Chapter 17
Wireless Telecommunications Towers and Antennas
Section 17.01 Purpose, Intent, and Applicability
A. The purpose of this chapter is to establish general guidelines for the siting of wireless
communications towers and antennas. The goals of this chapter are to:
1. Protect residential areas and land uses from potential adverse impacts of towers and
antennas;
2. Employ the “General Authority” preserved to the Town under 47 U.S.C. § 332(c)(7)(A) to
the greatest extent the United States Congress intended while simultaneously complying
with each of the substantive and procedural requirements set forth within the subsection
47 U.S.C. § 332(c)(7)(B).
3. Employ the authority reserved under A.R.S. §§ 9-462.01, and 9-596.A to exercise the
Town’s zoning powers, land use, planning and permitting authority, exercise its police
powers, and manage access to the Town’s public rights of way.
24. Encourage Promote the location of towers in nonresidential areas;
35. Minimize Limit the total number of towers throughout the community;
46. Strongly encourage the joint use of new and existing tower sites as a primary option
rather than construction of additional single-use towers;
57. Encourage Require users of towers and antennas to locate them, to the extent
possible, in areas where the adverse impact on the community is minimal;
68. Encourage Require users of towers and antennas to configure them in a way that
minimizes the adverse visual impact of the towers and antennas through careful design,
siting, landscape screening, and innovative camouflaging techniques;
1
79. Enhance the ability of the providers of telecommunications services to provide such
services to the community quickly, effectively, and efficiently;
10. Recognize that technology and laws regarding these facilities have changed, so the
Town’s regulations need to change accordingly;
811. Consider the public health and safety of communication towers; and
912. Avoid potential damage to adjacent properties from tower failure through
engineering and careful siting of tower structures.
13. Maintain the Town’s status as a designated International Dark Sky Community and an
optimum environment for stargazing,
14. Conserve and enhance the unique natural beauty, irreplaceable natural resources,
historical, natural, and man-made character and appearance of Fountain Park, McDowell
Mountain Preserve, Pleasantville Park, and views of Red Mountain and Four Peaks.
15. Protect Saguaro cacti as a unique natural resource promoting tourism, contributing to
the aesthetic well-being of the community, high property values, high quality of life, unique
lifestyles, and providing habitat protection for desert wildlife. Saguaro cacti grow slowly and
cannot be replaced by a plant of like character.
16. Protect the quiet small-town suburban, scenic and visual character of the Town.
In furtherance of these goals, Town of Fountain Hills shall give due consideration to the Town of
Fountain Hills General Plan, the Town of Fountain Hills Zoning Ordinance, existing land uses,
and environmentally sensitive areas in approving sites for the location of towers and antennas.
B. It is the intent of this chapter:
1. That no wireless communication towers or antenna be sited, constructed, reconstructed,
installed, materially changed, expanded, or used unless in conformity with this chapter.
2. To achieve a balance between the need to provide wireless services with the health,
safety, and general welfare of the residents of Fountain Hills by balancing five (5)
simultaneous objectives:
2
a. Enabling personal wireless service providers to provide adequate personal wireless
services throughout the Town so that Town residents can enjoy the benefits of same
from any FCC-licensed wireless carrier from which they choose to obtain such services;
b. Minimizing the number of cell towers and/or other personal wireless service facilities
needed to provide such coverage;
c. Preventing, to the greatest extent reasonably practical, any unnecessary adverse
impacts upon the Town’s communities, residential areas, and individual homes; and
d. Complying with all the legal requirements which the Telecommunications Act of
1996, as amended (“TCA”) imposes upon the Town, when the Town receives, processes
and determines each of the substantive and procedural requirements set forth within
the subsection 47 U.S.C. § 332(c)(7)(B) for permit applications seeking approvals for the
siting, construction and operation of cell towers and/or other personal wireless service
facilities.
e. Complying with the Federal Communications Commission’s (FCC) legislative rules for
communications facilities including those for Radio Frequency human exposure limits in
47 C.F.R. Part 1, Subpart I and those addressing State and Local government regulation
of the Placement, Construction, and Modification of Personal Wireless Service Facilities,
in 47 C.F.R. Part 1, Subpart U.
This Section is not intended to, nor shall it be interpreted or applied to: (1) prohibit or effectively
prohibit any wireless telecommunications service provider's ability to provide reasonable and
necessary wireless communications services; (2) prohibit or effectively prohibit any entity's
ability to provide reasonable and necessary interstate or intrastate telecommunications service;
(3) unreasonably discriminate among providers of functionally equivalent services; (4) deny any
request for authorization to place, construct or modify wireless telecommunications service
facilities solely on the basis of environmental effects of radio frequency emissions so long as
such wireless facilities comply in every instance and regard with all FCC's regulations
concerning such emissions; (5) prohibit any eligible facility that the Town may not deny under
federal or state law; or (6) otherwise authorize the Town to violate any applicable federal or
state law.
3
C. Applicability.
1. New Towers and Antennas. All new towers or antennas in the Town of Fountain Hills shall
be subject to these regulations. The following exceptions apply:
a. Amateur Radio Station Operators/Receive Only Antennas. This chapter shall not govern
any tower, or the installation of any antenna, that is under the maximum building height
of the zoning district in which such structure is located and which is owned and
operated by a federally licensed amateur radio station operator or is used exclusively
for receive only operations.
b. Pre-existing Towers or Antennas. Legally established pre-existing towers and pre-
existing antennas shall not be required to meet the requirements of this chapter, other
than the requirements of Sections 17.06(B)(1) and 17.06(C).
c. AM Array. For purposes of implementing this chapter, an AM array, consisting of one
(1) or more tower units and supporting ground system which functions as one (1) AM
broadcasting antenna, shall be considered one (1) tower. Measurements for setbacks
and separation distances shall be measured from the outer perimeter of the towers
included in the AM array. Additional tower units may be added within the perimeter of
the AM array by right.
d. Small Cell Towers Wireless Facilities in the Right-of-Way. Wireless communication
towers and antenna meeting the definition of small wireless facilities as contained in
A.R.S. 9-591 are subject to the requirements of Article 16-2, Small Wireless Facilities, of
the Town Code.
e. Mobile or Temporary Towers. Mobile wireless facilities, when placed on site for seven
(7) consecutive days or less, provided any necessary building permit or encroachment
permit is obtained.
f. Utility Service Antennas in the Right-of-Way. Utility service antennas as defined in this
chapter placed in the public right-of-way are subject to the requirements of Article 16-3,
Utility Service Antenna, of the Town Code. (24-08, Amended, 09/04/2024, Deleted and replaced)
g. Over-the-Air-Reception Devices ("OTARD") antennas as defined by 47 C.F.R. §
1.4000(a).
4
2. Existing Towers and Antennas. Any existing towers which are modified, upgraded, or
changed in any manner shall be subject to the provisions of this ordinance as applicable. All
existing towers and antennas shall be subject to the maintenance and operations
requirements in Sec. 17.06.
Section 17.02 Definitions
For the purposes of this article, and where not inconsistent with the context of a particular
section, the defined terms, phrases, words, abbreviations, and their derivations shall have the
meanings provided in this section. When not inconsistent with the context, words in the
present tense include the future tense, words used in the plural number include words in the
singular number, and words in the singular number include the plural number. The word “shall”
is always mandatory and not merely directory. The definitions set forth herein shall supersede
any definitions set forth within the Town Code and Zoning Ordinance, and the definitions set
forth herein below shall control and apply to Chapter 17 of the Zoning Ordinance and all
subparagraphs herein.As used in this chapter, the following terms shall have the meanings set
forth below:
“Accessory facility or accessory structure” means a facility or structure serving or being used in
conjunction with a personal wireless services facility or complex and located on the same
property or lot as the personal wireless services facility or complex or an immediately adjacent
lot, including, but not limited to utility or transmission equipment storage sheds or cabinets.
“ACHP” means the Federal Advisory Council on Historic Preservation.
ACHP
Review and compliance, meeting or exceeding the requirements of the Federal Advisory Council on
Historic Preservation.
ADA means American Disabilities Act.
Review and compliance, meeting or exceeding the requirements of the ADA is codified in Title 42 of
the United States Code, starting at Section 12101
ADEQ Arizona Department of Environmental Quality
5
Review and compliance, meeting or exceeding requirements of the ADEQ operates under the
statutory authority found in Arizona Revised Statutes (A.R.S.) §§ 49-101 et seq., and its regulatory
rules are detailed in Arizona Administrative Code (A.A.C.) Title 18, Chapters 1 through 18.
“ADEQ” means the Arizona Department of Environmental Quality.
“Adequate coverage” means, as determined by the Town Council, that a specific wireless
carrier’s personal wireless service coverage is such that the vast majority of its customers’
equipment can successfully use connect to the carrier’s radio access network and achieve a
received signal strength of -110 dBm or better and deliver a -90 dBm or better signal to the
base station receiver (uplink) with a signal to noise ratio (SINR) of 3 dB or higher the vast
majority of the time, in the vast majority of the geographic locations within the Town, that the
Voice Drop Call Rate, e.g. the percentage ratio of dropped voice calls to total call attempts or
successful call setups remains at or below 3%. personal wireless service the vast majority of
the time, in the vast majority of the geographic locations within the Town, that the success rate
of using their devices exceeds 97%, and that any geographic gaps in a carrier’s gaps in personal
wireless services are not significant gaps, A “gap” can exist when there is a lack of coverage or
when coverage exists but quality is below the above metrics. The Town will assess whether a
gap in a carrier’s personal wireless services are significant, based upon such factors including,
but not limited to, lack of significant physical size of the gap, whether the gap is located upon a
lightly traveled or lightly occupied area, whether only a small number of customers are affected
by the gap, and/or whether or not the carrier’s customers are affected for only limited periods
of time. A wireless carrier’s coverage shall not be deemed inadequate simply because the
frequency or frequencies at which its customers are using its services are not the most
preferred frequency of the wireless carrier.
For claimed capacity or quality shortfalls in an area that has coverage, the applicant must
demonstrate through independently-verifiable data and analysis, including network generated
recordings based on user equipment reports that users are consistently experiencing dropped
voice calls (in contrast to dropped sessions involving non-voice communications) at an
unacceptable level during peak periods, or user devices are consistently denied access to the
network due to lack of overall capacity at peak periods.
If the applicant relies on signal strength data (whether network recorded or through drive tests)
to demonstrate a lack of coverage or inadequate quality/capacity the applicant must disclose all
6
underlying data, its thresholds for acceptable quality in such fashion that all claims and
conclusions are independently verifiable.
The Town strongly encourages all applicants to use methods consistent with the FCC rules
governing provider reports and mapping data in 47 C.F.R. Part 1, Subpart V (§§ 1.7000 – 1.7010).
“Alternative tower structure” means man-made trees, clock towers, bell steeples, light poles and
similar alternative-design mounting structures that camouflage or conceal the presence of
antennas or towers.
“Adjacent properties or properties adjacent” shall mean (i) those lots or parcels of land that
abut another lot or parcel of land or public right-of-way that is contiguous to a wireless facility
site or proposed site and (ii) the lots or parcels of land or public right-of-way that would be
contiguous to lots or parcels or public rights-of-way but for an intervening local or collector
roadway.
“Aesthetic or aesthetics” refers to subjective or objective determinations related to whether and
if so, how well a facility will fit within the character of the area where the facility is proposed.
This requires a broad range of factors including but not limited to visual effects and impact on
property values. The Town will consider aesthetics for all applications and, where not
prohibited by federal or state law, reserves the ability to impose careful placement conditions
or restrictions.
“Antenna” means any exterior transmitting or receiving device mounted on a tower, building or
structure and used in communications that radiates or captures electromagnetic waves, digital
signals, analog signals, radio frequencies (excluding radar signals), wireless telecommunications
signals or other communication signals. an apparatus designed for the purpose of emitting
radiofrequency (RF) radiation, to be operated or operating from a fixed location pursuant to
FCC authorization, for the provision of personal wireless service and any commingled
information services. This definition does not apply to antennas designed for amateur radio use
or satellite dishes for residential or household purposes.
“Antenna equipment” means equipment, switches, wiring, cabling, power sources, shelters or
cabinets associated with an Antenna, located at the same fixed location as the Antenna, and,
when Co-located on a PWSF Structure, is mounted or installed at the same time as such
Antenna.
7
“Antenna facility” means Antenna and associated Antenna Equipment.
“Antenna” means an apparatus designed for emitting radiofrequency (RF) radiation to be
operated or operating from a fixed location for personal wireless service.
ANTENNA
Similar definition in Section 17.02
An apparatus designed for emitting radiofrequency (RF) radiation to be operated or operating from a
fixed location for personal wireless service.
ANTENNA-An apparatus designed for the purpose of emitting radiofrequency (RF) radiation, to be
operated or operating from a fixed location pursuant to Federal Communication Commission
authorization, for the provision of Personal Wireless Services and any commingled information
services. For purposes of this definition, the term Antenna does not include an unintentional radiator,
mobile station, or device authorized under 47 CFR Part 15 (Radio Frequency Devices).
ANTENNA EQUIPMENT
Equipment, switches, wiring, cabling, power sources, shelters or cabinets associated with an Antenna,
located at the same fixed location as the Antenna, and, when Co-located on a PWSF Structure, is
mounted or installed at the same time as such Antenna.
ANTENNA FACILITY
Antenna and associated Antenna Equipment.
"Applicant" means any individual, corporation, limited liability company, general partnership,
limited partnership, estate, trust, joint-stock company, association of two or more persons
having a joint common interest, or any other entity submitting an application for a wireless
communication facility permit, site plan approval, building permit, and/or any other related
approval, for the installation, operation and/or maintaining of one or more wireless
communication facilities.
“Applicant” means any individual, corporation, limited liability company, general partnership,
limited partnership, estate, trust, joint-stock company, association of two or more persons
having a joint common interest, or any other entity submitting an application for a special use
8
permit, site plan approval, variance, building permit, and/or any other related approval, for the
installation, operation and/or maintaining of one or more personal wireless service facilities.
"Application" shall mean all necessary and required documentation, information, and evidence
that an applicant must submit to receive a wireless communications facility permit, building
permit, or other Town approval for personal wireless service facilities from the Town.
“Application” refers to all necessary and required documentation and evidence that an
applicant must submit to receive a special use permit, building permit, or other approval for
personal wireless service facilities from the Town.
“Backhaul network” means the lines that connect a provider’s towers/cell sites to one (1) or
more cellular telephone switching offices, and/or long distance providers, or the public
switched telephone network.
“Balloon test” means the raising of a balloon (or placement of a “crank up” tower, crane or
temporary structure) equal to the height of a proposed personal wireless services facility tower
for a period of 4 hours on a pre-determined date and time prior to approval of a wireless
facility permit application to assess the visual impact of a proposed tower.
“Base station” means for purposes of eligible facilities requests the definition in the FCC’s
regulations at 47 CFR § 1.6100 shall apply. A structure or equipment at a fixed location that
enables FCC-licensed or authorized wireless communications between user equipment and a
communications network. The term does not encompass a tower or any equipment associated
with a tower.
BASE STATION
Shall have the definition in the FCC’s regulations at 47 CFR § 1.6100.
“Board of Adjustment” means the Board of Adjustment of the Town of Fountain Hills,
established pursuant to Sec. 1.07 of the Zoning Ordinance with membership, powers, duties,
and responsibilities as set forth in Article 2A-2 of the Town Code.
Carriers. See Wireless Carriers.
9
“Camouflage” is defined as the use of materials incorporated into the communications tower
design that give communications towers the appearance of tree branches and bark coatings,
church steeples and crosses, sign structures, lighting structures, or other similar structures.
“Cell tower” means a free-standing, guy-wired, or otherwise supported pole, tower, or other
structure designed to support or employed to support equipment and/or antennas used to
provide personal wireless services, including, but not limited to, a pole, monopole, monopine,
slim stick, lattice tower or other types of standing structures.
“CEQ” means the Council on Environmental Quality, as established under NEPA.
"Collocate, colocate" or "collocation, colocation" can have different meanings depending on
context.
1. When and where A.R.S. §§ 9-951 — 9-600 apply, the definition in A.R.S. §§ 9-951.8 shall
also apply. That definition currently states:
"Collocate" or "collocation" means to install, mount, maintain, modify, operate or replace
wireless facilities on, within or adjacent to a wireless support structure or utility pole.
2. Where and when the FCC’s general rules for placement, construction and modification of
personal wireless facilities apply, the definition in 47 C.F.R. § 1.6002(g) shall also apply. That
definition currently states:
Collocation, consistent with § 1.1320(d) and the Nationwide Programmatic Agreement (NPA)
for the Collocation of Wireless Antennas, appendix B of this part, section I.B, means—
(1) Mounting or installing an antenna facility on a pre-existing structure; and/or
(2) Modifying a structure for the purpose of mounting or installing an antenna facility on
that structure.
