PLZZ-25-0014 The Cascade PAD - 10-20-26 Council Staff Report.docx
Extracted text (via pymupdf_layout)
34716 characters
Planned Area Development and Development Agreement Report to the Mayor and City Council CASE NUMBER: PLZZ-25-0014 TITLE: The Cascade Planned Area Development (PAD) and Development Agreement (DA) MEETING DATE: October 20, 2026 Applicant: William E. Lally, Tiffany & Bosco, P.A. Owner(s): Elianto LandValorem LP, CRG Thomas Road Partners LLC, and Ben- Horin Family Trust/SVP 360 LLLP Request: The request involves two components, as follows: 1) approval of The Cascade Planned Area Development (“PAD”), rezoning approximately 2,771 acres from Planned Community (PC) with Elianto Community Master Plan (CMP) Overlay to Planned Area Development (PAD) and establishing a new master planned community framework allowing up to 11,600 dwelling units and up to 115 acres of non-residential development, together with associated land use, development, design, open space, circulation, and administrative standards; and 2) approval of a Development Agreement establishing developer and City obligations pertaining to development of the property. District(s): 4 Location: Area generally located north of Thomas Road, south of the Bethany Home Road alignment, east of Sun Valley Parkway, and west of the Turner Road alignment (Exhibits A, B, and C) Site size: Approximately 2,771.07 acres Public input: An advertised neighborhood meeting was held on April 20, 2026 at Tartesso Elementary School. Two members of the public attended and expressed support for the proposal, and a written letter of support was subsequently received from an adjacent property owner. One member of the public spoke during the September 22, 2026 Planning and Zoning Commission public Case PLZZ-25-0014 The Cascade Planned Area Development (PAD) Page 1 of 14 hearing and expressed concern regarding the public notification process and the potential effect of the proposal on area schools. No other substantive concerns with the proposal were identified. No opposition to the proposal has been received. All required notices of this public hearing are scheduled to be completed. Recommendation: Conduct a public hearing and adopt an Ordinance approving The Cascade Planned Area Development, subject to conditions (a) through (aa), and accompanying Development Agreement. PROJECT DESCRIPTION 1. William E. Lally, Tiffany & Bosco, P.A., on behalf of property owners Elianto LandValorem LP, CRG Thomas Road Partners LLC, and Ben-Horin Family Trust/SVP 360 LLLP, is requesting approval of The Cascade Planned Area Development (“PAD”) for approximately 2,771.07 acres generally located north of Thomas Road, south of the Bethany Home Road alignment, east of Sun Valley Parkway, and west of the Turner Road alignment (Exhibits A, B, and C). The request is being processed concurrently with a Major Amendment to the Elianto Community Master Plan (“CMP”) removing the subject property from that master plan. Upon approval, The Cascade PAD (Exhibit D) would establish a separate entitlement framework for the property and replace the prior zoning entitlements applicable to the site. The PAD is also accompanied by a Development Agreement addressing City and developer obligations associated with development of the property. 2. The Cascade is proposed as a predominantly residential master planned community organized into six Villages. The PAD establishes a tiered planning framework in which the overall PAD provides the community-wide land use, development, design, infrastructure, open space, and circulation standards, while subsequent Village Plans will provide additional detail for individual portions of the community. Village boundaries generally correspond with major roadways, drainage corridors, and transitions in land use. 3. The PAD provides substantial flexibility in the ultimate arrangement of land uses to allow the community to respond to market conditions and development opportunities over its long-term buildout. This flexibility is structured through a Land Use Density and Intensity Plan that divides the site into three density and intensity categories and establishes which land use classifications and Development Districts may be applied within each area. More detailed land use assignments are then established through Village Plans, Preliminary Plats, and Site Plans. 4. At full buildout, the PAD permits a maximum of 11,600 dwelling units (4.19 dwelling units per acre) and between 30 and 115 acres of non-residential development. Residential Case PLZZ-25-0014 The Cascade Planned Area Development (PAD) Page 2 of 14 development may include a broad range of detached and attached single-family housing, townhomes, horizontal and vertical multi-family development, and mixed-use residential products. To ensure that larger-lot housing remains part of the community’s housing mix, the PAD also requires a minimum of 150 single-family detached lots with a minimum lot area of 12,000 square feet. These lots may be distributed throughout one or more Villages but must ultimately be provided within the community. 