the existing wireless telecommunications facilities to meet federal standards for emissions.
5. Violation; penalty. Failure to comply with co-location requirements when feasible may result in denial
of a permit request or revocation of an existing permit. (24-08, Amended, 09/04/2024, Deleted and replaced)
23

Section 17.04 Application Types
A. Administrative. The following types of applications are processed administratively by staff:
1. Applications to change or modify an existing administratively approved wireless communication
facility that remains in compliance with all chapter requirements.
2. Applications to change or modify an existing wireless communication facility approved through public
review; provided, that the modification will not:
a. Increase the approved height of the supporting structure by more than ten percent (10%) or 20 feet,
whichever is greater;
b. Cause the original approved number of antennas to be exceeded by more than fifty percent (50%);
c. Increase the original approved square footage of accessory buildings by more than 200 square feet;
d. Add new, additional, or larger microwave antenna dishes;
e. Expand the footprint of said support structure; or
f. Potentially cause significant adverse impacts on the existing support structure or the surrounding
area.
3. Applications for co-location of additional antenna for an additional service provider on an existing
administratively approved tower that remains in compliance with all chapter requirements.
4. Applications for co-location of additional antenna for an additional service provider on an existing
tower approved through public review; provided, that the modification will not:
a. Increase the approved height of the supporting structure by more than ten percent (10%) or 20 feet,
whichever is greater;
b. Cause the original approved number of antennas to be exceeded by more than fifty percent (50%);
c. Increase the original approved square footage of accessory buildings by more than 200 square feet;
d. Add new, additional, or larger microwave antenna dishes;
e. Expand the footprint of said support structure; or
f. Potentially cause significant adverse impacts on the existing support structure or the surrounding
area.
5. Applications for new utility service antenna that comply with the height and setback requirements of
the zoning district in which they are located.
24

6. Applications for mobile or temporary wireless facilities for more than seven (7) consecutive days. An
application shall identify the proposed location, purpose, date of installation, anticipated duration of use,
maximum height, equipment to be installed, and measures necessary to ensure public and structural safety.
The permit shall specify the period during which the mobile or temporary tower or facility may remain at
the site, after which the Tower or Facility and all associated equipment shall be removed unless an
extension is approved by the Town. Application materials shall include upon submittal of:
a. Proof of event, emergency, or documented capacity need;
b. A site plan showing setback and fall zone compliance; and
c. Proof of general liability insurance per Section 17.06.G.1.
B. Public Review.
1. Any new tower or modification to existing towers or antennas that do not meet the requirements in
subsection (A) of this section for administrative review shall require review and approval as provided in
subsection 17.05 (C).
2. Any new tower not meeting the setback or separation requirements in Section 17.03(B).
Section 17.05 Application Submittal, Review, and Processing
A. General. Unless waived in writing by Zoning Administrator, the following provisions shall govern the
review of all wireless communication facility applications:
1. Complete Application. Applications for wireless communication facilities shall be filed electronically
on the Town’s website by an owner of real property and shall contain the area proposed for the wireless
communication facility using the process established by the Director for such applications. All such
applications shall include the information required in this section. Applications filed on behalf of the
property owner by a third party shall include a statement from the property owner authorizing the
submittal of the application.
2. Applications shall include documentation of compliance with items listed in Section 17.03(A) as
applicable to the application submitted.
3. Inventory of Existing Sites. Each applicant for a new tower or co-location of new antenna on an
existing tower shall provide to the Development Services Director an inventory of its existing towers,
antennas, or sites approved for towers or antennas, that are either within the jurisdiction of the Town of
Fountain Hills or within one (1) mile of the border thereof, including specific information about the
location, height, and design of each tower. Each applicant shall also provide a one (1) year build-out plan
for all other wireless communications facilities within the Town. The Development Services Director may
25

share such information with other applicants applying for administrative approvals or special use permits
under this chapter or with other organizations seeking to locate antennas within the jurisdiction of Town of
Fountain Hills; provided, however, that the Development Services Director is not, by sharing such
information, in any way representing or warranting that such sites are available or suitable.
4. Utility Service Antennas.
a. If the antenna complies with the height requirements of the underlying zoning district, the plans
for the antenna will be reviewed and approved with the overall site development plans if the site is
being developed concurrently. If the antenna is being added to an existing utility site, the plans will be
reviewed and processed consistent with the requirements of subsection (C)(2) of this section.
b. If the antenna does not comply with the height requirements of the underlying zoning district, the
plans for the antenna will be reviewed and processed consistent with the requirements of subsection
(C)(3) of this section.
5. A list of the full names and contact information for all applicants, co- applicants, facility owner(s),
facility operator(s), site developer(s), and wireless carrier(s), property owner(s) and other related third
parties and their agent(s), if any, on whose behalf the application is being submitted.
6. Proof of Authorization for Site Occupancy. Where an applicant is not the owner of the real property
upon which it seeks to install its equipment or facility, it shall submit proof of authorization to occupy the
site at issue.
If the applicant is leasing all or a portion of real property upon which it intends to install its facility or
equipment, then the applicant shall provide a written copy of its lease with the owner of such property.
The applicant may redact any financial terms contained within the lease, but it shall not redact any portion
of the lease which details the amount of area leased nor the specific portion of the real property to which
the applicant has obtained the right to occupy, access, or preclude others from entering.
Where an applicant seeks to Co-Locate new equipment into an existing facility, it shall provide a copy of
its written co-location agreement with the owner of such pre-existing facility, from which it may redact
any financial terms.
7. Fire Safety: The applicant shall submit a Fire Safety Plan that includes a general description of the
personal wireless services facility for purposes of ensuring the Fire Department is fully informed and
prepared in case of a fire. The Fire Safety Plan shall include:
a. Location of all Fire Safety Plan documents.
b. Location of the facility’s alarm panel.
c. List of emergency contacts.
26

d. Specific responsibilities assigned to designated personnel.
e. Location of signal-processing equipment.
f. Location and listing of types of power equipment, including rectifiers, inverters, distribution
cabinets, bus bars, cables, and communications raceways.
g. Listing and location of batteries, including description of quantities and types of batteries,
specifying whether batteries are lithium-ion, nickel cadmium, sodium-nickel, valve-regulated lead
acid, and/or vented, and description of any associated exhaust ventilation system(s).
h. Description of actions to detect and prevent thermal runaway events.
i. Description of whether the facility will be located in a lightning-prone area. If the facility is to be
located in a lightning-prone area, description of how the facility shall comply with NFPA 780
Standard for the Installation of Lightning Protection Systems;
j. Description of location and types of fuses used to ensure that if the wireless transmission facility
experiences overcurrent resulting from current exceeding the rating of equipment or the ampacity of a
conductor, the facility shall turn off temporarily.
k. Depowering procedures including identification of locations of electrical depowering devices,
which include:
i. Coded floor prints located in the Fire Safety Plan document;
ii. Facility signage to direct fire personnel to depowering locations;
iii. The method of turning off power to the following:
1) Alternating current power board. This is the primary source of electric power for a
telecommunications facility and is supplied by the local power company.
2) Standby power generator. This unit, usually a turbine or diesel generator, provides standby
ac power that is transferred manually or automatically whenever a loss of ac power is
experienced.
3) Direct current primary disconnect fuse or circuit breaker bay. This unit distributes dc
power to the secondary fuse or circuit breaker panels throughout the central office. The
secondary fuse or circuit breaker panels feed all the operating voltages to the central office
branch circuits.
4) Uninterruptible power supply (UPS)
5) HVAC systems serving the facility
27

6) Alternative energy devices, such as wind turbines, fuel cells, photovoltaic systems, or other
devices providing power to the facility.
l. Detailed electrical designs, signed and stamped by a licensed electrical engineer, demonstrating compliance
with the Building, Electric and Fire Code. The Code compliance demonstration shall include all necessary
underlying calculations and inputs, including but not limited to:
a. A short circuit and coordination study (“SCCS”) calculated pursuant to the IEEE 551-2006:
Recommended Practice for Calculating AC Short-Circuit Currents in Industrial and Commercial Power
Systems or the latest version of that standard. The study must demonstrate the protection devices will
ensure the equipment enclosure will not be breached. The SCCS must include analysis of Voltage
Transient Surges due to contact of conductors of different voltages;
b. A one-line diagram of the electrical system;
c. Voltage Drop & Load Flow Study;
d. Load Calculation;
e. Panel Directories;
8. Soil Erosion and Sedimentation Control: A soil erosion and sedimentation control plan, prepared in
accordance with the standards as established by the Town Engineering Division.
9. Engineer’s Report: For the construction of all new wireless facilities and to the extent not already
mandated herein, the applicant shall provide a report prepared and certified by a professional engineer
certifying the integrity and safety of all proposed new towers and/or structures and indicating the location,
type, and height of the proposed personal wireless services facility, antenna capacity, on-site and abutting
off-site land uses, means of access, setbacks from property lines, all applicable American National
Standards Institute (ANSI) technical and structural codes. To the extent that an application proposes the
co-location of new equipment onto an existing tower or personal wireless services facility, the applicant
shall provide an engineer's report certifying that the proposed shared use will not diminish the structural
integrity and safety of the existing structure and explaining what modifications, if any, will be required in
order to certify above.
10. Visual Impact Analysis. The applicant shall provide a completed visual impact analysis that shall
include the following:
a. A “Zone of Visibility Map” to determine locations from where the new facility will be seen.
b. A visual impact analysis which shall include photographic images taken from the perspectives of
the properties situated in closest proximity to the location being proposed for the siting of the facility,
as well as those properties which would reasonably be expected to sustain the most significant adverse
aesthetic impacts due to such factors as their close proximity to the site, their elevation relative to the
site, the existence or absence of a “clear line of sight” between the tower location and their location.
28