(3) The definition of “collocation” in § 1.6100(b)(2) applies to the term as used in that section.
3. Where and when the FCC’s rules for wireless facility modifications apply, the definition in
47 C.F.R. § 1.6100(b)(2) shall also apply. That definition currently states:
10
(2) Collocation. The mounting or installation of transmission equipment on an eligible
support structure for the purpose of transmitting and/or receiving radio frequency signals
for communications purposes.
“Complete application, completed application” means an application that contains all the
necessary and required information, records, evidence, reports, and/or data necessary to
enable an informed decision to be made with respect to an application. Where any information
is provided pursuant to the terms of this Chapter and the Development Services Director, Town
Engineer or the Town’s expert or consultant, or the Council determines, based upon
information provided, that any additional, further, or clarifying information is needed as to one
or more aspects, then the application will be deemed incomplete until that further or clarifying
information is provided to the satisfaction of the Development Services Director, Town
Engineer, Town Council or the Town’s expert or consultant of the Council.
“Complex” means the entire site or facility, including all structures and equipment, located at
the site.
CEQ Council on Environmental Quality,
Review and compliance, meeting or exceeding requirements of the Council on Environmental Quality
“The Council on Environmental Quality derives its authority from the National Environmental Policy
Act of 1969 (42 U.S.C. § 4342) and implements regulations at 40 C.F.R. §§ 1500–1508.”
“Council or Town Council” means the Town Council of the Town of Fountain Hills.
“Colocation, co-location, and/or co-locate means to install, mount or add new or additional
equipment to be used for the provision of personal wireless services to a pre-existing structure,
facility, or complex which is already built and is currently being used to provide personal
wireless services by a different provider of such services, wireless carrier or site developer.
CO-LOCATION and/or CO-LOCATE
The mounting or installation of an Antenna Facility on a pre-existing PWSF Structure, or the
modification of a PWSF Structure for the purpose of mounting or installing an Antenna Facility on
that PWSF Structure.
11
“DBM” (dBm) stands for decibel milliwatts, which is a concrete measurement of the wireless
signal strength of wireless networks. Signal strengths are recorded in negative numbers It
expresses power relative to 1 milliwatt (mW) on a logarithmic scale. Emissions are measured
using positive whole or fractional numbers. Received signal strengths are typically recorded in
negative numbers because they are usually weaker than 1 milliwatt, and can range from
approximately -30 dBm to -110 dBm. The closer the number is to 0, the stronger the cell signal.
FCC, HHS and OSHA regulate safe exposure thresholds but transmitter power (in dBm) is crucial
to determining exposure, as it is the starting point for calculating current exposure limits.
dBm (decibel-milliwatts) is a unit of power used in radio, microwave, and fiber optic communication
systems. It expresses power relative to 1 milliwatt (mW) on a logarithmic scale. FCC and OSHA
regulate safe exposure thresholds, not device power directly—but transmitter power (in dBm) is
crucial to determining exposure
“Deployment” means the placement, construction, or substantial modification of a personal
wireless service facility.
“Development Services Director” (or “Director): T” means the person appointed by the Town
Manager to be the Development Services Director. If there is no such person designated by the
Town Manager, the Town Manager is the Development Services Director.
“Distributed antenna system, DAS” means a network of spatially separated antenna nodes
connected to a common source via a transport medium that provides personal wireless service
within a geographic area.
“Effective prohibition” means a finding by the Town Council that if an application seeking
approval for a specific new Personal Wireless Service Facility at a specific location, and a specific
height, were to be denied, such denial would either: (a) prevent an identified Wireless Carrier
from providing personal wireless services within a specific geographic area, or areas, within the
Town, or (b) would prevent a specific Wireless Carrier from constructing a sufficient number of
such facilities necessary to enable it to provide Personal Wireless Services within the Town.
An effective prohibition shall not be found to exist if a Wireless Carrier has Adequate Coverage
in a specified geographic area , such that its end-use customers can use their cellular
telephones to connect to landlines using the Carrier’s Personal Wireless Services; however, the
frequencies are not the “most preferred” frequencies of the Carrier.
12
An effective prohibition shall also not be found to exist if an applicant fails to establish before
the Town Council that any existing geographic gap or capacity deficiency in the specific Wireless
Carrier’s coverage cannot be remedied through a less intrusive means than what is being
proposed, including, but not limited to, potential installations on alternative less intrusive sites,
a shorter tower or facility, the incorporation of a more stealthy design, etc.
A finding of Effective Prohibition, or lack thereof, shall be based upon an applicant’s submission
of sufficient probative, relevant, and sufficiently reliable evidence and the appropriate weight
the Town Council deems appropriate to afford.
EFFECTIVE PROHIBITION- Denial by the Town of a PWSF approval or permit for a
Personal Wireless Service Facility that is the Least Intrusive Means of remedying a significant gap in
Personal Wireless Service coverage (the ability of wireless telephones to make and receive voice calls
to and from land-lines that are connected to the national telephone network).
“Eleventh hour submissions” means an applicant’s submission of new and/or additional
materials in support of an application less than five (5) business days before the expiration of
an applicable shot clock or at an otherwise unreasonably short period of time before the
expiration of the shot clock, making it impracticable for the Town Council to adequately review
and consider such submissions due to their complexity, volume, or other factors, before the
expiration of the shot clock.
“Eligible facilities request” means a request that meets the requirements in 47 CFR § 1.6100 for
modification of an existing Tower or Base Station that does not substantially change the
physical dimensions of such Tower or Base Station and involving:
(a) Co-location of new transmission equipment,
(b) Removal of transmission equipment, or
(c) Replacement of transmission equipment.
“Enure” means to operate or take effect. To serve to a person or party's use, benefit, or
advantage.
“EPA” means the United States Environmental Protection Agency.
13
EPA United States Environmental Protection Agency.
Review and compliance, meeting or exceeding requirements of the EPA regulations
“Existing structure” means light poles, power poles, chimneys, billboards, and other similar
structures, which are placed, within the Town at the time of adoption of this chapter, except
existing buildings.
“FAA” means the Federal Aviation Administration.
“FAA” means the Federal Aviation Administration or its duly designated and authorized
successor agency.
FAA
The Federal Aviation Administration or its duly designated and authorized successor agency.
Review and compliance, meeting or exceeding requirements of the FAA
“Facility” means a set of wireless transmitting and/or receiving equipment, including any
associated electronics and electronics shelter or cabinet and generator.
FACILITY
A set of wireless transmitting and/or receiving equipment, including any associated electronics and
electronics shelter or cabinet and generator.
See Personal Wireless Service Facility or PWSF.
“FCC” means the Federal Communications Commission.
FCC
Review and compliance, meeting or exceeding requirements of the The Federal Communications
Commission. Sets limits on RF emissions for wireless and broadband devices (47 CFR §§ 1.1307–
1.1310)
FDA Food and Drug Administration
Review and compliance, meeting or exceeding requirements of the RF-emitting consumer devices (e.g.,
cell phones) for health impacts
14
“General population/uncontrolled exposure limits” means the applicable radiofrequency
radiation exposure limits set forth within 47 CFR §1.1310(e)(1), Table 1 Section (ii), made
applicable pursuant to 47 CFR §1.1310(e)(3).
“HHS” means U.S. Department of Health and Human Services or its constituent agencies,
including FDA Food and Drug Administration, charged with review and compliance, meeting or
exceeding requirements of the RF-emitting consumer devices (e.g., electronic products such as
cell phones) for health impacts.
“Height” means, when referring to a tower or other structure, the vertical distance measured
from the natural grade level to the highest point of the structure directly above the natural
grade when such structure is not located in a platted subdivision. If the structure is located in a
platted subdivision, the height shall be the vertical distance measured from the finished grade
as shown on the subdivision grading plans or finished grade as shown on the individual lot’s
grading plans (whichever is lower), to the highest point of the structure directly above the
finished grade. In the event that terrain problems prevent an accurate determination of height,
the Zoning Administrator shall rule as to height and appeal from that decision shall be to the
Board of Adjustment.
“Height” means, when referring to a tower, personal wireless service facility, or personal
wireless service facility structure, the height shall mean the distance measured from the pre-
existing grade level to the highest point on the tower, facility, or structure, including, but not
limited to, any accessory, fitting, fitment, extension, addition, add-on, antenna, whip antenna,
lightning rod or other types of lightning-protection devices attached to the top of the structure.
The distance measured from the pre-existing grade level to the highest point of a Personal Wireless
Service Facility.
“Historic Structure” means any structure that is either on the National Register of Historic Places
or is eligible for inclusion in the national register, irrespective of whether or not an application
for inclusion onto the national register has been filed or not filed.
Review and compliance, meeting or exceeding requirements of National Register of Historic Places
“Illegally excessive RF radiation or illegally excessive radiation” means RF radiation emissions at
levels that exceed the legally permissible limits set forth within 47 CFR §1.1310(e)(1), Table 1
Sections (i) and (ii), as made applicable pursuant to 47 CFR §1.1310(e)(3).
15
“In-kind call testing” means testing designed to measure the gap in Personal Wireless Service
coverage asserted by an applicant. In-Kind Call Testing for a claimed gap in Personal Wireless
Services in buildings means call testing performed in buildings to establish the existence or
absence of such a gap, unless the applicant provides an affidavit sworn under penalties of
perjury demonstrating good faith but unsuccessful attempts to secure access to buildings to
conduct such testing. In-Kind Call Testing for a claimed gap in Personal Wireless Services in
vehicles or in the open air means call testing performed in vehicles or in the open to establish
the existence or absence of such a gap.
“In-kind replacement” means the replacement of a malfunctioning component(s) with a
properly functioning component of substantially the same weight, dimensions, and outward
appearance.
LAST-MINUTE SUBMISSIONS
An applicant’s submission of new and/or additional materials in support of an application within 48
hours of the expiration of an applicable Shot Clock Period, or at an otherwise unreasonably short
period of time before the expiration of the Shot Clock Period, making it impracticable for the
Planning Board, Director of Planning or Director of Code Enforcement to adequately review and
consider such submissions due to their complexity, volume, or other factors, before the expiration of
the Shot Clock Period.
“Least intrusive” means the location and design of a personal wireless service facility that would
remedy a significant gap in Personal Wireless Service coverage and (1) does the least disservice
to the objectives stated in § 270-219A(2), and (2) deviates as little as possible from (a) the
preferential order of location in subsection K (Priority of siting locations) and (b) applicable
design standards in subsection L.
“Macrocell” means a cellular base station that typically sends and receives radio signals from
large towers and antennas. These include traditionally recognized cell towers, typically ranging
from 50 to 199 feet in height.
“Maintenance or routine maintenance” means plumbing, electrical or mechanical work that
may require a building permit but that does not constitute a modification to the personal
wireless service facility. It is work necessary to assure that a wireless facility and/or
telecommunications structure exists and operates reliably and in a safe manner, presents no
16
threat to persons or property, and remains compliant with the provisions of this chapter and
FCC requirements.
“Monopole” means a wireless support structure that is not more than forty inches in diameter
at the ground level and that has all of the wireless facilities mounted on the pole or contained
inside of the pole. Monopoles are typically unguyed.
“Necessary, or necessity, or need” means what is technologically required for the equipment to
function as designed by the manufacturer and anything less will result in prohibiting the
provision of service as intended and described in the narrative of the application. “Necessary”
or “need” does not mean what may be desired, preferred, or the most cost-efficient approach
and is not related to an applicant’s specific chosen design standards or unspecified “coverage
objectives.” Any situation involving a choice between or among alternatives or options is not a
need or a necessity.
“NEPA” means the National Environmental Policy Act, 42 U.S.C. §4321, et seq.
8 NEPA regulations and compliance. Review and compliance, meeting or exceeding requirements of
NEPA
“NHPA” means the National Historic Preservation Act, 54 U.S.C. 300101 et seq, and 36 CFR Part
800, et seq.
Review and compliance, meeting or exceeding requirements of NHPA
NIOSH National Institute for Occupational Safety and Health
OSHA sets enforceable limits, NIOSH provides science-based guidance through RELs (Recommended
Exposure Limits) Risk assessments Hazard evaluations
Review and compliance, meeting or exceeding requirements of OSHA
“Node, DAS node” means a fixed antenna and related equipment installation that operates as
part of a system of spatially separated antennas, all of which are connected through a medium
through which they work collectively to provide personal wireless services, as opposed to other
types of personal wireless facilities, such as macrocells, which operate independently.
17
“Node” means a fixed antenna and antenna equipment installation that operates as part of a
system of spatially separated Antennas, all of which are connected through a medium through
which they work collectively to provide personal wireless services using hand-off capabilities. A
4G (LTE) node is referred to as an ENode B, and a 5G node is referred to as a GNode B. Some
sites incorporate both 4G and 5G. Some 5G capable sites still rely on a 4G network core.
“Notice address” means an address, which is required to be provided by an applicant at the
time it submits an application, at which the Town, Town Council, and/or Development Services
Director or Town Engineer designee can mail notice, and the mailing of any notice to such
address by first-class mail shall constitute sufficient notice to any and all applicants, co-
applicants, and/or their attorneys, to satisfy any notice requirements under this Chapter, as
well as any notice requirements of any other local, state and/or federal law.
“Notice of incompleteness, notice of incomplete application” means a written notice, sent by
electronic mail , to an applicant seeking approval for the installation of a PWSF, wherein the
sender advises the applicant that its application is either incomplete, the wrong type of
application, or is otherwise defective, and setting for the reason or reasons why the application
is incomplete and/or defective.
“Notice of effective prohibition conditions” means a written notice, which is required to be
provided to the Town at the time of the filing of any application by all applicants seeking any
approval, of any type, for the siting, installation, and/or construction of a PWSF, wherein the
respective applicant asserts, claims or intends to assert or claim, that a denial of their
respective application, by any agent, employee, board or body of the Town, would constitute an
“effective prohibition ” within the meaning of the TCA, and concomitantly, that a denial of their
respective application or request would violate Section 47 U.S.C. §332(c)(7)(B)(i)(II) of the TCA.
“Occupational/controlled exposure limits” means the applicable radiofrequency radiation
exposure limits set forth within 47 CFR §1.1310(e)(1), Table 1 Section (i), made applicable
pursuant to 47 CFR §1.1310(e)(2).
OSHA requirements and compliance
Review and compliance, meeting or exceeding requirements of the Occupational Safety and Health
Act
18
"Permit" means written permission required by an authority to install, mount, maintain, modify,
operate or replace a utility pole or monopole, to collocate a wireless facility on a utility pole or
wireless support structure or to collocate wireless facilities on a monopole.
“Permittee” means a holder of a Personal Wireless Service Facility Permit.
“Personal wireless service/personal wireless services” means commercial mobile services,
unlicensed wireless services, and common carrier wireless exchange access services, within the
meaning of 47 U.S.C. §332(c)(7)(c)(i), and as defined therein.
“Personal wireless service facility, personal wireless services facility or PWSF” means a facility or
facilities used for the provision of personal wireless services, within the meaning of 47 U.S.C.
§332(c)(7)(c)(ii). It means a specific location at which a structure that is designed or intended to
be used to house or accommodate antennas or other transmitting or receiving equipment is
located. This includes, without limitation, towers of all types and all kinds of support structures,
including but not limited to buildings, church steeples, silos, water towers, signs, utility poles, or
any other structure that is used or is proposed to be used as a telecommunications structure
for the placement, installation and/or attachment of antennas or the functional equivalent of
such. It expressly includes all related facilities and equipment such as cabling, radios and other
electronic equipment, equipment shelters and enclosures, cabinets, and other structures
enabling the complex to provide personal wireless services.
The permit granted by the Director of Code Enforcement pursuant to which an applicant is allowed to
construct and use a Personal Wireless Service Facility.
PERSONAL WIRELESS SERVICE FACILITY or PWSF
An Antenna Facility and a PWSF Structure, or any components thereof, used for the provision of
Personal Wireless Service, whether such Personal Wireless Service is provided on a stand-alone basis
or commingled with other wireless communications services.
PWSF STRUCTURE
A pole, Tower, Base Station, or other building, whether or not it has an existing Antenna Facility, that
is used or to be used for the provision of Personal Wireless Service (whether on its own or comingled
with other types of services). PWSF Structure also includes the on-site fencing, equipment, switches,
19
wiring, cabling, power sources, shelters, and cabinets associated with that PWSF Structure but not
installed as part of an Antenna.
“Pre-existing towers and pre-existing antennas” means any tower or antenna for which a
building permit has been properly issued prior to the effective date of the ordinance codified in
this chapter, including permitted towers or antennas that have not yet been constructed so
long as such approval is current and not expired.
"Private easement" means an easement or other real property right that is only for the
benefit of the grantor and grantee and the grantor's or grantee's successors and assigns.