5. The PAD establishes a comprehensive, project-specific regulatory framework governing permitted uses, residential densities, lot sizes, setbacks, building heights, architecture, landscaping, signage, parking, lighting, walls and fencing, development review procedures, and other development requirements. Although the majority of these requirements and standards are based on comparable provisions of the Buckeye Development Code, the PAD modifies or replaces those provisions as necessary to establish a unified regulatory framework tailored to The Cascade. As a result, the Development Code will have little practical applicability within the community. 6. Open space and recreation are integrated throughout the Village framework. Each Village is required to provide open space equal to at least 18 percent of its net site area, and the PAD anticipates approximately 155 acres of parks, exceeding the acreage identified by the City’s Parks and Recreation Master Plan based on the projected population of the community. The open space system incorporates a hierarchy of parks, trails, paths, drainage corridors, and other landscaped areas intended to provide connections between neighborhoods and community destinations. Recommended conditions of approval further require regional trails and trailheads identified in the City’s Parks and Recreation Master Plan to meet applicable City standards. 7. The PAD also includes community-wide architectural, landscape, streetscape, wall/fencing, lighting, and signage standards intended to establish a cohesive character while allowing architectural and product diversity among individual Villages and neighborhoods. Residential development is required to incorporate multiple floor plans and elevations, while a recommended condition of approval requires additional lot-width diversity by limiting any single lot width to no more than 80 percent of the detached single-family lots within a Village. 8. The PAD establishes customized administrative procedures for implementation over the life of the community, including Village Plans, an Administrative Approval Process, a Land Use Budget tracking system, and an Architectural Review Committee. These processes are intended to allow individual portions of the community to be refined over time while maintaining consistency with the overall PAD framework and applicable infrastructure Case PLZZ-25-0014 The Cascade Planned Area Development (PAD) Page 3 of 14 capacity. Major changes that exceed the amendment thresholds established by the PAD remain subject to the applicable public hearing and City Council approval process. 9. This staff report is intended to summarize the principal components of The Cascade PAD and is not an exhaustive description of every permitted use, development standard, design requirement, administrative procedure, or modification from otherwise applicable City requirements. The complete PAD, attached as Exhibit D, will govern development of the property together with the conditions of approval. 10. The Cascade PAD is accompanied by a Development Agreement intended to establish certain City and developer obligations associated with development of the project, including infrastructure, public services, and coordination among property owners as development occurs. The Development Agreement will be considered by City Council concurrently with the PAD. 11. Following the September 22, 2026 Planning and Zoning Commission hearing, the PAD was revised to modify the administrative structure used to implement development of the property. Most significantly, the previously proposed Master Developer designation was replaced with a framework assigning applicable responsibilities to individual Property Owners, Village Developers, and Parcel Developers. Related provisions were revised to address coordination among separate Village Plan areas and property owners as development proceeds. These revisions are primarily administrative and do not materially modify the PAD’s overall development program, Land Use Budget, development standards, or design framework. The Master Traffic Impact Analysis was also approved following the Commission hearing, and recommended Condition (v) has been revised accordingly to remove the requirement that the Master TIA be approved prior to the City Council hearing. AREA CONTEXT: LAND USE GENERAL PLAN ZONING Planned Community (PC) with Subject Master Planned Unimproved desert Elianto Community Master Property Community Plan (CMP) overlay Master Planned Planned Community (PC) with North Unimproved desert Community Sun Valley South CMP overlay Primarily Planned Community Master Planned (PC) without overlay; smaller East Unimproved desert Community and portions of PC with Tartesso Neighborhood CMP overlay and Planned Case PLZZ-25-0014 The Cascade Planned Area