The photographic images shall depict the height at which the proposed facility shall stand when
completed, including all portions and proposed attachments to the facility, including, but not limited to, the
main support structure, all antennas, transmitters, whip antennas, lightning rods, t-bars, crossbars, and
cantilever attachments which shall, in whole or in part, be affixed to it, any and all surrounding equipment
compound(s), fencing, cellular equipment cabinets, transformers, transformer vaults and/or cabinets, sector
distribution boxes, ice bridges, backup generators, including but not limited to equipment boxes, switch
boxes, backup generators, ice bridges, etc., to the extent that any of such compound and/ or equipment will
be visible from properties other than the property upon which the proposed tower and compound are to be
installed.
The photographic images shall show the maximum silhouette, viewshed analysis, color and finish palette,
and proposed screening and landscaping. The analysis shall include the results of the drone/balloon test,
and other information as necessary to determine visual impact of the facility. The analysis shall include a
map depicting where the photos were taken. Where consistent with the natural or built environment, the
analysis shall include a native vegetation landscaping plan with a visual simulation of how the chosen
plants, at maturity, will screen the site.
11. For proposed towers and facilities taller than 100 feet, the applicant shall perform a balloon test and
shall publish reasonably advanced public notice of the same to enable the Reviewing Authority, property
owners, and the community an opportunity to assess the actual adverse aesthetic impact which the
proposed facility is likely to inflict upon the nearby properties and surrounding community. The balloon
test shall be conducted for not less than eight four consecutive hours between 7:00 a.m. and 6:00 p.m. The
primary test shall be conducted on a weekend. Said date and time will be established by the Development
Services Director in coordination with the applicant, including an alternative date in case of inclement
weather. If a balloon is used, the diameter shall be equal to the largest antenna or dish proposed for the
CRS tower or the width of the tower, whichever is larger. The applicant will be responsible for publishing
a public notice of the balloon test in at least one local newspaper publication and notifying abutters owning
property within one thousand (1,000) feet radius, via U.S. Mail at least one week prior to the test.
12. If the application is for a facility that will not be attached to an existing utility pole and the facility’s
proposed height will be greater than 30 feet then structural elevations of the facility(ies) shall include any
trees and other structures within twenty (20’) feet, and their height.
13. Environmental Assessment Form. A completed environmental assessment form (EAF) and a
completed visual EAF addendum if required by ADEQ.
14. FCC Compliance Report.
An FCC compliance report, prepared by a licensed engineer, and certified under penalties of perjury, that
the content thereof is true and accurate, wherein the licensed engineer shall certify that the proposed
facility will be FCC compliant as of the time of its installation, meaning that the facility will not expose
29

members of the general public to radiation levels that exceed the permissible radiation limits which the
FCC has set.
If it is anticipated that more than one carrier and/or user is to install transmitters into the facility, the FCC
compliance report shall take into account anticipated exposure from all users on the facility and shall
indicate whether or not the combined exposure levels will or will not exceed the permissible General
Population Exposure Limits, or alternatively, the occupational Exposure Limits, where applicable.
Such FCC Compliance Report shall provide the calculation or calculations with which the engineer
determined the levels of RF radiation and/or emissions to which the facility will expose members of the
general public.
On the cover page of the report, the report shall explicitly specify: (a) Whether the applicant and their
engineer are claiming that the applicable FCC limits based upon which they are claiming FCC compliance
are the General Population Exposure Limits or the Occupational Exposure Limits. If the applicant and/or
their engineer are asserting that the Occupational Exposure Limits apply to the proposed installation, they
shall detail a factual basis as to why they claim that the higher set of limits is applicable, (b) The exact
minimum distance factor, measured in feet, which the applicant’s engineer used to calculate the level of
radiation emissions to which the proposed facility will expose members of the general public. The
minimum distance factor is the closest distance (i.e., the minimum distance) to which a member of the
general public shall be able to gain access to the transmitting antennas mounted upon, or which shall be a
part of, the proposed facility.
15. FCC License. A copy of any applicable Federal Communications Commission license possessed by
any carrier named as an applicant, co-applicant, or whose equipment is proposed for installation as of the
time the application is being filed with the Town.
16. Effective Prohibition Claims.
a. The Town is aware that applicants seeking approvals for the installation of new wireless Facilities
often assert that federal law, and more specifically the TCA, prohibits the local government from
denying their respective applications.
In doing so, they assert that their desired facility is “necessary” to remedy one or more significant
gaps in a carrier’s personal wireless service, and they proffer computer-generated propagation maps to
establish the existence of such purported gaps.
The Town is additionally aware that, in December 2018, driven by a concern that propagation maps
created and submitted to the FCC by wireless carriers were inaccurate, the FCC caused its staff to
perform actual drive tests, wherein the FCC staff performed 24,649 tests, driving nearly ten thousand
(10,000) miles through twelve (12) states, with an additional 5,916 stationary tests conducted at 42
locations situated in nine (9) states.
30

At the conclusion of such testing, the FCC Staff determined that the accuracy of the propagation maps
submitted to the FCC by the wireless carriers had ranged from as little as 16.2% accuracy to a
maximum of 64.3% accuracy.
As a result, the FCC Staff recommended that the FCC no longer accept propagation maps from
wireless carriers without supporting drive test data to establish their accuracy. A copy of the FCC
Staff’s 66-page report is made a part of this Chapter as Appendix 1.
The Town considers it of critical import that applicants provide truthful, accurate, complete, and
sufficiently reliable data to enable the Town Council to render determinations upon applications for
new wireless facilities consistent with this Chapter’s requirements and the TCA’s statutory
requirements.
Consistent with same, if, at the time of filing an application under this Chapter, an applicant intends to
assert before the Town Council or the Town that: (a) an identified wireless carrier suffers from a
significant gap in its personal wireless services within the Town, (b) that the applicant’s proposed
installation is the least intrusive means of remedying such gap in services, and/or (c) that under the
circumstances pertaining to the application, a denial of the application by the Town Council would
constitute an “effective prohibition” under Section 47 U.S.C. §332 the TCA, then, at the time of filing
such application, the applicant shall be required to file a written statement which shall be entitled:
“Notice of Effective Prohibition Conditions”
If an applicant files a Notice of Effective Prohibition Conditions, then the applicant shall be required
to submit Probative Evidence to enable the Town Council to reasonably determine:
i. Whether or not the conditions alleged by the respective applicant exist,
ii. Whether there exists a significant gap or gaps in an identified wireless carrier’s personal
wireless services within the Town,
iii. The geographic locations of any such gaps, and
iv. The geographic boundaries of such gaps, to enable the Town Council to determine whether
granting the respective application would be consistent with the requirements of this Chapter and
the legislative intent behind same, and whether or not Federal law would require the Town
Council to grant the respective application, even if it would otherwise violate the Town Code,
including, but not limited to, this Chapter.
b. The additional materials which the applicant shall then be required to provide shall include the
following:
i. Drive Test Data and Maps. If, and to the extent that an applicant claims that a specific
wireless carrier suffers from a significant gap in its personal wireless services within the Town,
31

the applicant shall conduct or cause to be conducted a drive test within the specific geographic
areas within which the applicant is claiming such gap or gaps exist, for each frequency at which
the carrier provides personal wireless services. The applicant shall provide the Town and the
Town Council with the actual drive test data recorded during such drive test, in a simple format
which shall include, in table format:
1) The date and exact time of day for the test or tests,
2) The location, in longitude and latitude, of each point at which signal strength was recorded
and
3) Each signal strength recorded, measured in DBM, for each frequency. Such data is to be
provided in a separate table for each frequency at which the respective carrier provides
personal wireless services to any of its end-use customers.
4) The applicant shall also submit drive test maps depicting the actual signal strengths
recorded during the actual drive test for each frequency at which the carrier provides personal
wireless services to its end-use customers.
If an applicant claims that it needs a “minimum” signal strength (measured in DBM) to
remedy its gap or gaps in service, then for each frequency, the applicant shall provide three
(3) signal strength coverage maps reflecting actual signal strengths in three (3) DBM bins, the
first being at the alleged minimum signal strength, and two (2) additional three (3) DBM bin
maps depicting signal strengths immediately below the alleged minimum signal strength
claimed to be required.
By way of example, if the applicant claims that it needs a minimum signal strength of – 95
DBM to remedy its alleged gap in service, then the applicant shall provide maps depicting the
geographic area where the gap is alleged to exist, showing the carrier’s coverage at – 95 to -
98 DBM, -99 to -101 DBM, and -102 to -104 DBM, for each frequency at which the carrier
provides personal wireless services to its end-use customers.
ii. Denial of Service and/or Dropped Call Records. If and to the extent that an applicant claims
that a specific wireless carrier suffers from a capacity deficiency or a gap in service that renders
the carrier incapable of providing adequate coverage of its personal wireless services within the
Town, then the applicant shall provide dropped call records and denial of service records
evidencing the number and percentage of calls within which the carrier’s customers were unable
to initiate, maintain and conclude the use of the carrier’s personal wireless services without actual
loss of service, or interruption of service.
iii. The equipment and methodology used.
32