“Probative evidence” means evidence which tends to prove facts, and the more a piece of
evidence or testimony proves a fact, the greater its probative value, as shall be determined by
the Town Council or other decision making authority, as the finder-of-fact in determining
whether to grant or deny applications under this provision of the Town Code.
“Repairs” means the replacement or repair of any components of a wireless facility or complex
where the replacement is substantially identical to the component or components being
replaced, or for any matters that involve the normal repair and maintenance of a wireless
facility or complex without the addition, removal, or change of any of the physical or visually
discernible components or aspects of a wireless facility or complex that will impose new visible
intrusions of the facility or complex as originally permitted.
“RF” means radiofrequency.
“RF radiation” means radiofrequency radiation. That being electromagnetic radiation, which is a
combination of electric and magnetic fields that move through space as waves, and can include
both Non-Ionizing radiation and Ionizing radiation.
“School” means a public, charter, or private educational institution providing instruction for
elementary and secondary grades as defined in A.R.S. § 15-101 and includes the real property
and facilities used for such educational purpose.
“School property” means any parcel containing a public, charter, or private educational
institution providing instruction for elementary and secondary grades as defined in A.R.S. § 15-
101 and includes associated playgrounds, athletic fields, administrative buildings, parking
areas, and other school-related facilities.
20
“Section 106 Review” means a review under Section 106 of the National Historic Preservation
Act.
“Setback” means the distance between (a) any portion of a personal wireless facility and/or
complex, including but not limited to any and all accessory facilities and/or structures, and (b)
the exterior line of any parcel of real property or part thereof which is owned by, or leased by,
an applicant seeking to construct or install a personal wireless facility upon such real property
or portion thereof. In the event that an applicant leases only a portion of real property owned
by a landlord, the setback shall be measured from the facility to the line of that portion of the
real property that is actually leased by the applicant, as opposed to the exterior lot line of the
non-leased portion of the property owned by the landlord.
“Shot clock, Arizona” means the statutory timeframes within which the Town must review a
wireless application for completeness of an application for wireless facilities in right-of-way
pursuant to A.R.S. § 9-594.C.2 and act on a wireless application before it is otherwise deemed
approved pursuant to A.R.S. § 9-594.C.2. For deemed approved purposes, the Arizona shot
clock begins on the date when the Town determines the application is properly completed. For
applications involving wireless facilities not in right-of-way the FCC shot clock will apply.
Shot clock, FCC: the presumptively reasonable time frame within which the Town must act on a
wireless application, as defined by the FCC, shown below subject to amendment from the FCC.
The shot clock begins when the applicant takes the first procedural step that the Town requires.
a. Aggregate of 60 days:
1) Standby emergency generators at previously permitted macro cell tower
sites.
2) Collocation of small wireless facilities at existing small wireless facility
sites.
3) Eligible Facilities Requests.
b. Aggregate of 90 days:
1) New small wireless facilities.
2) Collocation applications for additions to existing communications facilities not
defined as an eligible facilities request.
21
c. Aggregate of 150 days:
1) All other applications, such as development of a new communication tower or
facility.
“Shot clock” means the applicable period, which is presumed to be a reasonable period within
which the Town is generally required to issue a final decision upon an application approval for
the installation or substantial modification of a personal wireless services facility or structure to
comply with Section 47 U.S.C. §332(c)(7)(B)(ii) of the TCA.
SHOT CLOCK PERIOD- The sum of the number of days specified by federal regulation as the
presumptively reasonable time for the Town to act on the relevant Personal Wireless Services Facility
application type, plus the number of days of any applicable Tolling period, per 47 CFR § 1.6003.
“SHPO” means the Arizona State Historic Preservation Office.
“Site developer or site developers” means individuals and/or entities engaged in the business of
constructing wireless facilities and wireless facility infrastructure and leasing space and/or
capacity upon, or use of, their facilities and/or infrastructure to wireless carriers. Unlike wireless
carriers, site developers generally do not provide personal wireless services to end-use
consumers.
“Small cell” means a fixed cellular base station that sends and receives radio signals and is
typically mounted upon poles or support structures at substantially lower elevations than
macrocell facilities.
“Small wireless facility” means a personal wireless service facility that meets all of the following
criteria
(a) The facility does not extend the height of an existing structure to a total cumulative
height of more than fifty (50) feet from ground level to the top of the structure, and any
equipment affixed thereto ;
(b) Each antenna associated with the deployment is no more than three (3) cubic feet in
volume;
22
(c) All wireless equipment associated with the facility, including any pre-existing equipment
and any proposed new equipment, cumulatively total no more than twenty-eight (28) cubic
feet in volume;
(d) The facility is not located on tribal land; and
(e) The facility will not result in human exposure to radiofrequency radiation in excess of
the applicable FCC safety standards set forth within Table 1 of 47 CFR §1.1310(E)(1).
SMALL WIRELESS FACILITY
A personal wireless service facility that meets all of the following criteria
The facility does not extend the height of an existing structure to a total cumulative height of
more than fifty (50) feet from ground level to the top of the structure, and any equipment affixed
thereto;
Each antenna associated with the deployment is no more than three (3) cubic feet in volume;
All wireless equipment associated with the facility, including any pre-existing equipment and
any proposed new equipment, cumulatively total no more than twenty-eight (28) cubic feet in volume;
The facility is not located on tribal land; and
The facility will not result in human exposure to radiofrequency radiation in excess of the
applicable FCC safety standards set forth within Table 1 of 47 CFR §1.1310(E)(1).
SMALL WIRELESS FACILITY STRUCTURE-A PWSF Structure for a Small Wireless
Facility.
"Small wireless facility" can have different meanings depending on context.
1. When and where A.R.S §§ 9-591 – 9-599 applies, the definition in A.R.S §§ 9-591.19 shall
also apply. That definition means a wireless facility that meets both of the following
qualifications:
(a) All antennas are located inside an enclosure of not more than six cubic feet in
volume or, in the case of an antenna that has exposed elements, the antenna and all of
the antenna's exposed elements could fit within an imaginary enclosure of not more
than six cubic feet in volume.
23
(b) All other wireless equipment associated with the facility is cumulatively not more
than twenty-eight cubic feet in volume, or fifty cubic feet in volume if the equipment was
ground mounted before August 9, 2017. The following types of associated ancillary
equipment are not included in the calculation of equipment volume pursuant to this
subdivision:
() An electric meter.
() Concealment elements.
() A telecommunications demarcation box.
() Grounding equipment.
() A power transfer switch.
() A cutoff switch.
() Vertical cable runs for the connection of power and other services
2. Where and when the FCC’s general rules for placement, construction and modification of
personal wireless service facilities apply, the definition in 47 CFR §1.6002(l) shall apply. That
definition states as follows:
(a) Small wireless facilities are facilities that meet each of the following conditions:
(i) The facilities—
. Are mounted on structures 50 feet or less in height including their antennas as
defined in § 1.1320(d); or
. Are mounted on structures no more than 10 percent taller than other adjacent
structures; or
. Do not extend existing structures on which they are located to a height of more
than 50 feet or by more than 10 percent, whichever is greater;
(ii) Each antenna associated with the deployment, excluding associated antenna
equipment (as defined in the definition of “antenna” in § 1.1320(d)), is no more than
three cubic feet in volume;
(iii) All other wireless equipment associated with the structure, including the wireless
equipment associated with the antenna and any pre-existing associated equipment on
the structure, is no more than 28 cubic feet in volume;
24
(iv) The facilities do not require antenna structure registration under part 17 of this
chapter;
(v) The facilities are not located on Tribal lands, as defined under 36 CFR 800.16(x); and
(vi) The facilities do not result in human exposure to radiofrequency radiation in excess
of the applicable safety standards specified in § 1.1307(b).
"Special taxing district" means a special district formed pursuant to title ARS 48, chapter 11, 12,
17, 18, 19, 20 or 22.
“Special Use Permit” means the official document or permit granted by the Town Council
pursuant to which an applicant is allowed to file for and obtain a building permit to construct
and use a personal wireless services facility, personal wireless service equipment, and/or any
associated structures and/or equipment which are used to house, or be a part of, any such
facility or complex, or to be used to provide personal wireless services.
“State” means the State of Arizona.
“Stealth or stealth technology” means a design or treatment that minimizes adverse aesthetic
and visual impacts on the land, property, buildings, and other facilities adjacent to,
surrounding, and generally in the same area as the requested location of such personal
wireless service facilities. This shall mean building the least visually and physically intrusive
facility and complex under the facts and circumstances.
“Structure” means a pole, tower, base station, or other building, physical support of any form
used for, or to be used for, the provision of personal wireless service.
“Substantial evidence” means such relevant evidence as a reasonable mind might accept as
adequate to support a conclusion. It means less than a preponderance but more than a scintilla
of evidence.
“TCA” means the Telecommunications Act of 1996, 47 U.S.C. §332(c) Pub. L. No. 104-104, 110
Stat. 56 (1996), codified at various provisions of Title 47 U.S.C.
“Tolling or tolled” means the pausing of the running of the time period permitted under the
applicable shot clock for the respective type of application for a personal wireless services
facility. Where a shot clock is tolled because an application has been deemed incomplete and
timely notice of incompleteness was mailed to the applicant, the submission of additional
25
materials by the applicant to complete the application will end the tolling, thus causing the shot
clock period to resume running, as opposed to causing the shot clock to begin running anew.
“Tower” means any structure that is designed and constructed primarily for the purpose of
supporting one (1) or more antennas for telephone, radio and similar communication
purposes, including self-supporting lattice towers, guyed towers, or monopole towers. The term
includes radio and television transmission towers, microwave towers, common-carrier towers,
cellular telephone towers, alternative tower structures, and the like. The term also includes the
structure and any support thereto a mast, pole, monopole, slim stick, guyed tower, lattice
tower, freestanding tower, or other structure designed to support or employed to support
antennas and other equipment, including but not limited to dishes, transceivers and arrays
used to provide personal wireless services and wireless communications services. A ground- or
building-mounted mast greater than ten feet tall and six inches in diameter supporting one or
more antennas, dishes, arrays, etc. shall be considered a communications tower.
TOWER, Commented
Any structure designed primarily to support one or more antennas and/or equipment used or
designed for receiving and/or transmitting a wireless signal.
A structure built for the sole or primary purpose of supporting FCC-licensed or authorized Antennas.
The term Tower also includes the on-site fencing, equipment, switches, wiring, cabling, power sources,
shelters, and cabinets associated with that Tower but not installed as part of an Antenna.
“Tower, telecommunications tower” means any structure designed primarily to support one or
more antennas and/or equipment used or designed for receiving and/or transmitting a wireless
signal.
“Town” means the Town of Fountain Hills.
“Town code” means the Town Code of the Town of Fountain Hills.
“Undertaking” means any application seeking Town approval for the installation of a personal
wireless services facility licensed under the authority of the FCC shall constitute an undertaking
within the meaning of NEPA, in accord with 42 CFR §137.289 and 36 CFR §800.16.
26
“Utility” means Arizona (under ARS § 40-360.51 (5)): A public utility includes corporations or
persons engaged in furnishing water, gas, electricity, telephone service, or sewage disposal to
the public for compensation.
“Utility service antennas” means antenna placed on or near utility boxes, poles, switches,
storage tanks, etc., and used by a utility provider to facilitate the operation of the utility system.
“Wireless carriers or carrier” means companies that provide Personal Wireless Services to end-
use consumers.
“Wireless communication” means the transmission of voice or data without cable or wires.
“Wireless communication facility” means wireless communication facilities including, but not
limited to, facilities that transmit and/or receive electromagnetic signals for cellular radio
telephone service, personal communications services, enhanced specialized mobile services,
paging systems, and related technologies. Such facilities also include antennas, microwave
dishes, parabolic antennas, and all other types of equipment used in the transmission or
reception of such signals; telecommunication towers or similar structures supporting said
equipment; associated equipment cabinets and/or buildings; and all other accessory
development used for the provision of personal wireless services. These facilities do not include
radio and television broadcast towers and government-operated public safety networks.
“Zoning ordinance” means the Zoning Ordinance of the Town of Fountain Hills, as codified in
Chapter 1, Sec. 1.01 of the Zoning Ordinance.
Section 17.03 Requirements
A. General Requirements.
1. Principal or Accessory Use. Antennas and towers may be considered either principal or
accessory uses. A different existing use of an existing structure on the same lot shall not
preclude the installation of an antenna or tower on such lot.
2. Lot Size. For purposes of determining whether the installation of a tower or antenna
complies with district development regulations, including but not limited to setback
requirements, lot coverage requirements, and other such requirements, the dimensions of
27
the entire lot shall control, even though the antennas or towers may be located on leased
parcels within such lot.
3. Aesthetics. Towers and antennas shall meet the following requirements:
a. Towers shall, subject to any applicable standards of the FAA, be painted a neutral
color so as to reduce visual obtrusiveness.
b. At a tower site, the design of the buildings and related structures shall, to the extent
possible, use materials, colors, textures, screening, and landscaping that will blend them
into the natural setting and surrounding buildings.
c. If an antenna is installed on a structure other than a tower, the antenna and
supporting electrical and mechanical equipment must be of a neutral color that is
identical to, or closely compatible with, the color of the supporting structure so as to
make the antenna and related equipment as visually unobtrusive as possible.
d. The choice of design for installing a new wireless communication facility or the
substantial modification of an existing wireless communication facility shall be chosen
to minimize the potential adverse impacts that the new or expanded facility may, or is
likely to, inflict upon nearby properties. Stealth designs Concealment elements such as
mono-palms or flagpoles should be utilized to camouflage the pole and antennas.
e. Accessory Structures. Unless approved by the Town Council, all equipment associated
with a wireless communication tower is to be located below grade in a vault. If above
grade accessory structures are approved by the Town Council, they shall comply with
the following requirements.
i. Accessory structures shall maximize the use of building materials, colors, and
textures designed to blend with the natural surroundings. The use of camouflage
specified concealment elements for communications towers may be required by the
Council to blend the communications tower and/or its accessory structures further
into the natural surroundings using specified concealment elements. “Camouflage”
is defined as the use of materials incorporated into the communications tower
design that give communications towers the appearance of tree branches and bark
coatings, church steeples and crosses, sign structures, lighting structures, or other
similar structures.
28
ii. Accessory structures shall be designed to be architecturally similar, compatible
with each other, and shall be no more than 12 feet high. The buildings shall be used
only for housing equipment related to the particular site. Whenever possible, the
buildings shall be joined or clustered so as to appear as one (1) building.
iii. No portion of any telecommunications tower or accessory structure shall be
used for a sign or other advertising purpose, including but not limited to the
company name, phone numbers, banners, and streamers, except the following. A
sign of no greater than 2 square feet indicating the name of the facility owner(s) and
a twenty-four (24) hour emergency telephone shall be posted adjacent to any entry
gate. In addition, “no trespassing” or other warning signs may be posted on the
fence. All signs shall conform to the sign requirements of the Town.
f. Towers must be placed to minimize visual impacts. Applicants shall place towers on
the side slope of the terrain so that, as much as possible, the top of the tower does not
protrude over the ridgeline, as seen from public ways.
g. Existing Vegetation. Existing vegetation shall be preserved to the maximum extent
possible. No cutting of trees shall take place on a site connected with an application
made under this chapter prior to the approval of the application.
h. Screening.
i. Tree plantings may be required to screen portions of the telecommunications
tower and accessory structures from nearby residential property as well as from
public sites known to include important views or vistas. The standard buffer shall
consist of a landscaped strip at least 4 feet wide outside the perimeter of the
compound. Additional palm trees may be required to accompany towers which use
a palm tree stealth design.
ii. Where a site adjoins a residential property or public property, including streets,
screening suitable in type, size and quantity shall be required by the Town Council.
iii. The applicant shall demonstrate to the approving board that adequate
measures have been taken to screen and abate noise emanating from on-site
equipment, including but not limited to heating and ventilating units, air
conditioners, and emergency power generators. Telecommunications towers shall
29
comply with all applicable sections of this chapter as it pertains to noise control and
abatement.
i. Utility Services Antennas.
i. If placed on another utility structure such as a water tower, the antenna shall be
painted to blend with the building or equipment it is placed on.
ii. If a separate tower structure is used, the design shall comply with the provisions in
this section.
4. Lighting. Towers shall not be artificially lighted, unless required by the FAA or other
applicable authority. If lighting is required, the lighting alternatives and design chosen must
cause the least disturbance to the surrounding views and, to the degree possible while
complying with FAA requirements, meet the standards set in Zoning Ordinance Chapter 8,
Outdoor Lighting Control.
5. Measurement. For purposes of measurement, tower setbacks and separation distances
shall be calculated and applied to facilities located in the Town of Fountain Hills irrespective
of municipal and county jurisdictional boundaries.