Development (PAD) Page 4 of 14 Residential (PR) Primarily Planned Community Master Planned (PC) without overlay; smaller South Unimproved desert Community and portions of PC with Tartesso Neighborhood CMP overlay and General Commerce (GC) Mix of Planned Community (PC) Primarily unimproved with Elianto CMP overlay, PC desert with developed with Tartesso West CMP Master Planned single-family overlay, PC with Valle del Sol West Community and residential CMP overlay, PC without Neighborhood neighborhoods in overlay, General Commerce Tartesso (GC), and Commercial Center (CC) PUBLIC PARTICIPATION SUMMARY: 12. A neighborhood meeting providing an opportunity for interested parties to learn more about the proposed Elianto Major CMP Amendment and The Cascade PAD was held on April 20, 2026 at 5:30 P.M. at Tartesso Elementary School. Written notices were provided to property owners within 500 feet of the subject property prior to the meeting. In addition to the applicant team and City staff, two members of the public attended, both expressing support for the proposal. One attendee represented property within the remaining Elianto CMP and stated that additional residential development would benefit surrounding properties. Following the meeting, an adjacent property owner submitted a written letter supporting the proposed PAD and removal of the eastern portion of Elianto from the existing CMP framework. The applicant also reported receiving general questions regarding access from a representative of an adjacent property, but no opposition to the request has been received. 13. One member of the public spoke during the September 22, 2026 Planning and Zoning Commission public hearing. The speaker expressed concern regarding the public notification process and requested that the proposal not negatively affect area schools. No other substantive concerns with the proposal were identified. The Commission unanimously recommended approval of The Cascade PAD. Case PLZZ-25-0014 The Cascade Planned Area Development (PAD) Page 5 of 14 14. All required notifications of this public hearing are scheduled for completion at least fifteen (15) days in advance of the meeting date, as follows: Notification Element Date Published in the Arizona Business Gazette To be completed by October 5, 2026 Republic Edition Site Posted To be completed by October 5, 2026 Mailing Notice to Property Owners Within 500 To be completed by October 5, 2026 Feet of Site BACKGROUND: 15. In 2004, the City Council adopted Ordinance No. 66-04, approving a Major Amendment to the Tartesso North Community Master Plan. The amendment replaced the previously approved Tartesso North CMP and renamed the master planned community as Elianto. The resulting Elianto CMP encompassed approximately 3,931 acres and reorganized the project into four villages, establishing a predominantly residential land use pattern supported by commercial and mixed-use areas, schools, parks, recreational amenities, and open space. Commercial and mixed-use areas were generally concentrated along Sun Valley Parkway, with residential neighborhoods comprising the majority of the planned community. 16. No subsequent amendments to the Elianto CMP have been approved since adoption of Ordinance No. 66-04, and no portion of the Elianto CMP has been developed to date. 17. The approximately 2,771 acres comprising The Cascade are presently governed by the Elianto CMP. Through the concurrently proposed Elianto Major CMP Amendment, this acreage would be removed from the Elianto CMP, leaving approximately 1,104.6 acres to continue under the existing Elianto framework. The subject property would instead be governed by The Cascade PAD, establishing a new land use, development, design, and administrative framework for the currently undeveloped site. 18. The Planning and Zoning Commission conducted a public hearing and recommended approval of The Cascade PAD on September 22, 2026. ANALYSIS: 19. The subject property is designated Master Planned Community (MPC) by the Imagine Buckeye General Plan 2040. The proposed PAD is consistent with that designation by establishing a predominantly residential master planned community incorporating a range of housing types, supporting commercial and mixed-use development, parks, open Case PLZZ-25-0014 The Cascade Planned Area Development (PAD) Page 6 of 14 space, trails, public facilities, and an interconnected transportation system. The maximum 11,600 dwelling units would result in an overall gross density of approximately 4.19 dwelling units per acre. 20. The proposal advances several goals and policies of the Imagine Buckeye General Plan 2040. These include Growth Theme Goal 1, which calls for land use patterns that support diverse, active lifestyles and align development intensity with infrastructure capacity; Growth Theme Goal 19, which promotes attractive, high-quality, healthy neighborhoods with pedestrian and bicycle connectivity to parks, schools, public