iv. A list of any concurrent special events, festivals, road closures, or unusual network conditions
occurring in the test area during the test period.
17. Estimate for Cost of Removal of Facility. At or prior to the filing of an application for a special use
permit for the installation of a new personal wireless service facility, each respective applicant shall
provide a written estimate for the cost of the decommissioning and removal of the facility, including all
equipment that comprises any portion or part of the facility, compound and/or complex, as well as any
accessory facility or structure, including the cost of the full restoration and reclamation of the site, to the
extent practicable, to its condition before development in accord with the decommissioning and
reclamation plan required herein. The Town Council’s Engineer shall review this estimate. A bond for the
cost of removal as required in Sec. 17.06 A. 2. shall be filed prior to commencement of construction.
18. Property Owner Consent & Liability Acknowledgement. A signed written consent from each owner of
the subject real property upon which the respective applicant is seeking installation of its proposed
personal wireless service facility, wherein the owner or owners both authorize the applicant to file and
pursue its application and acknowledge the potential landowner’s responsibility, under Section 17.08 for
engineering, legal and other consulting fees incurred by the Town.
19. Applications Using Existing Towers.
a. Dimensioned, to-scale drawings showing the existing and proposed antenna on the tower including
the height of the tower and the antennas.
b. The number and type of existing and proposed antennas.
c. Engineering calculations documenting the structural changes and certifying the tower’s ability to
carry the new antennas.
d. Dimensioned, to-scale drawings illustrating modification of ground equipment, if any.
20. Applications Using New Towers
In addition to any information required for applications for special use permits pursuant to Chapter 2,
Section 2.02, applicants for a new wireless facility shall submit the following information:
a. A site plan as required in Section 2.04 plus zoning, General Plan classification of the site and all
properties within the applicable separation distances set forth in Section 17.03(B)(1), adjacent
roadways, proposed means of access, elevation drawings of the proposed tower and any other
structures, photo simulations showing the tower in the proposed location from at least four (4)
directions, and other information deemed by the Development Services Director to be necessary to
assess compliance with this chapter.
b. The setback distance between the proposed tower and the nearest residential unit and residentially
zoned properties. Include an illustration of the fall zone for the tower.
33

c. The separation distance from other towers described in the inventory of existing sites submitted
pursuant to Section 17.03(B)(2) shall be shown on an updated site plan or map. The applicant shall
also identify the type of construction of the existing tower(s) and the owner/operator of the existing
tower(s), if known.
d. Method of fencing, and finished color and, if applicable, the method of camouflage and
illumination.
e. A description of compliance with Sections 17.03(A)(3), 17.03(A)(4), 17.03(A)(5), 17.03(A)(7),
17.03(A)(8), 17.03(A)(9), 17.03(A)(10), 17.03(A)(11), 17.03(B), subsection (A)(3) of this section,
Sections 17.06(A) and 17.06(B) and all applicable federal, state or local laws.
f. A notarized statement by the applicant as to whether construction of the tower will accommodate
collocation of additional antennas for future users.
g. Identification of the entities providing the backhaul network for the tower(s) described in the
application and other cellular sites owned or operated by the applicant in the municipality.
h. Alternatives Analysis. An itemized list of alternative sites considered, with a comprehensive
explanation of reasons alternative sites are not technologically feasible. Explanation shall include
specific comparative analysis of how different sites would impact aesthetic values, and other
environmental values.
i. A description of the feasible alternative location(s) of future towers or antennas within the Town of
Fountain Hills based upon existing physical, engineering, technological or geographical limitations in
the event the proposed tower is erected.
j. A statement of compliance with Federal Communications Commission (FCC) radio frequency
(RF) exposure standards.
k. A biological resource survey addressing potential impacts to locally present protected or sensitive
species, including but not limited to the Sonoran Desert Tortoise (Gopherus morafkai). The survey
shall include the following:
i. A proposed facility description including location, height of tower as measured from the
ground, description of associated equipment, width and length of access roads and driveways, and
length and right-of-way width of power and communication lines;
ii. Existing biological resources on-site including quantification of vegetation and habitat types,
color photo documentation of on-site and surrounding vegetation, a description of water
resources, potential habitat for federal and state-listed species, and sensitive species habitats;
iii. The results of any focused surveys for federally listed species (if required); and
34

iv. Impacts to biological resources including quantification of the habitat to be removed as a result
of the proposed facility.
The director may waive this requirement based on a finding that existing information verifies the lack
of such biological resources on the site.
21. Filing Fee. Payment of a filing fee in an amount established by a schedule adopted by resolution of
the Council and filed in the offices of the Town Clerk. No part of the filing fee shall be returnable.
B. Shot Clocks and Tolling. To comply with the requirements of Section 47 U.S.C. §332(c)(7)(B)(ii) of the
TCA, the following shot clock periods set forth hereinbelow shall be presumed to be reasonable periods within
which the Town shall render determinations upon applications for wireless communication facilities.
The Town shall render determinations upon such applications within the periods set forth hereinbelow, unless
the applicable shot clock period listed below is tolled, extended by agreement or the processing of the
application is delayed due to circumstances beyond the Town’s control.
1. Application Shot Clocks.
a. Receipt of Initial Application. Upon receipt of an application, the Development Services Director,
or designee, shall review the application for completeness. If the Director determines the application
is: (i) incomplete, (ii) missing required application materials, (iii) is the wrong type of application, or
(iv) is otherwise defective, then, within ten (10) days for administrative applications and thirty (30)
days for public hearing applications of the Town’s receipt of the application, the Director, or their
designee, shall notify the applicant of the finding and state what is needed to have a complete
application.
The notice of incompleteness shall toll the shot clock, which shall not thereafter resume running
unless and until the applicant tenders an additional submission to the Director to remedy the issues
identified in the notice of incomplete application. The submission of any responsive materials by the
applicant shall automatically cause the shot clock period to resume running.
If upon receipt of any additional materials from the applicant, the Director determines that the
application is still incomplete and/or defective, then the Director shall, once again notify the applicant
within ten (10) days for administrative applications and thirty (30) days for public hearing applications
of the applicant having filed its supplemental or corrected materials to the Town and the shot clock
shall once again be tolled, and the same procedure provided for hereinabove shall be repeated.
If Applicant does not cure the stated deficiencies within 30 days, the application shall be considered
withdrawn or closed.
35

b. Application Review. The shot clock for administrative applications is ninety (90) days. The shot
clock for applications with new towers, monopoles, utility poles and other wireless facilities that
trigger public review applications is one hundred fifty (150) days.
2. Shot Clock Tolls, Extensions and Reasonable Delay Periods. Consistent with the letter and intent of
Section 47 U.S.C. §332(c)(7)(B)(ii) of the TCA, each of the shot clock periods set forth within subsection
(B) of this section shall generally be presumed to be sufficient periods within which the Town shall render
decisions upon applications.
Notwithstanding the same, the applicable shot clock periods may be tolled, extended by mutual agreement
between any applicant and/or its representative and the Town, and the Town shall not be required to render
its determination within the shot clock period presumed to be reasonable for each type of application,
where the processing of such application is reasonably delayed, as described hereinbelow.
a. Tolling of the Applicable Shot Clock Due to Incompleteness and/or Applicant Error. As provided
for within subsection (B)(1) of this section, in the event that the Development Services Director deems
an application incomplete, the Director shall send a notice of incompleteness to the applicant to notify
the applicant that its application is incomplete and/or contains material errors, and shall reasonably
identify the missing information and/or documents and/or the error(s) in the application.
If the Director sends a notice of incompleteness as described hereinabove, the applicable shot clock
shall automatically be tolled, meaning that the applicable shot clock period within which the Town is
required to render a final decision upon the application shall immediately cease running, and shall not
resume running, unless and until the Town receives a responsive submission from the applicant.
If and when the applicant thereafter submits additional information in an effort to complete its
application, or cure any identified defect(s), then the shot clock shall automatically resume running,
but shall not be deemed to start running anew.
The applicable shot clock period shall, once again, be tolled if the Director thereafter provides a
second notice that the application is still incomplete or defective, despite any additional submissions
which have been received by the Town, from the applicant, up to that point.
b. Shot Clock Extension by Mutual Agreement. The Town shall be free to extend any applicable shot
clock period by mutual agreement with any respective applicant. This discretion on the part of the
Town shall include the Town’s authority to request, at any time, and for any period of time the Town
may deem reasonable or appropriate under the circumstances, consent from a respective applicant to
extend the applicable shot clock period to enable the Town, the applicant, or any relevant third party,
to complete any type of undertaking or task related to the review, analysis, processing, and
determination of the particular application, which is then pending before the Town, to the extent that
any such undertaking, task, or review is consistent with, or reasonably related to, compliance with any
36

federal, state, or local law and/or the requirements of any provision of the Town Code, including but
not limited to this chapter.
In response to any request by the Town, the applicant, by its principal, agent, attorney, site acquisition
agent, or other authorized representative, can consent to any extension of any applicable shot clock by
affirmatively indicating its consent either in writing or by affirmatively indicating its consent on the
record at any public hearing or public meeting. The Town shall be permitted to reasonably rely upon a
representative of the applicant indicating that they are authorized to grant such consent on behalf of
the respective applicant, on whose behalf they have been addressing the Town within the review
process.
c. Reasonable Delay Extensions of Shot Clock Periods. The Town recognizes that there may be
situations wherein, due to circumstances beyond the control of the Town and/or the Town Council, the
review and issuance of a final decision upon an application for a wireless communication facility
cannot reasonably be completed within the application shot clock periods delineated within subsection
(B) of this section.
If, despite the exercise of due diligence by the Town, the determination regarding a specific
application cannot reasonably be completed within the applicable shot clock period, the Town shall be
permitted to continue and complete its review and issue its determination at a date beyond the
expiration of the applicable period, if the delay of such final decision is due to circumstances
including, but not limited to, those enumerated hereinbelow, each of which shall serve as a reasonable
basis for a reasonable delay of the applicable shot clock period.
i. In the event that the rendering of a final decision upon an application under this chapter is
delayed due to natural and/or unnatural events and/or forces which are not within the control of
the Town, such as the unavoidable delays experienced in government processes due to the
COVID 19 pandemic, and/or mandatory compliance with any related federal or state government
orders issued in relation thereto, such delays shall constitute reasonable delays which shall be
recognized as acceptable grounds for extending the period for review and the rendering of final
determinations beyond the period allotted under the applicable shot clock.
ii. In the event that applicant tenders eleventh-hour submissions to the Town in the form of (a)
expert reports, (b) expert materials, and/or (c) materials which require a significant period for
review due either to their complexity or the sheer volume of materials which an applicant has
chosen to provide to the Town at such late point in the proceedings, the Town shall be afforded a
reasonable time to review such late-submitted materials.
If reasonably necessary, the Town shall be permitted to retain the services of an expert consultant
to review any late-submitted expert reports which were provided to the Town, even if such review
or services extend beyond the applicable shot clock period, so long as the Town completes such
review and retains and secures such expert services within a reasonable period of time thereafter
37