6. Not Essential Services. Towers and antennas shall be regulated and permitted pursuant to
this chapter and shall not be regulated or permitted as essential services, public utilities, or
private utilities.
7. Franchises. Owners and/or operators of towers or antennas shall certify that all
franchises required by law for the construction and/or operation of a wireless
communication system in the Town of Fountain Hills have been obtained and shall file a
copy of all required franchises with the Community Development Director.
8. Signs. No signs other than those required by law shall be allowed on an antenna or
tower.
9. Co-location and Multiple Antenna/Tower Plan. The Town of Fountain Hills encourages
tower and antenna users to submit a single application for approval of multiple towers
and/or antenna sites and to submit applications, which utilize co-location with an existing
wireless telecommunications provider. Applications for approval of multiple sites or for co-
location with an existing provider shall be given priority in the review process.
30
10. Security fencing. Towers PWSF shall be enclosed by security fencing not less than 6 feet
in height and no more than 8 feet in height, shall be constructed of a block or masonry, and
shall be equipped with an appropriate anti-climbing device; provided, however, that the
Town Council may waive such requirements, as it deems appropriate.
11. Noise. Submission of applications for towers and associated equipment placed above
grade, including backup generators or power supplies, shall include noise and acoustical
information, prepared by a qualified firm or individual, for the base transceiver station(s),
equipment buildings, and associated equipment such as air conditioning units and backup
generators. The Town may require the applicant to incorporate appropriate noise baffling
materials and/or strategies to avoid any ambient noise from equipment reasonably likely to
exceed the applicable noise regulations contained in Section 11-1-7 of the Town Code.
12. Any information of an engineering nature that the applicant submits, whether civil,
mechanical, or electrical, shall be certified by an Arizona licensed professional engineer.
13. Application approval issued under this chapter shall be conditioned upon verification
by the Town Engineer or designee that such tower structure is structurally sound. Such
verification shall be received by the applicant prior to submission.
14. Access and Parking. Areas sufficient for access to the tower and equipment location and
for temporary off-street parking of at least two vehicles shall be provided. The type and
configuration of the access and parking shall be subject to the standards set forth in Zoning
Ordinance Chapter 7, Parking and Loading Requirements.
B. Minimum Setbacks and Separations.
1. Setbacks From Property Lines. Except for utility service antennas, the following setback
requirements shall apply to all towers; provided, however, that the Town Council may
reasonably reduce the standard setback requirements if the goals of this chapter would be
better served thereby:
a. Towers must be set back a distance equal to at least one hundred twenty fifty
percent (100120150%) of the height of the tower from any adjoining lot line; provided,
however, that the setback distance shall be increased as required to comply with the
separation distances from residential uses in accordance with Table 1 set forth below.
31
b. Accessory buildings must satisfy the minimum zoning district setback requirements.
2. Separations From Adjacent Uses. Except for utility service antennas, the following
separation requirements shall apply to all towers and antennas; provided, however, that the
Town Council may reasonably reduce the standard separation requirements if the goals of
this chapter would be better served thereby.
a. Separation From Residential Uses.
i. Tower separation shall be measured from the base of the tower to the lot line of
the residential uses.
ii. Separation requirements for towers shall comply with the minimum standards
established in Table 1 be 500 feet from any residentially zoned or used land
including mixed-use.
Table 1. Separation Requirements From Offsite Uses/Areas
Off-Site Use/Designated Area Separation Distance
Single-family or duplex residential buildings 200 feet or 300% of tower height, whichever is greater
Residentially zoned or used land1, 2, 500 feet3
Vacant single-family or duplex residentially zoned 200 feet or 300% of tower height, whichever is greater2
land which is either platted or has preliminary plat
approval which is not expired2
Vacant unplatted residentially zoned lands3 100 feet or 100% of tower height, whichever is greater
Existing multifamily residential units greater than
duplex units
Nonresidentially zoned lands or nonresidential None, only setbacks apply
uses
1 Includes modular homes and mobile homes used for living purposes. Separation measured
from base of tower to the closest building wall.
32
2 If vacant residential property, Sseparation measured from base of tower to closest building
setback line.
3 Includes any unplatted residential use properties without a valid preliminary subdivision plan
or valid development plan and any multifamily residentially zoned land greater than a
duplex.The Town Council may reduce the standard separation requirements to 300’ if, through
information and data presented, the Council determines the goals of this chapter would be
better served thereby.
b. Separation Distances Between Towers. Separation distances between towers shall be
applicable for and measured between the proposed tower and pre-existing towers. The
separation distances shall be measured by drawing or following a straight line between
the base of the existing tower and the proposed base, pursuant to a site plan, of the
proposed tower. The separation distances (listed in linear feet) shall be as shown in
Table 2.
Table 2. Separation Distances Between Towers
Monopole less than 65
Monopole 65 ft. in Monopole less than
ft. in height but greater
height or greater 40 ft. in height
than 40 ft. in height
Monopole 65 ft. in height or 2,000 feet 1,500 feet 1,000 feet
greater
Monopole less than 65 ft. in height 1,500 feet 1,500 feet 1,000 feet
but greater than 40 ft. in height
Monopole less than 40 ft. in height 1,000 feet 1,000 feet 750 feet
C. Buildings or Other Equipment Storage.
1. Antennas Mounted on Structures or Rooftops. The equipment cabinet or structure used in
association with antennas shall comply with the following:
a. Unless approved otherwise by the Town Council for good cause shown, but located
in an underground vault.
33
b. If located above ground:
i. The cabinet or structure shall not contain more than 120 square feet of gross floor
area or be more than 8 feet in height and shall be located on the ground.
bii. Equipment storage buildings or cabinets shall comply with all applicable
building codes.
2. Antennas Mounted on Utility Poles, Light Poles, or Towers. The equipment cabinet or
structure used in association with antennas shall be located, unless otherwise approved by
the Town Council in an underground vault. If approved to be above ground, then in
accordance with the following:
a. In residential districts, the equipment cabinet or structure may be located:
i. In a required front yard or required street side yard, provided the cabinet
structure is no greater than 3.5 feet in height and 20 square feet of gross floor area
and the cabinet/structure is located a minimum of 3 feet from all lot lines. The
cabinet/structure shall be screened by sight obscuring landscaping which obscures
at least ninety-five percent (95%) of the structure at planting and throughout the
duration of the cabinet or structure’s existence with an ultimate height not to exceed
forty-two (42) inches.
ii. In a required rear yard, provided the cabinet or structure is no greater than 5
feet in height or 120 square feet in gross floor area. The cabinet/structure shall be
screened by sight obscuring landscaping which obscures at least ninety-five percent
(95%) of the structure at planting and throughout the duration of the cabinet or
structure’s existence with an ultimate height of 6 feet.
iii. The entry or access side of a cabinet or structure shall be gated by a solid, sight-
obscuring gate that is separate from the cabinet or structure.
b. In commercial or industrial districts the equipment cabinet or structure shall be no
greater than 14 feet in height or 300 square feet in gross floor area. The structure or
cabinet shall be screened by sight-obscuring landscaping with an ultimate height of 16
feet and a planted height of at least 6 feet. The entry or access side of a cabinet or
34
structure shall be gated by a solid, sight-obscuring gate that is separate from the cabinet
or structure. Such access way shall not face residentially zoned property.
3. Modification of Building Size Requirements. In the case of wireless facilities considered by
the Town Council, the requirements of subsections (C)(1) and (C)(2) of this section may be
modified by the Town Council to address site specific conditions and requirements.
D. Co-location.
1. Any new telecommunications tower shall be designed to accommodate future shared
use by other communications providers. Design considerations shall include sufficient area
for additional ground equipment, structural design of the tower, and sufficient electrical
power available for the load of at least two (2) additional wireless service providers.
2. Good Faith. Applicants and permittees shall cooperate and exercise good faith in co-
locating wireless telecommunications facilities on the same support structures or site, if the
Town so requests. Good faith shall include sharing technical information to evaluate the
feasibility of co-location, and may include negotiations for erection of a replacement
support structure to accommodate co-location. A competitive conflict to co-location or
financial burden caused by sharing such information normally will not be considered as an
excuse to comply with this section.
3. Third Party Technical Review. In the event a dispute arises as to whether a permittee has
exercised good faith in accommodating other users, the Town may require the applicant to
obtain a third-party technical study at the applicant’s expense. The Town may review any
information submitted by the applicant and permittee(s) in determining whether good faith
has been exercised.
4. Exceptions. No co-location may be required where the shared use would or does result in
significant interference in the broadcast or reception capabilities of the existing wireless
telecommunications facilities or failure of the existing wireless telecommunications facilities
to meet federal standards for emissions.
5. Violation; penalty. Failure to comply with co-location requirements when feasible may
result in denial of a permit request or revocation of an existing permit. (24-08, Amended,
09/04/2024, Deleted and replaced)
35
Section 17.04 Application Types
A. Administrative. The following types of applications are processed administratively by staff:
1. Applications to change or modify an existing administratively approved wireless
communication facility that remains in compliance with all chapter requirements.
2. Applications to change or modify an existing wireless communication facility approved
through public review; provided, that the modification will not:
a. Increase the approved height of the supporting structure by more than ten percent
(10%) or 20 feet, whichever is greater;
b. Cause the original approved number of antennas to be exceeded by more than fifty
percent (50%);
c. Increase the original approved square footage of accessory buildings by more than
200 square feet;
d. Add new, additional, or larger microwave antenna dishes;
e. Expand the footprint of said support structure; or
f. Potentially cause significant adverse impacts on the existing support structure or the
surrounding area.
3. Applications for co-location of additional antenna for an additional service provider on
an existing administratively approved tower that remains in compliance with all chapter
requirements.
4. Applications for co-location of additional antenna for an additional service provider on
an existing tower approved through public review; provided, that the modification will not:
a. Increase the approved height of the supporting structure by more than ten percent
(10%) or 20 feet, whichever is greater;
b. Cause the original approved number of antennas to be exceeded by more than fifty
percent (50%);
36
c. Increase the original approved square footage of accessory buildings by more than
200 square feet;
d. Add new, additional, or larger microwave antenna dishes;
e. Expand the footprint of said support structure; or
f. Potentially cause significant adverse impacts on the existing support structure or the
surrounding area.
5. Applications for new utility service antenna that comply with the height and setback
requirements of the zoning district in which they are located.
6. Applications for mobile or temporary wireless facilities for more than seven (7)
consecutive days.
7. Applications for new towers in the following locations:
a. Town property with the tower located at least 300 feet from a residential zoning
boundary.
b. On commercial, industrial, utility, or lodging zoned property and located at least 300
feet from a residential zoning boundary.
c. Alternative tower structures when such structures and their accompanying
equipment are appropriately blended into the surrounding terrain, are within the height
limitations of the underlying zoning district and are at least 300 feet from a residential
zoning boundary.
B. Public Review.
1. Any new tower or modification to existing towers or antennas that do not meet the
requirements in subsection (A) of this section for administrative review shall require review
and approval as provided in subsection 17.05 (C)(2).
2. Any new tower not meeting the setback or separation requirements in Section 17.03(B).
37
Section 17.05 Application Submittal, Review, and Processing
A. General. Unless waived in writing by Zoning Administrator, Tthe following provisions shall
govern the review of all wireless communication facility applications:
1. Complete Application. Applications for wireless communication facilities shall be filed
electronically on the Town’s website by an owner of real property and shall contain the area
proposed for the wireless communication facility using the process established by the
Director for such applications. All such applications shall include the information required in
this section. Applications filed on behalf of the property owner by a third party shall include
a statement from the property owner authorizing the submittal of the application.
2. Applications shall include documentation of compliance with items listed in Section
17.03(A) as applicable to the application submitted.
3. Inventory of Existing Sites. Each applicant for a new tower or co-location of new antenna
on an existing tower shall provide to the Development Services Director an inventory of its
existing towers, antennas, or sites approved for towers or antennas, that are either within
the jurisdiction of the Town of Fountain Hills or within one (1) mile of the border thereof,
including specific information about the location, height, and design of each tower. Each
applicant shall also provide a one (1) year build-out plan for all other wireless
communications facilities within the Town. The Development Services Director may share
such information with other applicants applying for administrative approvals or special use
permits under this chapter or with other organizations seeking to locate antennas within
the jurisdiction of Town of Fountain Hills; provided, however, that the Development Services
Director is not, by sharing such information, in any way representing or warranting that
such sites are available or suitable.
4. Utility Service Antennas.
a. If the antenna complies with the height requirements of the underlying zoning
district, the plans for the antenna will be reviewed and approved with the overall site
development plans if the site is being developed concurrently. If the antenna is being
added to an existing utility site, the plans will be reviewed and processed consistent with
the requirements of subsection (C)(2) of this section.
38
b. If the antenna does not comply with the height requirements of the underlying
zoning district, the plans for the antenna will be reviewed and processed consistent with
the requirements of subsection (C)(3) of this section.
5. A list of the full names and contact information for all applicants, co- applicants, facility
owner(s), facility operator(s), site developer(s), and wireless carrier(s), property owner(s) and
other related third parties and their agent(s), if any, on whose behalf the application is being
submitted.
56. Proof of Authorization for Site Occupancy. Where an applicant is not the owner of the
real property upon which it seeks to install its equipment or facility, it shall submit proof of
authorization to occupy the site at issue.
If the applicant is leasing all or a portion of real property upon which it intends to install its
facility or equipment, then the applicant shall provide a written copy of its lease with the
owner of such property. The applicant may redact any financial terms contained within the
lease, but it shall not redact any portion of the lease which details the amount of area
leased nor the specific portion of the real property to which the applicant has obtained the
right to occupy, access, or preclude others from entering.
Where an applicant seeks to Co-Locate new equipment into an existing facility, it shall
provide a copy of its written co-location agreement with the owner of such pre-existing
facility, from which it may redact any financial terms.
7. Fire Safety: The applicant shall submit a Fire Safety Plan that includes a general
description of the personal wireless services facility for purposes of ensuring the Fire
Department is fully informed and prepared in case of a fire. The Fire Safety Plan shall
include:
a. Location of all Fire Safety Plan documents.
b. Location of the facility’s alarm panel.
c. List of emergency contacts.
d. Specific responsibilities assigned to designated personnel.
e. Location of signal-processing equipment.
39
f. Location and listing of types of power equipment, including rectifiers, inverters,
distribution cabinets, bus bars, cables, and communications raceways.
g. Listing and location of batteries, including description of quantities and types of
batteries, specifying whether batteries are lithium-ion, nickel cadmium, sodium-nickel,
valve-regulated lead acid, and/or vented, and description of any associated exhaust
ventilation system(s).
h. Description of actions to detect and prevent thermal runaway events.
i. Description of whether the facility will be located in a lightning-prone area. If the
facility is to be located in a lightning-prone area, description of how the facility shall
comply with NFPA 780 Standard for the Installation of Lightning Protection Systems;
j. Description of location and types of fuses used to ensure that if the wireless
transmission facility experiences overcurrent resulting from current exceeding the
rating of equipment or the ampacity of a conductor, the facility shall turn off
temporarily.
k. Depowering procedures including identification of locations of electrical depowering
devices, which include:
(a) Coded floor prints located in the Fire Safety Plan document;
(b) Facility signage to direct fire personnel to depowering locations;
(c) The method of turning off power to the following:
i. Alternating current power board. This is the primary source of electric power
for a telecommunications facility and is supplied by the local power company.
ii. Standby power generator. This unit, usually a turbine or diesel generator,
provides standby ac power that is transferred manually or automatically
whenever a loss of ac power is experienced.
iii. Direct current primary disconnect fuse or circuit breaker bay. This unit
distributes dc power to the secondary fuse or circuit breaker panels throughout
40
the central office. The secondary fuse or circuit breaker panels feed all the
operating voltages to the central office branch circuits.
iv. Uninterruptible power supply (UPS)
v. HVAC systems serving the facility
vi. Alternative energy devices, such as wind turbines, fuel cells, photovoltaic
systems, or other devices providing power to the facility.
l. Detailed electrical designs, signed and stamped by a licensed electrical engineer,
demonstrating compliance with the Building, Electric and Fire Code. The Code compliance
demonstration shall include all necessary underlying calculations and inputs, including but not
limited to:
(a) A short circuit and coordination study (“SCCS”) calculated pursuant to the IEEE 551-2006:
Recommended Practice for Calculating AC Short-Circuit Currents in Industrial and
Commercial Power Systems or the latest version of that standard. The study must
demonstrate the protection devices will ensure the equipment enclosure will not be
breached. The SCCS must include analysis of Voltage Transient Surges due to contact of
conductors of different voltages;
(b) A one-line diagram of the electrical system;
(c) Voltage Drop & Load Flow Study;
(d) Load Calculation;
(e) Panel Directories;
8. Soil Erosion and Sedimentation Control: A soil erosion and sedimentation control plan,
prepared in accordance with the standards as established by the Town Engineering
Division.