facilities, and commercial areas; Services Theme Goals 6 and 8, which support coordination with school districts and the timely provision of educational facilities; Services Theme Goals 9 and 14, which promote connected multimodal transportation and bicycle and pedestrian networks; Services Theme Goals 15, 16, and 18, which address sustainable water supply, coordination of growth with available water resources, and water conservation; and Services Theme Goal 19, which calls for appropriately distributed parks and recreational amenities. The PAD advances these objectives through its coordinated land use and infrastructure framework, range of housing types, interconnected parks and trail system, school planning provisions, multimodal circulation network, and phased water and wastewater planning. 21. The Cascade represents a comprehensive replanning of property that has remained undeveloped since approval of the Elianto CMP in 2004. Rather than attempting to implement the approximately 22-year-old Elianto development framework on this portion of the property, the proposed PAD establishes a contemporary master planned community framework addressing current development patterns, housing products, infrastructure requirements, open space expectations, and design standards. Because the entire Cascade site remains undeveloped, the new framework can be implemented comprehensively without disrupting existing development within the property. 22. A notable characteristic of the PAD is the degree of flexibility provided in determining the ultimate location and mix of development. Residential and non-residential entitlements are not rigidly assigned to individual Villages or parcels at the PAD stage. Staff finds that this flexibility is appropriately bounded by the Land Use Budget, the Land Use Density and Intensity Plan, Village Plan requirements, and subsequent Preliminary Plat and Site Plan approvals. The PAD establishes an overall maximum of 11,600 dwelling units, requires between 30 and 115 acres of non-residential development, and limits the types and intensities of development that may occur within each density and intensity area. The Land Use Budget must also be updated as subsequent development approvals occur, allowing the remaining development capacity to be tracked throughout buildout. Case PLZZ-25-0014 The Cascade Planned Area Development (PAD) Page 7 of 14 23. The extent of the customized regulatory framework proposed for The Cascade is substantial. As described in the Project Description, the PAD establishes project-specific standards and procedures for essentially all principal aspects of development, leaving the Development Code with little practical applicability within the community. This level of customization is expressly contemplated by the Development Code for large-scale PADs. For PADs comprising at least 2,500 gross acres and providing sufficient design predictability through customized standards, the Code allows Article 8 development review procedures to be modified to project-specific requirements and similarly permits customized Major and Minor Amendment procedures. The Code further requires that modifications proposed through a PAD, when considered collectively, result in development of equal or better quality than could be achieved through application of the base zoning standards. 24. Staff believes the PAD provides sufficient standards and safeguards to satisfy that quality expectation while retaining the flexibility appropriate for a community of this scale. Among other requirements, each Village must provide at least 18 percent open space; the plan anticipates approximately 155 acres of parks; residential neighborhoods are subject to architectural diversity requirements; and at least 150 single-family detached lots of 12,000 square feet or greater must ultimately be developed. Recommended conditions of approval further limit any single lot width to no more than 80 percent of the detached single-family lots within a Village, require applicable regional trails and trailheads to meet City standards, and generally require common-area open space, parks, landscaping, tracts, and rights-of-way within a Final Plat to be completed before issuance of a Certificate of Occupancy for the first non-model dwelling within that plat. These requirements provide measurable development expectations while allowing the detailed configuration of individual neighborhoods to evolve through the Village Plan and subdivision processes. 