and otherwise acts with reasonable diligence in completing its review and rendering its final
decision.
C. Review and Processing of Applications.
1. Conformity to the following shall be considered in review of all applications:
a. The application is consistent with the objectives of this chapter.
b. The height of the proposed tower.
c. The adequacy of the proposed site, considering such factors as the sufficiency of the size of the
site to comply with the established criteria, the configuration of the site, and the extent to which the
site is formed by logical boundaries (e.g., topography, natural features, streets, relationship of adjacent
uses, etc.) that provide for the ability to comply with the provisions of this chapter.
d. The extent to which the proposal responds to the impact of the proposed development on adjacent
land uses, especially in terms of visual impact.
e. The extent to which the proposed telecommunications facility uses concealment elements.
f. The extent to which the proposed facility is integrated with existing structures (i.e., buildings,
signs, utility poles, etc.) with particular reference to design characteristics that have the effect of
reducing or eliminating visual obtrusiveness.
g. An applicant’s compliance with all Town requirements with respect to previous applications.
h. Whether the proposed installation will inflict a significant adverse impact upon the property values
of properties that are located adjacent to, or in close proximity to, the proposed site or properties that
are otherwise situated in a manner that would cause the proposed installation to inflict a significant
adverse impact upon their value.
i. Whether the proposed installation will be incompatible with the use and/or character of properties
located adjacent to or in close proximity to the proposed site or other properties situated in a manner
that would cause the proposed installation to be incompatible with their respective use.
j. Whether the proposed installation will be incompatible with and/or would have an adverse aesthetic
impact upon or detract from the use and enjoyment of, and/or character of, recognized aesthetic assets
of the Town, including, but not limited to, scenic areas and/or scenic ridgelines, scenic areas, public
parks, and/or any other traditionally or historically recognized valuable scenic assets of the Town.
k. Whether the proposed installation shall have a sufficient fall zone and/or safe zone around the
facility to afford the general public safety against the potential dangers of structural failure, icefall,
debris fall, and fire.
38

l. Whether the applicant has mitigated the potential adverse impacts of the proposed facility to the
greatest extent reasonably feasible. To determine mitigation efforts on the part of the applicant, the
mere fact that a less intrusive site, location, or design would cause an applicant to incur additional
expense is not a reasonable justification for an application to have failed to propose reasonable
mitigation measures.
2. Review of Administrative Applications.
a. Administrative applications will be reviewed by staff using the Town’s standard building permit
review processes.
b. Applications for mobile or temporary wireless facilities which remain in place for more than seven
(7) consecutive days must submit a request for a temporary use permit as provided in Section 2.03.
3. Review and Processing of Public Review Applications.
a. Applications which require public review and approval on private property will be processed as
special use permits and follow the requirements listed in Section 2.02 for special use permits.
Applications on Town-owned property will not require a special use permit but will follow the same
requirements for notice for review by the Town Council.
b. Factual Determinations.
To decide applications under this Section, the Town Council shall render factual determinations,
which shall include two (2) specific types of factual determinations, as applicable.
First, the Council shall render local zoning determinations according to Section i. hereinbelow.
Then, if, and only if, an applicant asserts claims that a denial of its application would effectively
prohibit an identified Wireless Carrier from providing Personal Wireless Services within the Town, or
its proposed wireless facility or installation is necessary to remedy a significant gap in personal
wireless services for an explicitly identified Wireless Carrier, and that its proposed installation is the
least intrusive means of remedying a specifically identified significant gap or gaps.
The Council shall then additionally render TCA determinations in accord with Section ii. herein
below.
The Council shall separately record each factual determination it makes in a written decision and shall
reference, or make note of, the evidence based upon which it rendered each of its factual
determinations.
Each factual determination made by the Council shall be based upon Substantial Evidence. For
purposes of this provision, “Substantial Evidence” shall mean such relevant evidence as a reasonable
39

mind might accept as adequate to support a conclusion. It means less than a preponderance but more
than a scintilla of evidence.
Evidence that the Council may consider shall include any evidence submitted in support of an
application and any evidence submitted by anyone opposing a respective application, whether such
evidence is in written or photographic form or whether it is in the form of testimony by any expert, or
any person who has personal knowledge of the subject of their testimony. The Council may, of course,
additionally consider as evidence any information or knowledge which they, themselves, personally
possess and any documents, records, or other evidence which is a matter of public record, irrespective
of whether such public record is a record of the Town, or is a record of or is maintained by, another
federal, state and/or other governmental entity and/or agency which maintains records which are
available for, or subject to, public review.
The requirements for specific factual determinations set forth below are intended to enure to the
benefit of the Town, its residents, and property owners, and not applicants.
If, and to the extent that the Town Council fails to render one or more of such determinations, that
omission shall not constitute grounds upon which the respective applicant can seek to annul, reverse
or modify any decision of the Town Council.
i Local Zoning Determination
The Council shall make the following factual determinations as to whether the application meets
the requirements for granting a special use permit under this Chapter.
(a) Compliance with Section 2.02
Whether the proposed installation will meet each of the conditions and standards set forth
within Section 2.02 in the absence of which the Town Council is not authorized to grant a
special use permit.
(b) Potential Adverse Aesthetic Impacts
Whether the proposed installation will inflict a significant adverse aesthetic impact upon
properties located adjacent to, or in close proximity to, the proposed site or any other
properties situated in a manner that would sustain significant adverse aesthetic impacts by the
installation of the proposed facility.
(c) Potential Adverse Impacts Upon Real Estate Values
Whether the proposed installation will inflict a significant adverse impact upon the property
values of properties that are located adjacent to, or in close proximity to, the proposed site or
properties that are otherwise situated in a manner that would cause the proposed installation
to inflict a significant adverse impact upon their value.
40

(d) Potential Adverse Impact Upon the Character of the Surrounding Community
Whether the proposed installation will be incompatible with the use and/or character of
properties located adjacent to or in close proximity to the proposed site or other properties
situated in a manner that would cause the proposed installation to be incompatible with their
respective use.
(e) Potential Adverse Impacts Upon Historic Properties or Historic Districts
Whether the proposed installation will be incompatible with and/or would have an adverse
impact upon, or detract from the use and enjoyment of, and/or character of a historic property,
historic site, and/or historic district, including, but not limited to, historic structures,
properties and/or districts which are listed on, or are eligible for listing on, the National
Register of Historic Places.
(f) Potential Adverse Impacts Upon Ridgelines or Other Aesthetic Resources of the
Town
Whether the proposed installation will be incompatible with and/or would have an adverse
aesthetic impact upon or detract from the use and enjoyment of, and/or character of,
recognized aesthetic assets of the Town, including, but not limited to, scenic areas and/or
scenic ridgelines, scenic areas, public parks, and/or any other traditionally or historically
recognized valuable scenic assets of the Town.
(g) Sufficient Fall Zones
Whether the proposed installation shall have a sufficient fall zone and/or safe zone around the
facility to afford the general public safety against the potential dangers of structural failure,
icefall, debris fall, and fire.
(h) Mitigation
Whether the applicant has mitigated the potential adverse impacts of the proposed facility to
the greatest extent reasonably feasible. To determine mitigation efforts on the part of the
applicant, the mere fact that a less intrusive site, location, or design would cause an applicant
to incur additional expense is not a reasonable justification for an application to have failed to
propose reasonable mitigation measures.
If, when applying the evidentiary standards set forth in Section 17.05 C. 3. b. i. hereinabove, the
Town Council determines that the proposed facility would not meet the standards set forth within
Section 2.02 or that the proposed facility would inflict one or more of the adverse impacts
described hereinabove to such a substantial extent that granting the respective application would
inflict upon the Town and/or its citizens and/or property owners the types of adverse impacts
41

which this provision was enacted to prevent, the Town Council shall deny the respective
application unless the Council additionally finds that a denial of the application would constitute
an Effective Prohibition, as provided for in Sections 17.05 C. 3. b. ii. and iii immediately
hereinbelow.
ii. TCA Determinations
In cases within which an applicant has filed a “Notice of Effective Prohibition Conditions,” the
Town Council shall determine if a denial of the respective application would “Effectively
Prohibit” a specifically identified Wireless Carrier from providing Personal Wireless Services
within any geographic area or areas in the Town.
More specifically, the Town Council shall determine whether a denial of the specific application
would either: (i) prevent an identified Wireless Carrier from providing personal wireless services
within a specific geographic area or areas within the Town or (ii) would prevent a specific
Wireless Carrier from constructing a sufficient number of such facilities necessary to enable it to
provide Personal Wireless Services within the Town.
In determining whether a denial of any specific application would constitute an “Effective
Prohibition,” the Town Council shall determine: (1) whether an applicant has established that an
identified Wireless Carrier suffers from one or more significant gaps in its Personal Wireless
Services, and (2) whether its proposed installation is the least intrusive means of remedying any
such gap or gaps.
(a) Significant Gap in Personal Wireless Services of an Identified Carrier
The Town Council shall determine whether the applicant has established, based upon
probative evidence provided by the applicant and/or its representative, that a specific Wireless
Carrier suffers from a significant gap in its personal wireless services within the Town.
In rendering such determination, the Council shall consider factors including, but not
necessarily limited to:
(1) Whether the identified Wireless Carrier, which is alleged to suffer from any
significant gap in their personal wireless services, already provides Adequate Service in
its Personal Wireless Services to its customers at any frequency being used by the carrier
to provide personal wireless services to its end-use customers,
(2) Whether any such alleged gap is relatively large or small in geographic size,
(3) Whether the number of the carrier’s customers affected by the gap is relatively small
or large,
42