9. Engineer’s Report: For the construction of all new wireless facilities and to the extent not
already mandated herein, the applicant shall provide a report prepared and certified by a
professional engineer certifying the integrity and safety of all proposed new towers and/or
structures and indicating the location, type, and height of the proposed personal wireless
services facility, antenna capacity, on-site and abutting off-site land uses, means of access,
setbacks from property lines, all applicable American National Standards Institute (ANSI)
41
technical and structural codes. To the extent that an application proposes the co-location of
new equipment onto an existing tower or personal wireless services facility, the applicant
shall provide an engineer's report certifying that the proposed shared use will not diminish
the structural integrity and safety of the existing structure and explaining what
modifications, if any, will be required in order to certify above.
10. Visual Impact Analysis. The applicant shall provide a completed visual impact analysis
that shall include the following:
a. A “Zone of Visibility Map” to determine locations from where the new facility will be
seen.
b. A visual impact analysis which shall include photographic images taken from the
perspectives of the properties situated in closest proximity to the location being
proposed for the siting of the facility, as well as those properties which would
reasonably be expected to sustain the most significant adverse aesthetic impacts due to
such factors as their close proximity to the site, their elevation relative to the site, the
existence or absence of a “clear line of sight” between the tower location and their
location.
The photographic images shall depict the height at which the proposed facility shall stand
when completed, including all portions and proposed attachments to the facility, including,
but not limited to, the main support structure, all antennas, transmitters, whip antennas,
lightning rods, t-bars, crossbars, and cantilever attachments which shall, in whole or in part,
be affixed to it, any and all surrounding equipment compound(s), fencing, cellular
equipment cabinets, transformers, transformer vaults and/or cabinets, sector distribution
boxes, ice bridges, backup generators, including but not limited to equipment boxes, switch
boxes, backup generators, ice bridges, etc., to the extent that any of such compound and/
or equipment will be visible from properties other than the property upon which the
proposed tower and compound are to be installed.
The photographic images shall show the maximum silhouette, viewshed analysis, color and
finish palette, and proposed screening and landscaping. The analysis shall include the
results of the drone/balloon test, and other information as necessary to determine visual
impact of the facility. The analysis shall include a map depicting where the photos were
taken. Where consistent with the natural or built environment, the analysis shall include a
42
native vegetation landscaping plan with a visual simulation of how the chosen plants, at
maturity, will screen the site.
11. For proposed towers and facilities taller than 100 feet, the applicant shall perform a
balloon test and shall publish reasonably advanced public notice of the same to enable the
Reviewing Authority, property owners, and the community an opportunity to assess the
actual adverse aesthetic impact which the proposed facility is likely to inflict upon the
nearby properties and surrounding community. Said date and time will be established by
the Development Services Director in coordination with the applicant, including an
alternative date in case of inclement weather. If a balloon is used, the diameter shall be
equal to the largest antenna or dish proposed for the CRS tower or the width of the tower,
whichever is larger. The applicant will be responsible for publishing a public notice of the
balloon test in at least one local newspaper publication and notifying abutters owning
property within one thousand (1,000) feet radius, via U.S. Mail at least one week prior to the
test.
12. If the application is for a facility that will not be attached to an existing utility pole and
the facility’s proposed height will be greater than 30 feet then structural elevations of the
facility(ies) shall include any trees and other structures within twenty (20’) feet, and their
height.
613. Environmental Assessment Form. A completed environmental assessment form (EAF)
and a completed visual EAF addendum if required by ADEQ.
714. FCC Compliance Report.
An FCC compliance report, prepared by a licensed engineer, and certified under penalties of
perjury, that the content thereof is true and accurate, wherein the licensed engineer shall
certify that the proposed facility will be FCC compliant as of the time of its installation,
meaning that the facility will not expose members of the general public to radiation levels
that exceed the permissible radiation limits which the FCC has set.
If it is anticipated that more than one carrier and/or user is to install transmitters into the
facility, the FCC compliance report shall take into account anticipated exposure from all
users on the facility and shall indicate whether or not the combined exposure levels will or
43
will not exceed the permissible General Population Exposure Limits, or alternatively, the
occupational Exposure Limits, where applicable.
Such FCC Compliance Report shall provide the calculation or calculations with which the
engineer determined the levels of RF radiation and/or emissions to which the facility will
expose members of the general public.
On the cover page of the report, the report shall explicitly specify: (a) Whether the applicant
and their engineer are claiming that the applicable FCC limits based upon which they are
claiming FCC compliance are the General Population Exposure Limits or the Occupational
Exposure Limits. If the applicant and/or their engineer are asserting that the Occupational
Exposure Limits apply to the proposed installation, they shall detail a factual basis as to why
they claim that the higher set of limits is applicable, (b) The exact minimum distance factor,
measured in feet, which the applicant’s engineer used to calculate the level of radiation
emissions to which the proposed facility will expose members of the general public. The
minimum distance factor is the closest distance (i.e., the minimum distance) to which a
member of the general public shall be able to gain access to the transmitting antennas
mounted upon, or which shall be a part of, the proposed facility.
815. FCC License. A copy of any applicable Federal Communications Commission license
possessed by any carrier named as an applicant, co-applicant, or whose equipment is
proposed for installation as of the time the application is being filed with the Town.
916. Effective Prohibition Claims.
a. The Town is aware that applicants seeking approvals for the installation of new
wireless Facilities often assert that federal law, and more specifically the TCA, prohibits
the local government from denying their respective applications.
In doing so, they assert that their desired facility is “necessary” to remedy one or more
significant gaps in a carrier’s personal wireless service, and they proffer computer-
generated propagation maps to establish the existence of such purported gaps.
The Town is additionally aware that, in August 2020December 2018, driven by a concern
that propagation maps created and submitted to the FCC by wireless carriers were
inaccurate, the FCC caused its staff to perform actual drive tests, wherein the FCC staff
performed 24,649 tests, driving nearly ten thousand (10,000) miles through nine
44
(9)twelve (12) states, with an additional 5,916 stationary tests conducted at 42 locations
situated in nine (9) states.
At the conclusion of such testing, the FCC Staff determined that the accuracy of the
propagation maps submitted to the FCC by the wireless carriers had ranged from as
little as 16.2% accuracy to a maximum of 64.3% accuracy.
As a result, the FCC Staff recommended that the FCC no longer accept propagation
maps from wireless carriers without supporting drive test data to establish their
accuracy. A copy of the FCC Staff’s 66-page report is made a part of this Chapter as
Appendix 1.
The Town considers it of critical import that applicants provide truthful, accurate,
complete, and sufficiently reliable data to enable the Town Council to render
determinations upon applications for new wireless facilities consistent with this
Chapter’s requirements and the TCA’s statutory requirements.
Consistent with same, if, at the time of filing an application under this Chapter, an
applicant intends to assert before the Town Council or the Town that: (a) an identified
wireless carrier suffers from a significant gap in its personal wireless services within the
Town, (b) that the applicant’s proposed installation is the least intrusive means of
remedying such gap in services, and/or (c) that under the circumstances pertaining to
the application, a denial of the application by the Town Council would constitute an
“effective prohibition” under Section 47 U.S.C. §332 the TCA, then, at the time of filing
such application, the applicant shall be required to file a written statement which shall
be entitled:
“Notice of Effective Prohibition Conditions”
If an applicant files a Notice of Effective Prohibition Conditions, then the applicant shall
be required to submit Probative Evidence to enable the Town Council to reasonably
determine:
i. Whether or not the conditions alleged by the respective applicant exist,
ii. Whether there exists a significant gap or gaps in an identified wireless carrier’s
personal wireless services within the Town,
45
iii. The geographic locations of any such gaps, and
iv. The geographic boundaries of such gaps, to enable the Town Council to
determine whether granting the respective application would be consistent with the
requirements of this Chapter and the legislative intent behind same, and whether or
not Federal law would require the Town Council to grant the respective application,
even if it would otherwise violate the Town Code, including, but not limited to, this
Chapter.
b. The additional materials which the applicant shall then be required to provide shall
include the following:
i. Drive Test Data and Maps. If, and to the extent that an applicant claims that a
specific wireless carrier suffers from a significant gap in its personal wireless services
within the Town, the applicant shall conduct or cause to be conducted a drive test
within the specific geographic areas within which the applicant is claiming such gap
or gaps exist, for each frequency at which the carrier provides personal wireless
services. The applicant shall provide the Town and the Town Council with the actual
drive test data recorded during such drive test, in a simple format which shall
include, in table format:
(a) The date and time for the test or tests,
(b) The location, in longitude and latitude, of each point at which signal strength
was recorded and
(c) Each signal strength recorded, measured in DBM, for each frequency. Such
data is to be provided in a separate table for each frequency at which the
respective carrier provides personal wireless services to any of its end-use
customers.
(d). The applicant shall also submit drive test maps depicting the actual signal
strengths recorded during the actual drive test for each frequency at which the
carrier provides personal wireless services to its end-use customers.
If an applicant claims that it needs a “minimum” signal strength (measured in
DBM) to remedy its gap or gaps in service, then for each frequency, the applicant
46
shall provide three (3) signal strength coverage maps reflecting actual signal
strengths in three (3) DBM bins, the first being at the alleged minimum signal
strength, and two (2) additional three (3) DBM bin maps depicting signal
strengths immediately below the alleged minimum signal strength claimed to be
required.
By way of example, if the applicant claims that it needs a minimum signal
strength of – 95 DBM to remedy its alleged gap in service, then the applicant
shall provide maps depicting the geographic area where the gap is alleged to
exist, showing the carrier’s coverage at – 95 to -98 DBM, -99 to -101 DBM, and -
102 to -104 DBM, for each frequency at which the carrier provides personal
wireless services to its end-use customers.
ii. Denial of Service and/or Dropped Call Records. If and to the extent that an
applicant claims that a specific wireless carrier suffers from a capacity deficiency or a
gap in service that renders the carrier incapable of providing adequate coverage of
its personal wireless services within the Town, then the applicant shall provide
dropped call records and denial of service records evidencing the number and
percentage of calls within which the carrier’s customers were unable to initiate,
maintain and conclude the use of the carrier’s personal wireless services without
actual loss of service, or interruption of service.
1017. Estimate for Cost of Removal of Facility. At or prior to the filing of an application
for a special use permit for the installation of a new personal wireless service facility, each
respective applicant shall provide a written estimate for the cost of the decommissioning
and removal of the facility, including all equipment that comprises any portion or part of the
facility, compound and/or complex, as well as any accessory facility or structure, including
the cost of the full restoration and reclamation of the site, to the extent practicable, to its
condition before development in accord with the decommissioning and reclamation plan
required herein. The Town Council’s Engineer shall review this estimate. A bond for the cost
of removal as required in Sec. 17.06 A. 2. shall be filed prior to commencement of
construction.
1118. Property Owner Consent & Liability Acknowledgement. A signed written consent
from each owner of the subject real property upon which the respective applicant is seeking
47
installation of its proposed personal wireless service facility, wherein the owner or owners
both authorize the applicant to file and pursue its application and acknowledge the
potential landowner’s responsibility, under Section 17.08 for engineering, legal and other
consulting fees incurred by the Town.
51219. Applications Using Existing Towers.
a. Dimensioned, to-scale drawings showing the existing and proposed antenna on the
tower including the height of the tower and the antennas.
b. The number and type of existing and proposed antennas.
c. Engineering calculations documenting the structural changes and certifying the
tower’s ability to carry the new antennas.
d. Dimensioned, to-scale drawings illustrating modification of ground equipment, if
any.
61320. Applications Using New Towers – Information Required.
In addition to any information required for applications for special use permits pursuant to
Chapter 2, Section 2.02, applicants for a new wireless facility shall submit the following
information:
a. A site plan as required in Section 2.04 plus zoning, General Plan classification of the
site and all properties within the applicable separation distances set forth in Section
17.03(B)(1), adjacent roadways, proposed means of access, elevation drawings of the
proposed tower and any other structures, photo simulations showing the tower in the
proposed location from at least four (4) directions, and other information deemed by
the Development Services Director to be necessary to assess compliance with this
chapter.
b. The setback distance between the proposed tower and the nearest residential unit
and residentially zoned properties. Include an illustration of the fall zone for the tower.
c. The separation distance from other towers described in the inventory of existing
sites submitted pursuant to Section 17.03(B)(2) shall be shown on an updated site plan
48
or map. The applicant shall also identify the type of construction of the existing tower(s)
and the owner/operator of the existing tower(s), if known.
d. Method of fencing, and finished color and, if applicable, the method of camouflage
and illumination.
e. A description of compliance with Sections 17.03(A)(3), 17.03(A)(4), 17.03(A)(5),
17.03(A)(7), 17.03(A)(8), 17.03(A)(9), 17.03(A)(10), 17.03(A)(11), 17.03(B), subsection (A)(3)
of this section, Sections 17.06(A) and 17.06(B) and all applicable federal, state or local
laws.
f. A notarized statement by the applicant as to whether construction of the tower will
accommodate collocation of additional antennas for future users.
g. Identification of the entities providing the backhaul network for the tower(s)
described in the application and other cellular sites owned or operated by the applicant
in the municipality.
h. A description of the suitability of the use of existing towers, other structures or
alternative technology not requiring the use of towers or structures to provide the
services to be provided through the use of the proposed new tower. Alternatives
Analysis. An itemized list of alternative sites considered, with a comprehensive
explanation of reasons alternative sites are not technologically feasible. Explanation
shall include specific comparative analysis of how different sites would impact aesthetic
values, and other environmental values.
i. A description of the feasible alternative location(s) of future towers or antennas
within the Town of Fountain Hills based upon existing physical, engineering,
technological or geographical limitations in the event the proposed tower is erected.
j. A statement of compliance with Federal Communications Commission (FCC) radio
frequency (RF) exposure standards.
71420. Filing Fee. Payment of a filing fee in an amount established by a schedule adopted
by resolution of the Council and filed in the offices of the Town Clerk. No part of the filing
fee shall be returnable.
49
B. Shot Clocks and Tolling. To comply with the requirements of Section 47 U.S.C. §332(c)(7)(B)(ii)
of the TCA, the following shot clock periods set forth hereinbelow shall be presumed to be
reasonable periods within which the Town shall render determinations upon applications for
wireless communication facilities.
The Town shall render determinations upon such applications within the periods set forth
hereinbelow, unless the applicable shot clock period listed below is tolled, extended by
agreement or the processing of the application is delayed due to circumstances beyond the
Town’s control.
1. Application Shot Clocks.
a. Receipt of Initial Application. Upon receipt of an application, the Development Services
Director, or designee, shall review the application for completeness. If the Director
determines the application is: (i) incomplete, (ii) missing required application materials,
(iii) is the wrong type of application, or (iv) is otherwise defective, then, within ten (10)
days for administrative applications and thirty (30) days for public hearing applications
of the Town’s receipt of the application, the Director, or their designee, shall notify the
applicant of the finding and state what is needed to have a complete application.
The notice of incompleteness shall toll the shot clock, which shall not thereafter resume
running unless and until the applicant tenders an additional submission to the Director
to remedy the issues identified in the notice of incomplete application. The submission
of any responsive materials by the applicant shall automatically cause the shot clock
period to resume running.
If upon receipt of any additional materials from the applicant, the Director determines
that the application is still incomplete and/or defective, then the Director shall, once
again notify the applicant within ten (10) days for administrative applications and thirty
(30) days for public hearing applications of the applicant having filed its supplemental or
corrected materials to the Town and the shot clock shall once again be tolled, and the
same procedure provided for hereinabove shall be repeated.
If Applicant does not cure the stated deficiencies within 30 days, the application shall be
considered withdrawn or closed.
50
b. Application Review. The shot clock for administrative applications which do not
involve new towers is ninety (90) days. The shot clock for administrative applications
with new towers, monopoles, utility poles and other wireless facilities that trigger public
review applications is one hundred fifty (150) days.
2. Shot Clock Tolls, Extensions and Reasonable Delay Periods. Consistent with the letter and
intent of Section 47 U.S.C. §332(c)(7)(B)(ii) of the TCA, each of the shot clock periods set forth
within subsection (B) of this section shall generally be presumed to be sufficient periods
within which the Town shall render decisions upon applications.
Notwithstanding the same, the applicable shot clock periods may be tolled, extended by
mutual agreement between any applicant and/or its representative and the Town, and the
Town shall not be required to render its determination within the shot clock period
presumed to be reasonable for each type of application, where the processing of such
application is reasonably delayed, as described hereinbelow.
a. Tolling of the Applicable Shot Clock Due to Incompleteness and/or Applicant Error. As
provided for within subsection (B)(1) of this section, in the event that the Development
Services Director deems an application incomplete, the Director shall send a notice of
incompleteness to the applicant to notify the applicant that its application is incomplete
and/or contains material errors, and shall reasonably identify the missing information
and/or documents and/or the error(s) in the application.