25. The customized administrative procedures are similarly structured to allow the community to evolve over its anticipated long-term buildout without eliminating City oversight. Village Plans, Site Plans, Preliminary Plats, Final Plats, Minor Amendments, and updates to the PAD’s Living Appendix are administered through the Administrative Approval Process, with review for consistency with the PAD and applicable infrastructure requirements. Changes meeting the PAD’s Major Amendment criteria—including certain modifications to permitted uses and increases exceeding established thresholds for residential units or non-residential acreage—remain subject to neighborhood outreach, public hearings before the Planning and Zoning Commission, and City Council approval. Case PLZZ-25-0014 The Cascade Planned Area Development (PAD) Page 8 of 14 26. Public services are planned to expand with development of the community. Police services will be provided by the Buckeye Police Department and fire and emergency medical services by Buckeye Fire-Medical-Rescue. The PAD also accommodates public safety facilities within the community, and a recommended condition requires the developer, prior to any Final Plat submittal, to coordinate with the Fire Chief and City Attorney regarding emergency response times, staffing, fire equipment, and associated facility needs for each phase of development. The accompanying Development Agreement is intended to address additional public-safety-related obligations associated with development of the project. 27. The site is located within the Saddle Mountain Unified School District. The District has provided a completed Certificate of Adequate School Facilities (Exhibit F) indicating that adequate school facilities exist or are planned to accommodate students generated by the proposed development, while noting that construction of future school facilities will largely depend on the District’s ability to secure bond funding. The District also indicated that school sites will be needed within The Cascade and that it has been coordinating with the developer regarding future school needs, including the number and type of schools. Specific school locations will be refined through subsequent planning, and the PAD requires school sites to be supported by traffic and circulation analysis addressing access, queuing, pedestrian safety, and surrounding roadway operations. 28. Water and wastewater service will be implemented through phased infrastructure systems coordinated with development of the individual Villages. The PAD’s Master Water Plan establishes the general location and sizing of primary water infrastructure, with subsequent Village-level technical reports required to identify the specific on- and off-site mains, pump stations, storage facilities, and well sites needed for service and system redundancy. Recommended conditions also require transfer of applicable existing surface-water rights to the City and provision of a Certificate of Assured Water Supply prior to development. Wastewater service will similarly be developed in accordance with the Wastewater Infrastructure Master Plan, which provides for sewer mains, lift stations, and construction or expansion of wastewater treatment facilities as necessary to serve phased development. Detailed water and wastewater system design and capacity must be demonstrated with each applicable Village Plan as development proceeds. 29. Development of the site will also require substantial transportation, drainage, utility, and related infrastructure to accompany growth. Recommended conditions require, among other items, construction and dedication of applicable perimeter and internal roadway improvements, approval and implementation of traffic analyses addressing the community and individual Villages, undergrounding of qualifying utility lines, and Case PLZZ-25-0014 The Cascade Planned Area Development (PAD) Page 9 of 14 completion of required drainage and floodplain approvals. These requirements are intended to ensure that infrastructure is provided in conjunction with development rather than deferred independently of growth. 30. Overall, staff finds that The Cascade PAD provides an appropriate framework for the long- term development of this approximately 2,771-acre subject property. Although the PAD provides considerably more land use, development-standard, and administrative flexibility than would occur under conventional zoning, that flexibility is paired with defined development limits, density and intensity controls, Village-level planning, infrastructure requirements, open space and recreation standards, design requirements, and the recommended conditions of approval. Collectively, these provisions provide sufficient predictability to guide development as a coordinated master planned community while allowing the plan to respond to changing market conditions and development needs over time. RECOMMENDATION: 31. Staff recommends that City Council conduct a public hearing and adopt an Ordinance approving The Cascade Planned Area Development (PAD), Application PLZZ-25-0014, subject to conditions (a) through (aa), and approve the accompanying Development Agreement, for the reasons outlined within the analysis section of this staff report. Planning/Standard a) Development of the property shall be in general conformance to the project narrative entitled “The Cascade – Planned