(4) Whether or not the location of the gap is situated on a lightly traveled road, or
sparsely or densely occupied area, and/or
(5) Overall, whether the gap is relatively insignificant or otherwise relatively de minimis.
An Effective Prohibition shall not be found to exist under subparagraph (iii) hereinbelow if a
Wireless Carrier has adequate coverage in any specified geographic area, such that its end-use
customers can use their cellular telephones to connect to landlines using the Carrier’s
Personal Wireless Services, but the frequency at which the customers are using such services
is not the frequency most desired by the Carrier.
(b) Least Intrusive Means of Remedying Gap(s) in Service
The Town Council shall determine whether the applicant has established, based upon
probative evidence provided by the applicant and/or its representative, that the installation of
the proposed facility at the specific site proposed by the applicant and the specific portion of
the site proposed by the applicant, and at the specific height proposed by the applicant, is the
least intrusive means of remedying whatever significant gap or gaps which the applicant has
contemporaneously proven to exist as determined by the Town Council based upon any
evidence in support of, and/or in opposition to, the subject application.
In rendering such determination, the Council shall consider factors including, but not
necessarily limited to:
(1) Whether the proposed site is the least intrusive location at which a facility to remedy
an identified significant gap may be located, and the applicant has reasonably established
a lack of potential alternative less intrusive sites and lack of sites available for co-
location,
(2) Whether the specific location on the proposed portion of the selected site is the least
intrusive portion of the site for the proposed installation
(3) Whether the height proposed for the facility is the minimum height actually necessary
to remedy an established significant gap in service,
(4) Whether or not a pre-existing structure can be used to camouflage the facility and/or
its antennas,
(5) Whether or not, as proposed, the installation mitigates adverse impacts to the greatest
extent reasonably feasible through the employ of Stealth design, screening, use of color,
noise mitigation measures, etc., and/or
(6) Overall whether or not there is a feasible alternative to remedy the gap through
alternative, less intrusive substitute installations.
43

An Effective Prohibition shall also not be found to exist in subparagraph (iii) hereinbelow if an
applicant fails to establish before the Town Council that any existing geographic gap or capacity
deficiency in the specific Wireless Carrier’s coverage cannot be remedied through a less intrusive
means than what is being proposed, including, but not limited to, potential installations on
alternative less intrusive sites, a shorter tower or facility, the incorporation of a more stealthy
design, etc.
iii. Finding of Effective Prohibition or Lack of Effective Prohibition
After considering the evidence presented before it, the Town Council shall determine whether or
not a denial of the respective application would constitute an effective Prohibition.
If the Town Council affirmatively determines that the applicant has failed to establish either: (i)
that a denial of the application would prevent an identified Wireless Carrier from providing
personal wireless services within a specific geographic area or areas within the Town or (ii) that a
denial of the application would prevent a specific Wireless Carrier from constructing a sufficient
number of such facilities necessary to enable it to provide Personal Wireless Services within the
Town, then the Town Council shall find that a denial of the application does not constitute an
Effective Prohibition.
If the Town Council affirmatively determines that: (i) a denial of the application would prevent an
identified Wireless Carrier from providing personal wireless services within a specific geographic
area or areas within the Town, or (ii) that a denial of the application would prevent a specific
Wireless Carrier from constructing a sufficient number of such facilities necessary to enable it to
provide Personal Wireless Services within the Town, then the Town Council shall find that a
denial of the application would constitute an Effective Prohibition, and the Town Council shall
grant the subject application, irrespective of whether or not the granting of same would otherwise
be inconsistent with any other provision of this Section §17.05 C. 3. b. Provided, the Town
reserves the right to deny an application even if doing so leads to an effective prohibition to the
extent allowed by the safe harbors contained in 47 U.S.C. §§ 253(b) and (c) and incorporated into
332(c)(7)(B)(i), based on the evidence of record.
c. Availability of Suitable Existing Towers, Other Structures, or Alternative Technology. No new
tower shall be permitted unless the applicant demonstrates to the reasonable satisfaction of the Town
Council that no existing tower, structure or alternative technology that does not require the use of
towers or structures can accommodate the applicant’s proposed antenna. An applicant shall submit
information requested by the Town Council related to the availability of suitable existing towers, other
structures or alternative technology. Evidence submitted to demonstrate that no existing tower,
structure or alternative technology can accommodate the applicant’s proposed antenna may consist of
any of the following:
44

i. No existing towers or structures are located within the geographic area, which meet applicant’s
reasonable engineering and personal wireless service related quality requirements. This evidence
cannot be merely conclusory and must be supported by propagation maps that include the
underlying analysis models, engineering reports speaking to the technical infeasibility, dropped
call logs, and other data showing that a new tower is the only means of accommodating the
proposed antenna.
ii. Existing towers or structures are not of sufficient height to meet applicant’s engineering
requirements.
iii. Existing towers or structures do not have sufficient structural strength to support applicant’s
proposed antenna and related equipment.
iv. The applicant’s proposed antenna would cause electromagnetic interference with the antenna
on the existing towers or structures, or the antenna on the existing towers or structures would
cause interference with the applicant’s proposed antenna as certified by an RF engineer.
v. The fees, costs, or contractual provisions required by the owner in order to share an existing
tower or structure or to adapt an existing tower or structure for sharing are unreasonable. Costs
exceeding new tower development are presumed to be unreasonable.
vi. The applicant demonstrates that there are other limiting factors that render existing towers
and structures unsuitable.
vii. The applicant demonstrates that an alternative technology that does not require the use of
towers or structures, such as a cable micro cell network using multiple low-powered
transmitters/receivers attached to a wire line system, is unsuitable. Costs of alternative technology
that exceed new tower or antenna development shall not be presumed to render the technology
unsuitable.
d. Following approval by the Town Council, the applicant may apply for a building permit through the
standard application process. Construction shall not commence prior to approval of the building
permit.
4. Environmental Impacts
If, and to the extent that, the Town Council determines a proposed installation bears the potential for a
significant adverse impact upon the environment within the meaning of ADEQ and/or the NEPA to the
extent NEPA procedures apply to the project, then the Council shall be expected to comply with the
requirements of ADEQ in determining both:
a. The extent of adverse impacts upon the environment and/or historic properties; and,
45

b. What mitigation measures the applicant should be required to undertake to minimize the adverse
environmental impacts and/or impacts upon historic sites, structure and/or districts.
If a respective applicant fails to obtain a review from the ADEQ and/or NEPA and opinion letters from the
ADEQ and the FCC pertaining to its proposed installation prior to a first public hearing before the Town
Council for the respective application, then the Town Council may make direct requests to the ADEQ and
the FCC for their review of the application. The Town Council may request the FCC’s review and input in
completing the statutorily-required environmental impact analysis pursuant to ADEQ and NEPA.
In addition, the Town Council shall comply with the statutory requirements of ADEQ to complete an
ADEQ review, make determinations of significance, and, where appropriate, require the applicant to
complete a draft environmental impact statement and, if additionally appropriate, to thereafter complete a
final environmental impact statement and analysis.
So long as the Town Council acts with reasonable diligence in completing its ADEQ and NEPA review, if
compliance with the statutory requirements for environmental review requires a period of effort that
extends beyond the expiration of the applicable shot clock period, the delays beyond such period shall be
deemed reasonable.
5. Historic Site Impacts
The Town Council shall consider the potential adverse impacts of any proposed facility upon any historic
site, district, or structure consistent with the Town’s historic preservation law requirements and
comprehensive plan and ADEQ.
If, and to the extent that, the Town Council determines that a proposed installation bears the potential for a
significant adverse impact on a historic site or a historic district within the meaning of ADEQ and/or the
NHPA (especially if the historic site at issue is listed upon the National Register of historic places), then
the Council shall comply with the requirements of both ADEQ and Town law in determining both:
a. The extent of adverse impacts upon the historic properties, and
b. What mitigation measure might the applicant be required to undertake to minimize the adverse
environmental impacts and/or adverse impacts upon historic sites, structures and/or district.
Should a respective applicant fail to obtain a SHPO and/or a Section 106 review under NHPA, and opinion
letters from SHPO and the FCC pertaining to its proposed installation prior to a first public hearing before
the Town Council for the respective application, then the Town Council shall make direct requests to
SHPO and the FCC for their review of the application. They shall request SHPO and the FCC’s review
and input in completing the statutorily-required environmental/historic impact analysis pursuant to ADEQ
and NHPA.
46