If the Director sends a notice of incompleteness as described hereinabove, the
applicable shot clock shall automatically be tolled, meaning that the applicable shot
clock period within which the Town is required to render a final decision upon the
application shall immediately cease running, and shall not resume running, unless and
until the Town receives a responsive submission from the applicant.
If and when the applicant thereafter submits additional information in an effort to
complete its application, or cure any identified defect(s), then the shot clock shall
automatically resume running, but shall not be deemed to start running anew.
The applicable shot clock period shall, once again, be tolled if the Director thereafter
provides a second notice that the application is still incomplete or defective, despite any
51
additional submissions which have been received by the Town, from the applicant, up to
that point.
b. Shot Clock Extension by Mutual Agreement. The Town shall be free to extend any
applicable shot clock period by mutual agreement with any respective applicant. This
discretion on the part of the Town shall include the Town’s authority to request, at any
time, and for any period of time the Town may deem reasonable or appropriate under
the circumstances, consent from a respective applicant to extend the applicable shot
clock period to enable the Town, the applicant, or any relevant third party, to complete
any type of undertaking or task related to the review, analysis, processing, and
determination of the particular application, which is then pending before the Town, to
the extent that any such undertaking, task, or review is consistent with, or reasonably
related to, compliance with any federal, state, or local law and/or the requirements of
any provision of the Town Code, including but not limited to this chapter.
In response to any request by the Town, the applicant, by its principal, agent, attorney,
site acquisition agent, or other authorized representative, can consent to any extension
of any applicable shot clock by affirmatively indicating its consent either in writing or by
affirmatively indicating its consent on the record at any public hearing or public
meeting. The Town shall be permitted to reasonably rely upon a representative of the
applicant indicating that they are authorized to grant such consent on behalf of the
respective applicant, on whose behalf they have been addressing the Town within the
review process.
c. Reasonable Delay Extensions of Shot Clock Periods. The Town recognizes that there may
be situations wherein, due to circumstances beyond the control of the Town and/or the
Town Council, the review and issuance of a final decision upon an application for a
wireless communication facility cannot reasonably be completed within the application
shot clock periods delineated within subsection (B) of this section.
If, despite the exercise of due diligence by the Town, the determination regarding a
specific application cannot reasonably be completed within the applicable shot clock
period, the Town shall be permitted to continue and complete its review and issue its
determination at a date beyond the expiration of the applicable period, if the delay of
such final decision is due to circumstances including, but not limited to, those
52
enumerated hereinbelow, each of which shall serve as a reasonable basis for a
reasonable delay of the applicable shot clock period.
i. In the event that the rendering of a final decision upon an application under this
chapter is delayed due to natural and/or unnatural events and/or forces which are
not within the control of the Town, such as the unavoidable delays experienced in
government processes due to the COVID 19 pandemic, and/or mandatory
compliance with any related federal or state government orders issued in relation
thereto, such delays shall constitute reasonable delays which shall be recognized as
acceptable grounds for extending the period for review and the rendering of final
determinations beyond the period allotted under the applicable shot clock.
ii. In the event that applicant tenders eleventh-hour submissions to the Town in the
form of (a) expert reports, (b) expert materials, and/or (c) materials which require a
significant period for review due either to their complexity or the sheer volume of
materials which an applicant has chosen to provide to the Town at such late point in
the proceedings, the Town shall be afforded a reasonable time to review such late-
submitted materials.
If reasonably necessary, the Town shall be permitted to retain the services of an
expert consultant to review any late-submitted expert reports which were provided
to the Town, even if such review or services extend beyond the applicable shot clock
period, so long as the Town completes such review and retains and secures such
expert services within a reasonable period of time thereafter and otherwise acts
with reasonable diligence in completing its review and rendering its final decision.
C. Review and Processing of Applications.
1. Conformity to the following shall be considered in review of all applications:
a. The application is consistent with the objectives of this chapter.
b. The height of the proposed tower.
c. The adequacy of the proposed site, considering such factors as the sufficiency of the
size of the site to comply with the established criteria, the configuration of the site, and
the extent to which the site is formed by logical boundaries (e.g., topography, natural
53
features, streets, relationship of adjacent uses, etc.) that provide for the ability to
comply with the provisions of this chapter.
d. The extent to which the proposal responds to the impact of the proposed
development on adjacent land uses, especially in terms of visual impact.
e. The extent to which the proposed telecommunications facility is camouflaged (i.e.,
use of stealth technology) uses concealment elements.
f. The extent to which the proposed facility is integrated with existing structures (i.e.,
buildings, signs, utility poles, etc.) with particular reference to design characteristics that
have the effect of reducing or eliminating visual obtrusiveness.
g. An applicant’s compliance with all town requirements with respect to previous
applications.
h. Whether the proposed installation will inflict a significant adverse impact upon the
property values of properties that are located adjacent to, or in close proximity to, the
proposed site or properties that are otherwise situated in a manner that would cause
the proposed installation to inflict a significant adverse impact upon their value.
i. Whether the proposed installation will be incompatible with the use and/or character
of properties located adjacent to or in close proximity to the proposed site or other
properties situated in a manner that would cause the proposed installation to be
incompatible with their respective use.
j. Whether the proposed installation will be incompatible with and/or would have an
adverse aesthetic impact upon or detract from the use and enjoyment of, and/or
character of, recognized aesthetic assets of the Town, including, but not limited to,
scenic areas and/or scenic ridgelines, scenic areas, public parks, and/or any other
traditionally or historically recognized valuable scenic assets of the Town.
k. Whether the proposed installation shall have a sufficient fall zone and/or safe zone
around the facility to afford the general public safety against the potential dangers of
structural failure, icefall, debris fall, and fire.
l. Whether the applicant has mitigated the potential adverse impacts of the proposed
facility to the greatest extent reasonably feasible. To determine mitigation efforts on the
54
part of the applicant, the mere fact that a less intrusive site, location, or design would
cause an applicant to incur additional expense is not a reasonable justification for an
application to have failed to propose reasonable mitigation measures.
2. Review of Administrative Applications.
a. Administrative applications will be reviewed by staff using the Town’s standard
building permit review processes.
b. Applications for new towers shall provide staff with the same information as
required in subsection of this section for public review applications.
cb. Applications for mobile or temporary wireless facilities which remain in place for
more than seven (7) consecutive days must submit a request for a temporary use
permit as provided in Section 2.03.
3. Review and Processing of Public Review Applications.
a. Applications which require public review and approval on private property will be
processed as special use permits and follow the requirements listed in Section 2.02 for
special use permits. Applications on Town owned property will not require a special use
permit but will follow the same requirements for notice for review by the Town Council.
b. In addition to the factors listed in subsection (C)(1) of this section for review of
applications, public review applications will also be subject to the standards for
consideration of special use permit applications pursuant to Chapter 2, Section 2.02 of
this chapter. Factual Determinations.
To decide applications under this Section, the Town Council shall render factual
determinations, which shall include two (2) specific types of factual determinations, as
applicable.
First, the Council shall render local zoning determinations according to Section i.
hereinbelow.
Then, if, and only if, an applicant asserts claims that a denial of its application would
effectively prohibit an identified Wireless Carrier from providing Personal Wireless
Services within the Town, or its proposed wireless facility or installation is necessary to
55
remedy a significant gap in personal wireless services for an explicitly identified Wireless
Carrier, and that its proposed installation is the least intrusive means of remedying a
specifically identified significant gap or gaps.
The Council shall then additionally render TCA determinations in accord with Section ii.
herein below.
The Council shall separately record each factual determination it makes in a written
decision and shall reference, or make note of, the evidence-based upon which it
rendered each of its factual determinations.
Each factual determination made by the Council shall be based upon Substantial
Evidence. For purposes of this provision, “Substantial Evidence” shall mean such
relevant evidence as a reasonable mind might accept as adequate to support a
conclusion. It means less than a preponderance but more than a scintilla of evidence.
Evidence that the Council may consider shall include any evidence submitted in support
of an application and any evidence submitted by anyone opposing a respective
application, whether such evidence is in written or photographic form or whether it is in
the form of testimony by any expert, or any person who has personal knowledge of the
subject of their testimony. The Council may, of course, additionally consider as evidence
any information or knowledge which they, themselves, personally possess and any
documents, records, or other evidence which is a matter of public record, irrespective of
whether such public record is a record of the Town, or is a record of or is maintained by,
another federal, state and/or other governmental entity and/or agency which maintains
records which are available for, or subject to, public review.
The requirements for specific factual determinations set forth below are intended to
enure to the benefit of the Town, its residents, and property owners, and not applicants.
If, and to the extent that the Town Council fails to render one or more of such
determinations, that omission shall not constitute grounds upon which the respective
applicant can seek to annul, reverse or modify any decision of the Town Council.
i Local Zoning Determination
56
The Council shall make the following factual determinations as to whether the
application meets the requirements for granting a special use permit under this
Chapter.
(a) Compliance with Section 2.02
Whether the proposed installation will meet each of the conditions and
standards set forth within Section 2.02 in the absence of which the Town Council
is not authorized to grant a special use permit.
(b) Potential Adverse Aesthetic Impacts
Whether the proposed installation will inflict a significant adverse aesthetic
impact upon properties located adjacent to, or in close proximity to, the
proposed site or any other properties situated in a manner that would sustain
significant adverse aesthetic impacts by the installation of the proposed facility.
(c) Potential Adverse Impacts Upon Real Estate Values
Whether the proposed installation will inflict a significant adverse impact upon
the property values of properties that are located adjacent to, or in close
proximity to, the proposed site or properties that are otherwise situated in a
manner that would cause the proposed installation to inflict a significant adverse
impact upon their value.
(d) Potential Adverse Impact Upon the Character of the Surrounding
Community
Whether the proposed installation will be incompatible with the use and/or
character of properties located adjacent to or in close proximity to the proposed
site or other properties situated in a manner that would cause the proposed
installation to be incompatible with their respective use.
(e) Potential Adverse Impacts Upon Historic Properties or Historic Districts
Whether the proposed installation will be incompatible with and/or would have
an adverse impact upon, or detract from the use and enjoyment of, and/or
character of a historic property, historic site, and/or historic district, including,
57
but not limited to, historic structures, properties and/or districts which are listed
on, or are eligible for listing on, the National Register of Historic Places.
(f) Potential Adverse Impacts Upon Ridgelines or Other Aesthetic Resources
of the Town
Whether the proposed installation will be incompatible with and/or would have
an adverse aesthetic impact upon or detract from the use and enjoyment of,
and/or character of, recognized aesthetic assets of the Town, including, but not
limited to, scenic areas and/or scenic ridgelines, scenic areas, public parks,
and/or any other traditionally or historically recognized valuable scenic assets of
the Town.
(g) Sufficient Fall Zones
Whether the proposed installation shall have a sufficient fall zone and/or safe
zone around the facility to afford the general public safety against the potential
dangers of structural failure, icefall, debris fall, and fire.
(h) Mitigation
Whether the applicant has mitigated the potential adverse impacts of the
proposed facility to the greatest extent reasonably feasible. To determine
mitigation efforts on the part of the applicant, the mere fact that a less intrusive
site, location, or design would cause an applicant to incur additional expense is
not a reasonable justification for an application to have failed to propose
reasonable mitigation measures.
If, when applying the evidentiary standards set forth in Section 17.05 C. 3. b. i.
hereinabove, the Town Council determines that the proposed facility would not
meet the standards set forth within Section 2.02 or that the proposed facility would
inflict one or more of the adverse impacts described hereinabove to such a
substantial extent that granting the respective application would inflict upon the
Town and/or its citizens and/or property owners the types of adverse impacts which
this provision was enacted to prevent, the Town Council shall deny the respective
application unless the Council additionally finds that a denial of the application
58
would constitute an Effective Prohibition, as provided for in Sections 17.05 C. 3. b. ii.
and iii immediately hereinbelow.
ii. TCA Determinations
In cases within which an applicant has filed a “Notice of Effective Prohibition
Conditions,” the Town Council shall determine if a denial of the respective
application would “Effectively Prohibit” a specifically identified Wireless Carrier from
providing Personal Wireless Services within any geographic area or areas in the
Town.
More specifically, the Town Council shall determine whether a denial of the specific
application would either: (i) prevent an identified Wireless Carrier from providing
personal wireless services within a specific geographic area or areas within the Town
or (ii) would prevent a specific Wireless Carrier from constructing a sufficient
number of such facilities necessary to enable it to provide Personal Wireless Services
within the Town.
In determining whether a denial of any specific application would constitute an
“Effective Prohibition,” the Town Council shall determine: (1) whether an applicant
has established that an identified Wireless Carrier suffers from one or more
significant gaps in its Personal Wireless Services, and (2) whether its proposed
installation is the least intrusive means of remedying any such gap or gaps.
(a) Significant Gap in Personal Wireless Services of an Identified Carrier
The Town Council shall determine whether the applicant has established, based
upon probative evidence provided by the applicant and/or its representative,
that a specific Wireless Carrier suffers from a significant gap in its personal
wireless services within the Town.
In rendering such determination, the Council shall consider factors including, but
not necessarily limited to:
(1) Whether the identified Wireless Carrier, which is alleged to suffer from
any significant gap in their personal wireless services, already provides
Adequate Service in its Personal Wireless Services to its customers at any
59
frequency being used by the carrier to provide personal wireless services to
its end-use customers,
(2) Whether any such alleged gap is relatively large or small in geographic
size,
(3) Whether the number of the carrier’s customers affected by the gap is
relatively small or large,
(4) Whether or not the location of the gap is situated on a lightly traveled
road, or sparsely or densely occupied area, and/or
(5) Overall, whether the gap is relatively insignificant or otherwise relatively
de minimis.
An Effective Prohibition shall not be found to exist under subparagraph (iii)
hereinbelow if a Wireless Carrier has adequate coverage in any specified
geographic area, such that its end-use customers can use their cellular
telephones to connect to landlines using the Carrier’s Personal Wireless Services,
but the frequency at which the customers are using such services is not the
frequency most desired by the Carrier.
(b) Least Intrusive Means of Remedying Gap(s) in Service
The Town Council shall determine whether the applicant has established, based
upon probative evidence provided by the applicant and/or its representative,
that the installation of the proposed facility at the specific site proposed by the
applicant and the specific portion of the site proposed by the applicant, and at
the specific height proposed by the applicant, is the least intrusive means of
remedying whatever significant gap or gaps which the applicant has
contemporaneously proven to exist as determined by the Town Council based
upon any evidence in support of, and/or in opposition to, the subject application.
In rendering such determination, the Council shall consider factors including, but
not necessarily limited to:
(1) Whether the proposed site is the least intrusive location at which a facility
to remedy an identified significant gap may be located, and the applicant has
60
reasonably established a lack of potential alternative less intrusive sites and
lack of sites available for co-location,
(2) Whether the specific location on the proposed portion of the selected site
is the least intrusive portion of the site for the proposed installation
(3) Whether the height proposed for the facility is the minimum height
actually necessary to remedy an established significant gap in service,
(4) Whether or not a pre-existing structure can be used to camouflage the
facility and/or its antennas,
(5) Whether or not, as proposed, the installation mitigates adverse impacts
to the greatest extent reasonably feasible through the employ of Stealth
design, screening, use of color, noise mitigation measures, etc., and/or
(6) Overall whether or not there is a feasible alternative to remedy the gap
through alternative, less intrusive substitute installations.
An Effective Prohibition shall also not be found to exist in subparagraph (iii)
hereinbelow if an applicant fails to establish before the Town Council that any
existing geographic gap or capacity deficiency in the specific Wireless Carrier’s
coverage cannot be remedied through a less intrusive means than what is being
proposed, including, but not limited to, potential installations on alternative less
intrusive sites, a shorter tower or facility, the incorporation of a more stealthy
design, etc.
iii. Finding of Effective Prohibition or Lack of Effective Prohibition
After considering the evidence presented before it, the Town Council shall
determine whether or not a denial of the respective application would constitute an
effective Prohibition.
If the Town Council affirmatively determines that the applicant has failed to establish
either: (i) that a denial of the application would prevent an identified Wireless Carrier
from providing personal wireless services within a specific geographic area or areas
within the Town or (ii) that a denial of the application would prevent a specific
Wireless Carrier from constructing a sufficient number of such facilities necessary to
61
enable it to provide Personal Wireless Services within the Town, then the Town
Council shall find that a denial of the application does not constitute an Effective
Prohibition.