Area Development”, consisting of 599 pages, dated September 2026, and stamped received on October 2, 2026, except as modified by these conditions of approval. b) The Property Owner/s and their successor waive any and all claims for diminution in value of the property with regard to any action taken by City of Buckeye as result of the PAD approval. Planning/Project Specific c) Design and construction of regional trails and trailheads identified in the Parks and Recreation Master Plan (PRMP), or as amended if less restrictive, including, but not limited to, size, width, surface material, lighting, landscaping, and seating, shall adhere to the applicable standards within the PRMP. Trail alignments through the project may meander, provided that the points where regional trails enter or exit the property coincide with the locations shown in the PRMP. All other private trails within the project may be designed and constructed in accordance with the applicable Case PLZZ-25-0014 The Cascade Planned Area Development (PAD) Page 10 of 14 standards of the Cascade PAD, or as approved by the Zoning Administrator if special circumstances are found to warrant a deviation. d) No more than eighty percent (80%) of the single-family detached lots within a Village shall have the same lot width, with the remaining lots incorporating one or more lot widths differing by at least five (5) feet. Compliance may be demonstrated cumulatively through the Preliminary Plats approved within the Village. e) Prior to issuance of a Certificate of Occupancy for the first non-model residential dwelling unit within a Final Plat, all common-area open space, parks, landscaping, tracts, and public rights-of-way located within the boundaries of that Final Plat shall be completed and approved by the City in accordance with the applicable approved plans, unless an alternative phasing plan is submitted with a Preliminary Plat or Final Plat and approved by the City Engineer and Zoning Administrator. f) Sun Valley Parkway will be annexed adjacent to the development. Any improvements to The Cascade project, including landscaping within the right-of-way, shall be completed to City of Buckeye standards. Fire Department/Standard g) Any RWC communication tower that the City determines is necessary for public safety purposes shall be exempt from any PAD restriction with the design location or height requirements. However, the property owner of the intended location shall receive notice of tower location and design, and shall have ability to provide comments to the City. Prior to any Final Plat submittals, the developer will need to work with the Fire Chief and City Attorney to agree upon emergency response times, staffing, fire equipment and housing for each phase of development. Engineering/Standard General h) This project is subject to a Maintenance Improvement District (MID) formed pursuant to Arizona Revised Statue § 48-574 and in accordance with City of Buckeye Ordinance 42-06. This will include a legal and exhibit of the ownership parcel. i) This project is subject to Street Light Improvement District (SLID) in accordance with City of Buckeye Ordinance 43-05. This shall be established prior to the recordation of the first Final Plat, Minor Subdivision, MOD, or any other related land division. This will include a gross boundary legal and exhibit of the ownership parcels for the following APN’s _504-05-002R, 504-05-002S, 504-05-002T, 504-05-003C, 504-05- 003D, 504-05-009B , 504-05-009E, 504-05-009F, 504-06-004A, 504-06-014A, 504-26- 014B, 504-06-015C, 504-06-015E, 504-06-016A, 504-06-016C, 504-06-016D, 504-06- 019C, 504-06-019D, 504-06-019E, 504-06-019F, 504-06-020E . Case PLZZ-25-0014 The Cascade Planned Area Development (PAD) Page 11 of 14 j) All existing overhead power lines less than 69 kV capacity, or any other overhead utilities within the project area or along its boundaries, shall be installed underground. k) All trash and construction debris shall be collected through a trash hauler that has a City of Buckeye business license. Trash enclosures shall be in accordance with City of Buckeye Standards. Engineering/Standard Grading & Drainage l) Prior to Final Plat approval, the CLOMR must be approved by the Flood Control District that is affecting this project. m) Prior to any construction plan approval, a Floodplain Clearance Letter or a Floodplain Use Permit (FUP) from the Flood Control District of Maricopa County (FCDMC), including the improvements on the parcel, shall be submitted to the City. n) A Floodplain Use Permit (FUP) must be approved by the Flood Control District (FCDMC) prior to the issuance of a building permit for lots located within an effective floodplain or floodway. o) Individual single family home Certificates of Occupancies (CofO) are allowed on lots which obtained a Floodplain Use Permit (FUP), if owner / developer obtains an Elevation Certificate for each home. Engineering/Standard Streets p) The Property