This request shall include, but not be limited to, a request to the FCC for a Section 106 review, as defined
in this Chapter, as the Town recognizes each application for a special use permit for the installation of a
personal wireless services facility shall constitute “an undertaking” for purposes of compliance with the
National Historic Preservation Act.
In addition, the Town Council shall comply with the statutory requirements of ADEQ to complete a SEQ
ADEQ RA review, make determinations of significance, and, where appropriate, require the applicant to
complete a draft environmental impact statement, and if additionally appropriate, to thereafter complete a
final environmental impact statement and analysis.
So long as the Town Council acts with reasonable diligence in completing its ADEQ and NHPA review, if
compliance with the statutory requirements for historic preservation review requires a period of effort that
extends beyond the expiration of the applicable shot clock period, the delays beyond such period shall be
deemed reasonable.
6. Tribal Site Impacts
The Town Council shall consider the potential adverse impacts of any proposed facility upon any tribal
lands associated with the Fort McDowell Yavapai Nation and the Salt River Prima-Maricopa Indian
Community near or within the general area of Fountain Hills, Arizona. If, and to the extent that, the Town
Council determines that a proposed installation bears the potential for a significant adverse impact on such
tribal lands, then the Council shall issue notice to tribal representatives and request tribal review of the
application.
7. Force Majeure
In the event that the rendering of a final decision upon an application under this Chapter is delayed due to
natural and/or unnatural events and/or forces which are not within the control of the Town or the Town
Council, such as the unavoidable delays experienced in government processes due to the COVID 19
pandemic, and/or mandatory compliance with any related federal or state government orders issued in
relation thereto, such delays shall constitute reasonable delays which shall be recognized as acceptable
grounds for extending the period for review and the rendering of final determinations beyond the period
allotted under the applicable shot clock.
8. In granting a permit, the Town may impose conditions to the extent such conditions are necessary to
minimize any adverse effect of the proposed tower on adjoining properties.
Section 17.06 Maintenance and Operation
A. Removal of Abandoned Antennas and Towers; Bond Required.
47

1. Any antenna or tower that is not operated for a continuous period of ninety (90) days shall be deemed
abandoned. Within ninety (90) days of receipt of notice from the Town of Fountain Hills notifying the
owner of such abandonment, the owner of such antenna or tower shall completely remove the same and all
related equipment and improvements and shall restore all affected areas to a condition compliant with all
applicable laws, which includes without limitation the Code. Failure to remove an abandoned antenna or
tower within said ninety (90) day period shall be grounds to remove the tower or antenna at the owner’s
expense. The Town shall have the right (but not the obligation) to perform such removal and restoration
with or without notice. If there are two (2) or more users of a single tower, then this provision shall not
become effective until all users cease using the tower for the prescribed period.
2. Upon receiving a special use permit approval from the Town Council and a building permit, prior to
the commencement of installation and/or construction of such facility or any part thereof, the applicant
shall file with the Town a bond for a length of no less than three (3) years in an amount of the estimate of a
certified engineer of one-hundred twenty-five percent (125% )equal to or exceeding the estimate of the
cost of removal of the facility and all associated structures, fencing, power supply, and other
appurtenances connected with the facility. The bond must be provided within thirty (30) days of the
approval date and before any installation or construction begins.
Replacement bonds must be provided ninety (90) days prior to the expiration of any previous bond.
At any time the Town has good cause to question the sufficiency of the bond at the end of any three-year
(3) period, the owner and/or operator of the facility, upon request by the Town, shall provide an updated
estimate and bond in the appropriate amount.
Failure to keep the bonds in effect is cause for the removal of the facility at the owner's expense. Each
facility will require a separate bond, regardless of the number of owners or location.
B. State or Federal Requirements.
1. Compliance with state and federal requirements. All towers must meet or exceed current standards and
regulations of the FAA, the FCC, and any other agency of the state or federal government with the
authority to regulate towers and antennas. If such standards and regulations are changed, then the owners
of the towers and antennas governed by this chapter shall bring such towers and antennas into compliance
with such revised standards and regulations within six (6) months of the effective date of such standards
and regulations, unless a different compliance schedule is mandated by the controlling state or federal
agency. Failure to bring towers and antennas into compliance with such revised standards and regulations
shall constitute grounds for the removal of the tower or antenna at the owner’s expense.
2. Prohibition against illegally excessive emissions and RF testing.
As disclosed on the FCC’s public internet website, personal wireless services facilities erected at any
height under 200 feet are not required to be registered with the FCC.
48

Of even greater potential concern to the Town is the fact that the FCC does not enforce the RF radiation
limits codified within the CFR by either: (a) testing the actual radiation emissions of wireless Facilities
either at the time of their installation or at any time thereafter, or (b) requiring their owners to test them.
See relevant excerpts from the FCC’s public internet website annexed as Appendix 2.
This means that when wireless Facilities are constructed and operated within the Town, the FCC will have
no idea where they are located and no means of determining, much less ensuring, that they are not
exposing residents within the Town and/or the general public to Illegally Excessive levels of RF
Radiation.
The Town deems it to be of critical importance to the health, safety, and welfare of the Town, its residents,
and the public at large that personal wireless service facilities do not expose members of the general public
to levels of RF radiation that exceed the limits which have been deemed safe by the FCC, and/or are
imposed under CFR. The FCC has recognized that 47 U.S.C. § 332(c)(7)(B)(iv) permits state and local
governments, when making decisions on the placement, construction, and modification of personal
wireless service facilities, to consider whether such facilities comply with the Commission's regulations
concerning RF emissions. In re Human Exposure to Radiofrequency Electromagnetic Fields et al., 34 FCC
Rcd 11687, 11739, ¶114 (2019).
In accord with the same, the Town enacts the following RF Radiation testing requirements and provisions
set forth herein below.
No wireless telecommunications facility shall at any time be permitted to emit illegally excessive RF
Radiation as defined in §17-2 or to produce power densities that exceed the legally permissible limits for
electric and magnetic field strength and power density for transmitters, as codified within 47 CFR
§1.1310(e)(1), Table 1 Sections (i) and (ii), as made applicable pursuant to 47 CFR §1.1310(e)(3) unless
the operator implements and retains responsibility for ongoing effectiveness of the mitigation actions
contained in 47 C.F.R. §1.1307(b)(4).
To ensure continuing compliance with such limits by all owners and/or operators of wireless
communication facilities within the Town, all owners, and operators of wireless communication facilities
shall submit reports as required by this section.
As set forth hereinbelow, the Town may additionally require, at the owner and/or operator’s expense,
independent verification of the results of any analysis set forth within any reports submitted to the Town
by the owner and/or operator.
If an operator of a personal wireless service facility fails to supply the required reports or fails to correct a
violation of the legally permissible limits described hereinabove, following notification that their
respective facility is believed to be exceeding such limits, any special use permit or other zoning approval
granted by the Town Council or any other body or representative of the Town is subject to modification or
revocation by the Town Council following a public hearing.
49

a. Certification of Compliance with Applicable RF Radiation Limits. Within forty-five (45) days of
initial operation or a substantial modification of a wireless communication facility, the owner and/or
operator of each telecommunications antenna shall submit to the Development Services Director a
written certification by a licensed professional engineer, sworn to under penalties of perjury, that the
facility’s radio frequency emissions comply with the limits codified within 47 CFR §1.1310(e)(1),
Table 1 Sections (i) and (ii), as made applicable pursuant to 47 CFR §1.1310(e)(3).
The engineer shall also measure the emissions of the approved wireless facility, including the
cumulative impact from other nearby wireless facilities, and determine if such emissions are within
the limits described hereinabove.
A report of these measurements and the engineer’s findings with respect to compliance with the
FCC’s maximum permissible exposure (MPE) limits shall be submitted to the Development Services
Director.
If the report shows that the facility does not comply with applicable limits, then the owner and/or
operator shall cease operation of the facility until the facility is brought into compliance with such
limits. Proof of compliance shall be a certification provided by the engineer who prepared the original
report. The Town may require, at the applicant’s expense, independent verification of the results of the
analysis.
b. Random RF Radiofrequency Testing. At the operator’s expense, the Town may retain an engineer
to conduct random unannounced RF radiation testing of such wireless facilities to ensure the facility’s
compliance with the limits codified within 47 CFR §1.1310(e)(1) et seq.
The Town may cause such random testing to be conducted as often as the Town may deem
appropriate. However, the Town may not require the owner and/or operator to pay for more than one
(1) test per facility per calendar year unless such testing reveals that one (1) or more of the owner
and/or operator’s facilities are exceeding the limits codified within 47 CFR §1.1310(e)(1) et seq., in
which case the Town shall be permitted to demand that the wireless facility be brought into
compliance with such limits, and to conduct additional tests to determine if, and when, the owner
and/or operator thereafter brings the respective wireless facility and/or facilities into compliance.
If the Town at any time finds that there is good cause to believe that a personal wireless service
facility and/or one or more of its antennas are emitting RF radiation at levels in excess of the legal
limits permitted under 47 CFR §1.1310(e)(1) et seq., then the Town shall provide written notice to the
owner and/or operator identifying the noncompliance and the corrective action required. Except where
the violation presents an immediate threat to public safety, the owner or operator shall be afforded a
reasonable period, not to exceed thirty (30) days, to cure the violation or demonstrate compliance. If
the violation has not been cured within the prescribed period, a hearing shall be scheduled before the
Town Council at which the owner and/or operator of such facility shall be required to show cause why
50