If the Town Council affirmatively determines that: (i) a denial of the application
would prevent an identified Wireless Carrier from providing personal wireless
services within a specific geographic area or areas within the Town, or (ii) that a
denial of the application would prevent a specific Wireless Carrier from constructing
a sufficient number of such facilities necessary to enable it to provide Personal
Wireless Services within the Town, then the Town Council shall find that a denial of
the application would constitute an Effective Prohibition, and the Town Council shall
grant the subject application, irrespective of whether or not the granting of same
would otherwise be inconsistent with any other provision of this Section §17.05 C. 3.
b. Provided, the Town reserves the right to deny an application even if doing so
leads to an effective prohibition to the extent allowed by the safe harbors contained
in 47 U.S.C. §§ 253(b) and (c) and incorporated into 332(c)(7)(B)(i), based on the
evidence of record.
c. Availability of Suitable Existing Towers, Other Structures, or Alternative Technology. No
new tower shall be permitted unless the applicant demonstrates to the reasonable
satisfaction of the Town Council that no existing tower, structure or alternative
technology that does not require the use of towers or structures can accommodate the
applicant’s proposed antenna. An applicant shall submit information requested by the
Town Council related to the availability of suitable existing towers, other structures or
alternative technology. Evidence submitted to demonstrate that no existing tower,
structure or alternative technology can accommodate the applicant’s proposed antenna
may consist of any of the following:
i. No existing towers or structures are located within the geographic area, which
meet applicant’s reasonable engineering and personal wireless service related
quality requirements. This evidence cannot be merely conclusory and must be
supported by propagation maps that include the underlying analysis models,
engineering reports speaking to the technical infeasibility, dropped call logs, and
other data showing that a new tower is the only means of accommodating the
proposed antenna.
62
ii. Existing towers or structures are not of sufficient height to meet applicant’s
engineering requirements.
iii. Existing towers or structures do not have sufficient structural strength to
support applicant’s proposed antenna and related equipment.
iv. The applicant’s proposed antenna would cause electromagnetic interference
with the antenna on the existing towers or structures, or the antenna on the existing
towers or structures would cause interference with the applicant’s proposed
antenna as certified by an RF engineer.
v. The fees, costs, or contractual provisions required by the owner in order to share
an existing tower or structure or to adapt an existing tower or structure for sharing
are unreasonable. Costs exceeding new tower development are presumed to be
unreasonable.
vi. The applicant demonstrates that there are other limiting factors that render
existing towers and structures unsuitable.
vii. The applicant demonstrates that an alternative technology that does not require
the use of towers or structures, such as a cable micro cell network using multiple
low-powered transmitters/receivers attached to a wire line system, is unsuitable.
Costs of alternative technology that exceed new tower or antenna development
shall not be presumed to render the technology unsuitable.
viii. If the applicant asserts a claim that a proposed facility is necessary to remedy
one (1) or more existing significant gaps in an identified wireless carrier’s personal
wireless services, the Council may require the applicant to provide drive-test
generated coverage maps, as opposed to computer-generated coverage maps, for
each frequency at which the carrier provides personal wireless services, to show
signal strengths in bins of three (3) DBM each, to enable the Council to assess the
existence of such significant gaps accurately, and/or whether the carrier possesses
adequate coverage within the geographic area which is the subject of the respective
application.
63
d. Following approval by the Town Council, the applicant may apply for a building permit
through the standard application process. Construction shall not commence prior to
approval of the building permit.
4. Environmental Impacts
If, and to the extent that, the Town Council determines a proposed installation bears the
potential for a significant adverse impact upon the environment within the meaning of
ADEQ and/or the NEPA, then the Council shall be expected to comply with the
requirements of ADEQ in determining both:
a. The extent of adverse impacts upon the environment and/or historic properties; and,
b. What mitigation measures the applicant should be required to undertake to
minimize the adverse environmental impacts and/or impacts upon historic sites,
structure and/or districts.
If a respective applicant fails to obtain a review from the ADEQ and/or NEPA and opinion
letters from the ADEQ and the FCC pertaining to its proposed installation prior to a first
public hearing before the Town Council for the respective application, then the Town
Council may make direct requests to the ADEQ and the FCC for their review of the
application. The Town Council may request the FCC’s review and input in completing the
statutorily-required environmental impact analysis pursuant to ADEQ and NEPA.
In addition, the Town Council shall comply with the statutory requirements of ADEQ to
complete an ADEQ review, make determinations of significance, and, where appropriate,
require the applicant to complete a draft environmental impact statement and, if
additionally appropriate, to thereafter complete a final environmental impact statement
and analysis.
So long as the Town Council acts with reasonable diligence in completing its ADEQ and
NEPA review, if compliance with the statutory requirements for environmental review
requires a period of effort that extends beyond the expiration of the applicable shot clock
period, the delays beyond such period shall be deemed reasonable.
5. Historic Site Impacts
64
The Town Council shall consider the potential adverse impacts of any proposed facility upon
any historic site, district, or structure consistent with the Town’s historic preservation law
requirements and comprehensive plan and ADEQ.
If, and to the extent that, the Town Council determines that a proposed installation bears
the potential for a significant adverse impact on a historic site or a historic district within the
meaning of ADEQ and/or the NHPA (especially if the historic site at issue is listed upon the
National Register of historic places), then the Council shall comply with the requirements of
both ADEQ and Town law in determining both:
a. The extent of adverse impacts upon the historic properties, and
b. What mitigation measure might the applicant be required to undertake to minimize
the adverse environmental impacts and/or adverse impacts upon historic sites,
structures and/or district.
Should a respective applicant fail to obtain a SHPO and/or a Section 106 review under
NHPA, and opinion letters from SHPO and the FCC pertaining to its proposed installation
prior to a first public hearing before the Town Council for the respective application, then
the Town Council shall make direct requests to SHPO and the FCC for their review of the
application. They shall request SHPO and the FCC’s review and input in completing the
statutorily-required environmental/historic impact analysis pursuant to ADEQ and NHPA.
This request shall include, but not be limited to, a request to the FCC for a Section 106
review, as defined in this Chapter, as the Town recognizes each application for a special use
permit for the installation of a personal wireless services facility shall constitute “an
undertaking” for purposes of compliance with the National Historic Preservation Act.
In addition, the Town Council shall comply with the statutory requirements of ADEQ to
complete a SEQ ADEQ RA review, make determinations of significance, and, where
appropriate, require the applicant to complete a draft environmental impact statement, and
if additionally appropriate, to thereafter complete a final environmental impact statement
and analysis.
So long as the Town Council acts with reasonable diligence in completing its ADEQ and
NHPA review, if compliance with the statutory requirements for historic preservation review
65
requires a period of effort that extends beyond the expiration of the applicable shot clock
period, the delays beyond such period shall be deemed reasonable.
6. Tribal Site Impacts
The Town Council shall consider the potential adverse impacts of any proposed facility upon
any tribal lands associated with the Fort McDowell Yavapai Nation and the Salt River Prima-
Maricopa Indian Community near or within the general area of Fountain Hills, Arizona. If,
and to the extent that, the Town Council determines that a proposed installation bears the
potential for a significant adverse impact on such tribal lands, then the Council shall issue
notice to tribal representatives and request tribal review of the application.
67. Force Majeure
In the event that the rendering of a final decision upon an application under this Chapter is
delayed due to natural and/or unnatural events and/or forces which are not within the
control of the Town or the Town Council, such as the unavoidable delays experienced in
government processes due to the COVID 19 pandemic, and/or mandatory compliance with
any related federal or state government orders issued in relation thereto, such delays shall
constitute reasonable delays which shall be recognized as acceptable grounds for extending
the period for review and the rendering of final determinations beyond the period allotted
under the applicable shot clock.
478. In granting a permit, the Town may impose conditions to the extent such conditions
are necessary to minimize any adverse effect of the proposed tower on adjoining
properties.
Section 17.06 Maintenance and Operation
A. Removal of Abandoned Antennas and Towers; Bond Required.
1. Any antenna or tower that is not operated for a continuous period of ninety (90) days
shall be considereddeemed abandoned, and. Within ninety (90) days of receipt of notice
from the Town of Fountain Hills notifying the owner of such abandonment, the owner of
such antenna or tower shall completely remove the same and all related equipment and
improvements and shall restore all affected areas to a condition compliant with all
66
applicable laws, which includes without limitation the Codewithin ninety (90) days of receipt
of notice from the Town of Fountain Hills notifying the owner of such abandonment. Failure
to remove an abandoned antenna or tower within said ninety (90) day period shall be
grounds to remove the tower or antenna at the owner’s expense. The Town shall have the
right (but not the obligation) to perform such removal and restoration with or without
notice. If there are two (2) or more users of a single tower, then this provision shall not
become effective until all users cease using the tower for the prescribed period.
2. Upon receiving a special use permit approval from the Town Council and a building
permit, prior to the commencement of installation and/or construction of such facility or
any part thereof, the applicant shall file with the Town a bond for a length of no less than
three (3) years in an amount equal to or exceeding the estimate of the cost of removal of
the facility and all associated structures, fencing, power supply, and other appurtenances
connected with the facility. The bond must be provided within thirty (30) days of the
approval date and before any installation or construction begins.
Replacement bonds must be provided ninety (90) days prior to the expiration of any
previous bond.
At any time the Town has good cause to question the sufficiency of the bond at the end of
any three-year (3) period, the owner and/or operator of the facility, upon request by the
Town, shall provide an updated estimate and bond in the appropriate amount.
Failure to keep the bonds in effect is cause for the removal of the facility at the owner's
expense. Each facility will require a separate bond, regardless of the number of owners or
location.
B. State or Federal Requirements.
1. Compliance with state and federal requirements. All towers must meet or exceed
current standards and regulations of the FAA, the FCC, and any other agency of the state or
federal government with the authority to regulate towers and antennas. If such standards
and regulations are changed, then the owners of the towers and antennas governed by this
chapter shall bring such towers and antennas into compliance with such revised standards
and regulations within six (6) months of the effective date of such standards and
regulations, unless a different compliance schedule is mandated by the controlling state or
67
federal agency. Failure to bring towers and antennas into compliance with such revised
standards and regulations shall constitute grounds for the removal of the tower or antenna
at the owner’s expense.
2. Prohibition against illegally excessive emissions and RF testing.
As disclosed on the FCC’s public internet website, personal wireless services facilities
erected at any height under 200 feet are not required to be registered with the FCC.
Of even greater potential concern to the Town is the fact that the FCC does not enforce the
RF radiation limits codified within the CFR by either: (a) testing the actual radiation
emissions of wireless Facilities either at the time of their installation or at any time
thereafter, or (b) requiring their owners to test them. See relevant excerpts from the FCC’s
public internet website annexed as Appendix 2.
This means that when wireless Facilities are constructed and operated within the Town, the
FCC will have no idea where they are located and no means of determining, much less
ensuring, that they are not exposing residents within the Town and/or the general public to
Illegally Excessive levels of RF Radiation.
The Town deems it to be of critical importance to the health, safety, and welfare of the
Town, its residents, and the public at large that personal wireless service facilities do not
expose members of the general public to levels of RF radiation that exceed the limits which
have been deemed safe by the FCC, and/or are imposed under CFR. The FCC has recognized
that 47 U.S.C. § 332(c)(7)(B)(iv) permits state and local governments, when making decisions
on the placement, construction, and modification of personal wireless service facilities, to
consider whether such facilities comply with the Commission's regulations concerning RF
emissions. In re Human Exposure to Radiofrequency Electromagnetic Fields et al., 34 FCC
Rcd 11687, 11739, ¶114 (2019).
In accord with the same, the Town enacts the following RF Radiation testing requirements
and provisions set forth herein below.
No wireless telecommunications facility shall at any time be permitted to emit illegally
excessive RF Radiation as defined in §17-2 or to produce power densities that exceed the
legally permissible limits for electric and magnetic field strength and power density for
transmitters, as codified within 47 CFR §1.1310(e)(1), Table 1 Sections (i) and (ii), as made
68
applicable pursuant to 47 CFR §1.1310(e)(3) unless the operator implements and retains
responsibility for ongoing effectiveness of the mitigation actions contained in 47 C.F.R.
§1.1307(b)(4).
To ensure continuing compliance with such limits by all owners and/or operators of wireless
communication facilities within the Town, all owners, and operators of wireless
communication facilities shall submit reports as required by this section.
As set forth hereinbelow, the Town may additionally require, at the owner and/or operator’s
expense, independent verification of the results of any analysis set forth within any reports
submitted to the Town by the owner and/or operator.
If an operator of a personal wireless service facility fails to supply the required reports or
fails to correct a violation of the legally permissible limits described hereinabove, following
notification that their respective facility is believed to be exceeding such limits, any special
use permit or other zoning approval granted by the Town Council or any other body or
representative of the Town is subject to modification or revocation by the Town Council
following a public hearing.
a. Certification of Compliance with Applicable RF Radiation Limits. Within forty-five (45)
days of initial operation or a substantial modification of a wireless communication
facility, the owner and/or operator of each telecommunications antenna shall submit to
the Development Services Director a written certification by a licensed professional
engineer, sworn to under penalties of perjury, that the facility’s radio frequency
emissions comply with the limits codified within 47 CFR §1.1310(e)(1), Table 1 Sections (i)
and (ii), as made applicable pursuant to 47 CFR §1.1310(e)(3).
The engineer shall also measure the emissions of the approved wireless facility,
including the cumulative impact from other nearby wireless facilities, and determine if
such emissions are within the limits described hereinabove.
A report of these measurements and the engineer’s findings with respect to compliance
with the FCC’s maximum permissible exposure (MPE) limits shall be submitted to the
Development Services Director.
If the report shows that the facility does not comply with applicable limits, then the
owner and/or operator shall cease operation of the facility until the facility is brought
69
into compliance with such limits. Proof of compliance shall be a certification provided by
the engineer who prepared the original report. The Town may require, at the applicant’s
expense, independent verification of the results of the analysis.
b. Random RF Radiofrequency Testing. At the operator’s expense, the Town may retain an
engineer to conduct random unannounced RF radiation testing of such wireless facilities
to ensure the facility’s compliance with the limits codified within 47 CFR §1.1310(e)(1) et
seq.
The Town may cause such random testing to be conducted as often as the Town may
deem appropriate. However, the Town may not require the owner and/or operator to
pay for more than one (1) test per facility per calendar year unless such testing reveals
that one (1) or more of the owner and/or operator’s facilities are exceeding the limits
codified within 47 CFR §1.1310(e)(1) et seq., in which case the Town shall be permitted to
demand that the wireless facility be brought into compliance with such limits, and to
conduct additional tests to determine if, and when, the owner and/or operator
thereafter brings the respective wireless facility and/or facilities into compliance.
If the Town at any time finds that there is good cause to believe that a personal wireless
service facility and/or one or more of its antennas are emitting RF radiation at levels in
excess of the legal limits permitted under 47 CFR §1.1310(e)(1) et seq., then a hearing
shall be scheduled before the Town Council at which the owner and/or operator of such
facility shall be required to show cause why any and all permits and/or approvals issued
by the Town for such facility and/or facilities should not be revoked, and a fine should
not be assessed against such owner and/or operator.
Such hearing shall be duly noticed to both the public and the owner and/or operator of
the respective facility or facilities at issue. The owner and/or operator shall be afforded
not less than two (2) weeks' written notice by first-class mail to its Notice Address.
At such hearing, the burden shall be on the Town to show that, by a preponderance of
the evidence, the Facilities emissions exceeded the permissible limits under 47 CFR
§1.1310(e)(1) et seq.
In the event that the Town establishes same, the owner and/or operator shall then be
required to establish, by clear and convincing evidence, that a malfunction of equipment
70
caused their failure to comply with the applicable limits through no fault on the part of
the owner/operator.
If the owner and/or operator fails to establish same, the Town Council shall have the
power to and shall revoke any special use permit, variance, building permit, and/or any
other form of zoning-related approval(s) which the Town Council, Board of Adjustment,
Town Engineer and/or any other representative of the Town may have then issued to
the owner and/or operator, for the respective facility.
In addition, the Town may issue a civil citation of not less than $1,000, nor more than
$5,000 for such violation of subparagraph 1. hereinabove, or, in the case of a second
offense within less than five (5) years, a minimum fine of $5,000, nor more than $25,000.
In the event that an owner or operator of one or more personal wireless service facilities
is found to violate subparagraph 1. hereinabove three or more times within any five (5)
year period, then in addition to revoking any zoning approvals for the facilities which
were violating the limits codified in 47 CFR §1.1310(e)(1) et seq., the Town Council shall
render a determination within which it shall deem the owner/operator prohibited from
filing any applications for any new wireless personal services facilities within the Town
for a period of five (5) years.
c. Annual Testing. The owner or operator of all PWSF shall provide for and conduct an
inspection of radio frequency radiation at least once annually by a licensed radio
frequency engineer. Three copies of a report shall be provided to the Development
Services Department, verifying that the radio frequency radiation is in compliance with
FCC Guidelines.