Owner/Developer shall be responsible for the dedication and construction of all adjacent half-street right-of-way and improvements, at no cost to the City, for Sun Valley Parkway, Turner Parkway and Thomas Road. The Property Owner/ Developer shall be responsible for dedicating and constructing Wilson Ave, Indian School Rd, Camelback Rd, and internal to the project. q) The Property Owner/Developer shall submit a Master Plat or other appropriate subdivision type to the City of Buckeye dedicating right-of-way outlined in the City approved Village Traffic Impact Analysis. Such right-of-way may be requested by the City to be dedicated in advance of development to permit the construction of needed City infrastructure to adjacent sites. r) It has been determined that a portion of the required improvements may not be constructed as part of this Development. The Developer shall be responsible to design all of the required improvements, including landscaped medians and/or gateway signage in accordance with the Buckeye Arterial Gateway Guide, if applicable (see condition s below), and then coordinate with the City to define the portion of improvements that will not be constructed as part of the development. A fee-in-lieu agreement may need to be completed to cover the omitted improvements, and the Property Owner/Developer will be required to enter into such agreement with each phase of improvements and provide payment to the City Case PLZZ-25-0014 The Cascade Planned Area Development (PAD) Page 12 of 14 to cover the costs prior to Certificate of Occupancy being issued by the City. This condition applies to Sun Valley Parkway, Thomas Road, and Turner Parkway for median improvements that cannot be constructed until other half of street is improved. s) The City of Buckeye Arterial Gateway Guide shall apply to medians in Sun Valley Parkway and Turner Road adjacent to this project. The developer shall have the ability to dictate the landscape and hardscape theming of all other street medians internal to or on the perimeter of the PAD, provided: 1) Theming and materials shall be consistent for the full extent of the median that lies within or adjacent to the project boundary and 2) the level of design, plant densities, and hardscape treatments shall be of comparable quality to the Tier 2 median concepts within the Arterial Gateway Guide. Engineering/Standard Water & Wastewater t) The Property Owner/Developer shall allocate any existing surface water rights at the time of this approval to the City prior to the issuance of any building permits. u) Property Owner/Developer shall provide a Certificate of Assured Water Supply based on the Arizona State subdivision requirements and/or Arizona Department of Water Resources (ADWR rules and regulations). Transportation/Traffic v) Any Village-level or subsequent project-specific TIA shall be consistent with the approved Master TIA and may be submitted following approval of the Master TIA. If the findings and recommendations of the approved Master TIA require modifications to the roadway cross-sections, intersection configurations, roadway classifications, or other transportation improvements depicted or contemplated in the approved PAD, a minor amendment to the PAD shall be required. w) All traffic signals required by this project in each phase shall be constructed per the approved Village Traffic Impact Analysis. x) All medians required for controlling site access (right-in/right-out or ¾ (RI-RO-Left in) shall be constructed with this development. y) Half-street improvements, including Rights-of-Way dedication shall be required along the entire parcel frontage as part of this development for each phase, including the installation of ITS conduit per the City standards. ITS conduits (2 7-way micro-ducts) must be installed along all arterial streets and collectors, if necessary, per City standards, including any necessary splice boxes. z) Driveway spacing and storage requirements shall be per Table 1 of the COB Engineering Design Standards (EDS) Section 6-3, unless agreed upon by the City Engineer or outlined in an approved Traffic Impact Analysis. Case PLZZ-25-0014 The Cascade Planned Area Development (PAD) Page 13 of 14 aa) All major intersections will require right turn slip lanes and dual left turn lanes per City Detail 63300 unless deemed to need more infrastructure per the Master TIA or Village TIA, unless agreed upon by the City Engineer or outlined in an approved Traffic Impact Analysis. ATTACHMENTS: Exhibit A – Aerial Vicinity Map Exhibit B – Zoning Vicinity Map Exhibit C – General Plan Land Use Map Exhibit D – Proposed The Cascade PAD Narrative Exhibit E – Citizen Participation Plan Exhibit F – Certificate of Adequate School Facilities from Saddle Mountain Unified School District Prepared By: Ken Galica, Planning Manager Reviewed By: Adam Copeland, Deputy Planning Director Case PLZZ-25-0014 The Cascade Planned Area Development (PAD) Page 14 of 14