any and all permits and/or approvals issued by the Town for such facility and/or facilities should not
be revoked, and a fine should not be assessed against such owner and/or operator.
Such hearing shall be duly noticed to both the public and the owner and/or operator of the respective
facility or facilities at issue. The owner and/or operator shall be afforded not less than two (2) weeks'
written notice by first-class mail to its Notice Address.
At such hearing, the burden shall be on the Town to show that, by a preponderance of the evidence,
the Facilities emissions exceeded the permissible limits under 47 CFR §1.1310(e)(1) et seq.
In the event that the Town establishes same, the owner and/or operator shall then be required to
establish, by clear and convincing evidence, that a malfunction of equipment caused their failure to
comply with the applicable limits through no fault on the part of the owner/operator.
If the owner and/or operator fails to establish same, the Town Council shall have the power to and
shall revoke any special use permit, variance, building permit, and/or any other form of zoning-related
approval(s) which the Town Council, Board of Adjustment, Town Engineer and/or any other
representative of the Town may have then issued to the owner and/or operator, for the respective
facility.
In addition, the Town may issue a civil citation of not less than $1,000, nor more than $5,000 for such
violation of subparagraph 1. hereinabove, or, in the case of a second offense within less than five (5)
years, a minimum fine of $5,000, nor more than $25,000.
In the event that an owner or operator of one or more personal wireless service facilities is found to
violate subparagraph 1. hereinabove three or more times within any five (5) year period, then in
addition to revoking any zoning approvals for the facilities which were violating the limits codified in
47 CFR §1.1310(e)(1) et seq., the Town Council shall render a determination within which it shall
deem the owner/operator prohibited from filing any applications for any new wireless personal
services facilities within the Town for a period of five (5) years.
c. Annual Testing. The owner or operator of all PWSF shall provide for and conduct an inspection of
radio frequency radiation at least once annually by a licensed radio frequency engineer. Three copies
of a report shall be provided to the Development Services Department, verifying that the radio
frequency radiation is in compliance with FCC Guidelines.
3. Actions for Noncompliance. If the Town at any time finds that there is good cause to believe that a
wireless communication facility and/or one (1) or more of its antennas are emitting RF radiation at levels
in excess of the legal limits permitted under 47 CFR §1.1310(e)(1) et seq., the Town shall provide written
notice to the owner and/or operator identifying the noncompliance and the corrective action required.
Except where the violation presents an immediate threat to public safety, the owner or operator shall be
afforded a reasonable period, not to exceed thirty (30) days, to cure the violation or demonstrate
compliance. If the violation has not been cured within the prescribed period, then a hearing shall be
51

scheduled before the Town’s Zoning Administrator at which the owner and/or operator of such facility
shall be required to show cause why any and all permits and/or approvals issued by the Town for such
facility and/or facilities should not be revoked, and a fine should not be assessed against such owner
and/or operator.
The owner and/or operator shall be afforded not less than two (2) weeks’ written notice of the hearing.
At such hearing, the burden shall be on the Town to show that, by a preponderance of the evidence, the
facilities emissions exceeded the permissible limits under 47 CFR §1.1310(e)(1) et seq.
In the event that the Town establishes same, the owner and/or operator shall then be required to establish,
by clear and convincing evidence, that a malfunction of equipment caused their failure to comply with the
applicable limits through no fault on the part of the owner/operator.
If the owner and/or operator fails to establish same, the Town shall have the power to revoke any permit,
building permit, and/or any other form of approval(s) which the Town Council or any other representative
of the Town may have then issued to the owner and/or operator, for the respective facility. The Zoning
Administrator may revoke an administrative approval. The decision of the Zoning Administrator may be
appealed to the Town Manager. If the tower or antenna was approved by the Town Council, revocation
will be considered by the Town Council in the same manner as the original approval.
In addition, the Town may issue a civil citation for noncompliance as provided in Section 1-8-3 of the
Town Code.
In the event that an owner or operator of one (1) or more wireless communication facility is found to
violate subsection (B)(1) of this section three (3) or more times within any five (5) year period, then in
addition to revoking any zoning approvals for the facilities which were violating the limits codified in 47
CFR §1.1310(e)(1) et seq., the Town Council shall render a determination within which it shall deem the
owner/operator prohibited from filing any applications for any new wireless personal services facilities
within the Town for a period of five (5) years.
C. Building Codes; Safety Standards. To ensure the structural integrity of towers, the owner of a tower shall
ensure that it is maintained in compliance with standards contained in applicable state or local building codes
and the applicable standards for towers that are published by the Electronic Industries Association, as amended
from time to time. If, upon inspection, the Town of Fountain Hills concludes that a tower fails to comply with
such codes and standards and constitutes a danger to persons or property, then upon notice being provided to
the owner of the tower, the owner shall have thirty (30) days to bring such tower into compliance with such
standards. Failure to bring such tower into compliance within said thirty (30) days shall constitute grounds for
the removal of the tower or antenna at the owner’s expense.
D. Noise. Wireless facilities and all related equipment must comply with all noise regulations and shall not
exceed such regulations, either individually or collectively. Backup generators shall only be operated during
power outages and/or for testing and maintenance purposes between the hours of 9:00 a.m. and 4:00 p.m.
52

E. Maintenance. Prior to scheduling a final inspection for construction of a tower and associated equipment,
the applicant shall file with the Town a bond in the amount of the estimate of a certified engineer of one-
hundred twenty-five percent (125% ) of the maintenance, equipment, and landscaping to cover the ongoing
maintenance of the tower, equipment, and landscaping. The bond amount shall be reviewed and revised every
three years thereafter. Should the owner of the tower, equipment, and/or landscaping fail to maintain said
facilities consistent with the Town’s approval and ordinance requirements, and after notice for correction by
the Town, the Town may call and utilize the bonds to perform the needed maintenance activities.
F. Maintenance Contact Information. Each permittee of a wireless telecommunications facility shall provide
the director with the name, address and 24-hour local or toll-free contact phone number of the permittee, the
owner, the operator and the agent responsible for the maintenance of the facility ("contact information"). The
contact information for the agent responsible for the maintenance of the facility must include at least one
natural person authorized to respond to maintenance and emergency matters concerning the facility. Contact
information shall be updated within seven (7) days of any change.
G. Indemnity and liability for damages.
1. The wireless telecommunications facility provider shall defend, indemnify, and hold harmless the Town
or any of its boards, commissions, agents, officers, and employees from any claim, action or proceeding
against the Town, its boards, commission, agents, officers, or employees to attack, set aside, void, or
annul, the approval of the project when such claim or action is brought within the time period provided for
in applicable state and/or local statues. The Town shall promptly notify the provider(s) of any such claim,
action or proceeding if the Town bears its own attorney's fees and costs, and the Town defends the action
in good faith.
2. Wireless telecommunications facility operators shall be strictly liable for interference caused by their
facilities with Town communications systems. The operator shall be responsible for costs for determining
the source of the interference, all costs associated with eliminating the interference (including but not
limited to filtering, installing cavities, installing directional antennas, powering down systems, and
engineering analysis), and all costs arising from third party claims against the Town attributable to the
interference.
H. Certificate of Insurance required. The applicant shall maintain adequate and sufficient liability insurance
during the construction period and thereafter, the carrier shall maintain liability insurance, issued by an insured
authorized to do business in the State of Arizona meeting the criteria of this section throughout the life of any
PWSF erected within the Town of Fountain Hills, at least as broad as follows:
1. Commercial General Liability Insurance. The permittee shall procure and maintain at its expense or
cause its contractor or subcontractor to procure and maintain throughout the term of this permit,
commercial General Liability ("CGL") insurance on an "occurrence" basis, with limits not less than
$2,000,000 per occurrence per wireless carrier or $4,000,000 per wireless carrier in the aggregate. If a
general aggregate limit applies, either the general aggregate limit shall apply separately to this project
53

location or the general aggregate limit shall be twice the required occurrence limit. CGL insurance
must include coverage for the following: Bodily Injury and Property Damage; Personal
Injury/Advertising Injury; Premises/Operations Liability; Products/Completed Operations Liability;
Aggregate Limits that Apply per Project; Explosion, Collapse and Underground ("UCX") exclusion
deleted; Contractual Liability with respect to the permit; Broad Form Property Damage; and
Independent Consultants Coverage. The policy shall contain no endorsements or provisions limiting
coverage for (i) contractual liability; (ii) cross liability exclusion for claims or suits by one insured
against another; (iii) products/completed operations liability; (iv) bodily injury or damage from RF
exposure at levels exceeding the FCC limits; or (v) contain any other exclusion contrary to the
conditions in this permit.
2. Environmental Pollution Liability Insurance. The permittee shall procure and maintain at its
expense or cause its contractor or subcontractor to procure and maintain throughout the term of this
permit, Contractors Pollution Liability Insurance including contractual liability coverage to cover
liability and legal expenses arising out of cleanup, removal, storage, or handling of hazardous or toxic
chemicals, materials, substances, or any other pollutants by the permittee or any subcontractor
resulting from pollution conditions associated with the personal wireless services facility in an amount
not less than $1,000,000 each occurrence combined single limit for bodily injury and property
damage.
3. Umbrella Policy. If an umbrella or excess liability insurance policy is used to satisfy the minimum
requirements for insurance coverage listed above, the umbrella or excess liability policies shall
provide coverage at least as broad as specified for the underlying coverages and covering those
insured in the underlying policies. Coverage shall be "pay on behalf," with defense costs payable in
addition to policy limits. Permittee shall provide a "follow form" endorsement or schedule of
underlying coverage satisfactory to the Town indicating that such coverage is subject to the same
terms and conditions as the underlying liability policy.
4. Endorsements. The relevant policy(ies) shall name the Town, its elected/appointed officials,
commission members, officers, representatives, agents, volunteers and employees as additional
insureds. The permittee shall use its best efforts to provide thirty (30) days' prior notice to the Town of
the cancellation or material modification of any applicable insurance policy.
5. Verification of Coverage. Permittee shall furnish the Development Services Department with
original certificates and amendatory endorsements or copies of the applicable policy language
providing the insurance coverage required herein. All certificates and endorsements are to be received
and approved by the Development Services Department before any work commences. However,
failure to obtain required documents prior to the work beginning shall not waive the Licensee's
obligation to provide them. Permittee shall furnish updated certificates and endorsements to the Town
annually. The Town reserves the right to require updated certificates and endorsements or complete,
54