3. Actions for Noncompliance. If the Town at any time finds that there is good cause to
believe that a wireless communication facility and/or one (1) or more of its antennas are
emitting RF radiation at levels in excess of the legal limits permitted under 47 CFR
§1.1310(e)(1) et seq., then a hearing shall be scheduled before the Town’s Zoning
Administrator at which the owner and/or operator of such facility shall be required to show
cause why any and all permits and/or approvals issued by the Town for such facility and/or
facilities should not be revoked, and a fine should not be assessed against such owner
and/or operator.
71
The owner and/or operator shall be afforded not less than two (2) weeks’ written notice of
the hearing.
At such hearing, the burden shall be on the Town to show that, by a preponderance of the
evidence, the facilities emissions exceeded the permissible limits under 47 CFR §1.1310(e)(1)
et seq.
In the event that the Town establishes same, the owner and/or operator shall then be
required to establish, by clear and convincing evidence, that a malfunction of equipment
caused their failure to comply with the applicable limits through no fault on the part of the
owner/operator.
If the owner and/or operator fails to establish same, the Town shall have the power to
revoke any permit, building permit, and/or any other form of approval(s) which the Town
Council or any other representative of the Town may have then issued to the owner and/or
operator, for the respective facility. The Zoning Administrator may revoke an administrative
approval. The decision of the Zoning Administrator may be appealed to the Town Manager.
If the tower or antenna was approved by the Town Council, revocation will be considered by
the Town Council in the same manner as the original approval.
In addition, the Town may issue a civil citation for noncompliance as provided in Section 1-
8-3 of the Town Code.
In the event that an owner or operator of one (1) or more wireless communication facility is
found to violate subsection (B)(1) of this section three (3) or more times within any five (5)
year period, then in addition to revoking any zoning approvals for the facilities which were
violating the limits codified in 47 CFR §1.1310(e)(1) et seq., the Town Council shall render a
determination within which it shall deem the owner/operator prohibited from filing any
applications for any new wireless personal services facilities within the Town for a period of
five (5) years.
C. Building Codes; Safety Standards. To ensure the structural integrity of towers, the owner of a
tower shall ensure that it is maintained in compliance with standards contained in applicable
state or local building codes and the applicable standards for towers that are published by the
Electronic Industries Association, as amended from time to time. If, upon inspection, the Town
of Fountain Hills concludes that a tower fails to comply with such codes and standards and
72
constitutes a danger to persons or property, then upon notice being provided to the owner of
the tower, the owner shall have thirty (30) days to bring such tower into compliance with such
standards. Failure to bring such tower into compliance within said thirty (30) days shall
constitute grounds for the removal of the tower or antenna at the owner’s expense.
D. Noise. Wireless facilities and all related equipment must comply with all noise regulations
and shall not exceed such regulations, either individually or collectively. Backup generators
shall only be operated during power outages and/or for testing and maintenance purposes
between the hours of 9:00 a.m. and 4:00 p.m.
E. Maintenance. Prior to scheduling a final inspection for construction of a tower and associated
equipment, the applicant shall file with the Town a bond in the amount of X to cover the
ongoing maintenance of the tower, equipment, and landscaping. The bond amount shall be
reviewed and revised every three years thereafter. Should the owner of the tower, equipment,
and/or landscaping fail to maintain said facilities consistent with the Town’s approval and
ordinance requirements, and after notice for correction by the Town, the Town may call and
utilize the bonds to perform the needed maintenance activities.
F. Indemnity and liability for damages.
1. The wireless telecommunications facility provider shall defend, indemnify, and hold
harmless the Town or any of its boards, commissions, agents, officers, and employees from
any claim, action or proceeding against the Town, its boards, commission, agents, officers,
or employees to attack, set aside, void, or annul, the approval of the project when such
claim or action is brought within the time period provided for in applicable state and/or
local statues. The Town shall promptly notify the provider(s) of any such claim, action or
proceeding if the Town bears its own attorney's fees and costs, and the Town defends the
action in good faith.
2. Wireless telecommunications facility operators shall be strictly liable for interference
caused by their facilities with Town communications systems. The operator shall be
responsible for costs for determining the source of the interference, all costs associated
with eliminating the interference (including but not limited to filtering, installing cavities,
installing directional antennas, powering down systems, and engineering analysis), and all
costs arising from third party claims against the Town attributable to the interference.
73
G. Certificate of Insurance required. The applicant shall maintain adequate and sufficient liability
insurance during the construction period and thereafter, the carrier shall maintain liability
insurance meeting the criteria of this section throughout the life of any PWSF erected within the
Town of Fountain Hills. Prior to the issuance of any necessary permit, whether special permit or
building permit, documentation that liability insurance in the amount of at least $1,000,000
single occurrence, $3,000,000 aggregate has been secured identifying the Town as coinsured
shall be submitted to the Development Services Department, such policy shall not include a
pollution exclusion. The carrier’s maintenance without interruption of liability insurance in like or
greater amount with the Town named as coinsured is a continuing condition of any permit or
certificate of building compliance. , issued by an insured authorized to do business in the State
of Arizona meeting the criteria of this section throughout the life of any PWSF erected within the
Town of Fountain Hills, at least as broad as follows:
1. Commercial General Liability Insurance. The permittee shall procure and maintain at
its expense or cause its contractor or subcontractor to procure and maintain
throughout the term of this permit, commercial General Liability ("CGL") insurance on
an "occurrence" basis, with limits not less than $2,000,000 per occurrence per wireless
carrier or $4,000,000 per wireless carrier in the aggregate. If a general aggregate limit
applies, either the general aggregate limit shall apply separately to this project location
or the general aggregate limit shall be twice the required occurrence limit. CGL
insurance must include coverage for the following: Bodily Injury and Property Damage;
Personal Injury/Advertising Injury; Premises/Operations Liability; Products/Completed
Operations Liability; Aggregate Limits that Apply per Project; Explosion, Collapse and
Underground ("UCX") exclusion deleted; Contractual Liability with respect to the permit;
Broad Form Property Damage; and Independent Consultants Coverage. The policy shall
contain no endorsements or provisions limiting coverage for (i) contractual liability; (ii)
cross liability exclusion for claims or suits by one insured against another; (iii)
products/completed operations liability; (iv) bodily injury or damage from RF exposure
at levels exceeding the FCC limits; or (v) contain any other exclusion contrary to the
conditions in this permit.
5. Environmental Pollution Liability Insurance. The permittee shall procure and maintain
at its expense or cause its contractor or subcontractor to procure and maintain
throughout the term of this permit, Contractors Pollution Liability Insurance including
contractual liability coverage to cover liability and legal expenses arising out of cleanup,
74
removal, storage, or handling of hazardous or toxic chemicals, materials, substances, or
any other pollutants by the permittee or any subcontractor resulting from pollution
conditions associated with the personal wireless services facility in an amount not less
than $1,000,000 each occurrence combined single limit for bodily injury and property
damage.
6. Umbrella Policy. If an umbrella or excess liability insurance policy is used to satisfy the
minimum requirements for insurance coverage listed above, the umbrella or excess
liability policies shall provide coverage at least as broad as specified for the underlying
coverages and covering those insured in the underlying policies. Coverage shall be "pay
on behalf," with defense costs payable in addition to policy limits. Permittee shall
provide a "follow form" endorsement or schedule of underlying coverage satisfactory to
the Town indicating that such coverage is subject to the same terms and conditions as
the underlying liability policy.
7. Endorsements. The relevant policy(ies) shall name the Town, its elected/appointed
officials, commission members, officers, representatives, agents, volunteers and
employees as additional insureds. The permittee shall use its best efforts to provide
thirty (30) days' prior notice to the Town of the cancellation or material modification of
any applicable insurance policy.
8. Verification of Coverage. Permittee shall furnish the Development Services
Department with original certificates and amendatory endorsements or copies of the
applicable policy language providing the insurance coverage required herein. All
certificates and endorsements are to be received and approved by the Development
Services Department before any work commences. However, failure to obtain required
documents prior to the work beginning shall not waive the Licensee's obligation to
provide them. Permittee shall furnish updated certificates and endorsements to the
Town annually. The Town reserves the right to require updated certificates and
endorsements or complete, certified copies of all required insurance policies, including
the endorsements required herein, at any time.
9. Permittee Has Full Liability: The permittee shall assume full liability for damage or
injury caused to any property or person by the personal wireless services facility.
75
10. Permittee shall provide an executed agreement, pursuant to which Permittee and
any related third parties agree to defend, hold harmless and fully indemnify the Town,
its officers, employees, agents, attorneys, and volunteers, from (i) any claim, action or
proceeding brought against the Town or its officers, employees, agents, or attorneys to
attack, set aside, void, or annul any such approval of the Town or (ii) a successful legal
action brought against the Town for loss of property value or other harm caused by the
placement or operation of a small cell installation. Such indemnification shall include
damages, judgments, settlements, penalties, fines, defensive costs or expenses,
including, but not limited to, interest, attorneys’ fees and expert witness fees, or liability
of any kind related to or arising from such claim, action, or proceeding whether incurred
by the Permittee, the Town and/or the parties initiating or bringing such proceeding.
The agreement shall also include a provision obligating the Permittee to indemnify the
Town for all of the Town’s costs, fees and damages which the Town incurs in enforcing
the indemnification provisions of this Section.
H. ADA Accommodations. The Town seeks to comply with the Americans With Disabilities Act,
and shall comply with same in the event that any person who is disabled within the meaning of
the Act seeks a reasonable accommodation, to the extent they are entitled to same under the
Act.
I. Decommissioning and Reclamation Plan shall include the following information:
1. A plan for disposal of all solid waste, special waste and hazardous waste in
accordance with local, state, and federal waste disposal regulations detailing the types
and quantities of waste materials and methods of disposal;
2. A description of how and on what schedule stabilization and re-vegetation of the site
as deemed necessary to minimize erosion will be accomplished. Permittee should
include, to the extent possible, restoration of native vegetation, and pollinator-friendly
seed mixtures shall be used to the maximum extent possible in re-vegetation of ground
cover;
3. An estimate of costs for the decommissioning of the personal wireless services facility
with a detailed description of how the estimated costs were derived, including the date
which was the basis for the estimate;
76
4. A decommissioning plan signed by the party responsible for decommissioning and
the landowner (if different) whose minimum requirements meet the standards of this
Ordinance. Such plan must be filed in the Town Office prior to the first operation of the
personal wireless services facility;
5. An estimate of the total cost of decommissioning value of the equipment and
itemization of the estimated major expenses, including the projected costs of measures
taken to minimize or prevent adverse effects on the environment during the
implementation of the decommissioning plan.
Section 17.07 Nonconforming Uses
A. Not Expansion of Nonconforming Use. Towers that are constructed, and antennas that are
installed, in accordance with the provisions of this chapter shall not be deemed to constitute
the expansion of a nonconforming use or structure.
B. Pre-existing Towers. Pre-existing towers shall be allowed to continue their usage as they
presently exist. Routine maintenance (including replacement with a new tower of like
construction and height) shall be permitted on such pre-existing towers. New construction
other than routine maintenance on a pre-existing tower shall comply with the requirements of
this chapter.
C. Rebuilding Damaged or Destroyed Nonconforming Towers or Antennas. Notwithstanding other
provisions of this chapter, bona fide nonconforming towers or antennas that are damaged or
destroyed may be rebuilt without having to first obtain a special use permit and without having
to meet the separation requirements specified in Section 17.03. The type, height, and location
of the tower on site shall be of the same type and intensity as the original facility approval;
provided, however, that any destroyed lattice or guyed tower shall be replaced with a
monopole structure only. Building permits to rebuild the facility shall comply with the then
applicable building codes and shall be obtained within ninety (90) days from the date the facility
is damaged or destroyed. If no permit is obtained or if said permit expires, the tower or
antenna shall be deemed abandoned as specified in Section 17.06(A).
Section 17.08 Retention of Consultants
77
A. Use of Consultants
Where deemed reasonably necessary by the Town Council and/or the Town, the Town Council
and/or the Town may retain the services of professional consultants to assist the Town in
carrying out its duties in review and approval of personal wireless service facilities. Where the
Town Council uses the services of private engineers, attorneys, or other consultants for
purposes of engineering, scientific, land use planning, environmental, legal, or similar
professional reviews of the adequacy or substantive aspects of applications or of issues raised
during the course of review of applications for special use permit approvals of personal
wireless service facilities, the applicant and landowner, if different, shall be jointly and severally
responsible for payment of all the reasonable and necessary costs incurred by the Town for
such services. That responsibility shall not exceed the actual cost to the Town of such
engineering, legal, or other consulting services.
B. Advance Deposits for Consultant Costs
The Town and/or Town Council may require advance periodic monetary deposits held by the
Town on account of the applicant or landowner to secure the reimbursement of the Town's
consultant expenses. The Town Council shall establish policies and procedures for the fixing of
deposits and the management of payment from them. After the review and approval of
itemized invoices by the Development Services Director, or designee, as to the reasonableness
and necessity of the consultant charges, the Town may make payments from the deposited
monies for engineering, legal, or consultant services. Upon receiving a request by the applicant
or landowner, the Town shall supply copies of such invoices to the applicant and/or landowner
reasonably in advance of review and approval, appropriately redacted where necessary to
shield legally privileged communications between Town officers or employees and the Town's
consultant. When it appears that the remaining deposit held for the applicant or landowner by
the Town may be insufficient to pay current or anticipated invoices, the Town shall cause the
applicant or landowner to deposit additional monies to meet such expenses or anticipated
expenses in accordance with policies and procedures established by the Town Council.
Consultants shall undertake no review on any matter scheduled before the Town until the initial
deposit has been made or requested replenishment of the deposit has been made. No
reviewing agency shall be obligated to proceed unless the applicant complies with deposit
requirements.
78
C. Reasonable Limit Upon Consultant Expenses
A consultant expense or part thereof is reasonable in amount if it bears a reasonable
relationship to the customary fee charged by engineers, attorneys, or planners within the
region for services performed on behalf of applicants or reviewing boards in connection with
comparable applications for land use or development.
The Town may also take into account any special conditions for consideration as it may deem
relevant, including but not limited to the quality and timeliness of submissions on behalf of the
applicant and the cooperation of the applicant and agents during the review process.
A consultant expense or part thereof is necessarily incurred if it was charged by the engineer,
attorney or planner, or other consultants for a service that was rendered to assist the Town in:
(a) making factual determinations consistent with the goals of protecting or promoting of the
health, safety or welfare of the Town or its residents; (b) assessing potential adverse
environmental impacts such as those identified within an ADEQ process; (c) accessing potential
adverse impacts to historic properties, structures and/or districts, and/or (d) assessing and
determining factual issues relevant to Effective Prohibition claims, as addressed herein,
enabling the Council to best comply with the letter and intent of the provision of the TCA which
is relevant thereto.
D. Audits Upon the Request of an Applicant
Upon request of the applicant or landowner, the Town Council shall review all invoices and
determine whether such engineering, legal, and consulting expenses are reasonable in amount
and necessarily incurred by the Town in connection with the review and consideration of an
application for personal wireless service facility. In the event of such a request, the applicant or
landowner shall be entitled to be heard by the Town Council on reasonable advance notice.
E. Liability for Consultant Expenses
For a land-use application to be complete, the applicant shall provide the written consent of all
owners of the subject real property, both authorizing the applicant to file and pursue land
development proposals and acknowledging potential landowner responsibility, under this
section, for engineering, legal, and other consulting fees incurred by the Town. If different from
the applicant, the owner(s) of the subject real property shall be jointly and severally responsible
for reimbursing the Town for funds expended to compensate services rendered to the Town
79
under this section by private engineers, attorneys, or other consultants. The applicant and the
owner shall remain responsible for reimbursing the Town for its consulting expenses,
notwithstanding that the deposit account may be insufficient to cover such expenses. No
building permit or other permit shall be issued until reimbursement of costs and expenses
determined by the Town to be due. In the event of failure to reimburse the Town for such fees,
the following shall apply:
The Town may seek recovery of unreimbursed engineering, legal, and consulting fees by court
action in an appropriate jurisdiction, and the defendant(s) shall be responsible for the
reasonable and necessary attorney's fees expended by the Town in prosecuting such action.
Alternatively, and at the sole discretion of the Town, a default in reimbursement of such
engineering, legal, and consulting fees expended by the Town shall be remedied by charging
such sums against the real property that is the subject of the application by adding that charge
to and making it a part of the next annual real property tax assessment roll of the Town. Such
charges shall be levied and collected simultaneously and in the same manner as Town-assessed
taxes and applied in reimbursing the fund from which the costs were defrayed for the
engineering, legal, and consulting fees. Prior to charging such assessments, the owners of the
real property shall be provided written notice to their last known address of record by certified
mail, return receipt requested, of an opportunity to be heard and object before the Town
Council to the proposed real property assessment, at a date to be designated in the notice,
which shall be no less than 30 days after its mailing.
80