Attachment A - 32nd Ave and Dobbins Rd - Task Force Analysis.pdf
Extracted text (via pymupdf_layout)
7167 characters
ATTACHMENT A CITY COUNCIL REPORT DATE: June 24, 2026 TO: Lori Bays Assistant City Manager FROM: Joshua Bednarek Planning and Development Director SUBJECT: Request for Task Force Analysis: 32nd Avenue and Dobbins Road Annexation, No. 566 This report recommends the approval of the proposed annexation of approximately 28.1173 acres located approximately 400 feet west of the southwest corner of 30th Avenue and Dobbins Road (APNs: 300-15-016, 300-15-017, 300-15-020C, 300-15-020G, 300-15-024L, 300-15-024M, 300-15-024N, 300-15-024P, 300-15- 024Q, 300-15-024X). THE REQUEST: The applicant is requesting to annex approximately 28.1173 acres from Maricopa County located approximately 400 feet west of the southwest corner of 30th Avenue and Dobbins Road. The applicant is requesting the annexation to allow the uses under the City of Phoenix R-3 zoning, including up to 489 apartments, condominiums, and/or townhomes. OTHER INFORMATION: Planning Village: Laveen General Plan Designation: Residential 2 to 3.5 dwelling units per acre Current Zoning District R-3 Equivalent Zoning District: R-3 Current Land Use Conditions On Site: Maricopa County jurisdiction, zoned R-3, single-family residential To the North: Maricopa County jurisdiction, zoned RU-43, utility facility, vacant land, equipment/vehicle sales, rural residential To the South: Maricopa County jurisdiction, zoned R-3, vacant land, storage, single-family residential To the West: Maricopa County jurisdiction, zoned R-3, single-family residential To the East: City of Phoenix jurisdiction, zoned R1-10, single-family residential Current Population Estimate: 5.30 Maricopa County History of Non- Conformities Present: NONE PRESENT MARICOPA COUNTY ZONING CASE HISTORY: N/A ALTERNATIVES: • Option A - Annex the land as requested: The City of Phoenix will control rezoning requests in this area to ensure conformance with the General Plan Land Use Map. The City of Phoenix will capture property tax, utility tax, state shared revenue, and impact fees when applicable. • Option B - Deny the request for annexation: If annexed later, this site would have been developed under County zoning and development standards that may not be consistent with the General Plan, Land Use Map, zoning, and development standards. RECOMMENDATION: Located adjacent to City of Phoenix lands, this annexation is supported by the 2025 General Plan, particularly the Land Use goal for land uses and development standards for unincorporated land, under Policies 1 and 2. This annexation is recommended for approval. Approval of annexation does not constitute recommendation for future rezoning actions. SUPPORTING INFORMATION: I. Water and Sewer Service Water Pressure Zone Area: (1) Acres: 28.11 Water: 12-inch ACP water main within W. Dobbins Rd 24-inch DIP transmission water main within W. Dobbins Rd. (Do not use) Sewer: 10-inch VCP sewer main within W. Dobbins Rd. Significant infrastructure improvements will be (or may be) required in order to serve the proposed parcels within the City of Phoenix service area. Design and construction of any infrastructure will be the responsibility of the developer. Specifics regarding infrastructure improvement requirements would be discussed and determined at a pre-application meeting after annexation. It is the City’s intent to provide water and sewer service. However, the requirements and assurances for water and sewer service are determined during the site plan application review, or the building permit approval, and may be subject to future restrictions as a result of water shortage. Water and/or sewer system requirements and stipulations are determined at time of site plan approval. Capacity on any existing infrastructure is determined at that time of preliminary site plan approval. Please be advised that capacity is a dynamic condition that can change over time due to a variety of factors. Per City Code 37-22, 37-39 and 37-142, annexation into the City requires all properties connect to the City’s public water system. All existing on-site private wells must be disconnected to prevent cross contamination with the City’s public water system. Developments that use an average of 250,000-gallons of water or more per day are required to provide a Water Conservation Plan. In addition, developments that use an average of 500,000- gallons of water or more per day are required to demonstrate a minimum of 30% water reuse in the Water Conservation Plan. The Water Conservation Plan must be reviewed and approved by the Water Services Department (WSD) prior to preliminary site plan approval. II. Fire Protection Servicing Station: Phoenix Fire Station 57 1660 West Dobbins Road Phoenix, AZ 85041 Current Response Time: 2 Min. 45 Sec. City Average Response 7 Min. 24 Sec. Time: Difference from Typical -5 Min. 21 Sec. Response Time: Number of Service Calls Expected: 186 Average Cost per Service Call: $830 Estimated Total Annual Fire Service Costs: $154,170 III. Police Protection Servicing Station: South Mountain Precinct 400 West Southern Avenue Phoenix, AZ 85041 Number Of New Officers Required: 1 Number Of New Patrol Cars Required: 1 Estimated Total Annual Police Service Costs: $288,967.46 IV. Refuse Collection Number of New Containers Required: 0 Cost for Refuse Containers, Each: $0 Cost for Recycling Containers, Each: $0 Total Start-Up Costs for Refuse Collection: $0.00 V. Street Maintenance Average Cost per Acre for Street Maintenance: $172 Estimated Total Annual Street Maintenance Costs: $4,836 VI. Public Transit Servicing Routes: N/A VII. Parks and Recreation Neighborhood Park Demand in Acres: 4.86 Community Park Demand in Acres: 2.59 District Park Demand in Acres: 2.59 Total Park Demand in Acres: 10.04 Cost Per Acre, Annual Maintenance: $20,127 Total Annual Parks and Recreation Costs: $202,132 VIII. Schools Elementary School District: Roosevelt #66 High School District: Phoenix Union High School District #210 Total Expected Elementary School Students: 342 Total Expected High School Students: 196 Total Expected New Students: 538 IX. Revenues Expected Total Impact Fees at Buildout: $3,032,394 Property Tax Income*: $1,493 Utility Fee Income: $61,125 Next State Shared Revenue: $550,385 Solid Waste: $0 Year Sales Tax Generated: $0 Beginning Fiscal Total Tax Related Income, Annually**: $613,003 Property Tax Income*: $1,493 Utility Fee Income: $61,125 2027- Year State Shared Revenue: $550,385 Solid Waste: $0 Fiscal Sales Tax Generated: $0 Beginning Total Tax Related Income, 2028 Annually**: $613,003 X. Total Costs Revenue, First Year Only: $3,645,397 Revenue, Year Two And Beyond: $613,003 Expenses, First Year Only: $650,098 Expenses, Year Two and Beyond: $650,098 XI. Total Annual Revenue Total Annual Revenue, First Year**: $2,995,300 Total Annual Revenue, 2026 and Beyond**: -$37,095 *The above referenced Property Tax Income numbers are based on vacant parcels only; it does not refer to future development which will vary depending on number of lots and individual square footage. **Total Tax Related Income and Total Annual Revenues will vary depending on project scope and size, the timing of permit issuance and build-out.