certified copies of all required insurance policies, including the endorsements required herein, at any
time.
6. Permittee Has Full Liability: The permittee shall assume full liability for damage or injury caused to
any property or person by the personal wireless services facility.
7. Permittee shall provide an executed agreement, pursuant to which Permittee and any related third
parties agree to defend, hold harmless and fully indemnify the Town, its officers, employees, agents,
attorneys, and volunteers, from (i) any claim, action or proceeding brought against the Town or its
officers, employees, agents, or attorneys to attack, set aside, void, or annul any such approval of the
Town or (ii) a successful legal action brought against the Town for loss of property value or other
harm caused by the placement or operation of a small cell installation. Such indemnification shall
include damages, judgments, settlements, penalties, fines, defensive costs or expenses, including, but
not limited to, interest, attorneys’ fees and expert witness fees, or liability of any kind related to or
arising from such claim, action, or proceeding whether incurred by the Permittee, the Town and/or the
parties initiating or bringing such proceeding. The agreement shall also include a provision obligating
the Permittee to indemnify the Town for all of the Town’s costs, fees and damages which the Town
incurs in enforcing the indemnification provisions of this Section.
All insurance required under this Chapter shall be issued by an insurer holding a current A.M. Best rating of
A- or better, that is not an affiliate, subsidiary, or captive insurance entity of the applicant, permittee, or any
parent or related company thereof. Self-insurance and insurance issued by a special-purpose or single-
project entity created by the applicant shall not satisfy this requirement. The Town reserves the right to
request and independently verify the insurer's rating and independence prior to permit issuance and at each
renewal.
I. ADA Accommodations. The Town seeks to comply with the Americans With Disabilities Act, and shall
comply with same in the event that any person who is disabled within the meaning of the Act seeks a
reasonable accommodation, to the extent they are entitled to same under the Act.
J. Decommissioning and Reclamation Plan shall include the following information:
1. A plan for disposal of all solid waste, special waste and hazardous waste in accordance with local,
state, and federal waste disposal regulations detailing the types and quantities of waste materials and
methods of disposal;
2. A description of how and on what schedule stabilization and re-vegetation of the site as deemed
necessary to minimize erosion will be accomplished. Permittee should include, to the extent possible,
restoration of native vegetation, and pollinator-friendly seed mixtures shall be used to the maximum
extent possible in re-vegetation of ground cover;
55

3. An estimate of costs for the decommissioning of the personal wireless services facility with a
detailed description of how the estimated costs were derived, including the date which was the basis
for the estimate;
4. A decommissioning plan signed by the party responsible for decommissioning and the landowner
(if different) whose minimum requirements meet the standards of this Ordinance. Such plan must be
filed in the Town Office prior to the first operation of the personal wireless services facility;
5. An estimate of the total cost of decommissioning value of the equipment and itemization of the
estimated major expenses, including the projected costs of measures taken to minimize or prevent
adverse effects on the environment during the implementation of the decommissioning plan.
Section 17.07 Nonconforming Uses
A. Not Expansion of Nonconforming Use. Towers that are constructed, and antennas that are installed, in
accordance with the provisions of this chapter shall not be deemed to constitute the expansion of a
nonconforming use or structure.
B. Pre-existing Towers. Pre-existing towers shall be allowed to continue their usage as they presently exist.
Routine maintenance (including replacement with a new tower of like construction and height) shall be
permitted on such pre-existing towers. New construction other than routine maintenance on a pre-existing
tower shall comply with the requirements of this chapter.
C. Rebuilding Damaged or Destroyed Nonconforming Towers or Antennas. Notwithstanding other provisions
of this chapter, bona fide nonconforming towers or antennas that are damaged or destroyed may be rebuilt
without having to first obtain a special use permit and without having to meet the separation requirements
specified in Section 17.03. The type, height, and location of the tower on site shall be of the same type and
intensity as the original facility approval; provided, however, that any destroyed lattice or guyed tower shall be
replaced with a monopole structure only. Building permits to rebuild the facility shall comply with the then
applicable building codes and shall be obtained within ninety (90) days from the date the facility is damaged or
destroyed. If no permit is obtained or if said permit expires, the tower or antenna shall be deemed abandoned
as specified in Section 17.06(A).
Section 17.08 Retention of Consultants
A. Use of Consultants. Where deemed reasonably necessary by the Town Council and/or the Town, the Town
Council and/or the Town may retain the services of professional consultants to assist the Town in carrying out
its duties in review and approval of personal wireless service facilities. Where the Town Council uses the
services of private engineers, attorneys, or other consultants for purposes of engineering, scientific, land use
planning, environmental, legal, or similar professional reviews of the adequacy or substantive aspects of
applications or of issues raised during the course of review of applications for special use permit approvals of
56

personal wireless service facilities, the applicant and landowner, if different, shall be jointly and severally
responsible for payment of all the reasonable and necessary costs incurred by the Town for such services. That
responsibility shall not exceed the actual cost to the Town of such engineering, legal, or other consulting
services.
B. Advance Deposits for Consultant Costs. The Town and/or Town Council may require advance periodic
monetary deposits held by the Town on account of the applicant or landowner to secure the reimbursement of
the Town's consultant expenses. The Town Council shall establish policies and procedures for the fixing of
deposits and the management of payment from them. After the review and approval of itemized invoices by
the Development Services Director, or designee, as to the reasonableness and necessity of the consultant
charges, the Town may make payments from the deposited monies for engineering, legal, or consultant
services. Upon receiving a request by the applicant or landowner, the Town shall supply copies of such
invoices to the applicant and/or landowner reasonably in advance of review and approval, appropriately
redacted where necessary to shield legally privileged communications between Town officers or employees
and the Town's consultant. When it appears that the remaining deposit held for the applicant or landowner by
the Town may be insufficient to pay current or anticipated invoices, the Town shall cause the applicant or
landowner to deposit additional monies to meet such expenses or anticipated expenses in accordance with
policies and procedures established by the Town Council. Consultants shall undertake no review on any matter
scheduled before the Town until the initial deposit has been made or requested replenishment of the deposit
has been made. No reviewing agency shall be obligated to proceed unless the applicant complies with deposit
requirements.
C. Reasonable Limit Upon Consultant Expenses. A consultant expense or part thereof is reasonable in amount
if it bears a reasonable relationship to the customary fee charged by engineers, attorneys, or planners within the
region for services performed on behalf of applicants or reviewing boards in connection with comparable
applications for land use or development.
The Town may also take into account any special conditions for consideration as it may deem relevant,
including but not limited to the quality and timeliness of submissions on behalf of the applicant and the
cooperation of the applicant and agents during the review process.
A consultant expense or part thereof is necessarily incurred if it was charged by the engineer, attorney or
planner, or other consultants for a service that was rendered to assist the Town in: (a) making factual
determinations consistent with the goals of protecting or promoting of the health, safety or welfare of the Town
or its residents; (b) assessing potential adverse environmental impacts such as those identified within an
ADEQ process; (c) accessing potential adverse impacts to historic properties, structures and/or districts, and/or
(d) assessing and determining factual issues relevant to Effective Prohibition claims, as addressed herein,
enabling the Council to best comply with the letter and intent of the provision of the TCA which is relevant
thereto.
D. Audits Upon the Request of an Applicant. Upon request of the applicant or landowner, the Town Council
shall review all invoices and determine whether such engineering, legal, and consulting expenses are
57

reasonable in amount and necessarily incurred by the Town in connection with the review and consideration of
an application for personal wireless service facility. In the event of such a request, the applicant or landowner
shall be entitled to be heard by the Town Council on reasonable advance notice.
E. Liability for Consultant Expenses. For a land-use application to be complete, the applicant shall provide the
written consent of all owners of the subject real property, both authorizing the applicant to file and pursue land
development proposals and acknowledging potential landowner responsibility, under this section, for
engineering, legal, and other consulting fees incurred by the Town. If different from the applicant, the owner(s)
of the subject real property shall be jointly and severally responsible for reimbursing the Town for funds
expended to compensate services rendered to the Town under this section by private engineers, attorneys, or
other consultants. The applicant and the owner shall remain responsible for reimbursing the Town for its
consulting expenses, notwithstanding that the deposit account may be insufficient to cover such expenses. No
building permit or other permit shall be issued until reimbursement of costs and expenses determined by the
Town to be due. In the event of failure to reimburse the Town for such fees, the following shall apply:
The Town may seek recovery of unreimbursed engineering, legal, and consulting fees by court action in an
appropriate jurisdiction, and the defendant(s) shall be responsible for the reasonable and necessary attorney's
fees expended by the Town in prosecuting such action.
Alternatively, and at the sole discretion of the Town, a default in reimbursement of such engineering, legal,
and consulting fees expended by the Town shall be remedied by charging such sums against the real property
that is the subject of the application by adding that charge to and making it a part of the next annual real
property tax assessment roll of the Town. Such charges shall be levied and collected simultaneously and in the
same manner as Town-assessed taxes and applied in reimbursing the fund from which the costs were defrayed
for the engineering, legal, and consulting fees. Prior to charging such assessments, the owners of the real
property shall be provided written notice to their last known address of record by certified mail, return receipt
requested, of an opportunity to be heard and object before the Town Council to the proposed real property
assessment, at a date to be designated in the notice, which shall be no less than 30 days after its mailing.
58